Name of

Work :

Cuddalore C&M (H) Division - Package 10 under CRIDP Works 2015-16.

Job No:

010-S-C

Size of metal

37.5mm

Sieve Size

Weight Retained

53 mm

% Retained

Cumulative % Retained

0.00 %

0.00 %

45 mm

2533.0 grams

25.33 %

25.33 %

22.4 mm

7467.0 grams

74.67 %

100.00 %

11.2 mm

0.00 %

100.00 %

4.75 mm

0.00 %

100.00 %

0.00 %

100.00 %

0.00 %

100.00 %

0.00 %

100.00 %

2.36 mm

0.0 grams

600
75
10000.0 grams

Size of metal

Sieve Size

26.5 mm

Weight Retained

% Retained

Cumulative % Retained

53 mm

0.0 grams

0.00 %

0.00 %

45 mm

0.0 grams

0.00 %

0.00 %

22.4 mm

3054.0 grams

61.08 %

61.08 %

11.2 mm

1946.0 grams

38.92 %

100.00 %

4.75 mm

0.0 grams

0.00 %

100.00 %

2.36 mm

0.00 %

100.00 %

600

0.00 %

100.00 %

75

0.00 %

100.00 %

5000.0 grams
Size of metal

Sieve Size

11.2 mm

Weight Passing

% Retained

Cumulative % Retained

53 mm

0.0 grams

0.00 %

0.00 %

45 mm

0.0 grams

0.00 %

0.00 %

0.00 %

0.00 %

22.4 mm
11.2 mm

624.0 grams

12.48 %

12.48 %

4.75 mm

4211.0 grams

84.22 %

96.70 %

2.36 mm

117.0 grams

2.34 %

99.04 %

600

48.0 grams

0.96 %

100.00 %

0.00 %

100.00 %

75
5000.0 grams

Size of metal

Sieve Size

6.7 mm

Weight Passing

% Retained

Cumulative % Retained

53 mm

0.0 grams

0.00 %

0.00 %

45 mm

0.0 grams

0.00 %

0.00 %

22.4 mm

0.00 %

0.00 %

11.2 mm

0.00 %

0.00 %

4.75 mm

1088.0 grams

54.40 %

54.40 %

2.36 mm

784.0 grams

39.20 %

93.60 %

600

96.0 grams

4.80 %

98.40 %

75

32.0 grams
2000.0 grams

1.60 %

100.00 %

Size of metal

Sieve Size

Quarry Dust

Weight Passing

% Retained

Cumulative % Retained

53 mm

0 grams

0.00 %

0.00 %

45 mm

0 grams

0.00 %

0.00 %

22.4 mm

0 grams

0.00 %

0.00 %

11.2 mm

0 grams

0.00 %

0.00 %

4.75 mm

22.0 grams

2.20 %

2.20 %

2.36 mm

174.0 grams

17.40 %

19.60 %

600

189.0 grams

18.90 %

38.50 %

75

536.0 grams
921.0 grams

53.60 %

92.10 %

10000 grams

% Passing
100.00 %
74.67 %
0.00 %
0.00 %
0.00 %
0.00 %
0.00 %
0.00 %

5000 grams

% Passing
100.00 %
100.00 %
38.92 %
0.00 %
0.00 %
0.00 %
0.00 %

0.00 %

5000 grams

% Passing
100.00 %
100.00 %
100.00 %
87.52 %
3.30 %
0.96 %
0.00 %
0.00 %

2000 grams

% Passing
100.00 %
100.00 %
100.00 %
100.00 %
45.60 %
6.40 %
1.60 %
0.00 %

1000 grams

% Passing
100.00 %
100.00 %
100.00 %
100.00 %
97.80 %

80.40 %
61.50 %
7.90 %

HIGHWAYS DEPARTMENT
QC Sub Division Laboratary, Cuddalore

Wet Mix Macadam


Name of Work:

Job No:

Sieve Size

Cuddalore C&M (H) Division - Package 10 under CRIDP Works 2015-16.

010-S-C

Date

37.5mm

26.5 mm

11.2 mm

6.7 mm

Quarry Dust

100%

10.0 %

100%

34.0 %

100%

12.0 %

100%

20.0 %

100%

24.0 %

53 mm

100

10.00

100

34.00

100

12.00

100

20.00

100

24.00

45 mm

74.67

7.47

100

34.00

100

12.00

100

20.00

100

24.00

22.4 mm

0.00

38.92

13.23

100

12.00

100

20.00

100

24.00

11.2 mm

0.00

0.00

87.52

10.50

100

20.00

100

24.00

4.75 mm

0.00

0.00

3.3

0.40

45.6

9.12

97.8

23.47

2.36 mm

0.00

0.00

0.96

0.12

6.4

1.28

80.4

19.30

600

0.00

0.00

0.00

1.6

0.32

61.5

14.76

75

0.00

0.00

0.00

0.00

7.9

1.90

Conducted By

Checked By

12.01.2016

Combined
Grading

Limits

100.00

100

97.47

95 - 100

69.23

60 - 80

54.50

40 - 60

32.99

25 - 40

20.69

15 - 30

15.08

8 - 22

1.90

0-5

HIGHWAYS DEPARTMENT
QC SUB DIVISION LABORATORY, CUDDALORE
Determination of Water Content - Dry density relation using Light / Heavy Compaction
( As per IS 2720- Part-7 / Part -8 )
Sample No
Name of Work

: 010-S-C
:

Volume of Cylinder in cc :
Weight of Cylinder in grams :

2250
6234

2%

4%

6%

8%

200

400

600

800

11463

11693

11859

11931

5229

5459

5625

5697

2.29 %

4.39 %

6.40 %

8.38 %

2.324

2.426

2.500

2.532

2.272

2.324

2.350

2.336

Volume of water in cc
Weight of Cylinder + Compacted Wet Soil in
grams
Weight of Compacted Wet Soil in grams
Average Moisture Content in %
Wet Density in gram / cc
Dry density in gram / cc

Determination Number

Weight of Container + Dry Soil in grams


Weight of Container in grams
Weight of Water in grams
Weight of Dry Soil in grams
Water content in %
Average

Location
Description of Soil
0 Weight of Soil in grams :

Water to be added in %

Weight of Container + Wet Soil in grams

Cuddalore C&M (H) Division - Package 10 under CRIDP Works 2015-16.

Determination Number

Container Number

Date

398.0

431.0

384.0

403.0

385.0

390.0

423.0

370.0

389.0 364.0

56.0

58.0

61.0

60.0

413.0
393.0

59.0

376.0
350.0

418.0
392.0

55.0

57.0

62.0

8.0

8.0

14.0

14.0

21.0

20.0

26.0

26.0

334.0

365.0

309.0

329.0

305.0

338.0

293.0

330.0

2.40

2.19

4.53

4.26

6.89

5.92

8.87

7.88

2.29 %

4.39 %

6.40 %

8.38 %

Maximum Dry density

2.351 gram/cc

Optimum Moisture Content :

HIGHWAYS DEPARTMENT
QC SUB DIVISION LABORATORY, C

ORE

eavy Compaction

Determination of Water Content - Dry density relation using L


( As per IS 2720- Part-7 / Part -8 )

12.01.2016
Works 2015-16.

Sample No

010-S-C

Maximum Dry Density versus Moi


:
:

ion of Soil
of Soil in grams :

2.360

10000

2.350
5

2.340

10 %

2.330

1000

2.320

11850

2.310

5616

2.300

10.29 %

2.290

Max Dry Density in gm/cc

2.280

2.496

2.270

2.263

2.260
2.250
2.240
5
9
418.0
384.0

2.230

10

2.220
0.0

429.0

1.0

2.0

3.0

34.0

34.0

324.0

337.0

10.49

10.09

5.0

Moisture con

395.0

60.0 58.0

4.0

98% of Max Dry Density :


Soil required for CBR Test :
Requirement of water

10.29 %
Calculated By

2.304

5184
346

re Content :

6.90 %

WAYS DEPARTMENT
N LABORATORY, CUDDALORE

Dry density relation using Light / Heavy Compaction


IS 2720- Part-7 / Part -8 )

Date

12.01.2016

Dry Density versus Moisure Content

.0

3.0

4.0

5.0

6.0

7.0

8.0

9.0

10.0 11.0 12.0

Moisture content in %

gram/cc

OMC:

6.90 %

gram

IMC :

0.23 %

cc

Diff

6.67 %

Checked by

HIGHWAYS RESEARCH STATION


QC SUB DIVISION LABORATORY, CUDDALORE
MIX DESIGN FOR WET MIX MACADAM
DIVISION
SUB DIVN :

Construction & Maintenance, Cuddalore


Construction & Maintenance, Panruti

Name of Work:

Cuddalore C&M (H) Division - Package 10 under CRIDP Works 2015-16.

Sl.no.

Sample No,

Location

DESCRIPTION OF SOIL

P.R.A.Soil Classification

Liquid Limit

Plastic Limit

Plasticity Index

53 mm

45 mm

22.4 mm

11.2 mm

4.75 mm

2.36 mm

600 Micron

75 micron

Job No. 010-S-C / 2013 - 2014


Date:
12.01.2016

711

37.5mm Metal

100

75

712

26.5 mm Metal

100

100

39

713

11.2 mm Metal

100

100

100

88

714

6.7 mm Metal

100

100

100 100

46

Quarry Dust

100

100

100 100

98

80

62

NP

100

97

69

33

21

15

2.351

6.90 %

5
715
MIX DESIGN FOR WMM
37.5mm
Metal

26.5 mm
Metal

11.2 mm Metal

6.7 mm Metal

Quarry
Dust

10 %

34 %

12 %

20 %

24 %

55

1 The test result are based on the samples received from Assistant Divisional Engineer(H), Construction & Maintenance, Panruti
2 The location details are as furnished by the Assistant Divisional Engineer(H), Construction & Maintenance, Panruti

Dry

Density gm/c.c.

Optimum
Moisture
Content(%)

Modified Proctor Test


(IS 2720 - part 8)

Sieve Analyis % passing

Maximum

Index Test

3 As per the grading ( Table - 400 - 13) requirements as specified in the MORT&H specifications, the above mix has been recommended for Wet Mix Macadam
QUALITY ASSURANCE & RESEARCH
QC SUB DIVISION LABORATORY, CUDDALORE
MIX DESIGN FOR WET MIX MACADAM
Name of Work:

Cuddalore C&M (H) Division - Package 10 under CRIDP Works 2015-16.

Name of the Division

(H), Construction & Maintenance, Cuddalore

Job No. 010-S-C / 2013 - 2014

Name of the Sub-Division

Construction & Maintenance, Panruti

Quarry Location
Date:
taken Optimum Moisture
Content

A.Sathanur - Puthukazhani Road Quarry


12.01.2016

Sl No

Material size

Weight of Sample
by %

37.5mm Metal

10 %

26.5 mm Metal

34 %

11.2 mm Metal

12 %

22.4 mm

6.7 mm Metal

20 %

11.2 mm

Quarry Dust

24 %

4.75 mm

6.90 %

Maximum Dry
Density
2.351 gm/cc

Seive designation
53 mm
45 mm

2.36 mm
600 Micron
75 micron

1
2

The tests were conducted on the the samples collected and handed over by Assistant Divisional Engineer(H), Construction & Maintenance, Panruti
The Name of work and location of quarry partculairs are as furnished by the Assistant Divisional Engineer(H), Construction & Maintenance, Panruti

The Assistant Divisional Engineer (H),Construction & Maintenance, Panruti has to ensure that the aggregate used at site should satisfy the physical requ
Specifications Revision - V

QUALITY ASSURANCE & RESEARCH


QC SUB DIVISION LABORATORY, CUDDALORE
MIX DESIGN FOR WET MIX MACADAM
Name of Work:

Cuddalore C&M (H) Division - Package 10 under CRIDP Works 2015-16.

Name of the Division

(H), Construction & Maintenance, Cuddalore

Job No. 010-S-C / 2013 - 2014

Name of the Sub-Division

Construction & Maintenance, Panruti

Quarry Location
Date:
taken Optimum Moisture
Content

A.Sathanur - Puthukazhani Road Quarry


12.01.2016

Sl No

Material size

Weight of Sample
by %

37.5mm Metal

10 %

26.5 mm Metal

34 %

11.2 mm Metal

12 %

22.4 mm

6.7 mm Metal

20 %

11.2 mm

Quarry Dust

24 %

4.75 mm

6.90 %

Maximum Dry
Density
2.351 gm/cc

Seive designation
53 mm
45 mm

2.36 mm
600 Micron
75 micron

1
2

The tests were conducted on the the samples collected and handed over by Assistant Divisional Engineer(H), Construction & Maintenance, Panruti
The Name of work and location of quarry partculairs are as furnished by the Assistant Divisional Engineer(H), Construction & Maintenance, Panruti

The Assistant Divisional Engineer (H),Construction & Maintenance, Panruti has to ensure that the aggregate used at site should satisfy the physical requ
Specifications Revision - V

QUALITY ASSURANCE & RESEARCH


QC SUB DIVISION LABORATORY, CUDDALORE
MIX DESIGN FOR WET MIX MACADAM
Name of Work:

Cuddalore C&M (H) Division - Package 10 under CRIDP Works 2015-16.

Name of the Division

(H), Construction & Maintenance, Cuddalore

Job No. 010-S-C / 2015 - 2016

Name of the Sub-Division

Construction & Maintenance, Panruti

Quarry Location
Date:
taken Optimum Moisture
Content

A.Sathanur - Puthukazhani Road Quarry


12.01.2016

Sl No

Material size

Weight of Sample
by %

37.5mm Metal

10 %

26.5 mm Metal

34 %

11.2 mm Metal

12 %

22.4 mm

6.7 mm Metal

20 %

11.2 mm

Quarry Dust

24 %

4.75 mm

6.90 %

Maximum Dry
Density
2.351 gm/cc

Seive designation
53 mm
45 mm

2.36 mm
600 Micron
75 micron

1
2

The tests were conducted on the the samples collected and handed over by The Assistant Divisional Engineer(H), Construction & Maintenance, Panruti
The Name of work and location of quarry partculairs are as furnished by The Assistant Divisional Engineer(H), Construction & Maintenance, Panruti

The Assistant Divisional Engineer (H),Construction & Maintenance, Panruti has to ensure that the aggregate used at site should satisfy the physical requ
Specifications Revision - V

Assistant Divisional Engineer (H),


Quality Control Sub Division,
Cuddalore

Divisional Engine
Quality Control

Quality Control Sub Division,


Cuddalore

Villupuram

Remarks

1.396

1.365

1.329

1.297

1.555

Required C.B.R.

Soaking

Loose density in g/cc

P.D.&OMC after 4 days

C.B.R.@Modified

013 - 2014

Mix Macadam

% Passing
Actual

Allowable

100

100

97.47

95 - 100

69.23

60 - 80

54.50

40 - 60

32.99

25 - 40

20.69

15 - 30

15.08

8 - 22

1.90

0-5

physical requirement as laid down in MoRT&H

% Passing
Actual

Allowable

100

100

97.47

95 - 100

69.23

60 - 80

54.50

40 - 60

32.99

25 - 40

20.69

15 - 30

15.08

8 - 22

1.90

0-5

physical requirement as laid down in MoRT&H

% Passing
Actual

Allowable

100

100

97.47

95 - 100

69.23

60 - 80

54.50

40 - 60

32.99

25 - 40

20.69

15 - 30

15.08

8 - 22

1.90

0-5

physical requirement as laid down in MoRT&H

sional Engineer (H),

ality Control Division,

upuram

HIGHWAYS DEPARTMENT
QUALITY ASSURANCE AND RESEARCH
From:

To:
Thirumathi. R.Meena B.E.,
Assistant Chief Engineer (H)
Regional Laboratory, Thanjavur
Panagal Building Complex
Thanjavur

The Chief Engineer (H)


Quality Assurance Research,
Highways research Station
Guindy,
Chennai.25

Letter No : RLT/ Job.No. 010-S-C / 2013 - 2014/ dt: 12.01.2016

Sir
Sub :

Regional Laboratory Thanjavur - Trichy Laboratory - Cuddalore C&M (H) Division


under CRIDP Works 2015-16. - Design of WMM - Evolved - Approval requested - r

Ref:

Assistant Divisional Engineer(H), Construction & Maintenance, Panruti Letter


2013 -14 /dated 12.08.2013

This office letter No.Regional Lab. DD / 062 S/ 2013 - 14 dated : 14.08.2013


~*~*~*~*~

I submit that, Assistant Divisional Engineer(H), Construction & Maintenance, Panrut


materials and requested to evolve Job Mix Formula for WMM as per MORTH specification for the work.

Further, I Submit that the Assistant Divisional Engineer(H), Construction & Maintenance
furnished the test charges for evolving Job Mix Formula in the form of Demand Draft for Rs.6798 ( DD
drawn at Indian Bank, Thiruthuraipoondi, Dated 13.03.2013), and the same had been submitted to the Chie
QA&R, Chennai vide this office letter in the reference 2nd cited.

Job Mix Formula for Wet Mix macadam is evolved and the test results are submitted
approval.
I request that the approval for the same may kindly be accorded and communicated early.
Encl:

As above

Assistant Chief Enginee


Regional Laborator
Thanjavur.

HIGHWAYS DEPARTMENT
QUALITY ASSURANCE AND RESEARCH
From:

To:
Thirumathi. R.Meena B.E.,
Assistant Chief Engineer (H)
Regional Laboratory, Thanjavur
Panagal Building Complex
Thanjavur

The Chief Engineer (H)


Quality Assurance Research,
Highways research Station
Guindy,
Chennai.25

Letter No : RLT/ Job.No. 010-S-C / 2012 - 2013/ dt: 09.04.2013


Sir
Sub :

Regional Laboratory Thanjavur - Cuddalore C&M (H) Division - Package 10 under


2015-16. - Design of WMM - Evolved - Approval requested - reg.

Ref:

Assistant Divisional Engineer(H), Construction & Maintenance, Panruti Letter


2013 -14 /dated 12.08.2013

This office letter No.Regional Lab. DD / 062 S/ 2013 - 14 dated : 14.08.2013


~*~*~*~*~

I submit that, Assistant Divisional Engineer(H), Construction & Maintenance, Panrut


materials and requested to evolve Job Mix Formula for WMM as per MORTH specification for the work.

Further, I Submit that the Assistant Divisional Engineer(H), Construction & Maintenance
furnished the test charges for evolving Job Mix Formula in the form of Demand Draft for Rs.6798 ( DD
drawn at Indian Bank, Thiruthuraipoondi, Dated 13.03.2013), and the same had been submitted to the Chie
QA&R, Chennai vide this office letter in the reference 2nd cited.

Job Mix Formula for Wet Mix macadam is evolved and the test results are submitted
approval.
I request that the approval for the same may kindly be accorded and communicated early.
Encl:

As above

Assistant Chief Enginee


Regional Laborator
Thanjavur.

Office of the Chief Engineer (

Quality Assurance & Researc


Chennai - 600 025.

Memo No.
Sub:

Ref:

/RLThanjavur/ Job.No. 010-S-C / 2013 - 2014/ dt: 12.01.

Highways - Quality Assurance & Research, Regional Laboratory Thanjavur - Tric


-Construction & Maintenance, Cuddalore - Cuddalore C&M (H) Division - Package 10
Works 2015-16. - Design of WMM - Evolved - Comunicated reg.

Assistant Divisional Engineer(H), Construction & Maintenance, Panruti Letter


2013 -14 /dated 12.08.2013

Assistant Chief Engineer(H),QA&R, Regional Laboratory, Thanjavur Lette


Job.No. 010-S-C / 2013 - 2014/ dt: 12.01.2016
~*~*~*~*~*~*~*~

With reference to the above the job mix formula for Wet Mix Macadam for the wor
from SL to IL and IL to DL, Rebuilding including reconstruction of Minor bridge in respect o
in Thiruvaiyaru (H) C&M Sub division have been evolved and the report on the same is enclose

AE(H)
RLT
Encl:

ACE(H)
RLT

ACE

DCE - II
(Soils)

Report - 1 No

To
The Divisional Engineer (H)
Construction & Maintenance, Cuddalore
Copy to Assistant Chief Engineer(H), QA&R, Regional Laboratory, Thanjavur

JCE

O.N Submitted,
Sub:

Ref:

Soils Laboratory, HRS

Highways - Quality Assurance & Research, Regional Laboratory Thanjavur - C


Maintenance, Cuddalore
- Widening from SL to IL and IL to DL, Rebuildin
reconstruction of Minor bridge in respect of SH and MDR in Thiruvaiyaru (H) C&M
Design of WMM - Evolved - Approval requested - reg.

Assistant Divisional Engineer(H), Construction & Maintenance, Panruti Letter


2013 -14 /dated 12.08.2013

Assistant Chief Engineer(H),QA&R, Regional Laboratory, Thanjavur Lette


Job.No. 010-S-C / 2012 - 2013/ dt: 09.04.2013
~*~*~*~*~*~*~*~

The Assistant Chief Engineer(H), Regional Laboratory, has sent the report for Granullar
Wet Mix Macadam for the work of Widening from SL to IL and IL to DL, Rebuilding including reconstru
bridge in respect of SH and MDR in Thiruvaiyaru (H) C&M Sub division

Test Charges of Rs.6798 /- was paid vide reference 1 ( DD No.824208, dated 13.03.2013 d
Bank, Thiruthuraipoondi) .

The WMM materials have been tested at Regional Laboratory, Thanjavur and the job mix t
been sent to Soils Laboratory. The same has been received at Soils Laboratory on

The Job mix test report for Wet Mix Macadam is submitted for perusal and approval.

Subject to approval, a draft memo addressed to Divisional Engineer, Construction &


Cuddalore Division, is submitted for perusal and approval

AE-I

ACE-1

DCE - II

JCE(QA&R)

Office of the Chief Engineer (

Quality Assurance & Researc


Chennai - 600 025.

Memo No.
Sub:

Ref:

/RLThanjavur/ Job.No. 010-S-C / 2013 - 2014 / dt: 12.01.

Highways - Quality Assurance & Research, Regional Laboratory Thanjavur - C


Maintenance, Cuddalore - Cuddalore C&M (H) Division - Package 10 under CRIDP
16. - Design of WMM - Evolved - Comunicated reg.

Assistant Divisional Engineer(H), Construction & Maintenance, Panruti Letter


2013 -14 /dated 12.08.2013

Assistant Chief Engineer(H),QA&R, Regional Laboratory, Thanjavur Lette


Job.No. 010-S-C / 2012 - 2013/ dt: 09.04.2013
~*~*~*~*~*~*~*~

With reference to the above the job mix formula for Wet Mix Macadam for the wor
from SL to IL and IL to DL, Rebuilding including reconstruction of Minor bridge in respect o
in Thiruvaiyaru (H) C&M Sub division have been evolved and the report on the same is enclose

AE -1

ACE

DCE - II
(Soils)

Encl:

Report - 1 No

To
The Divisional Engineer (H)
Construction & Maintenance, Cuddalore
Copy to Assistant Chief Engineer(H), QA&R, Regional Laboratory, Thanjavur

JCE

Office of the Chief Engineer (

Quality Assurance & Researc


Chennai - 600 025.

Memo No.
Sub:

Ref:

/RLThanjavur/ Job.No. 010-S-C / 2013 - 2014/ dt: 12.01.

Highways - Quality Assurance & Research, Regional Laboratory Thanjavur - C


Maintenance, Cuddalore - Cuddalore C&M (H) Division - Package 10 under CRIDP
16. - Design of WMM - Evolved - Comunicated reg.

Assistant Divisional Engineer(H), Construction & Maintenance, Panruti Letter


2013 -14 /dated 12.08.2013

Assistant Chief Engineer(H),QA&R, Regional Laboratory, Thanjavur Lette


Job.No. 010-S-C / 2013 - 2014/ dt: 12.01.2016

~*~*~*~*~*~*~*~

With reference to the above the job mix formula for Wet Mix Macadam for the wor
from SL to IL and IL to DL, Rebuilding including reconstruction of Minor bridge in respect o
in Thiruvaiyaru (H) C&M Sub division have been evolved and the report on the same is enclose

For Chief Engineer(H),


Quality Assurance & Reasearch
Guindy, Chennai - 25

Encl:

Report - 1 No

To
The Divisional Engineer (H)
Construction & Maintenance, Cuddalore
Copy to Assistant Chief Engineer(H), QA&R, Regional Laboratory, Thanjavur

Engineer (H)
ssurance Research,
research Station

4/ dt: 12.01.2016

alore C&M (H) Division - Package 10


Approval requested - reg.

ntenance, Panruti Letter No. AE 001 /


- 14 dated : 14.08.2013

& Maintenance, Panruti has sent the


ecification for the work.

struction & Maintenance, Panruti have


Draft for Rs.6798 ( DD No. 824208,
n submitted to the Chief Engineer(H),

t results are submitted herewith for

d communicated early.

Assistant Chief Engineer (H)


Regional Laboratory,
Thanjavur.

Engineer (H)
ssurance Research,
research Station

13/ dt: 09.04.2013

ion - Package 10 under CRIDP Works


- reg.

ntenance, Panruti Letter No. AE 001 /


- 14 dated : 14.08.2013

& Maintenance, Panruti has sent the


ecification for the work.

struction & Maintenance, Panruti have


Draft for Rs.6798 ( DD No. 824208,
n submitted to the Chief Engineer(H),

t results are submitted herewith for

d communicated early.

Assistant Chief Engineer (H)


Regional Laboratory,
Thanjavur.

of the Chief Engineer (H),

y Assurance & Research,

hennai - 600 025.

- 2014/ dt: 12.01.2016

atory Thanjavur - Trichy Laboratory


H) Division - Package 10 under CRIDP
reg.

ntenance, Panruti Letter No. AE 001 /

atory, Thanjavur Letter No : RLT/

ix Macadam for the work of Widening


inor bridge in respect of SH and MDR
rt on the same is enclosed herewith.

JCE

CE(H)
QA&R

Soils Laboratory, HRS

oratory Thanjavur - Construction &


nd IL to DL, Rebuilding including
in Thiruvaiyaru (H) C&M Sub division -

ntenance, Panruti Letter No. AE 001 /

atory, Thanjavur Letter No : RLT/

the report for Granullar sub base and


ng including reconstruction of Minor

208, dated 13.03.2013 drawn at Indian

javur and the job mix test report has

usal and approval.

ngineer, Construction & Maintenance,

CE(QA&R)

of the Chief Engineer (H),

y Assurance & Research,

hennai - 600 025.

- 2014 / dt: 12.01.2016

oratory Thanjavur - Construction &


Package 10 under CRIDP Works 2015-

ntenance, Panruti Letter No. AE 001 /

atory, Thanjavur Letter No : RLT/

ix Macadam for the work of Widening


inor bridge in respect of SH and MDR
rt on the same is enclosed herewith.

JCE

CE(H)
QA&R

of the Chief Engineer (H),

y Assurance & Research,

hennai - 600 025.

- 2014/ dt: 12.01.2016

oratory Thanjavur - Construction &


Package 10 under CRIDP Works 2015-

ntenance, Panruti Letter No. AE 001 /

atory, Thanjavur Letter No : RLT/

ix Macadam for the work of Widening


inor bridge in respect of SH and MDR
rt on the same is enclosed herewith.

hief Engineer(H),
ssurance & Reasearch
dy, Chennai - 25