OBRA VINGATE
PARTIDA
VALORIZACION N
SUB CONTRATISTA
FECHA
: MECANICA WME
04
: WME
26-sep-16
COD:
PRESUPUESTO
TRABAJO EJECUTADO
UND
m2
m2
m2
CANT.
TOTAL
1.00
1.00
1.00
48908.51
3.0
S/.
ACTUAL
Valorizacin Acumulada
Metrado
Total
S/.
S/.
Total
S/.
AVANCE
150,522.22
0.80
120,987.83
0.20
29,534.2
1.00
150,522.07
0.00
0.15
100.0%
38,508.56
0.86
33,276.06
0.14
5,232.5
1.00
38,508.53
0.00
0.03
100.0%
48,908.51
0.91
44,426.83
0.09
4,481.8
1.00
48,908.61
(0.00)
-0.10
100.0%
237,939.29
2.58
198,690.73
0.08
100.0%
0.4
39,248.48
237,939.21
-35,690.9
0.0
TOTAL
-35,690.9
% Avanc.
OBS.
100.0% Ya descontado cuadro superior
Ya descontado cuadro superior
-3,500.0
-2,315.66
FONDO GARANTIA 5%
Saldo
Metrado
(1)
ACUM.
-5,887.27
0.0
AMORTIZACION AD2%
Valorizacin Actual
Metrado
Total
S/.
39,248.48
-5,887.27
33,361.21
6,005.02
39,366.23
AMORTIZACION AD1%
150522.22
Valorizacin Anterior
Metrado
Total
S/.
38508.56
PARCIAL
TOTAL VALORIZADO
AMORTIZACION ADELANTO (-)
TOTAL VAL (S/.)
IMPUESTO GENERAL A LAS VENTAS 18%
PARCIAL
S/.
PRECIO
UNITARIO
-14,038.41
(2)
33,550.57
S/.
31,975.57
S/.
1,575.00
NOTAS
En el cuadro de descuentos la columna "TOTAL" indica el monto total a descontar al finalizar el contrato (monto de adelanto, prestamo, etc.). La columna "ACUM." indica dicho descuento acumulado a la fecha.
El item de detraccion en este formato es de manera referencial, el monto y su aplicacin debern ser verificados en la oficina central (tesoreria y contabilidad).
ING. RESIDENTE
CONTRATISTA