Вы находитесь на странице: 1из 4

BERNALDO VILLAROSA JR

June 21, 2016


TO:
THRU:

INFOTOUCH SYSTEMS INC.


Sir Albert

SUBJECT: PROPOSAL FOR OFFICE PARTITIONING & CEILING RETOUCH WORKS and FINISHING
(to include Door fabrication, assembly and installation, computer table fabrication) L
Dear Sir:
We are pleased to submit our proposal for the above captioned subject matter as specified below:

Item No.
1

Work Description
DRYWALL OFFICE PARTITION and PAINTING WORK

1.1 Double Sided Partition using LMF


1.2 Painting Works for Drywall Partition

DOORS FABRICATION, INSTALLATION and PAINTING WORKS


2.1 Door Jamb and Flush Door Fabrication
2.2 Door Jamb and Flush Door Installation
including Hardware Accessories
2.3 Painting Works for Jamb and Door

PERIMETER WALL AND SLAB SAUFFIT PAINTING WORKS RETOUCH


3.1 Painting Works Retouch of Existing Perimeter Walls
3.2 Painting Works Retouch of Existing Slab Sauffit

OFFICE COMPUTER TABLE FABRICATION AND PAINTING WORKS


4.1 Table Fabrication
4.2 Painting Works

GRAND TOTAL (LABOR COST ONLY)

Terms of payment:

a. Fifteen Percent (15%) Downpayment


b. Weekly Actual Accomplishment/Progress Billing

If the aforementioned proposal is acceptable, kindly affix your signature of conformity on the space provided
and this will serve as a contract.
Thank you and hoping to be of service to you soon.
God bless and more power!

Very truly yours;

BERNARLDO VILLAROSA JR.

VILLAROSA JR

KS and FINISHING
er table fabrication) LABOR ONLY

ecified below:

QTY.

UNIT

UNIT COST

AMOUNT

153.425

SQ.M.

420.00

64,438.50

306.85

SQ.M.

180.00

55,233.00

set

1,200.00

10,800.00

set

800.00

7,200.00

set

600.00

5,400.00

127.95

SQ.M.

160.00

20,472.00

182.704

SQ.M.

160.00

29,232.64

11

set

1,000.00

11,000.00

11

set

800.00

8,800.00

212,576.14

ty on the space provided below

Вам также может понравиться