Project

Designed by

Component
Checked by

Lahore Ring Road


PS Engineer

Javaid Khalid

PC Beam Prop

Properties - PC Beam used by NESPAK


INPUT DATA :
(1) : Deck :
C/C Pier distance

=
=
=
=
=
=
=
=
=
=
=

Length of Girder

Effective Span of Main Girder

" 2a"

No. of Main Girders :


No. of Cross Girders :

Spacing of Cross Girders

/3

###

Width of Roadway :
Width of NJB :

" 2b"

Total width of Deck Slab :


Thickness of Deck Slab :
Thickness of Carpet on Slab :

102.44

Feet.

98.43

Feet.

96.18

Feet.

No.

No. having size

32.05841

Ft.

at
=

48.97

Feet.

1.23

Feet.

51.43

Feet.

8.858

Inches

1.969

Inches

384.70

(2) : Cross Section of Girders :

A - Main Girder :

Exterior Girder :

23.6
134.59

.
9.843

53.15

in
15.4

8.858

in. thick

in

in

in

###

9.842519685

3.937

13.8 in

in

" : Also adopted as Ex

35.43 in

in

2.76 in

7.9

78.7

in

Slab
5.12

"X

13.78

2.755906

7.874 in

in
7.87

63.8
in

78.74

in
.

7.87 in

7.9

Part plan of girder at

9.84 in

7.9 in

in

7.9

in

4.0

in

6.0

in

diaphragm beam location

110.97

###

in
Curb =

###

B - Diaphragm :
a - Interior Diaphragm - Inner part

9.8

in.

"X

78.7

"

Ft

Roadway =

b - Interior Diaphragm - Outer part


c - End Diaphragm

:
:

9.8

"X

78.7

"

9.8

"X

66.7

"

Ft.

11.22
3.28

(3) : Materials - Concrete and steel :


A - Concrete :

f'c-Deck

Cylinder Strength of Deck Slab

f'c-Girder

Cylinder Strength of Main Girder


Ec = EConcrete-Deck slab
:

4000

Psi

6000

Psi

( f )0.5
'
c

57,000

EConcrete-Girder
Esteel
Ratio of Modulii of Concrete of slab &
Girder

57,000

4000

57,000

6000

29,000

Ksi

Reinforcing
60 Bars having fy =

Using Grade

B - Reinforcing Bars :

11.22

Ft.

E/c-Girder

nE=c-Deck slab

60,000

=
=

3605

###

Modular ratio for Girder

m =ESteel

EConcrete-Girder
/

29000

###

Modular ratio for Slab

m =ESteel

EConcrete-Slab
/

29000

###

(4) : Cable Data :

Cables to be used :

f'ci

Concrete strength at Transfer

270 K

psi x

5,000

[ ASTM : A-416 ]

0.0068950

No. and size of cables to be used :


Using

Cable No.

12

0.50 in. :

Xnal Area of Cable

= 0

in2 / Strand x

Cable No.

12

0.50 in. :

Xnal Area of Cable

= 0

in2 / Strand x

Cable No.

12

0.50 in. :

Xnal Area of Cable

= 0

in2 / Strand x

Total

(5) : Losses Data :

No.

Shrinkage strain
Creep strain

200
36

x 10-6
x 10-6

CALCULATIONS :
No. of Cables :

C.G. of Cables :

[ 3

Dia. of Sheath :

6.00

51

X-nal Area of holes :

= 3

[ (

mm

2.008

0 upper row.
at

at bottom row &

in. +

0
###

)2 /

x### 6.00
/ 25.4
4

in.
=

+
2.008

= 12.666

10.00

in
in2

Section Properties :

(1)-Un-grouted Section
Taking moments about the bottom of the Girders :

Area
Section
1

23.62

( in .)
2

in x

9.84

in

Y
( in.)
232.50

AY
( in .)

( in4.)

4.92

1,144.20

7.87

in x

7.87

in /

7.87

in x

63.78

in

9.84

in x

2.76

in /

3.94

in x

3.94

in /

3.94

in x

2.76

in x

35.43

in x

5.12

in

2 x 2

62.00

12.47

772.97

502.20

41.73

20,957.90

2 x 2

27.13

72.70

1,972.08

2 x 2

15.50

69.55

1,078.08

21.70

72.24

1,567.70

181.35

76.18

13,815.44

Deduction for holes :


1.000 -

TOTAL
Total area i/c area of holes :

Yb
Yt
IN.A.
Zb
Zt

12.67

6.00 -

1,029.71
1,042.38

Ay / A

41,232.37

d - yb

78.74

I0+Ay -Ay.yb

172,753.40

IN.A. / yb

795,220.50

IN.A. / yt

795,220.50

/
+
/
/

75.99

41,232.37

1,029.71
40.04
2,273,522.44

###

40.04
38.70

(2)-Transformed Section
EConcrete-Girder
/
m =ESteel
Taking moments about the bottom of the Girders :

Area
Section

( in .)

IN.A. =
Zb =
Zt =

/
+
/
/

78.74
795,221.29
832,329.81
832,329.81

###

AY

( in.)

( in .)

( in4.)

1,029.71

40.04

41,232.37

33.05

6.00

198.29

1,062.76

41,430.66

29000

Precast Section :
5.508
6.00
in2 x
TOTAL

Yb =
Yt =

41,430.66

1,062.76

38.98

38.98

39.76

1,652,245.07

- ###

38.98

832,329.81

38.98

21,350.50

39.76

20,936.00

(3)-Composite Section
E/c-Girder
nE=c-Deck slab
Taking moments about the bottom of the Girders :

Area
Section

( in2.)

Precast Section :
134.59 in x
8.86
TOTAL

Yb =
Yt =

122,393.29
78.74

in

3605

Y
( in.)

0.816

###

AY
( in3.)

( in4.)

1,062.76

38.98

41,430.66

973.47

83.17

80,962.63

2,036.23

/
-

122,393.29

2,036.23

60.11

60.11

18.63

IN.A. =
Zb =
Zt =

+
/
/

838,695.40
1,830,625.75
1,830,625.75

- ###

8,348,728.21

60.11

1,830,625.75

60.11

30,455.68

18.63

98,250.93

DEAD LOADS :
1 - Girder - self weight :
=

Weight
(1) of main girder

Weight(2-i)of Diaphragm

=(
=
=

( For interior girder )


(2-ii)

1042.38

Wt. of half Diaphragm

in2

134.6

144

7.239

68.9

Ft.2

x 150 Pcf

809.9

X 150 / 144

Lbs.
Lbs.

8816
4408

( For exterior girder )

Weight(2-i)of Diaphragm

=(
=
=

( For interior End girder )


(2-ii)

Wt. of half Diaphragm

134.6

63.7

688.0

X 150 / 144

Lbs.
Lbs.

8220
4110

( For exterior End girder )


(2-iii)

Wt. of parts of X-girder cast in-situ with


Main girder - (for both sides)

2=x [ { (

9.8

=
2x[(
=
1762

)/2
15.4

}x{(

53.1

)x(

12.6

63.8

58.46

Lbs.

2 - Deck :
Description

NJB
Carpet

Slab

=
=

1.97 in. thick

No.

Cross Girders ext

5
2
2
2

No.

=
=
=
=
=
=

Cross Girders

No.

8.9

in. thick

Haunch

Main Girders
Cross Girders int

Cross Girders

No.
No.

No.

L (ft.)

x B (ft.)

x H (ft.)

102.32
102.32 X ###

102.32 X ###

98.43

98.43
6
4
6
4

x
x
x
x

X 0.16
X 0.74

x Unit weight

401 Lbs/Rft

140

Pcf

=
=

82.06
115.06

=
=
=
=
=
=

582.63

=
=

16.44
1,526.35

1,921.7

259.4

150

64 Lbs/Rft

Pcf

X 1176

Lbs. / Ft.

8816

Lbs

4408

Lbs

8220

Lbs

4110

Lbs

TOTAL :

31.50
578.83
52.89
17.63
49.32

Bending Moments :
Moment due to Diaphragm weight :

(1)
(2)

Reaction R

1.00

Mmax

1.00

P x L/

Moment
Moment

due to

Wt. of Slab

due to

Wt. of Shuttering

- P

=
=

L/

1.662
0.224

x(
x(

0.17

96.175
96.175

P xL

)2 /
)2 /

(3-i)
(3-ii)
(4)

Moment
Moment
Moment

Moment
(5)

due to

Wt. of Diaphragm

due to

Wt. of Half Diaphragm

due to

Wt. of part of cross beam cast with


main girder

Wt. of Girder

due to

Job

=
=

8.816

=
=

1.762

4.408

1.176

x(
x(

96.175

x(
x(

96.175

96.175

96.18

) /
) /

423.9

212.0

) /
)2 /

84.7

1,359.9

Component
Checked by

Designed by

###

0
0

Stresses :
1 Main Girder - self weight :
Un-grouted Section :
MOMENT due to self weight of Girder =

Stress at bottom fiber

fb

1444.637

12000

19859.3

Stress at top fiber

ft

1444.637

12000

20549.8

Stressing of Cables :
Cables to be used :

Using

270

and stressing upto

[ ASTM : A-416 ]

Cable No.

12

Cable No.

12

0.50 in. :

Xnal Area of Cable

= 0

in2 / Strand x

Cable No.

12

0.50 in. :

Xnal Area of Cable

= 0

in2 / Strand x

Cable No.

0.50 in. :

Xnal Area of Cable

= 0

in2 / Strand x

Total

nal

0.50 in. :

Xnal Area of Cable

Area of above Cables

No.

= 0

in2 / Strand x

Stressing Force
For ungrouted Section :

= (
Yb

=
Eccentricity "e" =

270

1000

40.043

[ P/A

0.670

=
C.G. of cable

&

6.000 =

) x

5.508

in.

40.043 -

fb&t =

34.043

in.

M/Z]

fb

996,397 /

1,029.71

996,397

x ###

ft

996,397 /

1,029.71

996,397

x ###

3 Slab, Cross girder & Shuttering


Transformed -- holes grouted :
MOMENT due to weight of Slab, Cross girder & Shuttering =

Stress at bottom fiber

fb

2393.064

12000

21350.5

Stress at top fiber

ft

2393.064

12000

20936.0

4 Shuttering release :
Composite section :
MOMENT due to Shuttering release =

Stress at bottom fiber

fb

259.361

12000

30455.7

Stress at top fiber

ft

259.361

12000

98250.9

120 Lbs/Rft

=
=
=
=
=
=

5 Applied Loads :
Composite section :

(i) Railing
(ii) Side walks 1.2 ' wide
(iii) Carpet 2.0
" thick
TOTAL LOAD
Load per Girder per Rft.
Moment due to
Applied Loads :

=
=
=

102.32

102.32 X ###

X 1.00

150

Pcf

102.32 X ###

X 0.16

140

Pcf

#REF!

x No.
4 of Girder
( 96.175 )2 /

102.32

#REF! x

MOMENT due to Applied Loads =

Stress at bottom fiber

fb

#REF!

12000

30455.7

Stress at top fiber

ft

#REF!

12000

98250.9

Job

Component
Checked by

Designed by

###

0
0

6 Live Loads :
Composite section :
Distribution Analysis :

Using relation :

Ri

=P/n

[1+{6(n+1-2i)/(n

-1)}e/a

]
Where

a = c/c distsnce betweem Girders.


n = No. of Girders.
i = Girder Location i.e.

Eccentricity "e"

= [(

i=

For girder location 1 :

Ri

= 1/

###

)/2]-(

+
2.75 + 2

###

15.733 Ft. Tank at

[ 1+ { 6 (

+1-2x

)/(

25

15.73

-1)}

###

Live Load Moment :


Class "AA" Loading :
Effective Span

96.18

Feet.

Tank at Midspan :

###

RA

Equivalent U.D.L. of Tank Load :


=### Tons
RA = 70 x 2.240

x ###

###

Feet.

12.00

Feet.

96.18

Feet.

= ###

Kips/Ft.

Kips.

78.400

Gross Bending Moment :


=(

78.400

x ###

)-(
D.F.

Mmax

3534.869

###

6.000

3.000

3534.869

1868.541

Imp. Factor

x ###

###

Stress at bottom fiber

fb

1868.541

12000

30455.7

Stress at top fiber

ft

1868.541

12000

98250.9

Job

Component
Checked by

Designed by

###

0
0

(iv)-Delayed Losses
=
=
Eccentricity "e" =
( Composite Section : )
=
270 ksi
Using
Prestressing Cables :

P
P

fb&t =
fb

0.90
0.90

x
x

Pi

where

Pi = Force =
Stressing

270,000

996,397

Lbs.

896,757

Yb

- Distance from bottom of Girder to C.G. of Cables


=
60.11 6.00
54.108
[ P/A
896,757

in

M/Z ]
2036.23

896,757

x ###

###

ft

896,757

2036.23

x ###

896,757

###

Stressing including sustained Loads :


Immediate losses @ 6
%

Prestessing

Wt. of Girder

Slab, X-Girder
& Shuttering

Prestessing

Relief due to
Shuttering

fb

2676

-161

-873

2034

-1345

102

ft

-683

41

844

-53

1372

-32

Wt. of Girder

Slab, X-Girder
& Shuttering

Prestessing

Relief due to
Shuttering

fb

-873

2034

-1345

102

ft

844

-53

1372

-32

1 Loss of Pre-stress due to Creep :


fcs = Stress at C.G. level of prestressing tendons :
fcs =
fcs =
Creep strain

#REF!

psi

#VALUE!

36

#VALUE!

6.0

0.006895

10

/ ##
#VALUE!

N/mm2

78.74

73

in

in

-6

6.00

Creep :

= 36 x10-6

40

x fcs

'
/ f ci x Es

where
&

P
or

= 36 x10
= #VALUE!
=
/

x
x
(

= 200

10-6

-6

40

#VALUE!

1000

270

200

) x

34.5

0.67

'
ci

#VALUE!

100

=
=
=

5800.0

100

=
=
=

###
1000

Es

#VALUE!
#VALUE!

s of Pre-stress
2 due to Shrinkage :
Shrinkage strain

= 200 x
x Es
10-6
= 200 x 10-6
x 29.00 x 106
Total losses due to Creep and Shrinkage :
or
= #VALUE!
/ (
270
x
1000 x
Stress

0.67

) x

psi

#VALUE!
#VALUE!

3 Loss of Pre-stress due to Relaxation :


=

0.06

Total Delayed Losses

i.e.

=
=

6.00

#VALUE!

% say

270 ksi
Using
Prestressing Cables :

= Force = (
PStressing
= 996,397
P

Eccentricity "e" =
=

) x

0.67

996,

5.508

Lbs.

Yb

( Composite Section : )

fb&t =

Job

###

- Distance from bottom of Girder to C.G. of Cables


=
40.04 6.00
34.043
[ P/A

in

M/Z ]

fb

996,397

1029.71

996,397

x ###

###

ft

996,397

1029.71

996,397

x ###

###

Component
Checked by

Designed by

###

0
0

Permissible Stresses :
At transfer :
fCompression
fTension
At Service Load :

=
=

0.55

fCompression
fTension

=
=

0.40

3.00

6.00

x f'ci
x ( f'ci )0.5

0.55

3.00

x (

fc
x
x ( f'c )0.5

0.40

6.00

x (

'

5,000
5,000

6,000
6,000

Summary of Stresses
Sl.
No.

Bottom

Stages

Immediate Losses @

Self weight of Girder :

5.00

Stress

Prestressing :

Top

2676

Psi

2676

Psi

-134

Psi

2542

Psi

-873

Psi

1669

Stress

-683

Psi

34

Psi

844

Psi

At transfer :
Net Stresses :

1669

Psi

Permissible Stresses :
4
5
6

2750

Slab + X-girder +
Shuttering & Labour :

Shuttering relief :
Applied Dead Loads :
( Railing, Curb & Carpet )

Delayed
7 Losses @
8 Live Loads :

18.0

Psi

-1345

Psi

324

Psi

1372

Psi

102

Psi

426

Psi

-32

Psi

#REF!

Psi

Psi

-482

Psi

Psi

-123

Psi

-736

Psi

Psi

228

Psi

Psi

At Service Load :
Net Stresses :
Permissible Stresses :

#VALUE!

Psi

-465

Psi

Director Bridges,

Punjab Highway Departme


2 - Lake Road, Lahore.

Job

Component
Checked by

Designed by

###

0
0

(iii)-Delayed Losses
=
=
Eccentricity "e" =
=

270 ksi
Using
Prestressing Cables :

P
P

fb&t =
fb

0.67
0.67

Pi

x
x

Yb
40.04

where

Pi = Force =
Stressing

###

1,487,160

Lbs.

996,397

- Distance from bottom of Girder to C.G. of Cables


=
6.00
34.04

[ P/A
996,397

in

M/Z]
1029.71

996,397

x ###

###

ft

996,397

1029.71

x ###

996,397

###

Stressing including sustained Loads :


Wt. of Girder

Slab, X-Girder &


Shuttering

Prestessing

Relief due to
Shuttering

Applied Loads

fb

-873

2676

-1345

102

ft

844

-683

1372

-32

#REF!

fcs = Stress at C.G. level of prestressing tendons :


fcs = #REF!
+
#VALUE!
fcs = #VALUE! psi
fcs = #VALUE!
x 0.0068950
fcs = #VALUE! N/mm2

6.0

/ ##

N/mm2

78.74

73

in

in

6.00

1 Creep :

= 36 x 10-6

= 36 x 10-6
= #VALUE!
=
/

or

x
x
(

= 200 x 10-6
= 200 x 10-6
Total losses for Creep and Shrinkage :
or
= #VALUE!
/ (
=
3 Relaxation :
0.06
2 Shrinkage :

x fcs

40

40

#VALUE!

1000

270

where

Es

200,000

&

fci

27

27.0

200

###
1000

x Es
x 29 x
270

/ fci x Es

) x

0.68

100

106

1000

0.68

) x
i.e.

100

Total Delayed Losses

4Cables of

Prestressing
Using

Grade @
270

=
=
=

#VALUE!

=
=
=
=
=

5800.0

#VALUE!

#VALUE!
#VALUE!
6.00
#VALUE!

Pu

0.67

0.50 in. :

nal

Cable No.

0.50 in. :

nal

Area of Cable

= 0

in2 / Strand x

Cable No.

0.50 in. :

Xnal Area of Cable

= 0

in2 / Strand x

Cable No.

0.50 in. :

Xnal Area of Cable

= 0

in2 / Strand x

Cable No.

Total

Area of Cable

= 0

in / Strand x

Xnal Area of above Cables

Stressing Force

= (
Yb

=
Eccentricity "e" =

fb&t =

% say

No.

270

1000

40.043

4.284

in.

40.043 -

[ P/A

0.670

C.G. of cable

&

6.000 =

) x
34.043

M/Z]

in.

[ P/A

fb

774,976 /

1,029.71

774,976

x ###

ft

774,976 /

1,029.71

774,976

x ###

Job

Component
Checked by

Designed by

###

0
0

Summary of Stresses
Using
Sl.
No.

Bottom

Stages

Self weight of Girder :


2 Prestressing
Cables
of
2
### / 0.5 " of
Cables
of
2
### / 0.5 " of
270 Grade @
0.67 Pu
:
1

Best
Result

ksi Prestressing Cables

270

Top

-873

Psi

-873

Psi

844

Psi

2081

Psi

1208

Psi

-531

Psi

-66

Psi

1142

Psi

17

Psi

2000

Psi

LOSSES :
3 Shrinkage loss @

3.16

<
4
5
6
7
8
9

Slab, X-girder & Shuttering :


Shuttering relief :
Applied Loads :
Live Loads :
Delayed Losses @
13
Delayed Losses @
19

%
%

-1345

Psi

-203

Psi

1372

Psi

-102

Psi

-305

Psi

32

Psi

#REF!

Psi

Psi

-736

Psi

Psi

228

Psi

-271

Psi

Psi

69

Psi

-395

Psi

Psi

101

Psi

#VALUE!

<

-424

Psi

Psi

Job

Component

Designed by

###

Checked by

Cable Profile
14.0

in

12.0

in

12.0

in

4
.

2
.

12.0 in

10.0

###

in

4.0

in

6.0

in

in

Section at End
14.63

ft.

10.0

5.0

ft.

ft.

10.0

Length of Cable

Cables

&

ft.

69.250

4 .

Horizontal Cable Profile

Straight length of vertical curve


Vertical Cable Profile

ft.

Job
Designed by

Component
Checked by

###

0
0

Cable Profile
Effective length of Main Girder
Half of effective length of Main Girder
Half Curved length of Main Girder
Half Curved length of Main Girder
Half Curved length of Main Girder
Half Curved length of Main Girder

=
=
=
=
=
=

102.44
50.85

Ft.

- (

3.0

in. +

3.0

Ft.

45.85

Ft.

45.85

Ft.

45.85

Ft.

46.85

Ft.

=
=
=
=

"L" for cable No. 1


L for cable No. 2
L for cable No. 3
L for cable No. 4

in

y
x

Vertical ordinate of cable at section X :

Cable

No.

Rise at
end from
Soffit

in

Net rise
Rise at centre
from Soffit

in

"r"

in

Curved
length- Part
of cable

ft.

=
=

[ Rise at mid-span section


]
x-coordinate of cable profile in horizontal plane

Distance from mid spa

Straight Portion

ft.

Vertical

10.0

in

6.0

in

4.0

in

45.85

ft

5.0

ft

'Y' in.

5 ###

15 ###

25

ft.

ft.

ft.

ft.

ft.

6.00

6.05

6.19

6.43

6.76

0.00

0.00

0.00

0.00

0.00

6.00

6.19

6.76

7.7

9.0

5.0

5.0

2.50

0.00

0.00

6.00

6.33

7.33

9.0

11.3

-5.00

-2.50

0.00

0.00

0.00

10.0

10.6

12.0

14.2

17.2

0.00

0.00

0.00

0.00

0.00

St. part

Horizontal

'x'

in.

Vertical

22.0

in

6.0

in

16.0

in

45.85

ft

5.0

ft

'Y' in.
Horizontal

'X'

in.

Vertical

34.0

in

6.0

in

28.0

in

45.85

ft

5.0

ft

'Y' in.
Horizontal

'X'

in.

Vertical

46.0

in

10.0

in

36.0

in

46.85

ft

4.0

ft

'Y' in.
Horizontal

'X'

in.

Job

Component
Checked by

Designed by

###

0
0

(i)-Immediate Losses :

Elastic Shortening of Concrete :


For

Elastic Shortening of Concrete :

0.67

fcs

P( n =
-1)/2n.

Cables

Pu applied at midspan

. Es

/ Ej

. As

As

where

fcs
Es
fci
Es
n
Stressing

Using

2 No. :

1 For

/ Ej

Cables of

270

0.67 Pu

Grade @

Cable No.

12

0.50 in. :

Xnal Area of Cable

= 0

in2 / Strand x

Cable No.

12

0.50 in. :

Xnal Area of Cable

= 0

in2 / Strand x

Cable No.

12

0.50 in. :

Xnal Area of Cable

= 0

in2 / Strand x

Cable No.

0.50 in. :

Xnal Area of Cable

= 0

in2 / Strand x

Total area of cables

Stressing Force - "P"

= (

270

Yb

=
Eccentricity "e" =

fb&t =

Net at transfer :

1000

40.043

3.672

in.

40.043 -

0.670

C.G. of cable

&

6.000 =

[P/A

) x
34.043

M/Z]

in.

[P/A

fb

664,265 /

1,029.71

664,265

x ###

ft

664,265 /

1,029.71

664,265

x ###

fb

-872.9

ft

843.6

1,783.8
-455.3

fcs = Stress at C.G. level of prestressing tendons :


fcs =
fcs =

388.3
871.0

+
psi

522.6

72.7

/ ##
78.74

73

fcs =
fcs =

871.0

N/mm2

0.0068950

in

in

N/mm2

6.0058

6.00

P
P
P
n

2 For

Stressing
Using

fcs

=(n-1)/2n.
= ( 2 - )1/ ( 2 x
=
3 No. :

. Es
2

3 Cables of

/ Ej

)x

6.0058

. As
x ###

270
Grade @

x(

1185

Pu

0.67

0.50 in. :

Cable No.

0.50 in. :

nal

Area of Cable

= 0

in2 / Strand x

Cable No.

0.50 in. :

Xnal Area of Cable

= 0

in2 / Strand x

Cable No.

0.50 in. :

Xnal Area of Cable

= 0

in2 / Strand x

Total area of cables

Area of Cable

= 0

in / Strand x

Stressing Force - "P"

= (

270

Yb

=
Eccentricity "e" =

1000

40.043

[P/A

0.670

C.G. of cable

&

6.000 =

) x

3.213

in.

40.043 -

fb&t =

Net at transfer :

i.e.

nal

Cable No.

34.043

M/Z]

in.

[P/A

fb

581,232 /

1,029.71

581,232

x ###

ft

581,232 /

1,029.71

581,232

x ###

fb

-872.9

ft

843.6

1,560.8
-398.4

fcs = Stress at C.G. level of prestressing tendons :


fcs =
fcs =
fcs =
fcs =

+
psi
x

445.2
669.4
669.4
4.6154

242.7

/ ##

N/mm

0.0068950

N/mm

72.7

78.74

73

in

in

6.00

P1( n =
-1)/2n.
P1 = ( 3 - )1/ ( 2 x
P1

Job

. Es
3

)x

/ Ej
4.6154

. As
x ###

x(

1185

Designed by
Loss due to

fcs

0
3

rd. cable only :

###

Component
Checked by

0
0

P '1

38.816

Using

25.254

This loss will be distributed on first

P '1 / 2 =
13.562
n =
4 No. :
3 For

Stressing

KN/mm2

KN/mm2

cables :
/2

KN/mm2

4Cables of

270
Grade @

Pu

0.67

Cable No.

0.50 in. :

Xnal Area of Cable

= 0

in2 / Strand x

Cable No.

0.50 in. :

Xnal Area of Cable

= 0

in2 / Strand x

Cable No.

0.50 in. :

Xnal Area of Cable

= 0

in2 / Strand x

Cable No.

0.50 in. :

Xnal Area of Cable

= 0

in2 / Strand x

Total area of cables

Stressing Force - "P"

= (

270

Yb

=
Eccentricity "e" =

1000

40.043

[P/A

) x

4.284

in.

40.043 -

fb&t =

Net at transfer :

C.G. of cable

&

6.000 =

0.670

34.043

M/Z]

in.

[P/A

fb

774,976 /

1,029.71

774,976

x ###

ft

774,976 /

1,029.71

774,976

x ###

fb

-872.9

ft

843.6

2,081.1
-531.2

fcs = Stress at C.G. level of prestressing tendons :


fcs =
fcs =
fcs =
fcs =

312.4
1139.9
1139.9
7.8596

+
psi
x

895.8

72.7

N/mm

0.0068950

N/mm

/ ##

78.74

73

in

in

6.00

P2( n =
-1)/2n.
P2 = ( 4 - )1/ ( 2 x
P2 =
Loss due to

fcs
4

th. cable only :

99.149

KN/mm2

This loss will be distributed on first

P '2 / 3 =

60.333

KN/mm

P '2

. Es
)x

3
2

/ Ej

. As
x ###

7.8596

38.816
.

x(

1185

KN/mm2

cables :

/ 3

mary of Elastic Loss :


Girder length

69.75

ft.

Elastic Loss in
Cable - 1
12

0.50

Cable - 2
.

12

0.50

Cable
Cable
Cable
Cable

1Stressed
2Stressed
3Stressed
4Stressed
Total Loss / cable
Total Loss in all cables
%age Loss / cable

P
P '1
P '2

/
/

25.254

KN/mm

6.781

KN/mm

20.111

0
6.781

KN/mm2

KN/mm2

20.111

KN/mm2

52.146

KN/mm2

26.892

KN/mm2

99.149

KN/mm2

& average loss in all cables

For n =

Xnal Area =

1184.514 mm2

1.8360

in2 Stressing Force =

270000

1.8360

For n =

Xnal Area =

1184.514 mm2

1.8360

in2 Stressing Force =

270000

1.8360

For n =

Xnal Area =

1184.514 mm2

1.8360

in2 Stressing Force =

270000

1.8360

For n =

Xnal Area =

0.0000

in2 Stressing Force =

270000

0.0000

mm2

Area
52.146

=
/

1.836

in2
x

2205

Area

100

= 2.365

69.3649

1.836

26.892

2205

1.220

67 %

Stress including

Elastic Loss Effect :

Job

Component
Checked by

Designed by

###

68.2196

0
0

(ii)-Friction & Pull in Losses


y

r . X2 / L 2

= tan-1( 2.r / L )
=

tan-1( 2.r / L )

For curved portion :

K
Net Rise
Cable(
No.

r)

( r / 12 ) ft.

4.00

in.

16.00

in.

28.00

in.

36.00

in.

0.0145

rad

0.8331

Deg

+ K xcurved
=
=

0.30

-4
Meter
X 10Per

33

Curved Portion

in.

xc

xc

( Radians )

Curved Length

tan-1(2.r/L)

( ft. )

( Meters )

45.84549

13.97728

0.004362

0.046125

45.84549

13.97728

0.017430

0.046125

45.84549

13.97728

0.030433

0.046125

46.84549

14.28216

0.038216

0.047131

0.01454

rad

0.83311

Deg

0.05810

rad

3.32894

Deg

0.10144

rad

5.81219

Deg

0.12739

rad

7.29874

Deg

Effective Length of Cables


d ( Horizontal deviation )

1
l1

( Deviation Length )

= #
=
33

Per Meter

10-4

Horizontal deviation
Cable

l1

No.

d
tan
Deviation

( d / 12".l1 )

-1

ft.

( For one side )

( Radians )

0.00

Ft.

0.00

in

10.00

Ft.

5.00

in###

Radian
0

10.00

Ft.

5.00

in###

0.00

Ft.

0.00

in

0.0000000

###

0.0124928

###

0.0124928

###

0.0000000

###

Degrees
Radian

###
3

K XC

Degrees
Radian

###

Degrees

Radian
0

Degrees

ve Length of Cables
Points on cable profile
Cable
No.

(Assuming full
force at
Jacking end)

End of curve from

Centre Line

Jacking end)
1.0000

0.0505

0.950

Stretches on cable p

0.005

AB

BC

End of curve from

End of St. line


from

(A+B)/2 * Curved
length

(B+C)/2 * Straight length

other end)

other end)

45.84549

5.00000

0.9445

0.01

0.9395

0.05

1.00000

0.94951

0.94448

0.93945

0.88896

44.68818

4.73499

1.00000

0.91146

0.90643

0.90140

0.81286

43.81589

4.54472

1.00000

0.89846

0.89343

0.88840

0.78685

43.51784

4.47971

1.00000

0.91465

0.91063

0.90660

0.82126

44.84642

3.65056

Job

Component

Designed by

###

Checked by

Horizontal Projection of vertical curve


50.8454897 Ft.
Length of Girder=
102.191 Ft.
Length of Girder at face of recess=
102.191 Ft. - 3 in
Half Length= 101.69098 Ft. / 2
Vertical Cable Profile

Jack Pressure & Extension :


One end jacking
Calculation of Friction & Pull in Losses in :
Cable No. 1 :
Full force applied =

1.00000

Centre Line

A
0.94951

xc=
Segments :
(
AB
(
BC
(
CD
(
DE

+
+
+
+

1.00000
0.94951
0.94448
0.93945

0.94448

45.8455

ft.

5.0000

ft.

13.9773

1.5244

0.94951
0.94448
0.93945
0.88896

)/2x
)/2x
)/2x
)/2x

0.93945

45.8455
5.0000
5.0000
45.8455

=
=
=
=
=

44.68818
4.73499
4.70984
41.91232
96.04533

ft.
ft.
ft.
ft.
ft.

13.97728

Points :

A
B
C

=
=
=

1.00000

73.4423

0.94951

69.7344

0.94448

69.3649

% of PU
% of PU
% of PU

( Including Elastic Shortening Loss.)

Checking of pull in Losses :

Stressing
Using

1 Cable
.
of

0.67 Pu

270
Grade @

i.e.

0.50 in. :

Xnal Area of Cable

= 0

in2 / Strand x

0.50 in. :

Cable No.

Cable No.

Cable No.
Cable No.

nal

Area of Cable

= 0

in2 / Strand x

0.50 in. :

nal

Area of Cable

= 0

in2 / Strand x

0.50 in. :

Xnal Area of Cable

= 0

in2 / Strand x

Total area of cables

=
=

Stressing Force

Jacking Force at end

270,000 x

193,744

1.0710

0.67

###

67.0000
[ 1-Lb =

For curved portion :


P0

For cable No. 1

- Pc

P
P

= ( P0

As

= 690.96636 mm2

=
=

Es
W = Length of Tendon upto which Pull in
effect develops :

Job

+ K xc =

944.635

x 0.050487

4.448

1000

N. ]

0.050487

47.692006298

KN

3.4121084038

KN/M

- P c ) / xc

47.6920062977

W
W
W

=[
=
=

KN/mm2

200,000

=[

/ ###

Pull in.
=###
N/mm

mm

l x Es
6.00

x As

200

15,589

mm

15.589

>

690.9664 )

0.5

0.0034121084

Half Span

Component
Checked by

###

)/

15.502

Designed by

4.448

Adjusting Stresses at Mid Span for Pull in Losses :


1

For curved portion :

For straight portion :

P =
Kx

Jacking Force at Point B :

Weighted average

Iteration :
Weighted

Adopt

=
193,744 x

=
= ( P0

0.005030

KN/mm

W
W
W

=[
=
=

P
P

0.003412 x (

0.0043170

W
W
W

=[
=
=

###

67.0000

4.448

- Pst ) / xst

896.943

0.00296

0.003412 x (

0.0039360

KN/mm

(St.)

P
P
P
P
P

0.0034121

6.00

x###

/
13.977

1000

1.36000 ) +

0.00296

KN/mm
x

200

mm

14.514

<
13.977

690.9664 )

/
M

15.502

0.0039360

1.74120 ) +

Half Span

0.00296

KN/mm
x

200

13,859

mm

13.859

0.0043170

KN/mm

14,514

6.00

1.5244

KN/mm

<

690.9664 )

15.502

0.0043170

Half Span

P0

- Pw

Cable No. 1 :

0.0043170

14.5142

1.00000

62.6574

1,000 =

Centre Line

A
0.95210

xc=

33.7917

5.0000

ft.

10.3023

1.5244

14.5142

Stressing
4

1Cable of

Area of

cable
1

Area of

cables
0

Area of

cable
1

Area of

cables
1

0.5

0 cables

Total area of cables

Pu
Pu

Stressing Force

270000
289,170

[ 1-Lb =

%age Loss

Pu

0.67

= (
mm2 ) / (
743
25.40
= 0 x 1.151652 in2 .
= (
mm2 ) / (
836
25.40
= 1 x 1.295803 in2
0.5 / 0.5 " &
1cables
= (
=

2.6874

270
Grade @

"
1 / 0.5 "
1 / 0.5 "
1 / 0.5 "
1 /

ft.

)2

1.1517

in2

)2

1.2958

in2

1 / 0.5 " .

) x

1.071
4.448

4.448

i.e.

0.670

1000

N. ]

23.2031

100

###

0.0043170

2.6874

1000

x
x
+

###

uction of Forceat Mid-span due to Pull in :

Loss
%age Loss
Force to be applied at Jacking End

=
=
=

11.602

KN
23.2031

73.442

100
1.804

Force after initial losses at end on anchorage :

Elastic Shortening
Pull in

Job
Designed by

Calculation of Friction Loss in Cable No. 2 :

###

0.94707

Component
Checked by

1.00000

Centre Line

A
0.91146

0.90643

xc=

+
+
+
+

1.00000
0.91146
0.90643
0.90140

45.8455

ft.

5.0000

ft.

10.3023

1.5244

0.91146
0.90643
0.90140
0.81286

)/2x
)/2x
)/2x
)/2x

0.3063

12.1330

Segments :
(
AB =
(
BC =
(
CD =
(
DE =

0.90140

=
=
=
=
=

45.8455
5.0000
5.0000
45.8455

ft.
ft.
ft.
ft.
ft.

43.81589
4.54472
4.51957
39.29544
92.17562

13.97728

Points :

A
B
C

=
=
=

1.00000

75.2620

0.91146

68.5982

0.90643

68.2196

% of PU
% of PU
% of PU

( Including the Elastic Shortening Los

Force to be applied at Jacking End including Elastic Loss & Friction

Checking of pull in Losses :


Area of

cable
1

1 /

0.0

Jacking Force at end

"
=

= ( 1184.5
270,000

)/(

mm2

)2

25.40

x ###

1.8360

[ 1-Lb =

For curved portion :


P0

- Pc

P
P
P

= ( P0

As

= 1184.51376 mm2

=
=

Es

+ K xc =

1,711.492

x 0.06057

4.448

For curved portion :

For straight portion :

103.66506675

0.010062

103.66506675

10.062276208 KN/M

W
W
W

=[
=
=

l x Es
6.00

11,885.3660
11.8854

)/

x As
200

P =
Kx

= ( P0

=
1,711.492 x
(St.)

KN/mm

KN/mm2

200,000

=[

/ ###

Pull in.
=###
N/mm

mm

KN

- P c ) / xc

Jacking Force at Point B :

N. ]

1184.514 )

0.5

0.010062

mm
M

>

11.8267

Adjusting Stresses at Mid Span for Pull in Losses :


1

100

0.010062

KN/mm

0.00503

KN/mm

###

- Pst ) / xst

###

Half Span

Weighted average

Iteration :
Weighted

Job

P
P
P
P

1,559.955

0.005147

0.010062 x (

0.0096095

W
W
W

=[
=
=

P
P

0.010062 x (

0.0096087

W
W
W

=[
=
=

1.5244

Iteration :
Weighted

6.00

200

1184.514 )

P0

>

0.010062 x (

0.0096557

W
W
W

=[
=
=

Loss

Pu

200

1184.514 )

>

0.0096087

11.8267

- )+

200

1184.514 )

Half Span

0.00515

0.0096557

mm

>

11.8267

1,000 =

Half Span

KN/mm

0.0096557

12.1330

x 2
x
289,170Lbs.
KN

[ 1-Lb =

4.448
4.448

1000

N. ]

100

###

x
x
x
+

0.3063

1000

###

2
100
0.460

Force after initial losses at end on anchorage :

n of Friction Loss in Cable No. 3 :

KN/mm

=
234.3060
Reduction of Force at Mid-span due to Pull in :
=
0.0096557
=
Loss
2.957 KN
=
%age Loss
5.9142
=
Force to be applied at Jacking End
75.262 %
%age Loss

0.00515

mm

10.302

12.1330

117.153

Half Span

Component
Checked by

12,132.9920

0.0096557

- )+

###

=
=
=
=

11.8267

10.302

12.1626

- Pw

0.0096095

mm

P
P

Adopt

KN/mm

6.00

6.00

0.005147

KN/mm

12,162.6451

1000

- )+

10.302

12.1622

KN/mm

12,162.1710

Designed by

x###

MinusElastic Shortening
& Minus
Pull in

117.1530

1.00000

Centre Line

A
0.89846

0.89343

xc=

+
+
+
+

1.00000

ft.

5.0000

ft.

10.3023

1.5244

0.89846
0.89343
0.88840

0.89846
0.89343
0.88840
0.78685

)/2x
)/2x
)/2x
)/2x

45.8455

#VALUE!

Segments :
(
AB =
(
BC =
(
CD =
(
DE =

0.88840

=
=
=
=
=

45.8455
5.0000
5.0000
45.8455

ft.
ft.
ft.
ft.
ft.

43.51784
4.47971
4.45456
38.40130
90.85340

13.97728

Points :

A
B
C

=
=
=

1.00000

76.0131

0.89846

68.2945

0.89343

67.9121

% of PU
% of PU
% of PU

( Including the Elastic Shortening Los

e applied at Jacking End including Elastic Loss & Friction

Checking of pull in Losses :


Area of

cable
1

1 /

0.5

Jacking Force at end

"
=

= (

743

mm2

270,000

)/(

)2

25.40

x ###

1.1517

[ 1-Lb =

For curved portion :


P0

- Pc

P
P
P

= ( P0
=

As

=
=

Es

=
=

Job
Designed by

+ K xc =

1,076.873

4.448

0.07807

84.071443058

0.008160

N. ]
.

KN

- P c ) / xc

84.0714430582

/ ###

8.1604161149 KN/M
743

KN/mm

mm2

mm

=[

W
W
W

=[
=
=

Pull in.
=###
N/mm

KN/mm2

200,000

l x Es
6.00

10,452.7094
10.4527

x 0.07807

100

###

x As
200

)/
)/

743

0.5

0.008160

mm
M

<

11.8267

Component
Checked by

Half Span

[ Not needed --- hence hiding

g Stresses at Mid Span for Pull in Losses :

Since pull in effect is not extending upto midspan, therefore adopting :

P0

=
=
=
=

- Pw

Loss

Pu

KN/mm

0.0075760
0.0075760

10.4527

x 2
x
289,170Lbs.

79.190

79.1897

1,000 =

KN

[ 1-Lb =

4.4480
4.448

N. ]

=
/ ###
158.3795 x
100
P
=
%
<
Force to be applied at Jacking End
76.013
0.8
U %
[ Including Elastic & Friction effect.]
Reduction of Force at Mid-span due to Pull in :
=
0.0075760 x 0.0000 *
1000
=
Loss
KN x 2
=
/ ###
%age Loss
- x
100
=
+
Force to be applied at Jacking End
76.013 %
%age Loss

Force after initial losses at end on anchorage :

Minus
Minus

&

Elastic Shortening
Pull in

Calculation of Friction Loss in Cable No. 4 :


1.00000

Centre Line

A
0.91465

xc=

1.00000
0.91465
0.91063
0.90660

+
+
+
+

ft.

4.0000

ft.

10.6070

1.2200

0.91465
0.91063
0.90660
0.82126

)/2x
)/2x
)/2x
)/2x

0.90660

46.8455

Segments :
(
AB =
(
BC =
(
CD =
(
DE =

0.91063

D
M

#VALUE!

46.8455
4.0000
4.0000
46.8455

=
=
=
=
=

44.84642
3.65056
3.63446
40.47124
92.60269

ft.
ft.
ft.
ft.
ft.

14.28216

Points :

A
B
C

=
=
=

1.00000

73.5756

0.91465

67.2961

0.91063

67.0000

% of PU
% of PU
% of PU

( Including the Elastic Shortening Los

Force to be applied at Jacking End including Elastic Loss & Friction

Checking of pull in Losses :


Area of

cable
1

0 /

0.5

Jacking Force at end

"
=

= (

743
287,913

mm2

)/(

)2

25.40

0.7718
[ 1-Lb =

+ K xc =

For curved portion :


P0

- Pc

P
P
P

= ( P0

x 0.08902

87.9869812191

=
=

8.2951806561 KN/M

As
Es

=
=

743

87.986981219

0.008295

mm
200,000

=[

W
W
W

=[
=
=

/ ###

Pull in.
=###
N/mm2

KN/mm

l x Es
6.00

10.3675

)/

x As
200

10,367.4537

KN/mm2

)/

743

0.5

0.008295

mm

<

11.8270

Half Span

Component
Checked by

###

KN

mm2

Designed by

N. ]

- P c ) / xc

Job

988.396

4.448

[ Not needed ---hiding the sam

g Stresses at Mid Span for Pull in Losses :

Since pull in effect is not extending upto midspan, therefore adopting :

P0

- Pw

Loss

Pu

=
=
=
=

KN/mm

0.0082952
0.0082952

10.3675

85.9999 KN x

=
=
Force to be applied at Jacking End
[ Including Elastic & Friction effect.]
=
Force to be applied at Jacking End

85.9999

1,000 =

Lbs.

[ 1-Lb =

%age Loss

171.9998

73.576

% <

73.576

4.4480
4.448

100

###

PU

0.8

N. ]

O'k

Force after initial losses at end on anchorage :

MinusElastic Shortening
& Minus
Pull in

Jack Pressure & Extension

One end Jacking


Area of Cable
Cable

%age Force to be applied


( Sq. inches )

Force applied at the jacking end of Girder a


( % of Pu ) : ( Lb
270,000

0.7358

x
x
x
x

in.

29.00 x 106

73.4423

1.8360

0.7344

75.2620

1.8360

0.7526

76.0131

1.8360

0.7601

73.5756

0.0000

Extension

PL / AE

%age

%age

%age

%age

f.L/E
270,000 x L x

x
x
x
x

270,000
270,000
270,000

1.8360
1.8360
1.8360
0.0000

x
x L

12

in.

0.1117241379

Jack Pressure :

Ram Area of Jack

G-200 =

Interpolation :

Cable
No.

x
270,000
x Area of cable

cm2

267.2

6519.207

Lbs.

mm2

267.2

78.5

Area of cable

171.46

428

158.57

415

Kg/cm2
Kg/cm2

76.296

Force applied at the jacking end of Girder at A Effective length of


Cable ( L )
( % of Pu )

Extension
( Inches.)

mm

364,068

Lbs

96.04533

Ft.

7.881

200.171948282

373,089

Lbs

92.17562

Ft.

7.751

196.8667355041

376,812

Lbs

90.85340

Ft.

7.716

195.9792874518

Lbs

92.60269

Ft.

7.612

193.3472331858

Conversions :
1

Mpa

psi

N/mm2
1 KN/mm2
1

Job

=
=
= 1
=

N/mm2
Mpa

1
0.006895

/
1000

0.006895

0.006895

Designed by

Fabricated Trumpet :

###

=
=
=

0.006895
145.032632
145,032.632

N/mm2

psi
psi

Component
Checked by

r=

6.0 in.
( For cable 1)

Cured Portion

L=
( Table - 22 )

Area
Area

=
=

45.845

( For
+ 30
+ 30

CF - 14
220
250

Straight Portion

Ft.

12 /
x

=
=

5.000

0.5
280
310

"
mm
mm

Ft.

11.02

12.20

in.
in.

Cable - 1 :
(L)

Rise at centre from Soffit

( r ) in.

Cable No.

(r)

ft.

Curved Length

( ft. )

0.333

45.845

16

1.333

45.845

28

2.333

45.845

36

3.000

46.845

-1
Tan=
( 2.r / L )
=
tan-1(
=
tan-1(

y1

y2

x2

0.01454

Radians.

0.83311

Degrees.

11.0

11

10.9988

=
=

11

5.500

x 1
/Cos (

5.5006

inches.

45.845

0.01454

=
=
=
=

0.333

5.5006

/Cos (

0.83311

0.83311

0.83311

xCos (

When

1 in radians

inches.

xSin (

0.1599

0.83311

inches.
10.9988

15o

- 1

y3

=
=
=
=

15o
14.1669
4

0.83311

Degrees.

xtan

1.0097

in.=

(
inches.

14.16689

in.=

15o

Cable - 2 :

= tan-1( 2.r / L )
=
tan-1(
2 x
1.333
-1
=
)
tan (
0.05817
= 0.05810
Radians.
= 3.32894
Degrees.

y1

y2
x2

Job

=
=
=

11

=
=

11

=
=

11

5.500

x 1
/Cos (

5.5093

inches.

45.85

/Cos (

3.32894

3.32894

xCos (

10.9814

3.32894

3.32894

inches.

xSin (

0.6388

inches.

Component
Checked by

Designed by

###

Cable - 3 :

y1

y2
x2

= tan-1( 2.r / L )
= tan-1(
2 x
2.333
-1
= tan (
)
0.10179
= 0.10144
Radians.
= 5.81219
Degrees.
=
=
=

11

=
=

11

=
=

11

5.500

x 1
/Cos (

5.5284

inches.

/Cos (

45.845

5.81219
5.81219

xCos (

10.9435

5.81219

5.81219

inches.

xSin (

1.1139

inches.

Cable - 4 :

y1

= tan-1( 2.r / L )
= tan-1(
2 x
-1
= tan (
0.12808
= 0.12739
Radians.
= 7.2987
Degrees.
=

11

3.00

46.85

/Cos (

7.29874

0
0

=
=

y2

=
=

x2

=
=

5.500
5.5449
11

10.9109
11

x
1.3975

/Cos (

7.29874

inches.

Cos (

7.29874

7.29874

inches.
Sin (
inches.

Job

Designed by

###

###

###

Component
Checked by

in.

in.

###

###

###

in.

in.

in.

1.073

in.
###

###

###

in.

in.

1.038

in.
###

###

in.

in.

in.

0
0

###

in.

1.010

in.
###

###

in.

y2

= ###

y3

in.

= x2

in.

1.010

in.

###

in.

###

in.

END BLOCK DETAIL


Span

Job
Designed by

###

69.25

Feet.

Component
Checked by

0
0

PC Beam Properties
.

PAK

at

11.22
9.8in.

384.70

feet centre to centre.

inches.

###

inches.

225

mm

50

mm

Also adopted as Exterior Girder.

35.43

in

5
4

ft. 78.74

7
in

in

###
in
7.9

in
7.9

in

7.9 in

Roadway =###

Ft

Curb =

###

Ft

Ft.

11.22

11.22

Ft.
Ft.

3.28

4000

)0.5

3,605

Ksi

6000

)0.5

4,415

Ksi

psi

29,000,000 psi

0.816

6.568

say

as whole no.

8.044

say

as whole no.

0.67

x Pu

and stressing upto


34.475

N/mm

12

1.836

in2

12

1.836

in2

12

1.836

in2

5.5080

in2

]
in.

10.00

) /

6.00 in. from bottom

I0

AY2
( in .)
4

( in .)
4

5,630.88

1,876.96

9,636.73

213.56

874,619.51

170,237.69

143,376.61

11.45

74,984.65

13.35

113,256.57

4.58

1,052,473.42

395.87

455.96

1.00 ###

2,273,522.44

40.04

172,753.40

40.043

in.

38.697

in.

795,220.50

in4

19,859.32

in3

20,549.76

in3

6.568

say

as whole no.

I0

AY2
( in4.)

( in4.)

1,651,055.34

795,220.50

1,189.73

0.80

1,652,245.07

795,221.29

38.98 in.
39.76 in.
832,329.81

in4

21,350.50 in3
20,936.00 in3

0.816

I0

AY2
( in4.)

( in4.)
1,615,136.55
6,733,591.66
8,348,728.21

60.11 in.
18.63 in.

832,329.81
0.816

###
838,695.40

.
.
.
.
.
.

1,830,625.75

in4

30,455.68 in3
98,250.93 in3

1176

Lbs. per Rft.

8816

Lbs.

8220

Lbs.

) / 2 } x(

13.8

) x(

13.8

/
/

1728

x 150

1728

x 150

)]
)]

82.06 Kips.
115.06Kips.

779.748

Kips.

746.606

Kips.

136.284

Kips.

582.63 Kips.
31.50 Kips.
578.83 Kips.
52.89Kips.
17.63 Kips.
49.32 Kips.
16.44 Kips.
1,526.35

Kips.

Span = L

1,921.7 Kip-ft.
259.4 Kip-ft.

2393.064
.

Kips.

For exterior girder

423.9 Kip-ft.

212.0 Kip-ft.

84.7 Kip-ft.

1,359.9 Kip-ft.

1444.637

2605.030

Kips.

1444.637

Kips.

Kip-ft.

-873

psi

844

psi

0.67

Pu

12

1.836

in2

12

1.836

in2

12

1.836

in2

0.000

in2

5.5080

in2

For interior girder

996,397 Lbs.
C.G. of cable =

6.000 in. from bottom

19859.3

2675.7

psi

20549.8

-683.0

psi

2393.064

Kip-ft.

-1345 psi

[ Holes grouted ]

psi

[ Holes grouted ]

1372

259.361

Kip-ft.

-102

psi

[ Composite Section ]

32

psi

[ Composite Section ]

24.556

Kips.

#REF!

Kips.

115.060

Kips.

#REF!

Kips.

#REF!

Kips/Rft.

#REF!

Kip-ft.

#REF!

Kip-ft.

#REF! psi

[ Composite Section ]

#REF! psi

[ Composite Section ]

betweem Girders.

=
=
=

Tank at

4.00

] = ###

11.22 Ft.
5
1 , 2 , 3

& 4

ft. away from Curb.

[1+

1.4027

] = ###

Kips/Ft.

RB

534.869

K-Ft.

1868.541

K-Ft.

-736.2 psi

[ Composite Section ]

228.2 psi

[ Composite Section ]

0.67

) x

5.508

Lbs.

2034

psi

996,397 Lbs.

psi

-53

Relief due to
Shuttering

Applied Loads

102

-32

#REF!

#REF!

Relief due to
Shuttering

psi
psi

Applied Loads

102

-32

#REF!

#REF!

psi
psi

psi
### #VALUE! psi
psi

in
#REF! psi
200,000
34.475

N/mm2

200

KN/mm2

N/mm2

KN/mm2

psi
%:

psi
psi
%

#VALUE!

Loss due to Creep

3.21

Loss due to Shrinkage

%
% say

#VALUE! %

Psi

996,397

Lbs.

2676

psi

-683

psi

5,000
5,000 )0.5

6,000 )0.5

psi =

2750

psi =

-212

psi =

2400

psi =

-465

Top

Stress
Psi

-683

Psi

Psi

-649

Psi

Psi

195

195

Psi

psi
psi <

-200

psi

psi
psi <

-200

psi

-212

Psi

Psi

Psi

1566

Psi

Psi

1535

Psi

x Pu .

0.67

Psi

Psi

Psi

Psi

4.0

Psi

Psi

6.0

6.0

#VALUE!

Psi

2400

Psi

ctor Bridges,

hway Department,
e Road, Lahore.

)x

5.508

1,487,160

Lbs.

2,676

psi

Lbs.

683

psi

Applied Loads

#REF!

psi

#REF!

psi
psi

###

#VALUE! psi

psi

in
#REF! psi
200,000

N/mm2

27

N/mm2

200

KN/mm2

KN/mm2

psi
#VALUE!

Loss due to Creep

3.16

Loss due to Shrinkage

psi
psi
%
%
% say

#VALUE! %

1.071

in2

1.071

in2

1.071

in2

1.071

in2

4.2840

in2

774,976 Lbs.

C.G. of cable =

6.000 in. from bottom

P.e / Z ]

19859.3

2081.1

psi

20549.8

-531.2

psi

g Cables

Top

Limiting
Stresses

844

Psi

312

Psi

329

Psi

1701

Psi

1732

Psi

At transfer :
< -189 Psi

Psi
Psi
Psi

<

#VALUE!

Psi

2000

Psi

<

2000

Psi

20.0

in

###

in

###

in

6.06
in.
7.9
in
7.9

53.1

in

in

7.874 in

###

in

###

in

4
3

-5.0

5.0 in

###

in

Section at Midspan
10.0

ft.

Cable

###

Cable
5.0

ft.

Centre
Line

Straight

5.0

ft.

in.

.
x

) =

101.691

Ft.

+
orizontal plane

r X 2 / L2

Jack

Cable extension

tance from mid span

Pressure
.

30
ft.

31

48.85

ft.

ft.

50.85 .

mm

ft.

Kg./cm2

.
7.19

7.29

9.66

200.172

10.00

617.816

0.00

0.00

0.00

0.00

10.8

11.1

20.63

22.00

0.00

0.00

0.00

0.00

14.3

15.0

31.61

34.00

0.00

0.00

0.00

0.00

196.867

.
.
.

633.123

.
.
.
195.979

639.442

21.1

22.0

43.0

193.347

46.0

0.000

0.00

0.00

0.00

0.00

crete :

Cross-sectional area of Cables

N/mm2

7.5833

200,000

N/mm2

27

N/mm2

7.10

=###

No. of Cables actually to be used

12

1.836

in2

12

1.836

in2

12

1.836

in2

0.000

in2

3.672

in2

664,265 Lbs.

C.G. of cable =

6.000 in. from bottom

P.e / Z ]

19859.3

1783.8

psi

20549.8

-455.3

psi

910.9

psi

388.3

psi

388
psi

psi

KN/mm2

#REF!

in
911
###

523

1185

psi
psi

) =
=

25254.42

N/mm2

25.254

KN/mm2

No. of Cables actually to be used

1.071

in

1.071

in2

1.071

in2

1.071

in2

3.213

in2

581,232 Lbs.

C.G. of cable =

6.000 in. from bottom

P.e / Z ]

19859.3

1560.8

psi

20549.8

-398.4

psi

687.9

psi

445.2

psi

445

psi

psi

in
688
###

psi

243

psi

psi
1185

) =
=

38816.03

N/mm2

38.816

KN/mm2

Err:504

13.562

KN/mm2

6.781

KN/mm2

1.071

in2

1.071

in2

1.071

in2

1.071

in2

4.284

in2

774,976 Lbs.

=
C.G. of cable =

6.000

in. from bottom

P.e / Z ]

19859.3

2081.1

psi

20549.8

-531.2

psi

1208.2

psi

312.4

psi

312

psi

psi

in
1208
###

1185

896

psi
psi

) =
=

99148.9

N/mm2

99.149

KN/mm2

60.333

KN/mm2

20.111

KN/mm2

Elastic Loss in

Cable - 2

Cable - 3
0.50

12

Cable - 4
0.50

0.50

0
20.111

KN/mm

20.111

KN/mm

e loss in all cables

0.0
24.787

KN/mm

1.8360

4.448

2205

KN

1.8360

4.448

2205

KN

1.8360

4.448

2205

KN

0.0000

4.448

KN

1.836

in2
x

100

Area

20.111

1.836

in2
x

2205

0.912

100

0.000

in2

67.9121

67.000

osses

.
r=

6.0 in.

( For cable 1)
Straight Portion

Cured Portion

L=

45.845 Ft.

5.000

Ft.

Straight Portion

XStraight

K XC

K . xStraight

( Meters )
5.0
.

0.050487

0.076558

ft.
ft.
ft.

1.21951

0.005030
.

0.005030
.

1.524390244
4.0

0.085347

1.524390244
5.0

ft.

1.524390244
5.0

0.063555

0.005030
.

0.004024

orizontal deviation

Factor for

K XC

Curved
Portion
B

2A+B

K . xStraight

0.050487

0.005030

0.088541

0.005030

0.101543

0.005030

0.085347

0.004024

.
.

Stretches on cable profile


CD

0
DE

Total

(B+C)/2 * Straight length

(C+D)/2 * Straight length

(D+E)/2 * Curved
length

Length

5.00000

5.00000

45.84549

AB+BC+CD+DE

4.73499

4.70984

41.91232

96.04533

4.54472

4.51957

39.29544

92.17562

4.47971

4.45456

38.40130

90.85340

3.65056

3.63446

40.47124

92.60269

.
.
.
.
.
.
.
.

CL
2

Straight

- ### in

Input here :

ft.

5.0

= 101.691 Ft.
= 50.845 Ft.

sion :

0.88896

c Shortening Loss.)

No.

No. of Cables actually to be used

-1

1.071

in2

1.071

in2

1.071

in2

1.071

in

1.0710

=
=

1000

in2

193,744 KN

944.635 KN

0.0034121

KN/mm

0.5

Half Span

No good. Adjust Stresses.

1000

896.943 KN

.
0.00296

3.04880 /

15.5886 .

0.5

Half Span

0.00296

O'k

3.04880 /

0.5

Half Span

O'k

14.5142 .

62.6574

KN

0.90420

No.

0.000

in2

1.296

in2

1.296

in2

289,170 Lbs.
1,286.228 KN

1.804 %

11.602 KN

=
=
=
=
=
=

23.2031

KN

1.804 %
75.246 %

Say

#
=## 2 %

3.610 %
9.240 %
62.396

<

0.67

O'K.

0.81286

lastic Shortening Loss.)


=

77.620 %

1.8360

=
=

in2

384,778 Lbs.
1,711.492 KN

KN/mm

0.5

Half Span

No good. Adjust Stresses.

1,559.955 KN

0.005147

2.04900 / ###

0.5

Half Span

0.00515

x(

No good. Adjust Stresses.

1.5244

1.0396

/ ###

0.5

Half Span

0.00515

x(

No good. Adjust Stresses.

1.5244

1.1516

/ ###

0.5

Half Span
117.1530

No good. Adjust Stresses.

KN

=
=
=
=
=
=
=
=
=
=
=

234.3060

KN

1,286.228 KN

18.217 %
2.957 KN
5.9142

KN

0.460 %
75.722 %

Say

#
=## 0 %

75.722 %
2.530 %
18.217 %

54.975

<

O'K.

0.67

0.78685

lastic Shortening Loss.)


=
77.860 %
=

=
=

1.1517

in2

242,103 Lbs.
1,076.873 KN

0.5

Half Span

O'k
0

eded --- hence hiding the same ]

79.1897

KN

=
=

158.3795

Lbs.

1,286.228 KN

=
=
=
=
=
=
=
=

KN

12.313 %

0.0000

KN
KN

- %
76.013 %

Say

#
=##-

76.013 %
1.390 %
12.313 %

62.310

<

O'K.

0.82126

lastic Shortening Loss.)

0.67

PU

=
=

77.860 %
1.1517

=
=

in2

222,211 Lbs.
988.396 KN

0.5

Half Span

O'k
0

eded ---hiding the same ]

sion

85.9999

KN

171.9998

KN

1,280.640 KN

13.431 %

=
=
=
=
=

73.576 %

Lbs.

73.576 %
-

13.431 %

60.145

<

PU

O'K.

Ram area of Jack

jacking end of Girder at A


( % of Pu ) : ( Lbs.)

1.8360

=
=
=

0.0000

1.8360
1.8360

cm2

( Sq. inches )

364,068
373,089
376,812

6.452
6.452
6.452

6.452

41.4160828 in.2 )

Extension

Jack Pressure
.

mm

( Psi.)

( Kg/cm2 )
.

200.171948282

8,790.5

617.82

196.8667355041

9,008.3

633.12

195.9792874518

9,098.2

639.44

193.3472331858

1
1

= 4.448 N
= 0.224820144Lb.
= 224.8201439 Lb.

Lb.

KN
Bridge Directorate, Highway Deptt.
.

Centre line of Cable

y1

1 =

When

1 <

11

0.83311

Degrees.

4 Degrees

1 in radians = Sin 1 = Tan 1


X2

y2

11.0

in.

90o

5.50

in.

1
- 1 )

1
15o

96.18

Feet C/C of Bearing

102.41

Feet.

=
=
=
=
=
=
=
=
=
=

98.425

Feet.

96.175

Feet.

Pre-stressed Girder - Span

INPUT DATA :
(1) : Deck :
Centre to centre distance between Piers :

[ Applicble to inne

For Abutment :

Length of Girder

Effective Span of Main Girder


No. of Main Girders :
No. of Cross Girders :

Spacing of Cross Girders

96.18

Width of Roadway :
Width of NJB :
Total width of Deck Slab :
Thickness of Deck Slab :
Thickness of Carpet on Slab :

No.

No. having size

31.68

at

Ft.

47.65

Feet.

1.23

Feet.

50.115

Feet.

8.86

Inches

1.97

Inches

380.20

(2) : Cross Section of Girders :


A - Main Girder :
Exterior Girder :

"X

28.0

" : Also adopted as Exterior Girder.

63.0

35.42

8
8.1

in

3.9

in

in

41.93

6.46

in
9.843 in

2.953

13.39

8.1

in

4.9

in

3.5433071

6.99
33.1

8.86 in. thick

Slab

13.39
7.9

in

in

in
.

25.84 in

47.05
in

9.94
in

62.992
1,600

Part plan of main girder at


diaphragm beam location

10.04

in

8.07

in

9.9 in
2

8.0
Inches :

8.0

6.0

5.67

in

6.0

95.94

27.95

in.

in

B - Diaphragm :

a - Interior Diaphragm - Inner part


b - Interior Diaphragm - Outer part
c - End Diaphragm

4.41

Ft

: 9.843 " X
: 9.843 " X
: 9.843 " X

63
63
48

"
"
"

Roadway =

41.29

Ft

5 - Beams :

10.324
4.41

Ft.

10.324

Ft.

10.324

Ft.

10.324

Ft.
41.29

Ft.

4 - Diaphragms :
3.00
5.25

Centre Line

Ft.

Ft.

40.963

Feet.

Expansion Joint on abutment side

7.00
3
in 1.250
Ft.

Ft.

48.088

Feet.

96.175
98.425

Feet.
Feet.

(3) : Materials - Concrete and steel :


( a ) - Concrete :

f'c-Deck
f'c-Girder

Cylinder Strength of Deck Slab


Cylinder Strength of Main Girder

Ec

= EConcrete-Deck slab

57,000 ( f'c )0.5

EConcrete-Girder

4000

6500

(
57,000 (

57,000

4000
6500

( b ) - Reinforcing Bars :

Using Grade
Ratio of Modulii of Concrete of slab &
Girder
Modular ratio for Girder
Modular ratio for Slab

60

Reinforcing Bars having fy =

n = Ec-Deck slab
m = ESteel
m = ESteel

/E
/E

/E

Esteel

60,000 psi
28,000 Ksi

=
=

3605

Concrete-Girder

28000

Concrete-Slab

28000

c-Girder

/
/
/

4595

4595.487

3604.997

(4) : Cable Data :


Cables to be used :
and stressing upto

270
0.70

K
x

[ ASTM : A-416 ]

Pu

f'ci

Concrete strength at Transfer

0.75

psi

Cable

17

Cable

17

Cable

17

Total

17

No. and size of cables to be used :

Using

6,500

12

mm

12 mm dia.

Xnal Area

2.601

in2 per cable

12 mm dia.

Xnal Area

2.601

in2 per cable

12 mm dia.

Xnal Area

2.601

in2 per cable

7.803

No.

in2

(5) : Losses Data :


Shrinkage strain

200

x 10-6

Creep strain

36

x 10-6

Immediate Losses

=
=
=

6
18
24

%
%
%

Delayed Losses
Total Losses

Range

OUTPUT :
No. of Cables :

C.G. of Cables :

Dia. of Sheath :

75

(
+

1
0

5.67

in.

5.67

in.

5.67

in.

5.67

in.

2.953

mm

X-nal Area of holes :

[
x
x

x [ (

mm

2.953

)2 /

25.4

x
x

5.67

2.953

in

20.543

in2

5.67

Section Properties :
(1)-Un-grouted Section :
Taking moments about the bottom of the Girders :

Section
27.95 in x
8.07
9.94 in x 10.04
2
8.07 in x 47.05
3
3.54 in x
3.94
4
13.39
2.95
5
in x
2.95
6 15.16 in x
4.92
7 41.93 in x
Deduction for holes :
1

Area

AY

( in .)

( in.)

( in3.)

in
in /

in

225.61

4.04

910.44

99.80

11.42

1,139.42

379.72

31.59

11,997.00

in /

13.95

52.49

732.29

in /

39.53

56.10

2,217.62

in

44.76

56.59

2,533.20

in

206.33

60.53

12,489.65

1.000 -

TOTAL
Total area i/c area of holes :

20.54
989.15
1,009.69

5.67 -

116.46
31,903.16

Yb
Yt
IN.A.
Zb
Zt

Ay / A

31,903.16

d - yb

62.99

I0+Ay2-Ay.yb

IN.A. / yb

521,565.71

IN.A. / yt

521,565.71

72,303.18

/
+
/
/

1,009.69
31.60
1,457,301.18

31,903.16

31.60
31.40

(2)-Transformed Section :

/ EConcrete-Girder
m = ESteel
=
Taking moments about the bottom of the Girders :
Section

31,519.48

62.99

521,569.44

551,619.94

551,619.94

4595.487

AY

( in .)

( in.)

( in3.)

989.15

31.60

31,254.06

46.82

5.67

265.42

1,035.97

/
+
/
/

28000

Area
Precast Section :
7.803 in2 x
6.00
TOTAL

Yb
Yt
IN.A.
Zb
Zt

31,519.48

1,035.97

30.43

30.43

32.57

551,619.94

30.43

18,130.42

32.57

16,937.99

989,034.00

31,519.48

30.43

(3)-Composite Section :

/ Ec-Girder
n = Ec-Deck slab
=
Taking moments about the bottom of the Girders :
Section
Precast Section :
35.42 in x
8.86
TOTAL

Yb
Yt
IN.A.
Zb
Zt

in

48,115.99

62.99

553,229.61

825,466.89

825,466.89

3605

4595.487

Area

AY

( in2.)

( in.)

( in3.)

1,035.97

30.43

31,519.48

246.16

67.42

16,596.50

0.784

1,282.13

/
+
/
/

48,115.99

1,282.13

37.53

37.53

25.46

825,466.89

37.53

21,995.95

25.46

32,417.03

2,077,940.62

48,115.99

37.53

DEAD LOADS :
1 - Girder - self weight :
(1)

Weight of main girder

1013.0

in2

144

7.035

Ft.2

150 Pcf

At ends
(2-i)

Av. Weight
Weight of Diaphragm
( For interior girder )

(2-ii)

Wt. of half Diaphragm

= 1840.4 in2
1176
=
= [{
123.9

Lbs. per Rft.

5876

Lbs.

2938

Lbs.

144

64.1

12.780

Ft.2

}x

1,059

150 Pcf

9.84

1728

(i/c haunch margin of 43.065" x 1.065")

( For exterior girder )

Weight(2-i)of Diaphragm

= (

( For interior End girder )


(2-ii)

Wt. of half Diaphragm

123.9

5034

Lbs.

2517

Lbs.

=
=
=

2x[{(

55.1

}x

936.5

9.84

1728

( For exterior End girder )


(2-iii)

Wt. of parts of X-girder cast in-situ with


Main girder - (for both sides)

9.8

2x[(

)/2}x{(

25.8

33.1

)x(

17.8

44.1

38.57

Lbs.

956

2 - Deck :
Description

NJB
Wearing surface
Slab
Haunch
Main Girders
Diaphragms interior
Diaphragms exterior
Utilities

=
=
=
=
=
=
=
=
=

TOTAL :

={
Check for
8.9 in. slab = {
={
Shuttering weight on girder
Share of slab on girder top

567.758
110.7
20.0

/(
Psf.
Psf.

102.29

50.1

1000

1000

)}x
}x
}x

82.3
112.0
567.8
24.7
578.8
47.0
40.3
10.2
1,463.0

10.32

1.143

10.32

1.143

10.32

0.206

Bending Moments :
4

- Diaphragms :

Moment due to Diaphragm weight :


Reaction R
= 1.00 P

Mmax

1.00

P x L/

0.33

P x L

(1)

Moment

due to

Wt. of Slab

1.143

x(

96.175

)2 /

1,322.1

(2)

Moment

due to

Wt. of Shuttering

0.206

x(

96.175

)2 /

238.7

(3-i)

Moment

due to

(3-ii)
(4)

Moment
Moment

due to

(5)

Moment

due to

Wt. of Diaphragm

5.876

x(

96.175

) x

0.33

188.4

Wt. of Half Diaphragm

2.938

x(

96.175

) x

0.33

94.2

0.956

x(

96.175

) x

0.33

30.6

x(

96.175

)2 /

1,359.9

Wt. of part of cross beam cast with


main girder

Wt. of Girder

due to

1.176

Stresses :
1 Main Girder - self weight :
Un-grouted Section :
MOMENT due to self weight of Girder =
=

fb
ft

Stress at bottom fiber


Stress at top fiber
2

fb&t =

M.y/I

=
=

16,686,530
16,686,530

/
/

521,180
521,180

Stressing of Cables :
Cables to be used :
Using

Total

270

Cable

17

Cable

17

Cable

17

K
12 mm dia.

Xnal Area

2.601 in2 per cable

12 mm dia.

Xnal Area

2.601 in2 per cable

12 mm dia.

Xnal Area

2.601 in2 per cable

No.

Xnal Area of above Cables

Stressing Force

and stressing upto

[ ASTM : A-416 ]

=(

270

1000

7.803

7.803

in2
0.700

For ungrouted Section :

Yb =

31.960 in.

C.G. of cable =
Eccentricity "e" =
M
=

fb
ft

5.669 in. from bottom


31.960 -

5.669 =
26.291

1,474,767 x

fb&t = [ P / A
=
=

1,474,767 /
1,474,767 /

26.291 in.

M/Z]
989 +
989 -

38,772,686

= [ P/A
38,772,686 /
38,772,686 /

521,180
521,180

3 Slab, Cross girder & Shuttering


Transformed -- holes grouted :
MOMENT due to weight of Slab, Cross girder & Shuttering =
=

fb&t =

M / Z)

Stress at bottom fiber

fb

=-

20,989,853

18,130

(1,158)

Stress at top fiber

ft

=+

20,989,853

16,938

1,239

fb
ft

fb&t =

M / I (y)

=+
=-

/
/

20,989,853
20,989,853

551,620 x

30.43

551,620 x

32.57

=
=

4 Shuttering release :
Composite section :
MOMENT due to Shuttering release =
=

Stress at bottom fiber

fb

=+

2,864,809

825,467 x

37.53

130

Stress at top fiber

ft

=-

2,864,809

825,467 x

25.46

(88)

5 Applied Loads :
Composite section :

(i) NJB
(ii) Wearing Surface
TOTAL LOAD
Load per Girder per Rft. =
Moment due to
Applied Loads :

194.239

98.43

0.395

=
=
=
=
=

No. of Girder

96.175

)2 /

MOMENT due to Applied Loads =


=

Stress at bottom fiber

fb

=-

5,476,174 /

825,467 x

37.53

(249)

Stress at top fiber

ft

=+

5,476,174 /

825,467 x

25.46

169

Live Loads :
Composite section :
Distribution Analysis :
Eccentric Loading : Tracked Vehicle (Military Tank) at maximum allowable eccentricity of 4 ft. from NJB

Using relation :

Ri = P / n

[1+{6(n+1-2i)/(n

-1)}e/a

]
Where

c/c distsnce betweem Girders.

n = No. of Girders.
i = Girder Location i.e.

Eccentricity "e"
For girder location 1 :

= [(

i=
Ri = 1/

47.65

)/2]-(

4.00

+ 2.75 + 2

15.08

Ft.

Tank at

[ 1+ { 6 (

+1-2x

) / (

25

-1)}

15.08

10.32

i=

For girder location 2 :

Ri = 1/
i=
For girder location 3 :
Ri = 1/

i=

For girder location 4 :

Ri = 1/
i=
For girder location 4 :
Ri = 1/

[ 1+ { 6 (
3

+1-2x

) / (

25

-1)}

15.08

10.32

+1-2x

) / (

25

-1)}

15.08

10.32

+1-2x

) / (

25

-1)}

15.08

10.32

+1-2x

) / (

25

-1)}

15.08

10.32

[ 1+ { 6 (
5

[ 1+ { 6 (
4

[ 1+ { 6 (

Concentric Loading : Military Tank at centre of carriageway

Using relation :

Ri = P / n

[1+{6(n+1-2i)/(n

-1)}e/a

]
Where

c/c distsnce betweem Girders.

n = No. of Girders.
i = Girder Location i.e.

Eccentricity "e"
For girder location 1 :

= [(

i=

Ri = 1/
i=
For girder location 2 :
Ri = 1/
For girder location 3 :

i=
Ri = 1/

0.00

Ft.

Tank at

+1-2x

) / (

25

-1)}

0.00

10.32

+1-2x

) / (

25

-1)}

0.00

10.32

+1-2x

) / (

25

-1)}

0.00

10.32

+1-2x

) / (

25

-1)}

0.00

10.32

+1-2x

) / (

25

-1)}

0.00

10.32

[ 1+ { 6 (
5

+ 2.75 + 2

[ 1+ { 6 (
4

4.00

[ 1+ { 6 (
3

)/2]-(

[ 1+ { 6 (
2

i=

Ri = 1/
i=
For girder location 4 :
Ri = 1/
For girder location 4 :

47.65

[ 1+ { 6 (

Eccentric loading governs for exterior girders

Live Load Moment :


Class "AA" Loading :
Effective Span

96.18

Feet.

Tank at Midspan :

13.067

RA

Equivalent U.D.L. of Tank Load :


= 70 Tons
x
2.240
/

12.00

Feet.

12.00

Feet.

96.18

Feet.

13.067

Kips/Ft.

RA =

70 x

2.240

78.400

Kips.

Gross Bending Moment :


=(

78.400

)-(

48.088
D.F.

Mmax

3,534.9

13.067

6.000

3.000

3,534.9

1,913.4
22,960,815

Imp. Factor

0.492

1.100

fb&t =

M /Z

Stress at bottom fiber

fb

=-

22,960,815

825,467 x

37.53

(1,044)

Stress at top fiber

ft

=+

22,960,815

825,467 x

25.46

708

fb&t =

M / I . (y)

Stress at bottom fiber

fb

=-

22,960,815

825,467 x

37.53

Stress at top fiber

ft

=+

22,960,815

825,467 x

25.46

(i) - Losses :
Stressing including sustained Loads :

fb
ft

Wt. of Girder

=
=

-1023
994

Immediate
Losses @

Prestessing

+
+

3869
-818

+
+

6%

+
+

-232
49

Relief due to
Shuttering

Slab, X-Girder & Shuttering

-1158
1239

Total Delayed Losses

+
+

130

20.00

-88

Permissible Stresses :
At transfer :
Temporary stress before losses due to creep and shrinkage :
1

Compression - Post-tensioned members :

fCompression
2

0.55

x f'ci

0.55

4,875

Tension :
In tension areas with no bonded reinforcement

fTension

=
3.00

x ( f'ci )0.5

The maximum tensile stress shall not exceed

=
=

3.0 x
3.0
7.5 x
7.5

( f'ci )0.5
x(

4,875

( f'ci )0.5
x(

4,875

Where

f'ci
f'c
At Service Load :
Stress at service load after losses have ocurred :

Compressive strength of concrete at time of initial

Compressive strength of concrete at 28 days.

Compression - Post-tensioned members :

fCompression
2

Tension :
(a)-

in the pre-compressed steel

6.00

x ( f'c )0.5

6,500

6.00

x (

6,500

Zero

For members without bonded reinforcement :

fTension
3

0.40

For members with bonded reinforcement :

fTension
(b)-

'
x fc

0.40

Zero

7.5 x

Cracking stress :

Modulus of Rupture For Normal weight concrete


-

x(

7.5

( f'c )0.5
6,500

Anchorage Bearing Stress :

Post-tensioned anchorage at Service Load


3,000 psi
=
But

>

0.90

x f'ci

>

i.e.

0.90

4,875

Hence use :

Summary of Stresses
Sl.
No.

Bottom

Stages
.

Prestressing :

Immediate Losses @

Self weight of Girder :

6.00

Top

Stress

Stress

3869

Psi

3869

Psi

-818

Psi

-232

Psi

3636

Psi

49

Psi

-1023

Psi

2613

994

Psi

At transfer :
Net Stresses :

2613

Psi

Permissible Stresses :

2681

Psi

Slab + X-girder +
Shuttering & Labour :

5
6

Shuttering relief :
Applied Dead Loads :

-1158

( Railing, Curb &


Carpet )

Delayed Losses @
8 Live Loads :
7

18.0

Psi

1455

Psi

1239

Psi

130

Psi

1586

Psi

-88

Psi

-249

Psi

1337

Psi

169

Psi

-696

Psi

640

Psi

-147

Psi

-1044

Psi

-403

Psi

708

Psi

At Service Load :
Net Stresses :

-403

Psi

Permissible Stresses :

-484

Psi

et C/C of Bearing

[ Applicble to inner span ]

10.324
9.84

380.20

feet centre to centre.

in. x

inches.

63

inches.

41.9

in

7
4

13.39

5
6

4.921
6.463

ft. -

in

62.992

1.542

6.99
in

in
1,600 mm

8.1
in

68.88

9.9

9.9 in

Ft

6.40

4.41

6.99

13.39

Area

=
=

6.99
79.55

5.69
x
sq.in.

10.324

Ft.
4.41

Ft.

Ft.
Expansion Joint on abutment side

3.0

in

4 in. for Stronghold system

7.999
95.9921 in.

3 in. for Freyssinet system


in

Abutment
/ Pier
End Block

3
in

4000
6500

)0.5
)0.5

3,605

Ksi

4,595

Ksi

28,000,000 psi

0.784

6.093

say

as whole no.

7.767

say

as whole no.

4,875

Range

psi

to

15

to

18

in the rows

5.67

in.

5.67

in. ) /

AY2

I0

( in .)

( in .)

in. from bottom

5.67

3,674.10

1,224.70

13,009.18

558.76

379,040.09

70,039.88

38,440.18

12.01

124,413.67

19.15

143,365.51

32.53

756,018.72

416.38

660.27
1,457,301.18

1.00 -

0.23

72,303.18

Area :

From Properties of AASHTO Standard Sections

1,013 in.

1,840 in.

31.60

31.597

in.

31.96 in.

31.395

in.

31.04 in.

521,565.71

in4

521,180 in4

16,506.90

in3

16,507 in3

16,612.86

in3 ,

16,613 in3

6.093

say

as whole no.

AY2

I0

( in4.)

( in4.)

987,529.23

521,565.71

1,504.76

3.73

989,034.00

521,569.44

30.43 in.
32.57 in.
551,619.94 in4
18,130.42 in3
16,937.99 in3

0.784

AY2

I0

( in4.)

( in4.)
958,983.50

1,118,957.12
2,077,940.62

37.53 in.
25.46 in.
825,466.89 in4
21,995.95 in3
32,417.03 in3

1,055 Lbs. per Rft.

551,619.94
0.784

1,609.67
553,229.61

.
.
.
.
.
.

Wt. / ft =

1,055 lb/ft

1,917 Lbs. per Rft.

150
5876

Lbs.

150

5034

Lbs.

1728

) / 2 } x(

/
/

8.0

) x(

8.0

82.3 Kips.

1728

150

1728

150

762.00

Kips.

701.04

Kips.

)]
)]

112.0 Kips.
567.8 Kips.
24.7 Kips.
578.8 Kips.
47.0 Kips.
40.3 Kips.
10.2 Kips.
1,463.0

Kips.

1.143

Kips per Rft.

1.143

Kips per Rft.

0.206

Kips per Rft.

Span = L

O'K.

1,322.1 Kip-ft.
238.7 Kip-ft.

1,655

Kips.

For exterior girder

188.4 Kip-ft.
94.2 Kip-ft.

Kips.

1,749

For interior girder

30.6 Kip-ft.

1,359.9 Kip-ft.

1,391

1,391

Kips.

Kip-ft.

16,686,530 lb-in

521,180 x

31.96

521,180 x

31.04

=
=

psi
psi

Compression

psi
(818) psi

Compression

292

Compression

2,309

-1023
994

Tension

0.70 x Pu

1,474,767 Lbs.

lb-in

M.y/I]

521,180 x

31.96

521,180 x

31.04

=
=

1,749

Kip-ft.

20,989,853 lb-in

(1,158)

psi

Tension

1,239

psi

Compression

3,869

psi
psi

(1,158)
1,239

psi
psi

239

Compression
Compression

Kip-ft.

2,864,809 lb-in
130

psi

Compression

(88)

psi

Tension

82.3

Kips.

112.0

Kips.

194.2

Kips.

0.395

Kips/Rft.

456.3

Kip-ft.

456.3

Kip-ft.

5,476,174 lb-in
(249) psi

Tension

169 psi

Compression

e betweem Girders.

=
=
=

Tank at
10.32

10.32
5
1 ,
2

4.00

ft. away from NJB

0.20

[1+

1.4604

Ft.
,

3 ,

0.4921

, 4 5

10.32

0.20

[1+

0.7302

0.3460

10.32

0.20

[1+

0.0000

0.2000

10.32

0.20

[1+

-0.7302

0.0540

10.32

0.20

[1+

-1.4604

-0.0921

e betweem Girders.

=
=
=

Tank at

10.32
5
1 ,
2

4.00

ft. away from NJB

Ft.
,

3 ,

10.32

0.20

[1+

0.0000

0.2000

10.32

0.20

[1+

0.0000

0.2000

10.32

0.20

[1+

0.0000

0.2000

10.32

0.20

[1+

0.0000

0.2000

10.32

0.20

[1+

0.0000

0.2000

13.067

Kips/Ft.

RB

Kips/Ft.

, 4 5

K-Ft.
K-Ft.

22,960,815 lb-in

(1,044)

psi

Tension

708

psi

Compression

(1,044)

psi

Tension

708

psi

Compression

Applied Loads

+
+

-249
169

=
=

1,337
1,544

psi
psi

Reference : AASHTO - 2007

4,875

psi

]
2,681 psi

200

psi

-209

psi

-524

psi

or
4,875

0.5

psi

4,875

)0.5

psi

gth of concrete at time of initial prestress

gth of concrete at 28 days.

Reference : AASHTO - 2007

<

-200

psi

6,500

6,500

)0.5

6,500

4,875

2600

psi

psi

-484

psi

-605

psi

4388

psi

3000

psi

Reference : AASHTO - 2007

)0.5
[

psi

psi

psi

-200

psi

Reference : AASHTO - 2007

<

sses
Top

Stress

-818

Psi

-769

Psi

225

Reduce

Psi

225

Psi

-209

Psi

1464

0.7

Psi

1375

Psi

1544

Psi

1397

Psi

0.0

2105

Psi

5.7

0.70

2105

Psi

2600

Psi

Change value
here :

5.7

Pu

17 Tendons
.

Eccentricity

5.669

4.921
1.542

2.953

6.40

Вам также может понравиться