SHORT-TERM PLANNING
VIEW
Being the best team that creates business value.
MISSION
Generate operational plans and flexible undermined, maximizing profitability
and contributing to the optimization of the processes of mine and plant.
MINE CUAJONE
Features pit:
- Pit Length (N - S): 2.7km.
- Pit width (E -W): 2.5km.
- Elevation (m): 2.950 - 3.850
PRODUCTION UNIT
MINE CUAJONE
Design:
- Inter-ramps angle: 38 - 49
- Gradient ramps: 10%
- Bank height: 15 m.
LOAD:
07 BLADES ELECTRICAL:
02 P & H 4100A, 56 yd3.
01 P & H 2800XPB, 42 yd3.
Bucyrus 495BII 01, 56 and d3.
495 Bucyrus 01 HR, 73 yd3.
495 Bucyrus 01 HR, 60 yd3.
Pala 01 P & H 4100XPC, 74 yd3.
02 loaders:
01 Le Tourneau 1800, 33 yd3.
01 Le Tourneau 2350, 50 yd3.
51 MINERS VOLQUETES:
10 Komatsu 830E, 218 t (240 ton).
06 Caterpillar 793C, 793D, 231 t (255
ton).
15 Komatsu 930E, 290 t (320 ton).
18 Caterpillar 797F, 363 t (400 ton).
02 Komatsu 930E-4SE, 290 t (320
ton).
COMMUNICATION:
Production Control (Control Mina)
Tipper
-Despacho: MineOps System 2008 upgrade installed 2013
-Despacho Station: centralized traffic control (CTC) 2005 upgrade.
Held in June last year, targets are set: production, law, fine, sterile deposits and
sizing of fleet; course which will serve to carry out the following plans undermined.
cuts are made monthly.
DAILY PLAN
Made every day, they are presented in turn cuts the blades that provide mineral. In
this mining plan polygons which are charged to JMineOPS system to adequately
monitor the shipment of material to their respective destination is.
DRILLING PLAN
The drilling plan is essential to the fulfillment of the plans undermined as this plan
depends on the availability of material that may be triggered undermined by the
blades.
GEOLOGA
GEOTECNIA
SAMPLING BLASTHOLES
Blastholes sampling ultimate goal is to improve the quality of information model
that the daily and weekly plans are made undermined. It is carried out by the
contract MINCOSER SAC.
INVENTORY MINESIGHT" .TXT format folder whose name is the number and
project level.
The same procedure applies to polygons shipping, selecting the holes that are in
and exporting them to the "DRILLS POSTED MINESIGHT" .TXT format folder
whose name is the number and project level.
Comparison Blastholes
Excel reports sent sampled and opens holes and create a new tab where we can
make the comparison. We open each of the exported files from Minesight and
paste in the new Excel spreadsheet. Use conditional formatting to duplicate and
painted both columns means that both
tags digitized and exported holes are equal verifying that good control of the
sampling was carried.
Furthermore, in the case that white would blastholes means:
Exported column blastholes the MineSight.- There was error exporting drills
MineSigth or there was an error in the planes that delivered the Muestrero and in
any case must be corrected.
In the column copied blastholes There was fingering inicial.- error scanning labels
with the gun and these should be checked again.
This process is the same for both sampled for drills holes as sent.