Activity

ID

Activity Description

Original
Duration

2016-2017
Early Start

Early Finish
10

JULY
17

24

31

1.0 ROAD CONCRETING - Cantaoan, City of Naga


Total

1.1

Subtotal
5
10
20
30
40
50
60
70
80
90

1.2

345

4-Jul-16

13-Jun-17

Segment CD - Sta. 3+310 to Sta. 4+270 (Guindaruhan Bridge to NAVA Ga


Mobilization
Temporary Facilities
Survey Works
Clearing and Grubbing(with stripping)
Roadway Excavation (Surplus Common)-60 cu.m.
Subgrade Preparation (Common Excavation)
Aggregate Subbase Course
PCCP (plain)-conventional method, 300mm thck., 3500
Pipe Culvert 610mm dia. (24" dia.)
Catch Basin (Single Barrel 610mm dia. RCPC)

193
2
1
10
25
8
35
27
148
10
12

4-Jul-16
4-Jul-16
5-Jul-16
5-Jul-16
15-Jul-16
25-Jul-16
2-Aug-16
15-Aug-16
22-Aug-16
22-Aug-16
25-Aug-16

Start of Project

21-Oct-13
5-Jul-16
5-Jul-16
14-Jul-16
8-Aug-16
1-Aug-16
5-Sep-16
10-Sep-16
12-Jan-17
31-Aug-16
5-Sep-16

Segment AB - Sta. 1+000 to Sta. 2+860 (Inayagan to Sitio Palanas)

Subtotal
95
100
110
120
130
140
150
160
170
180
190

Survey Works
Clearing and Grubbing(with stripping)
Roadway Excavation (Surplus Common)-60 cu.m.
Subgrade Preparation (Common Excavation)
Aggregate Subbase Course
PCCP (plain)-conventional method, 300mm thck., 3500
Pipe Culvert 610mm dia. (24" dia.)
Catch Basin (Single Barrel 610mm dia. RCPC)
Stone Masonry
Grouted Riprap (class A)
Plastering

15
56
43
68
53
281
15
20
25
15
7

15-Jul-16
15-Jul-16
25-Jul-16
1-Aug-16
6-Sep-16
28-Sep-16
5-Sep-16
5-Sep-16
8-Sep-16
12-Nov-16
10-Dec-16
26-Dec-16

12-Jun-17
29-Jul-16
19-Sep-16
12-Sep-16
12-Nov-16
19-Nov-16
12-Jun-17
19-Sep-16
27-Sep-16
9-Dec-16
15-Dec-16
1-Jan-17

18-Jul-16
18-Jul-16
18-Jul-16
12-Jun-17

12-Jun-17
15-Sep-16
27-Jul-16
13-Jun-17
13-Jun-17

1.3 ADDITIONAL WORKS SEGMENT AB


Subtotal
195
200
210
213

Removal of existing Asphalt Pavement


Removal of existing Concrete Pavement
Final clean up & demobilization
Road Concreting project completes

60
10
2
0

GENERAL SPECIFICATION:
WIDTH
: 7m + 0.5m Shouldering
THICKNESS : 300mm or 12"
Fc'
: 3,500 PSI, G1, S4, 28 days
Prepared by:
E.G. & I. CONSTRUCTION, CORPORATION

Checked by:
E.G. & I. CONSTRUCTION, CORPORATION

Engr. Edwin Catarata


Project Engineer

Engr. Geovani Fernandez


Project Manager

AUG.
14

21

28

SEPT.
11

18

25

OCT.
16

23

30

NOV.
13

20

27

DEC.
11

18

25

JAN.
15

22

2016-2017
JAN.
29

FEB.
12

19

26

MARCH
12
19

26

APRIL
16

23

30

MAY
14

21

28

JUNE
11

18

25

End of Project

Activity
ID

Activity Description

Original
Duration

REL WT (%)
10

JULY
17

24

31

100
100
100
12

100
100
100
40

100
100
100
68
87.5

100
100
100
96
100
17.14

20

66.67

100
12.50

100
25.00
16.28

AUG.
14

21

28

100
100
100
100
100
37.14

100
100
100
100
100
57.14
25.93

100
37.50
32.56

100
50.00
48.84

100
100
100
100
100
80.00
51.85
4.83
70
40
100
62.50
65.12

100
100
100
100
100
97.14
77.78
9.66
100
92
100
75.00
81.40

SEPT.
11

1.0 ASH POND - B EXPANSION PROJECT


5
10
20
30
40
50
60
70
80
90
95
100
110
120
130
140
150
160
170
180
190
195
200
210

Mobilization
Temporary Facilities
Survey Works
Clearing and Grubbing(with stripping)
Roadway Excavation (Surplus Common)-60 cu.m.
Subgrade Preparation (Common Excavation)
Aggregate Subbase Course
PCCP (plain)-conventional method, 300mm thck., 3500
Pipe Culvert 610mm dia. (24" dia.)
Catch Basin (Single Barrel 610mm dia. RCPC)
Survey Works
Clearing and Grubbing(with stripping)
Roadway Excavation (Surplus Common)-60 cu.m.
Subgrade Preparation (Common Excavation)
Aggregate Subbase Course
PCCP (plain)-conventional method, 300mm thck., 3500
Pipe Culvert 610mm dia. (24" dia.)
Catch Basin (Single Barrel 610mm dia. RCPC)
Stone Masonry
Grouted Riprap (class A)
Plastering
Removal of existing Asphalt Pavement
Removal of existing Concrete Pavement
Final clean up & demobilization

2
1
10
25
8
35
27
145
10
12
15
56
43
68
53
281
15
20
24
6
7
60
10
2
935

0.21
0.11
1.07
2.67
0.86
3.74
2.89
15.51
1.07
1.28
1.60
5.99
4.60
7.27
5.67
30.05
1.60
2.14
2.57
0.64
0.75
6.42
1.07
0.21
100.00

100
100
60

100
100
100
100
100
100
100
14.48
100
100
100
87.50
97.67
8.82
2.4911
46.67
20

0.96

11.6667 23.3333
70
100
100
100
100
2.25
5.24
9.09

35 46.6667 58.3333
100
100
100
100
100
100
12.83
15.94
19.68

70 81.6667 93.3333
100
100
100
100
100
100
25.54
30.91
37.33

960
145

2016-2017
SEPT.
18

25

OCT.
16

100
100
100
100
100
100
100
19.31
100
100
100
100.00
100
19.12

100
100
100
100
100
100
100
24.14
100
100
100
100
100
29.41

4.98
93.33
55

7.47
100
90

100
100
100
100
100
100
100
28.97
100
100
100
100
100
39.71
7.55
9.96
100
100

100
100
100
100
100
100
100
33.79
100
100
100
100
100
50.00
20.75
12.46
100
100

100
100
100
100
100
100
100
38.62
100
100
100
100
100
60.29
33.96
14.95
100
100

100
100
100
100
100
100
100
43.45
100
100
100
100
100
70.59
47.17
17.44
100
100

100
100
100
100
100
100
100
48.28
100
100
100
100
100
80.88
60.38
19.93
100
100

100
100
100
100
100
100
100
53.10
100
100
100
100
100
91.18
73.58
22.42
100
100

100
100
100
42.35

100
100
100
45.45

100
100
100
48.34

100
100
100
51.34

100
100
100
54.33

100
100
100
57.33

100
100
100
60.32

100
100
100
63.32

23

30

NOV.
13

20

27

100
100
100
100
100
100
100
57.93
100
100
100
100
100
100
86.79
24.91
100
100
8.33

100
100
100
100
100
100
100
62.76
100
100
100
100
100
100
100
27.40
100
100
37.50

100
100
100
100
100
100
100
67.59
100
100
100
100
100
100
100
29.89
100
100
66.67

100
100
100
100
100
100
100
72.41
100
100
100
100
100
100
100
32.38
100
100
95.83

100
100
100
66.42

100
100
100
69.41

100
100
100
71.66

100
100
100
73.90

DEC.
11

18

25

100
100
100
100
100
100
100
77.24
100
100
100
100
100
100
100
34.88
100
100
100
33.33

100
100
100
100
100
100
100
82.07
100
100
100
100
100
100
100
37.37
100
100
100
100

100
100
100
100
100
100
100
86.90
100
100
100
100
100
100
100
39.86
100
100
100
100

100
100
100
75.72

100
100
100
77.65

100
100
100
79.14

100
100
100
100
100
100
100
91.72
100
100
100
100
100
100
100
42.35
100
100
100
100
100
100
100
100

100
100
100
100
100
100
100
96.55
100
100
100
100
100
100
100
44.84
100
100
100
100
100
100
100
100
82.89

JAN.
15

100
100
100
100
100
100
100
100
100
100
100
100
100
100
100
47.33
100
100
100
100
100
100
100
100
84.17

22

29

100
100
100
100
100
100
100
100
100
100
100
100
100
100
100
49.82
100
100
100
100
100
100
100
100
84.92

100
100
100
100
100
100
100
100
100
100
100
100
100
100
100
52.31
100
100
100
100
100
100
100
100
85.67

1860
280.938

100
100
100
100
100
100
100
100
100
100
100
100
100
100
100
54.80
100
100
100
100
100
100
100
100
86.42

FEB.
12

100
100
100
100
100
100
100
100
100
100
100
100
100
100
100
57.30
100
100
100
100
100
100
100
100
87.17

19

26

100
100
100
100
100
100
100
100
100
100
100
100
100
100
100
59.79
100
100
100
100
100
100
100
100
87.91

100
100
100
100
100
100
100
100
100
100
100
100
100
100
100
62.28
100
100
100
100
100
100
100
100
88.66

100
100
100
100
100
100
100
100
100
100
100
100
100
100
100
64.77
100
100
100
100
100
100
100
100
89.41

MARCH
12
19

100
100
100
100
100
100
100
100
100
100
100
100
100
100
100
67.26
100
100
100
100
100
100
100
100
90.16

100
100
100
100
100
100
100
100
100
100
100
100
100
100
100
69.75
100
100
100
100
100
100
100
100
90.91

26

APRIL
16

23

30

100
100
100
100
100
100
100
100
100
100
100
100
100
100
100
72.24
100
100
100
100
100
100
100
100
91.66

100
100
100
100
100
100
100
100
100
100
100
100
100
100
100
74.73
100
100
100
100
100
100
100
100
92.41

100
100
100
100
100
100
100
100
100
100
100
100
100
100
100
77.22
100
100
100
100
100
100
100
100
93.16

100
100
100
100
100
100
100
100
100
100
100
100
100
100
100
79.72
100
100
100
100
100
100
100
100
93.90

100
100
100
100
100
100
100
100
100
100
100
100
100
100
100
82.21
100
100
100
100
100
100
100
100
94.65

100
100
100
100
100
100
100
100
100
100
100
100
100
100
100
84.70
100
100
100
100
100
100
100
100
95.40

100
100
100
100
100
100
100
100
100
100
100
100
100
100
100
87.19
100
100
100
100
100
100
100
100
96.15

MAY
14

100
100
100
100
100
100
100
100
100
100
100
100
100
100
100
89.68
100
100
100
100
100
100
100
100
96.90

21

28

100
100
100
100
100
100
100
100
100
100
100
100
100
100
100
92.17
100
100
100
100
100
100
100
100
97.65

100
100
100
100
100
100
100
100
100
100
100
100
100
100
100
94.66
100
100
100
100
100
100
100
100
98.40

100
100
100
100
100
100
100
100
100
100
100
100
100
100
100
97.15
100
100
100
100
100
100
100
100
99.14

JUNE
11

100
100
100
100
100
100
100
100
100
100
100
100
100
100
100
99.64
100
100
100
100
100
100
100
100
99.89

18

100
100
100
100
100
100
100
100
100
100
100
100
100
100
100
100
100
100
100
100
100
100
100
100
100.00

25

100
100
100
100
100
100
100
100
100
100
100
100
100
100
100
100
100
100
100
100
100
100
100
100
100.00

CONSTRUCTION S- CURVE
DATE: 10/13/13
W1
SEP

W2
8

W3
15

W4
22

W5
29

W6
6

W7
13

W8
20

W9
27

100%

90%

80%

70%

60%

50%

40%

30%

20%

10%

0%
LEGEND:
Ideal S-curve
Commulative S-curve
Actual S-curve

Cummulative Schedule:
Actual Accomplishment:
Slippage:
D
=
D
=
No. of days delayed =

days

%
%
%

Prepared by:

ENGR. GEOVANI L. FERNANDEZ


Project Engineer-E.G. & I. Construction Corp.