Issues
Mr.Murali to come up with
analysis of despatch
movements for 3 months sos
that they can justify the
request for additional
despatch staff. This is cater
for the ad-hock delivery
request.
Mr.Murali and Cik.Wan to redesign the Store/Admin
Department space
requirements. Currently there
is space issues in Admin
Department with all their
cabinets and tables
arrangements
Action by
Murali
Status
Murali
On-going.
Estimate
31/5/2016
To check Ms.Mahesh PC
Informed her PC is very slow.
Ravin
On-going
Ravin
Flow-up
Ravin
Follow-up
Remarks
Shamilar
Will assign
one of the
Tech staff to
check the
status of her
PC
During the
meeting
advice the
staff to put
up request
for changing
the monitors.
Nee to
arrange with
Card Access
Vendor for
the remote
control
To give the
schedule for
PowerPoint raining.
8
Murali/Amran
training
status
To provide
the status for
implementati
on