Вы находитесь на странице: 1из 129

DOCUME

Total Pages

Customer

SPACELABS

Project No.

Solder Paste Printing and Solder Paste Inspection (SPI)


Machine

Project Name

Document No.

FMEA/MP/008

Document Title

(Include Cover Page)

Revision History
S/N
1

Reason for change


Initial Release

F-01-01 Rev. B

Effective Date: 22 Sep12

Review & Approved by: (Name & Signature & Date)

This is

Engineering

Wahyudi

Material

Production

Budiawan Wawan

Program

Quality Assurance

Ling CK

F-01-01 Rev. B

Effective Date: 22 Sep12

DOCUMENT COVER PAGE

es

ver Page)

ame

N/A
Process FMEA of DEK Screen Printing and KOH YOUNG SPI
Machine

Title

History

F-01-01 Rev. B

Date

Revision

Originator

2-Sep-16

Zulfadli

Effective Date: 22 Sep12

This is an electronics approval document, no signatory required.


NA
NA

F-01-01 Rev. B

Effective Date: 22 Sep12

Process Name

Solder Paste Printing and Solder Paste Inspection (SPI) M

Part Name

: N/A

Customer

: Spacelabs

Step / Opr. #

Process Function

Requirements

Power input single phase 210 230Volts

PCB loader Machine

Air pressure 4-6 bar

Power input single phase 210 230Volts

Solder Paste Printing Machine

Machine Installation

Air pressure 4-6 bar

Power input single phase 210 230Volts

Solder Paste Inspection (SPI)


Machine

Power input single phase 210 230Volts

Solder Paste Inspection (SPI)


Machine

Air pressure 4-6 bar

Out put link conveyor

Power input single phase 210 230Volts

Solder Paste Printing Machine Software Instintive Version 9 SP 13

Machine Software
Solder Paste Inspection (SPI)
Machine

Software Graphical User Interface


(GUI) Version 4.6.17.5304

Operation Temperature
Max 30 C
Environmental

Solder Paste Printing and Solder


Paste Inspection (SPI) Machine
Humidity Max 80 %

ESD Requirement

Machine grounding

Ground machine specification shall be


< 1 ohm impedance

Installation Manual

Operation Manual

Documentation

Solder Paste Printing and Solder


Maintenance Manual
Paste Inspection Machine

Electrical Drawing

Machine Operation Work Instruction

PCB data parameter on length X width


X Thickness shall be matched with
actual PCB

PCB fiducial mark shall matched with


stencil mark

Squeeze pressure setting shall be


within specification range (5-20Kgf)

Speed printing setting shall be within


specification range (25 - 150 mm/sec)
Solder Paste Printing Machine

Loading program file name shall be


correct

Separation speed shall be 1 - 5


cm/minute

Separation speed shall be 1 - 5


cm/minute

Machine Programming

Print gap shall be zero

Separation distance shall be 0.2 - 5


mm

Auto cleaning frequency shall be 1 - 5


following individual model

Environment temperature shall be 22 26C

Loading program file name shall be


correct

Shall use actual gerber stencil from


stencil maker

Cad data load to the SPI machine


shall be correct with actual PCB and
current revision

Stencil thickness set shall be match


with actual stencil thickness

Solder paste volume checking set


within 50-150%

Solder Paste Inspection (SPI)


Machine

Solder short/bridge option shall be


thicked

Solder shape option shall be thicked

Solder area option shall be thicked

Smear area shall be less than 50%

setting barcode shall be activated

Machine Operation

Operator shall be certified to operate


PCB loader, Solder paste printing and
SPI operation

Machine Maintenance

Technicians hall be certified to carry


out preventive maintenance PCB
loader, Solder paste printing and SPI
operation

Machine Operation and


Maintenance gudeline (WI)

Machine Operation and Maintenance


gudeline (WI) shall be avaiable

Training

Work Instruction

Operator shall be certified to operate


PCB loader, Solder paste printing and
SPI operation

Machine operation can't be interupted

Magazine shall be suitable with PCB


size

PCB Loader operation

PCB Loader operation

PCB pusher speed shall be stable

PCB guide shall be matched with PCB


size

Magazine indexing pitch shall be


matching with PCB stacking

Cover machine printing shall be in


close condition
Before running shall be conducted first
test print using plastic lamination to
verify the solder paste result
Production only allowed to run after
QC buy off Passed

Wiper shall be installed correctly

Wiper shall be installed correctly

Wiper shall be in clean condition

IPA shall be within operation level


(within minimum and maximum control
mark)

Squeeze shall be match with PCB size

Squeeze shall not dented

Squeeze shall not curly


Solder Paste Printing Machine

Squeeze shall be suitable as per


process type (Lead Free or Non Lead
Free)

Squeeze shall be suitable as per


process type (Water soluble and Non
Clean)

Support pin locations can't be hit to


components

Support pins mapping have to cover


the balance pressure to the overall
PCB surface (minimum cover 5
location : centre, upper left, upper
right, lower left & lower right)

Conveyor width shall match with PCB


width.

Squeeze direction shall install correctly

Squeeze shall be tighten properly.

Operation

Squeeze shall clean from solder paste


residue from previous running

Stencil identification shall be matched


with Product no

Stencil revision shall be match with


current PCB running

Stencil shall be clean from solder


paste or others residue

Stencil opening are not clogging

Prepare stencil for the model is


going to run

Stencil tension shall be within 20 - 50


Nm/cmSQ

Stencil shall be flat and no deep


scratches

Stencil shall no dented

Mesh stencil can not be spoilt

Stencil mark for PCB fiducial shall


identify clearly
Solder paste storage on refrigerator
with temperature controled within 010degC

Solder paste manual thawing duration


shall be meet requiremn on WI-MP06-03

Solder paste auto thawing duration


shall be meet requirement on WI-MP06-03

Solder paste shall be within shelf life


periode
Opened container solder paste only
allowed to use within 24 hours

Used (left over) Solder paste shall not


mix with fresh solder paste
Scoope back solder paste shall be
less than 24H

Solder paste printed on board max 1


hour before mounted with
componnents for LF solder paste

Solder paste handling

Solder paste printed on board max 4


hour before mounted with
componnents for Non-LF solder paste

Solder paste segregation for LF and


Non LF shall be clearly identified

Solder paste segregation for Water


soluble and No Clean shall be clearly
identified

Used solder paste shall be consumed


within 24 hours and remain solder
paste shall be scrapped
Spatulla used for solder paste
scooping shall be clearly identified for
LF and Non-LF

Spatulla used for solder paste


scooping shall be clearly identified for
Water Soluble and Non Clean

Spatulla used for solder paste


scooping shall be clearly identified for
Water Soluble and Non Clean

Cover machine printing shall be in


close condition
Solder miss-printed shall be cleaned
correctly refer to solder paste type and
procedure
Solder Paste Inspection (SPI)
Machine

Security access level shall be suitable


with personnel function (Admin,
Technician and Operator).

Failed boards shall be taken out from


the machine.

Out put link conveyor

Out put link conveyor be suitable with


PCB size

Before load PCB into Screen printing


machine, the PCB serial number will
scanned auotmaticly use scaner for
traceability

MES SYSTEM

Aegis Scanning Process

before inspection solder paste by SPI


machine, the PCB serial number will
scanned auotmaticly use for
traceability

Aegis shall implement interlock system

Solder Paste Printing Machine

Preventive Maintenance for Printing


Machine is monthly basis

Solder Paste Inspection (SPI)


Machine

Preventive Maintenance for SPI


Machine is monthly basis

Solder Paste Screen Printing


Machine shall be calibrated
yearly

Printing offset shall be calibrated and


within specification (Min CPK 1.33)

Preventive Maintenance

SPI Machine shall be calibrated the


LED Brightness and within
specification (3D Ch1 and CH 2 = 85
10 for 2D Ch1-3 = 95 10 and Ch4 =
130 10)
Calibration

Solder Paste Inspection (SPI)


Machine shall be calibrated
yearly

SPI Machine shall be calibrated the


PZT and within Specification (100 2)

SPI Machine shall be calibrated the


Jig Inspection and within specification
(1.5 %)

Emergency Switch

Emergency switch button shall be


functioning

Safety

Front and rear Cover Safety


switch

Front or Rear machine cover safety


switch shall be functioning

Potential Failure Mode

Power input lower than 210 Volt

Power input higher than 230 Volt

Potential Effects of Failure

Machine cannot power up for Production Run


causing Downtime

Machine cannot power up for Production Run


( fuse burnt due to over rating on voltage )

Severity

nspection (SPI) Machine

Machine cannot power up for Production Run


causing Downtime

DC power supply adapter will be damaged and


strain measurement cannot be performed

PLC Software of the PCB Loader can be


corrupted

Air pressure supply lower than 4 Bar

Air cylinder not function properly. It causes the


machine can't be run

Air pressure higher than 6 Bar

Air cylinder in the PCB loader machine spoilt.


It causes the machine cann't be run

Power failure

Power surge

Power input lower than 210 Volt

Power input higher than 230 Volt

Machine cannot power up for Production Run


causing Downtime

Machine cannot power up for Production Run


( fuse burnt due to over rating on voltage )

Machine cannot power up for Production Run


causing Downtime

DC power supply adapter will be damaged and


strain measurement cannot be performed

PLC Software of the PCB Loader can be


corrupted

Air pressure supply lower than 4 Bar

Air cylinder not function properly. It causes the


machine can't be run

Air pressure higher than 6 Bar

Air cylinder in the PCB loader machine spoilt.


It causes the machine cann't be run

Power input lower than 210 Volt

Machine cannot power up for Production Run


causing Downtime

Power failure

Power surge

Power input higher than 230 Volt

Power failure

Machine cannot power up for Production Run


( fuse burnt due to over rating on voltage )

Machine cannot power up for Production Run


causing Downtime

DC power supply adapter will be damaged and


strain measurement cannot be performed

PLC Software of the PCB Loader can be


corrupted

Air pressure supply lower than 4 Bar

Air cylinder not function properly. It causes the


machine can't be run

Air pressure higher than 6 Bar

Air cylinder in the PCB loader machine spoilt.


It causes the machine cann't be run

Power input lower than 210 Volt

Machine cannot power up for Production Run


causing Downtime

Power surge

Power input higher than 230 Volt

Power failure

Machine cannot power up for Production Run


( fuse burnt due to over rating on voltage )

Machine cannot power up for Production Run


causing Downtime

DC power supply adapter will be damaged and


strain measurement cannot be performed

PLC Software of the PCB Loader can be


corrupted

Power surge

Upgrade software by machine vendor to


support run replacement new electrical part
on the machine due to end of life (EOL) the
part for replacement

Machine software can't control or operated the


new electrical part installed

Upgrade software by machine vendor to


support run replacement new electrical part
on the machine due to end of life (EOL) the
part for replacement

Machine software can't control or operated the


new electrical part installed

Room temperature > 30 C

Machine can't operate (Hang Up)

Humidity > 80 %

Machine can't operate (Hang Up)

It can cause different electrical potential in the


Screen Printing machine which triggering
electrostatic charge causing PCBA failure

10

It can cause different electrical potential in


theAOI machine which impact to personnel
injury if there is electrical shock
The impedance of machine grounding > 1
ohm

10

if there is electrical shock will cause the


fuses/components in the DageAOI damage

Machine unproper installation

Machine cant up or operation unstable

Machine unproper operation

Machine operation unstable

Not achive expected maintenance

Machine operation unstable or intermitten

wrong connection electric cable

Machine cant up or electric fuse burn

Machine malfunction

Machine cant operation

PCB width in the data program is too small


than actual PCB width

PCB can't be loaded into printing machine


causing production can't run

PCB will be slanted causing fiducial


recognition error and machine can't be run

PCB will be dropped causing PCB/PCBA


scratch or damage.

PCB length in the data program is too short


or too long than actual PCB length

PCB fiducial will not align with Stencil fiducial


causing recognition error and machine can't
run

PCB thickness in the data program is less


than actual PCB thickness

Squeeze pressure will be too strong causing


less solder paste printed and impact to
insufficient solder after reflow process

PCB thickness in the data program is over


than actual size

Squeeze pressure will be lower causing


excessive solder paste printed and impact to
excess solder after reflow process

PCB fiducial mark not match with stencil


fiducial mark

PCB fiducial will not align with Stencil fiducial


causing recognition error and machine can't
run

PCB width in the data program is too wide


than actual PCB width

Solder paste will not be clean swept causing


solder paste is not release smoothly to PCB
pad. It will be less solder paste printed on fine
pitch opening and excess solder on large
opening.

Squeeze pressure will be too strong causing


less solder paste printed and impact to
insufficient solder after reflow process

Stencil will be scratches and worn out faster

Speed printing setting less than 25 mm/sec

Squeeze pressure will be too strong causing


less solder paste printed and impact to
insufficient solder after reflow process

Speed printing setting over than 150mm/sec

Solder paste will not be clean swept causing


solder paste is not release smoothly to PCB
pad. It will be less solder paste printed on fine
pitch opening and excess solder on large
opening.

Wrong loading program

Machine can't recognize PCB fiducial causing


the machine can't run

Separation speed less than 1

The printing cycle time will be too long and


productivity decrease.

Squeeze pressure less than 5 kgf

Squeeze pressure over than 20 kgf

For fine pitch opening stencil, Solder paste is


not maximum release causing insufficient
solder

For large opening stencil, solder paste printed


will have solder tailing which causing excess
solder

Print gap more than 0

Print gap > 0 causing the PCB not touch the


stencil during printing and will create solder
issue

Separation distance less than 0.2mm

Separation distance less than 0.2mm causing


solder paste haven't fully released from stencil
while the table move down with high speed.

Separation distance over than 5mm

Separation distance over than 5mm causing


lower cycle time

No stencil cleaning or over than 5

No stencil cleaning causing the stencil dirty


and create solder issue as solder short,
splash, excessive solder, stencil clogged

Temperature less than 22C

Solder paste not roll during printing causing


insufficient solder

Temperature Over than 26C

Solder paste slump causing solder paste


smear, short

Wrong loading program

Machine can't recognize PCB fiducial causing


the machine can't run

SPI inspection high false reject

High false reject causing SPI inspection may


escapee

Separation speed over than 5

Cad data wrong revision

SPI machine program is not matched with


actual PCB causing false rejected.

Stencil thickness data in program not match


with actual stencil thickness

SPI machine reading will be not accurate


causing false rejected

Volume set less than 50 %

SPI machine will not detect insufficient solder


paste causing escapee from SPI inspection

Volume set less than 150 %

SPI machine will not detect excess solder


paste causing escapee from SPI inspection

Solder bridge unthicked

SPI machine will not detect solder paste


bridging causing escapee from SPI inspection

Solder shape unthicked

SPI machine will not detect solder paste tailing


causing escapee from SPI inspection

Solder area unticked

SPI machine will not detect solder paste missalignment causing escapee from SPI
inspection

Smear set over than 50 %

SPI machine will not detect solder paste


smearing causing escapee from SPI
inspection

Barcode in activate

Serial No is not recorded in the SPI machine


causes missing traceability

Operator not certified

Operator will not operate the machine correctly


and causing machine broken, accident,
products failure

Technicians not certified

Technician will not carry out machine


preventive maintenance

Machine Operation and Maintenance gudeline Machine operation and maintenance not
(WI) shall not avaiable
proper

Operator is not trained and certified

Operator will not operate the machine correctly


and causing machine broken, accident,
products failure

During operation the machine interupting by


loaded PCB into magazine

It may cause accident, PCB broken

PCB warpage

Solder crack due to PCB flexure

PCB cannot load into magazine

Solder crack due to PCB flexure

PCB drop can cause components broken


and/or PCB scratches

Magazine width setting is too tight

Magazine width setting is too loose

Magazine width setting is too loose


PCB slanted can cause PCB stuck and
production cannot run

PCB pusher is not push smoothly

PCB loading process to conveyor slow down,


it causes decrease productivity.

PCB pusher too fast moving

The PCB loader machine will operater faster


than normal condition. It will cause break or
damage PCB.

PCB stuck & production can not running

PCB broken due to PCB hit the PCB guide

PCB drop cause components broken and/or


PCB scratches

PCB slant and hit by the pusher causing PCB


Broken / Scratches

PCB guide width is too tight

PCB guide width is too loose

PCB magazine indexing pitch over than PCB Pusher will miss to push one or more PCB
stacking
stacking that cause decrease productivity

PCB magazine indexing pitch lower than PCB Pusher will push on slot which is no PCB
stacking
cause decrease the productivity

Cover machine printing is not closed during


running

Machine printing can't run if the cover is not


closed as there is cover sensor in the
machine

Not conducted first test print using plastic


lamination before production running

If there is solder paste printing problem (missprint, miss-alignment etc) will cause to clean
actual PCB.

Production running without QC buy-off


Passed

Rejected PCBA may escapee from each


process to next process.

Wiper will not move & process cleaning will not


perform causing opening stencil clogged

Wiper will not move & process cleaning will not


perform causing solder paste spread on the
PCB

Wiper Installed reverse

Wiper improper lock

Machine error & production can't run

Process cleaning not optimum causing


opening stencil clogged

process cleaning not optimum causing solder


paste spread on the PCB

IPA level more than maximum control mark

IPA Overflow

IPA level less than minimum control mark

Machine error & production can't run

Squeeze size too short than PCB length

Squeeze not cover whole PCB surface


causing missing solder

Squeeze size too long than PCB length

Would require to much solder paste and


causing to shorten solder paste life

Squeeze dented

During printing squueze wiping not clean and


solder paste leftover on the stencil surface and
creating solder issue.

Squeeze curly

Preassure of squeeze imbalance causing


squeeze wiping not clean causing solder paste
leftover on the stencil surface and create
solder issue

Squeeze not match with process type (Lead


Free or Non Lead Free)

Solder paste contamination between led free


and non lead free

Wiper not in clean condition

Squeeze not match with process type (Water Solder paste contamination between Water
soluble and Non Clean)
Soluble and No Clean

Support pin hit the bottom side components

Component broken

PCB surface not flat causing the solder issue


such as:missing solder, inssufficient solder,
execessive solder , solder short

PCB warp and bow during printing solder


issue as:missing solder, inssufficient solder,
execessive solder , solder short

PCB can not load in and process causing


production stop

PCB slant and causing intermittent the fiducial


reading

PCB drop can cause components broken


and/or PCB scratches

Squeeze can not installed causing production


stop

Sgueeze preassure inconsistent causing


machine error

Sgueeze preassure inconsistent causing


squeeze wipe not clean and will creat solder
issue

Squeeze dirty

Solder paste contaminated by old solder paste

Install wrong stencil

Machine can't recognize the stencil as the


PCB not matched with stencil causing
machine can't run.

Install wrong stencil revision

The solder paste printed will not matched with


the current PCB causing the solder paste may
not printed at PCB pads correctly.

Opening stencil clogged causing the solder


paste may printed insufficient amount.

Solder paste spread out to PCB surface


causing the solder splash and solder short
after reflow soldering

Solder paste residue may contaminated the


fresh solder paste causing solderability issue

Opening stencil clogged causing the solder


paste may printed insufficient amount.

Support pins only cover one side of PCB


surface

Conveyor widht too tight

Conveyor widht too loose

Squeeze wrong direction

Sgueeze loose

Stencil dirty by solder paste residue

Opening stencill clogged

Solder paste printed will be slumped causing


solder ball

Solder paste printed will be scavenged


causing excessive solder

Solder paste printed will be bridging causing


solder short after reflow soldering process

Stencil tension more than 50 Nm/cmSQ

Stencil tension too much tight causing it easy


to break when applied squeeze pressure

Stencil has scratches

solder paste thickness willl be less than stencil


thickness causing insuficient solder after
reflow soldering process

Stencil dented

solder paste thickness willl be over than


maximum specification thickness causing
excessive solder after reflow soldering process

Mesh stencil spoilt

Stencil tension is low, it causes solder paste


printed inconsistently. The impact is solder
slumped generating solder balls.

Stencil recognation mark error

Machine can't recognize the stencil fiducial


causing machine can't run.

Solder paste store at temperature that over


than 10 degC

Solder paste need to be scrap if store at


temperature more than 10 degC for more than
3 month

Solder paste manual thawing less than


duration at WI-MP-06-03

solder paste still have moisture which can


causes solder void

Solder paste manual thawing less than


duration at WI-MP-06-03

solder paste still have moisture which can


causes solder void

Solder paste expired use in production line

Creating solderability issues in reflow


soldering process

Production use opened container solder paste Creating solderability issues in reflow
that already exceed 24 hour
soldering process

Stencil tension less than 20 Nm/cmSQ

Production mix the used (left over) solder


paste with fresh solder paste

Creating solderability issues in reflow


soldering process

Solder paste left in the stencil more than 24


hours

Creating solderability issues in reflow


soldering process

Solder paste dried causing component


missing during mounting process due to less
flux tackiness

Solder paste dried causing solder no-wetting


after reflow soldering process

Solder paste dried causing component


missing during mounting process due to less
flux tackiness

Solder paste dried causing solder no-wetting


after reflow soldering process

LF PCBA contaminated with Non-LF solder


paste

Wrong solder paste used, causing reflow


profile not suitable with solder paste. It will
impact to solderability issue.

Wrong solder paste used. If PCBA No-clean


process is using water soluble solder paste will
causing PCB corrosion due to no washing
process performed in No-clean process

Wrong solder paste used. If PCBA water


soluble process is using no-clean solder paste
will causing solder white residue due to
washing process is applying on Clean (water
soluble) process

Production consumed solder paste that


already exceed 24 hours

Creating solderability issues in reflow


soldering process

Wrong using Spatulla

Solder paste contamination between led free


and non lead free

If Spatulla No-clean process is used for water


soluble process will causing PCB corrosion
due to water soluble solder paste
contaminated to the no-clean solder paste

Solder paste printed on board more than 1


hour

Solder paste printed on board more than 4


hours

Solder paste mix between Solder paste LF


and Non LF

No identification for Solder paste Water


soluble and No Clean

Wrong using Spatulla

Wrong using Spatulla


If Spatulla Water soluble process is used for
no-clean process will causing PCB white
residue due to no-clean solder paste
contaminated to water soluble solder paste

Cover SPI machine is not closed during


running

SPI Machine can't run if the safety cover is


opened

Solder paste miss-printed is improper


cleaning

Creating solder ball and solder splash.

SPI machine access level has no password

Machine parameter and program can't be


controlled it may cause some error updating.

Failed board is not taken from the machine

SPI machine can't be run if the failed board


not taken from the machine.

Link conveyor width setting is too tight

PCB cannot eject from SPI causing production


can not run

Link conveyor width setting is too loose

PCB drop can cause components broken


and/or PCB scratches

Scanner for Screen Printing machine can not


Serial number of PCBA can not record as
scanned the serial number on PCB before
traceability
screen printing process

machine Camera on the SPI Machine can not


Serial number of PCBA can not record as
scanned the serial number on PCB before
traceability
solder inspection process

Aegis system interlock is not performed

un complete process due to non traceability


recorder

Preventive maintenance is not following PM


schedule (exit from schedule planned)

un-stable solder paste screen printing result

Preventive maintenance is not following PM


schedule (exit from schedule planned)

un-stable solder paste measurment result

The Solder paste Print offset has out of


tolerance

The result of printing the solder paste will not


centre on pad PCB

The camera specification has out of tolerance

The measurement result of solder paste on


PCB will not accurately measured

The ilumination specification has out of


tolerance

The measurement result of solder paste on


PCB will not accurately measured

The reference specification has out of


tolerance

The measurement result of solder paste on


PCB will not accurately measured

The emergency Switch button not working

may will be effect to machine and operator


accident

10

The Front or Rear cover switch not working

may will be effect to machine and operator


accident

10

PROCESS FAILURE MODE EFFECTS ANA


Process Responsibility :
MDT Team

Potential Cause(s) /
Mechanisms of Failure

Occurrence

Class

Key Date

Moderate

Electric main supply from power


generator is lower than specification
(210 Volt)

High

Electric main supply from power


generator is higher than specification
(230 Volt)

Main electric supply suddenly cut


down

High

Incoming supply or lightning may


cause sudden increase in the power
input

High

Incoming supply or lightning can


cause sudden increase in the power
input

Moderate

Moderate

High

Main supply lower than specification


(4 bar),

Air supply is higher than 6 bar.

Moderate

Electric main supply from power


generator is lower than specification
(210 Volt)

High

Electric main supply from power


generator is higher than specification
(230 Volt)

Main electric supply suddenly cut


down

High

Incoming supply or lightning may


cause sudden increase in the power
input

High

Incoming supply or lightning can


cause sudden increase in the power
input

Moderate

Main supply lower than specification


(4 bar),

Air supply is higher than 6 bar.

Moderate

Electric main supply from power


generator is lower than specification
(210 Volt)

High

Electric main supply from power


generator is higher than specification
(230 Volt)

Main electric supply suddenly cut


down

Moderate

High

Moderate

High

Incoming supply or lightning may


cause sudden increase in the power
input

High

Incoming supply or lightning can


cause sudden increase in the power
input

Main supply lower than specification


(4 bar),

Air supply is higher than 6 bar.

Moderate

Electric main supply from power


generator is lower than specification
(210 Volt)

High

Electric main supply from power


generator is higher than specification
(230 Volt)

Main electric supply suddenly cut


down

High

Incoming supply or lightning may


cause sudden increase in the power
input

High

Incoming supply or lightning can


cause sudden increase in the power
input

Moderate

High

Moderate

High

new electrical part installed can't


operation as normal

High

new electrical part installed can't


operation as normal

High

Air Conditioner not working

High

Air Conditioner not working

Electrical leakage in the electrical


installation of power source DageAOI

Extreme

Electrical leakage in the electrical


installation of power source DageAOI

Extreme

Electrical leakage in the electrical


installation of power source DageAOI

High

High

Machine vendor not provide manual


book for guiden

High

Machine vendor not provide manual


book for guiden

High

Machine vendor not provide manual


book for guiden

High

Machine vendor not provide manual


book for guiden

High

Machine vendor not provide manual


book for guiden

Moderate

technician failed set PCB width size in


PCB data parameters

Moderate

technician failed set PCB width size in


PCB data parameters

High

technician failed set PCB width size in


PCB data parameters

Moderate

technician failed set PCB length size


in PCB data parameters

Moderate

technician failed set PCB thickness in


PCB data parameters

Moderate

technician failed set PCB thickness in


PCB data parameters

Moderate

the original Stencil mark not clear

High

The Technician / Engineer was not


evaluation the good setting of
squeeze pressure to achive good
squeeze swept during printing
process

High

The Technician / Engineer was not


evaluation the good setting of
squeeze pressure to achive good
squeeze pressure on the stencil
during printing process

High

The Technician / Engineer was not


evaluation the good setting of
squeeze pressure to achive good
squeeze pressure on the stencil
during printing process

High

The Technician / Engineer was not


evaluation the good setting of
squeeze speed to achive good
squeeze speed during printing
process

High

The Technician / Engineer was not


evaluation the good setting of
squeeze speed to achive good
squeeze speed during printing
process

Moderate

program reciepe not clear


identification

Moderate

The Technician / Engineer was not


evaluation the good setting of
separation speed to achive good
solder paste printing result and good
machine cycle time

High

The Technician / Engineer was not


evaluation the good setting of
separation speed to achive good
solder paste printing result on the fine
pitch opening stencil

High

The Technician / Engineer was not


evaluation the good setting of
separation speed to achive good
solder paste printing result on the
large opening stencil

High

The Technician / Engineer not check


the gap between stencil and PCB
during setup stencil

High

The Technician / Engineer was not


evaluation the good setting of
separation distance to achive good
solder paste printing result during
printing process

Moderate

The Technician / Engineer was not


evaluation the good setting of
separation distance to achive good
solder paste printing result during
printing process

High

The Technician / Engineer was not


evaluation the good setting of auto
cleaning frequency to achive good
stencil cleaness

High

Air con setting very cool

High

Air Con not function properly

Moderate

the program recipe not clear


identification

Moderate

Not use actual gerber stencil from


stencil maker

High

High

High

High

High

High

High

High

High

the stencil CAD data not clear


identification

Engineer/Techncian failed to set


paremeter in machine program
during create program

Engineer/Techncian failed to set


paremeter in machine program
during create program

Engineer/Techncian failed to set


paremeter in machine program
during create program

Engineer/Techncian failed to thick


paremeter in machine program
during create program

Engineer/Techncian failed to set


paremeter in machine program
during create program

Engineer/Techncian failed to set


paremeter in machine program
during create program

Engineer/Techncian failed to set


paremeter in machine program
during create program

Engineer/Techncian failed to check


barcode in machine program during
create program

High

Engineering not conducted training


Operator

High

Engineering not conducted training


Technician

Moderate

Engineering not provide work


instruction for machine operation and
maintenance

High

Production can't operate the machine

High

Operator loading pcb during machine


run

High

During setting the magazine is not


using actual PCB

High

During setting the magazine is not


using actual PCB

Low

During setting the magazine is not


using actual PCB

High

During setting the magazine is not


using actual PCB

High

During setting the magazine is not


using actual PCB.

High

Screw is not tighten

Moderate

During setting the magazine is not


using actual PCB.

Moderate

Screw is not tighten

Moderate

Throtle valve setting too low

Throtle valve setting too hight

Moderate

During setting the PCB guide is not


using actual PCB

Moderate

During setting the PCB guide is not


using actual PCB

High

During setting the PCB guide is not


using actual PCB

High

During setting the PCB guide is not


using actual PCB

Moderate

Select the indexing pitch not refer to


actual PCB stacking

Moderate

Select the indexing pitch not refer to


actual PCB stacking

Operator opened the safety door


during machine running

Moderate

Not using plastic lamination before


production run

High

Production not submit the PCB to


IPQC for buy off

Moderate

No guideline for wiper installation


guidline

Moderate

No guideline for wiper installation


guidline

High

High

Moderate

No guideline for wiper installation


guidline

Moderate

Use the other side of recycle wiper


due to no stock available

Moderate

Use the other side of recycle wiper


due to no stock available

Moderate

Overload during top up IPA to


container

Moderate

not following the IPA top up schedule

Moderate

Wrong setup sequeeze during


conversion

Moderate

Wrong setup sequeeze during


conversion

Moderate

Moderate

Sequeeze not store properly

Pressure setting too high (higher than


20 kgf)

High

1. Wrong selection squeeze base on


process running (Lead free or Non
Lead Free)
2. Squeeze identivication not clear
( Lead free or Non Lead free)

High

1. Wrong selection squeeze base on


process running (water soluble Lead
free or Non Lead Free)
2. Squeeze identivication not clear
( Water soluble Lead free or Non
Lead free)

High

No guiden for set up support PIN


mapping on Screen printing table

High

No guide for set up support PIN


mapping on Screen printing table

High

No guiden for set up support PIN


mapping on Screen printing table

Moderate

Wrong set PCB width size in data


parameter

Moderate

Wrong set PCB width size in data


parameter

High

Wrong set PCB width size in data


parameter

Moderate

Wrong loading squeeze during set up


conversion

Moderate

Untighten locked squeeze during


setup conversion

Moderate

Untighten locked squeeze during


setup conversion

High

Squeeze not clean properly after


production finish

Moderate

No stencil identification

Moderate

No stencil identification for stencil


revision

Moderate

stencil not clean properly after


production finish before storage

High

stencil Auto cleaning on the screen


printing machine not setting to auto
cleaning

High

inproper cleaning after production


finish before storage

Moderate

inproper cleaning after production


finish before storage

Moderate

Stencil worn out causing the stencil


tension out of specification

Moderate

Stencil worn out causing the stencil


tension out of specification

Moderate

Stencil worn out causing the stencil


tension out of specification

Moderate

Stencil worn out causing the stencil


tension out of specification

Moderate

Stencil worn out causing the stencil


tension out of specification

Moderate

Used metal spatula during scope up


solder paste from stencil

Moderate

Stencil worn out causing the stencil


tension out of specification

Moderate

Stencil mark covered by foreign


material

Refrigerator spoilt

The thawing time is not following


procedure

Wrong writing of timinig taken out


from refrigerator

The thawing time is not following


procedure

Wrong writing of timinig taken out


from refrigerator

High

Poor control in FIFO system

High

Not follow solder paste control timing


stade in the procedure

High

High

High

High

Operator fail to follow MAI process

High

Line down and Operator didn't scoop


back the solder paste to container

High

Line down and Operator didnt follow


procedure WI-MP-06-03

High

Line down and Operator didn't clean


solder paste on the board.

High

Line down and Operator didn't clean


solder paste on the board.

High

Line down and Operator didn't clean


solder paste on the board.

High

No clear indetification between LF


and Non LF solder paste

High

No clear indetification between LF


and Non LF solder paste

High

No clear indetification between water


soluble and Non clean solder paste

High

No clear indetification between water


soluble and Non clean solder paste

High

Production returned back to freezer


and re used for production

Moderate

Spatulla no identification clearly of LF


and Non-LF

Moderate

Spatulla no identification clearly of


Water soluble and Non-Clean
process

Spatulla no identification clearly of


Water soluble and Non-Clean
process

High

Operator is not follow operation


instruction to closing the safety cover

Moderate

Operator wasn't cleaned properly and


not inspection after cleaning process

High

Acces level with personnel function is


not set

None

Operator is not follow operation


instruction

Moderate

During setting the link conveyor widht


is not using actual PCB

High

During setting the link conveyor widht


is not using actual PCB

High

Scanner is spoilt or LED as lighting is


OFF

High

Camera is spoilt or LED as lighting is


OFF

High

Server down causing aegis scanning


process can not performed

Moderate

Moderate

Missed to follow Preventive


Maintenance Schedule

Moderate

Missed to follow Preventive


Maintenance Schedule

High

Call Supplier for carry out for


calibration over due the schedule

High

Call Supplier for carry out for


calibration over due the schedule

High

Call Supplier for carry out for


calibration over due the schedule

High

Call Supplier for carry out for


calibration over due the schedule

High

emergency switch button functioning


intermittent

High

Cover safty switch functioning


intermittent

RE MODE EFFECTS ANALYSIS


: Zulfadli
: Zulfadli, Waldeman, Muh. Hasyim, Wahyudi, Anggun J,
M. Ridwan, Isnawan, Edy Siswo
: 2 Sept 2016

Current Process Controls Prevention.

Capacitor bank has install in the main power source.


Use UPS (uninterruptible power supply).

Capacitor bank has been installed in the main power source.


The high voltage will be stabilzed by Capacitor bank

Pre-inform by Power supplier if there is a schedule in power


supply cut.

Capacitor bank has been installed in the main power source.


Use UPS (un-interruptible power supply) as back-up supply.
The power generator is connected to ground to netralized
high voltage due to lightning.

Capacitor bank has been installed in the main power source.


Use UPS (un-interruptible power supply) as back-up supply.
The power generator is connected to ground to netralized
high voltage due to lightning.

Set the range setting of air supply 6.5-7 bar in main


compressor. Stated in WI-MP-05-82

Air pressure regulator installed in PCB loader machine and


set at max 5 bar.

Bambang K,

Capacitor bank has install in the main power source.


Use UPS (uninterruptible power supply).

Capacitor bank has been installed in the main power source.


The high voltage will be stabilzed by Capacitor bank

Pre-inform by Power supplier if there is a schedule in power


supply cut.

Capacitor bank has been installed in the main power source.


Use UPS (un-interruptible power supply) as back-up supply.
The power generator is connected to ground to netralized
high voltage due to lightning.

Capacitor bank has been installed in the main power source.


Use UPS (un-interruptible power supply) as back-up supply.
The power generator is connected to ground to netralized
high voltage due to lightning.

Set the range setting of air supply 6.5-7 bar in main


compressor. Stated in WI-MP-05-82

Air pressure regulator installed in PCB loader machine and


set at max 5 bar.
Capacitor bank has install in the main power source.
Use UPS (uninterruptible power supply).

Capacitor bank has been installed in the main power source.


The high voltage will be stabilzed by Capacitor bank

Pre-inform by Power supplier if there is a schedule in power


supply cut.

Capacitor bank has been installed in the main power source.


Use UPS (un-interruptible power supply) as back-up supply.
The power generator is connected to ground to netralized
high voltage due to lightning.

Capacitor bank has been installed in the main power source.


Use UPS (un-interruptible power supply) as back-up supply.
The power generator is connected to ground to netralized
high voltage due to lightning.

Set the range setting of air supply 6.5-7 bar in main


compressor. Stated in WI-MP-05-82

Air pressure regulator installed in PCB loader machine and


set at max 5 bar.
Capacitor bank has install in the main power source.
Use UPS (uninterruptible power supply).

Capacitor bank has been installed in the main power source.


The high voltage will be stabilzed by Capacitor bank

Pre-inform by Power supplier if there is a schedule in power


supply cut.

Capacitor bank has been installed in the main power source.


Use UPS (un-interruptible power supply) as back-up supply.
The power generator is connected to ground to netralized
high voltage due to lightning.

Capacitor bank has been installed in the main power source.


Use UPS (un-interruptible power supply) as back-up supply.
The power generator is connected to ground to netralized
high voltage due to lightning.

Only machine vendor to upgrade machine software

Only machine vendor to upgrade machine software

Monthly Preventive maintenace

Monthly Preventive maintenace

Overall electricall installation in PT OSIE have been


connected to Ground with specification < 1ohm as required
by ESD S.20.20 standard. PT OSIE has certified S.20.20
standard in ESD implementation.

Overall electricall installation in PT OSIE have been


connected to Ground with specification < 1ohm as required
by ESD S.20.20 standard. PT OSIE has certified S.20.20
standard in ESD implementation.

Overall electricall installation in PT OSIE have been


connected to Ground with specification < 1ohm as required
by ESD S.20.20 standard. PT OSIE has certified S.20.20
standard in ESD implementation.

Keep maunal Book on the one folder at SMT Engineering


Cabinet

Keep maunal Book on the one folder at SMT Engineering


Cabinet

Keep maunal Book on the one folder at SMT Engineering


Cabinet

Keep maunal Book on the one folder at SMT Engineering


Cabinet

Keep maunal Book on the one folder at SMT Engineering


Cabinet

use actual PCB for fill in PCB size in the PCB data
parameters

use actual PCB for fill in PCB size in the PCB data
parameters

use actual PCB for fill in PCB size in the PCB data
parameters

use actual PCB for fill in PCB size in the PCB data
parameters

use actual PCB for fill in PCB size in the PCB data
parameters

use actual PCB for fill in PCB size in the PCB data
parameters

check during setup using the actual PCB

during setup technician / engineer check the squeeze


pressure on the stencil and ensure squeeze clean swept
solder paste on the stencil and set the squeeze pressure on
the good setting after evaluation done

during setup technician / engineer check the squeeze


pressure on the stencil and ensure squeeze not to strong
press stencil during printing process and set the squeeze
pressure on the good setting after evaluation done

during setup technician / engineer check the squeeze


pressure on the stencil and ensure squeeze not scratch the
stencil and set the squeeze pressure on the good setting
after evaluation done

during setup technician / engineer check the squeeze speed


during printing process and set the squeeze speed on the
good setting after evaluation done

during setup technician / engineer check the squeeze speed


during printing process and set the squeeze speed on the
good setting after evaluation done

create program reciepe following model name / model


number mention at MAI

during setup technician / engineer check the separation


speed during printing process and set the separation speed
on the good setting after evaluation done

during setup technician / engineer check the separation


speed during printing process and set the separation speed
on the good setting after evaluation done

during setup technician / engineer check the separation


speed during printing process and set the separation speed
on the good setting after evaluation done

Check gap between stencil and PCB during setup stencil


and set gap to 0

during setup technician / engineer check the separation


speed during printing process and set the separation speed
on the good setting after evaluation done

during setup technician / engineer check the separation


speed during printing process and set the separation speed
on the good setting after evaluation done

during setup technician / engineer check the separation


speed during printing process and set the separation speed
on the good setting after evaluation done

Facility have setting rom temperature between 22-26 C

Prevent Maintenance every weekly maintenance

The program naming follow actual model no.

Using actual the stencil Gerber maker

Use actual CAD data from chip mounter machine

Programmer Engineer/Technician are trained and certified

Programmer Engineer/Technician are trained and certify

Programmer Engineer/Tecnician are trained and certify

Programmer Engineer/Technician are trained and certify

Programmer Engineer/Technician are trained and certify

Programmer Engineer/Technician are trained and certify

Programmer Engineer/Technician are trained and certify

Programmer Engineer/Technician are trained and certify

All New operator shall be conduct machine operation


training

All New Technician shall be conduct machine preventive


maintenance training

engineeing shall be create work instruction each new


machine for machine operation and maintenance

Operator trained and certify

Operator trained and certify

Setting the magazine using actual PCB on top and bottom


magazine to ensure the setting is matching with PCB width.

Setting the magazine using actual PCB on top and bottom


magazine to ensure the setting is matching with PCB width.

Setting the magazine using actual PCB on top and bottom


magazine to ensure the setting is matching with PCB width.
Setting the magazine using actual PCB on top and bottom
magazine to ensure the setting is matching with PCB width.
Setting the magazine using actual PCB on top and bottom
magazine to ensure the setting is matching with PCB width.
Operator to set the magazine been trained and certified.

Setting the magazine using actual PCB on top and bottom


magazine to ensure the setting is matching with PCB width.
Operator to set the magazine been trained and certified.

Technician to set the throtle valve been trained and certified.

Technician to set the throtle valve been trained and certified.

Setting the PCB guide using actual PCB to ensure the


setting is matching with PCB width.
Setting the PCB guide using actual PCB to ensure the
setting is matching with PCB width.
Setting the PCB guide using actual PCB to ensure the
setting is matching with PCB width.
Setting the PCB guide using actual PCB to ensure the
setting is matching with PCB width.

Select the indexing pitch using actual PCB stacking

Select the indexing pitch using actual PCB stacking

Safety door is equipped with sensor

IPQC buy off the first piece PCB

Operator is trained and certified

Technician that install wiper been trained.

Technician that install wiper been trained.

Technician that install wiper been trained.

Control buffer stock of wiper minimum 20pcs

Control buffer stock of wiper minimum 20pcs

IPA leveling mark on the container as guideline to top up the


IPA
weekly top up IPA as part of preventive maintenance
inspection checklist
Record sequeeze size on "PARAMETERS SETTING
VERIFICATION PRINTING PROCESS" Form no. F-04-73

Record sequeeze size on "PARAMETERS SETTING


VERIFICATION PRINTING PROCESS" Form no. F-04-73

Squeeze storage inside of polyfoam box

set the squeeze pressure within pressure spec (5 - 20 kgf)

put clear identification for Lead free or non lead free

put clear identification for Lead free or non lead free

Using PCB Tamplate during set up support PIN Mapping

Using PCB Tamplate during set up support PIN Mapping

Using velable mask for marking support pin during set up

Setting the PCB size using actual PCB to ensure the setting
is matching with PCB width.
Setting the PCB size using actual PCB to ensure the setting
is matching with PCB width.
Setting the PCB size using actual PCB to ensure the setting
is matching with PCB width.

put squeeze PIN orientation at squeeze holder

Training technician and Machine Operator

Training technician and Machine Operator

Cleaning Squeeze after production finished

Put clear identification label at front Stencil base on product


or model name

Put clear identification label for stencil revision at front


Stencil base on revision numbers

Cleaning Squeeze after production finished


1. setting auto cleaning mode at screen printing machine
2. setting auto cleaning frequency as per product running (1
- 10)
cleaning stencil use ultrasonic stencil cleaner

cleaning stencil use ultrasonic stencil cleaner

Stencil preventive maintenance every 3 month

Stencil preventive maintenance every 3 month

Stencil preventive maintenance every 3 month

Stencil preventive maintenance every 3 month

Stencil preventive maintenance every 3 month

Replace spatula material from metal to Plastics

Stencil preventive maintenance every 3 month

cleaning stencil use ultrasonic stencil cleaner every


production finished

Conduct monthly preventive maintenance (F-GE-04-15).

Use chemichal control sticker (F-04-05) to control the


duration of manual thawing already meet the specification
Use chemichal control sticker (F-04-05) to control the
duration of manual thawing already meet the specification
Use chemichal control sticker (F-04-05) to control the
duration of manual thawing already meet the specification
Use chemichal control sticker (F-04-05) to control the
duration of manual thawing already meet the specification
Identification FIFO system using color sticker in each solder
paste jar/tube
Using shelf life material tracking record (F-GE-04-18)
Use chemichal control sticker (F-04-05) to control the
duration of manual thawing already meet the specification

Retraining the operator how to handle the fresh solder paste


and used.
Retraining the operator how to handle the solder paste.

Operator trained WI-MP-06-03

Operator trained WI-MP-06-03

Operator trained WI-MP-06-03

Operator trained WI-MP-06-03

Operator trained and certify

Operator trained and certify

Operator trained and certify

Operator trained and certify

Operator trained and certify

Operator trained and certify

Operator trained and certify

Operator trained and certify

Operator is trained and certified

Operator is trained and certified

Engineering setting user level with personnel funtion

Operator is trained and certified

Setting the out put link conveyor widht using actual PCB on
top and bottom magazine to ensure the setting is matching
with PCB width.

Setting the out put link conveyor widht using actual PCB on
top and bottom magazine to ensure the setting is matching
with PCB width.

Initial set up before production run using Scanner

Initial set up before production run using SPI machine

Initial set up before production run using AOI machine

Created Preventive Maintenance schedule and checklist to


control the PM was performed as per planning generated.

Created Preventive Maintenance schedule and checklist to


control the PM was performed as per planning generated.

Every equipment which required calibration is listing in the


Calibration Master List. There is reminder 2 months earlier
before calibration due date to Calibration Coordinator and 1
month alert notice before calibration due date to equipment
owners (users). As stated in QP-04-12, Equipment
Calibration.

Every equipment which required calibration is listing in the


Calibration Master List. There is reminder 2 months earlier
before calibration due date to Calibration Coordinator and 1
month alert notice before calibration due date to equipment
owners (users). As stated in QP-04-12, Equipment
Calibration.

Every equipment which required calibration is listing in the


Calibration Master List. There is reminder 2 months earlier
before calibration due date to Calibration Coordinator and 1
month alert notice before calibration due date to equipment
owners (users). As stated in QP-04-12, Equipment
Calibration.

Every equipment which required calibration is listing in the


Calibration Master List. There is reminder 2 months earlier
before calibration due date to Calibration Coordinator and 1
month alert notice before calibration due date to equipment
owners (users). As stated in QP-04-12, Equipment
Calibration.

currently no system control prevention

currently no system control prevention

ALYSIS
Prepared By

im, Wahyudi, Anggun J,


o

Bambang K,

Approved By

Detection.

RPN

Doc. No.

PCB Loader will not be able to power up.

20

The capacitor bank will automatically stabilize the higher


voltage

28

Pre-inform by Power supplier if there is a schedule in power


supply cut.

60

The capacitor bank will automatically stabilize the higher


voltage

42

The capacitor bank will automatically stabilize the higher


voltage

48

Daily check of air supply in PCB loader by using Daily


Preventive Maintenance Record (F-GE-04-15)

40

Daily check of air supply in PCB loader by using Daily


Preventive Maintenance Record (F-GE-04-15)

56

Current Process Controls Detection

PCB Loader will not be able to power up.

20

The capacitor bank will automatically stabilize the higher


voltage

28

Pre-inform by Power supplier if there is a schedule in power


supply cut.

60

The capacitor bank will automatically stabilize the higher


voltage

42

The capacitor bank will automatically stabilize the higher


voltage

48

Daily check of air supply in PCB loader by using Daily


Preventive Maintenance Record (F-GE-04-15)

40

Daily check of air supply in PCB loader by using Daily


Preventive Maintenance Record (F-GE-04-15)

56

PCB Loader will not be able to power up.

20

The capacitor bank will automatically stabilize the higher


voltage

28

Pre-inform by Power supplier if there is a schedule in power


supply cut.

60

The capacitor bank will automatically stabilize the higher


voltage

42

The capacitor bank will automatically stabilize the higher


voltage

48

Daily check of air supply in PCB loader by using Daily


Preventive Maintenance Record (F-GE-04-15)

40

Daily check of air supply in PCB loader by using Daily


Preventive Maintenance Record (F-GE-04-15)

56

PCB Loader will not be able to power up.

20

The capacitor bank will automatically stabilize the higher


voltage

28

Pre-inform by Power supplier if there is a schedule in power


supply cut.

60

The capacitor bank will automatically stabilize the higher


voltage

42

The capacitor bank will automatically stabilize the higher


voltage

48

software will error

24

software will error

24

Manual cek using humiditymeter

24

Manual cek using humiditymeter

24

ESD Personnel measures the Electrical and


machine/equipment grounding regularly every 6 month and
recorded in the form F-ESD-05-07

40

ESD Personnel measures the Electrical and


machine/equipment grounding regularly every 6 month and
recorded in the form F-ESD-05-07

40

ESD Personnel measures the Electrical and


machine/equipment grounding regularly every 6 month and
recorded in the form F-ESD-05-07

42

Validation Machine by IQ Validation

32

Validation Machine by IQ Validation

32

Validation Machine by IQ Validation

32

Validation Machine by IQ Validation

32

Validation Machine by IQ Validation

32

Conveyor is Auto width adjustment following PCB widht data

20

Conveyor is Auto width adjustment following PCB widht data

20

Conveyor is Auto width adjustment following PCB widht data

28

machine detection PCB Fiducial mark error

20

Technician check PCB gap during setup

30

Solder Paste Inspection machine will error during detected


exessive solder

20

Camera sensor of machine will detect un-matched fiducial


mark

20

1. Record fix value the squeeze pressure in the "


PARAMETERS SETTING VERIFICATION PRINTING
PROCESS " (F-04-73)
2. Buy off by IPQC after technician setup complete

63

1. Record fix value the squeeze pressure in the "


PARAMETERS SETTING VERIFICATION PRINTING
PROCESS " (F-04-73)
2. Buy off by IPQC after technician setup complete

63

1. Record fix value the squeeze pressure in the "


PARAMETERS SETTING VERIFICATION PRINTING
PROCESS " (F-04-73)
2. Buy off by IPQC after technician setup complete

63

1. Record fix value the squeeze speed in the "


PARAMETERS SETTING VERIFICATION PRINTING
PROCESS " (F-04-73)
2. Buy off by IPQC after technician setup complete

63

1. Record fix value the squeeze speed in the "


PARAMETERS SETTING VERIFICATION PRINTING
PROCESS " (F-04-73)
2. Buy off by IPQC after technician setup complete

63

1. Record program name in " PARAMETERS SETTING


VERIFICATION PRINTING PROCESS " (F-04-73)
2. Buy off by IPQC after technician setup complete

45

1. Record program name in " PARAMETERS SETTING


VERIFICATION PRINTING PROCESS " (F-04-73)
2. Buy off by IPQC after technician setup complete

45

1. Record program name in " PARAMETERS SETTING


VERIFICATION PRINTING PROCESS " (F-04-73)
2. Buy off by IPQC after technician setup complete

63

1. Record program name in " PARAMETERS SETTING


VERIFICATION PRINTING PROCESS " (F-04-73)
2. Buy off by IPQC after technician setup complete

63

1. Record program name in " PARAMETERS SETTING


VERIFICATION PRINTING PROCESS " (F-04-73)
2. Buy off by IPQC after technician setup complete

63

1. Record program name in " PARAMETERS SETTING


VERIFICATION PRINTING PROCESS " (F-04-73)
2. Buy off by IPQC after technician setup complete

63

1. Record program name in " PARAMETERS SETTING


VERIFICATION PRINTING PROCESS " (F-04-73)
2. Buy off by IPQC after technician setup complete

45

1. Record program name in " PARAMETERS SETTING


VERIFICATION PRINTING PROCESS " (F-04-73)
2. Buy off by IPQC after technician setup complete

21

Manual check room temperature refer to room temperature


control monitor

70

Manual check room temperature refer to room temperature


control monitor

70

Technician check & verified before load the program

10

Technician check & verified before load the program

30

Technician check & verified before load the program

42

Programmer Engineer/Technician check during programming

42

Programmer Engineer/Technician check during programming

42

Programmer Engineer/Technician check during programming

42

Programmer Engineer/Technician check during programming

42

Programmer Engineer/Tecnician check during programming

42

Programmer Engineer/Technician check during programming

42

Programmer Engineer/Technician check during programming

21

Programmer Engineer/Technician check during programming

48

Identify the certify operator at ID Badge

96

log in training record on the training centre

96

documented during machine validation (IQ)

36

At SPI machine only the certify operator has own user and
pasword can log in to machine

63

Provide stanby magazine for PCB loading preparation

96

Leader checks the magazine setting before load the PCBs

96

Leader checks the magazine setting before load the PCBs

96

Leader checks the magazine setting before load the PCBs

27

Leader checks the magazine setting before load the PCBs

96

Leader checks the magazine setting before load the PCBs

63

Leader checks the magazine setting before load the PCBs

42

Leader checks the magazine setting before load the PCBs

45

Leader checks the magazine setting before load the PCBs

30

Technician check & verified after complete setting

45

Technician check & verified after complete setting

63

Technician check & verified after complete setting

45

Technician check & verified after complete setting

54

Technician check & verified after complete setting

63

Technician check & verified after complete setting

63

Technician check & verified after complete setting

30

Technician check & verified after complete setting

30

SPI alarm active( red tower lamp on and buzzer on)

42

Visual detection by IPQC during buy off

45

Production/engineering/IPQC buy off 1st 5 pcs/panel use


form F-MP-04-16

96

Technician check & verified after complete installation

24

Technician check & verified after complete installation

24

Technician check & verified after complete installation

30

control wiper inventory stock using stock card

24

control wiper inventory stock using stock card

24

Technician check & verified after top up IPA.


As part of weekly preventive maintenance inspection
checklist

30

Machine sensor will active if the level IPA lower than control
limit

20

IPQC Checked / Buy Off after setup complited (Form F-0473)

30

IPQC Checked / Buy Off after setup complited (Form F-0473)

30

Weekly Preventive Maintenance

45

IPQC Checked / Buy Off after setup complited (Form F-0473)

30

Technician check & verified during setup conversion

96

Technician check & verified during setup conversion

96

Technician check & verified during setup conversion

42

Technician check & verified during setup conversion

42

Technician check & verified during setup conversion

48

Technician check & verified after complete setting

20

Detection PCB Fiducial Mark

20

Technician check & verified after complete setting

28

Technician check & verified after complete setting

30

Machine detection fedback squeeze pressure

20

Machine detection fedback squeeze pressure

20

Technician check & verified after cleaning complete before


storage

48

Detection Stencil Fiducial Mark

30

Buy off PCB after solder paste printing proces every setup
setup complited

45

detection by SPI Machine for insufficient solder

24

detection by SPI Machine for excessive solder

42

Technician check & verified the stencil cleaness before load


stencil into screen printer machine

63

Technician check & verified the stencil cleaness before load


stencil into screen printer machine

36

measuring stencil tension before setup or loading into screen


printing machine

36

measuring stencil tension before setup or loading into screen


printing machine

36

measuring stencil tension before setup or loading into screen


printing machine

36

measuring stencil tension before setup or loading into screen


printing machine

36

Technician check & verified the stencil before load into


screen printer machine

36

Technician check & verified the stencil before load into


screen printer machine

36

measuring stencil tension before setup or loading into screen


printing machine

36

Technician check & verified the stencil before load into


screen printer machine

30

Temperature control performed every shift (3 times a day) - FGE-04-19

28

IPQC verification before solder paste use for production


process. (QP-04-25) (F-MP-05-05)

42

IPQC verification before solder paste use for production


process. (QP-04-25) (F-MP-05-05)

28

IPQC verification before solder paste use for production


process. (QP-04-25) (F-MP-05-05)

42

IPQC verification before solder paste use for production


process. (QP-04-25) (F-MP-05-05)

28

IPQC verification before solder paste use for production


process. (QP-04-25) (F-MP-05-05)

28

IPQC verification before solder paste use for production


process. (QP-04-25) (F-MP-05-05)

28

IPQC verification before solder paste use for production


process. (QP-04-25) (F-MP-05-05)

28

IPQC verification before solder paste use for production


process. (QP-04-25) (F-MP-05-05)

28

Production record duration of line down

42

Production record duration of line down

42

Production record duration of line down

42

Production record duration of line down

42

Production and IPQC check and buy off use form F-MP-0416 revC

28

Production and IPQC check and buy off use form F-MP-0416 revC

28

Production and IPQC check and buy off use form F-MP-0416 revC

28

Production and IPQC check and buy off use form F-MP-0416 revC

28

Production fill in Chemical Control Sticker use form F-04-05


revC

14

36

36

Put identification on spatula LF and Non-LF

Put identification on spatula Water soluble and Non-Clean


process

Put identification on spatula Water soluble and Non-Clean


process

36

SPI alarm active( red tower lamp on and buzzer on)

42

PCB/PCBA after cleaning submit to QC for inspection before


used.

45

Operation menu in operator level can not edit program.

24

Machine stop and PCB will not transfer out

SPI machine stop and system alarm on

30

Technician checks the link conveyor setting before load the


PCBs

63

the connecting conveyor machine software will not work to


turn ON conveyor motor to transfer PCB to screen printing
machine, then AOI machine will stop (can not run)

24

SPI machine software have message error appears on the


screen, then AOI machine will stop (can not run)

24

Message error appears on the next process station

42

To control the preventive maintenance by using form F-GE04-15

45

To control the preventive maintenance by using form F-GE04-15

45

Calibration masterlist will reminder to Calibration Coordinator


2 month earlier and 1 month notice alert to equipment owners
(users) before calibration due date. As stated in QP-04-12,
Equipment Calibration.

32

Calibration masterlist will reminder to Calibration Coordinator


2 month earlier and 1 month notice alert to equipment owners
(users) before calibration due date. As stated in QP-04-12,
Equipment Calibration.

32

Calibration masterlist will reminder to Calibration Coordinator


2 month earlier and 1 month notice alert to equipment owners
(users) before calibration due date. As stated in QP-04-12,
Equipment Calibration.

32

Calibration masterlist will reminder to Calibration Coordinator


2 month earlier and 1 month notice alert to equipment owners
(users) before calibration due date. As stated in QP-04-12,
Equipment Calibration.

32

Press Emergency button switch then Machine sudenly stop

30

Open front and Rear machine cover then Machine sudenly


stop

30

: Zulfadli
:

Responsibili
ty / Target
Date

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

Install electric surge protector at


Edy Siswo/ WW52- 2016
individual panel

Action Implemented

Sev.

Recommend
ed action.

: FMEA/MP/008

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

Install electric surge protector at


Edy Siswo/ WW52- 2016
individual panel

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

Install electric surge protector at


Edy Siswo/ WW52- 2016
individual panel

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

Install electric surge protector at


Edy Siswo/ WW52- 2016
individual panel

Software is centralized and


controlled by DCC as stated in
WI-GE-05-08, on Software
Revision Control.

Wahyudi/ WW31- July


2016

N/A

N/A

Software is centralized and


controlled by DCC as stated in
WI-GE-05-08, on Software
Revision Control.

Wahyudi/ WW31- July


2016

N/A

N/A

provide temperature Alert


system

IT Team continuesly

N/A

N/A

provide temperature Alert


system

IT Team continuesly

N/A

N/A

Electrical source grounding


installation during setup or
machine re-installation will
check and ensure the grounding
measuremetn below 1 Ohm and
recorded in the form F-ESD-0507

Indra / Continously

N/A

N/A

Electrical source grounding


installation during setup or
machine re-installation will
check and ensure the grounding
measuremetn below 1 Ohm and
recorded in the form F-ESD-0507

Indra / Continously

N/A

N/A

N/A

N/A

N/A

N/A

Machine Vendor provide soft


copy

Zulfadli / WK-34 2016

N/A

N/A

Machine Vendor provide soft


copy

Zulfadli / WK-34 2016

N/A

N/A

Machine Vendor provide soft


copy

Zulfadli / WK-34 2016

N/A

N/A

Machine Vendor provide soft


copy

Zulfadli / WK-34 2016

N/A

N/A

Machine Vendor provide soft


copy

Zulfadli / WK-34 2016

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

use MES System

MES Team / Continuesly

N/A

N/A

1.Operator who is responsible to


operate screen printing and SPI
machine shall be dedicated and
trained by Engineering.
2.Enginnering create user name
at SPI Machine computer for the
certify operator

Waldeman
WW25-2016

N/A

N/A

Technician who is responsible to


handle preventive maintenance
shall be dedicated and trained
by Engineer.

Zulfadli / WK-35 2016

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

Provide stand by magazine


atleast 1 unit each PCB Loader

Zulfadli / Continuesly

N/A

N/A

Engineering shall be training


operator machine

Ahmad / WK-35 2016

N/A

N/A

Engineering shall be training


operator machine

Ahmad / WK-35 2016

N/A

N/A

Engineering shall be training


operator machine

Ahmad / WK-35 2016

N/A

N/A

Engineering shall be training


operator machine

Ahmad / WK-35 2016

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

IPQC perform buy off first 5 pcs

IPQC
(continuesly)

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

Egineering provide Squeeze


weekly maintenance

Zulfadli / continously

N/A

N/A

Egineering provide Squeeze


weekly maintenance

Zulfadli / continously

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

Using PCB Tamplate during set


Zulfadli / continously
up support PIN Mapping

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

Egineering provide Squeeze


weekly maintenance

Zulfadli / continously

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

Provide individual user name


and password at SPI computer

Zulfadli

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

Zulfadli / continously

N/A

N/A

Regular Maintenance to check


Camera Inspection condition by Zulfadli / continously
monthly basis

N/A

N/A

NA

NA

Regular Maintenance to check


scan camera condition by
monthly basis

NA

NA

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

To implement Metrology Out-ofTolerance procedure for any


Ibnu / Start WW29-2016
equipment calibration of out
tolerance

N/A

N/A

To implement Metrology Out-ofTolerance procedure for any


Ibnu / Start WW29-2016
equipment calibration of out
tolerance

N/A

N/A

To implement Metrology Out-ofTolerance procedure for any


Ibnu / Start WW29-2016
equipment calibration of out
tolerance

N/A

N/A

To implement Metrology Out-ofTolerance procedure for any


Ibnu / Start WW29-2016
equipment calibration of out
tolerance

N/A

N/A

Add in daily check List


maintenance record

Zulfadli / WK-40 2016

N/A

N/A

Add in daily check List


maintenance record

Zulfadli / WK-40 2016

N/A

N/A

Occ.

Det.

RPN

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

NA

NA

NA

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

1 SEVERITY

2 OCCURANCE
Risk
Extereme
High
Moderate

Low
None

3 DETECTION

Occurence of Effect

Failure
Rate
in 2
in 3
in 8
in 20
in 80
in 400
in 2000
in 15K

1
1
1
Process is not in statistical control. Similar processes have
experienced problems
1
1
Process is in statistical control but with isolated failures.
Previous processes have experienced occasional failures or out- 1
of-control conditions
1
Process in statistical control
1
Process is in statistical control. Only isolated failures associated
with almost identical processes
1 in 150K
Failure is unlikely. No known failures associated with almost
identical processes.
1 in 1.5M
Failure is almost inevitable

Capability
(Cpk)
< 0.33
> 0.33
> 0.51
< 0.67
> 0.83
> 1.00
> 1.17
> 1.33

Rating
10
9
8
7
6
5
4
3

> 1.50

> 1.67