Вы находитесь на странице: 1из 9

VASCON ENGINEERS LIMITED

INTERNATIONAL SCHOOL, AAMBY VALLEY CITY


COMPARISON SHEET

Sr.
No.

Description

Unit

Qty for DORM- Budgeted


01 & DORM-02
Rate

1.0

PAINTING

1.1

Providing and applying Acrylic washable distemper


MATT finish(Asian Paints-Lambs Wool,5176) two coats
of Putty Again Two Coats of Acrylic distempar complete.

sq.m.

933

110

1.2

Providing and applying Acrylic Premium emulsion MATT


finish (Asian Paints- Lambs Wool,5176) [two coats of
Primar free Putty( saint gobain Make) & Two coats Acrylic
Premium emulsion Paint etc. complete.

sq.m.

5737

150

1.3

Providing and applying Acrylic Premium emulsion MATT


finish (Asian Paints- PURITY O766) [two coats of Primar
free Putty( saint gobain Make) & Two coats Acrylic Premium
emulsion Paint etc. complete.

sq.m.

6742

150

1.4

Providing and applying Acrylic washable emulsion


"TEXTURED FINISH(DEER FINISH)"(MATT FINISH)[two
coats or more] (MAKE:ASIAN PAINT-MORNING GLORY
0765) as per manufactures specification of application and
required finish form including preparing the surface,a
priming coat,cost of scaffolding,cleaning the surface,for aa
type of elements in the structure at all levels with all leads
and lifts etc. complete.

sq.m.

1140

180

1.5

Providing and applying


Anti-fungal Exterior grade
(Weather Coat) Paint MATT finish(White Base 90) on
the Spanj plastered surface and concrete surface in
approved shade One coat external primar & Two Coats of
Weather Coat Paint. complete.

sq.m.

5172

140

1.6

Providing and applying


Anti-fungal Exterior grade
(Weather
Coat)
Paint
TEXTURED
finish(ICIDulex,Burnese Beige 40YY51/084) on the Spanj
plastered surface and concrete surface in approved shade
One coat external primar & Two coats of Weather coat Paint
etc. complete.

sq.m.

2707

180

sq.m.

2384

190

1.7

Providing and applying Acrylic washable emultion matt


finish (Asian Paints, Premium Emultion, Morning
Glory, 0765) two coats of Primar free Putty( saint gobain
Make) & Two coats Acrylic Premium emulsion Paint etc.
complete.

TAXES

TOTAL AMOUNT

Include

Sale Rate

Quoted Rate by
Contractor VASTU
SAJAVAT

Quoted Rate by
Contractor RAJE
ENTERPRISES

Budgeted
Amount

95

97

97

102630

175

175

150

860550

175

175

150

1011300

210

180

200

205200

165

150

140

724080

165

180

155

487260

185

175

180

452960

Extra VAT form 406


Include
certificate given
against material
Extra 4.12 % ST

Extra 8 % VAT
against material
Extra 4.12 % ST

3843980.00

Date: 31.10.2011

Sale Amount

Quoted Amount
by Contractor
VASTU SAJAVAT

Quoted Amount
by Contractor
RAJE
ENTERPRISES

Difference in
Amount Bud Cont

Difference in
Amount Sale Cont

88635

90501

90501

12129

-1866

1003975

1003975

860550

143425

1179850

1179850

1011300

168550

239400

205200

228000

-22800

11400

853380

775800

724080

129300

446655

487260

419585

67675

27070

441040

417200

429120

23840

11920

4252935.00 4159786.00 3763136.00 80844.00

489799.00