Академический Документы
Профессиональный Документы
Культура Документы
Project:
Date:
Contractor:
No.:
Building / item(s)
According to Drawing No.
Date:
Accept
Time:
No
N.A
Remark
Inspection work
Purity (do not stick dust, moss, oil)
Even (do not have raveling, asperity )
Wetness (watering up the wall before plastering)
Roughness (in compliance with each type of
structure)
Plaster coat (slump)
Thickness of plastering
Solid of wall
Your submission for approval is subject to following conditions:
Approved
Note:
Witnessed by Owner
Name:
Position:
Date:
Approved by Consultant
Royal HaskoningDHV
Name:
Position:
Date:
Requested by Contractor
Name:
Position:
Date:
Code: TEC-00-16-A2