JOB LIST MRS 1500

JUNE
29

30

MON

TUE

WED

THU

FRI

SAT

SUN

STAGE 2 (PAINTING)
8

WIRE BRUSH AND POLISH WITH SAND PAPER

DO FINAL FINISHING (CEMENT PLASTER)

10

UNDERCOAT

Firdaus

11

RUB WITH SAND PAPER TO GET SMOOTH SURFACE

Nazrin

12

PAINTING

Firdaus

CUT AND WELDING PIPE


STAGE 3 (INSTALLATION MAJOR ITEM)
13

INSTALL 2 INLET FILTER

Nazrin

14

INSTALL FLOWMETER(CNG050 MICRO MOTION)

Nazrin

15

INSTALL 3 HEAT EXCHANGER

16

INSTALL PULSATION BOTTLE

Firdaus

17

INSTALL 1ST STAGE REGULATOR (TESCOM) ASSEMBLY

Firdaus

18

INSTALL 2ND STAGE REGULATOR (TESCOM) ASSEMBLY

19

INSTALL SOLENOID VALVE AND PILOT REGULATOR

20

INSTALL 3RD STAGE REGULATOR (627 FISHER 1)

21

INSTALL EXZOS PIPE

22

INSTALL SAFETY VALVE 1ST STAGE 2900 PSI

23

INSTALL SAFETY VALVE 2ND STAGE 750 PSI

24

INSTALL SAFETY VALVE 3RD STAGE 150 PSI

25

Rofaiza

Nazrin

INSTALL TEMPERATURE INDICATOR AT PULSATION BOTTLE

26

INSTALL ACTUATOR BALL VALVE AT INLET

27

INSTALL ACTUATOR BALL VALVE AT BYPASS

28

INSTALL PRESSURE INDICATOR 6000 PSI AT HIGH PRESSURE H.E.

29

INSTALL PRESSURE INDICATOR 140 BAR AT PULSATION BOTTLE

30

INSTALL NEEDLE VALVE AT FILTER

31

INSTALL OUTLET BALL VALVE

32

INSTALL TEMPERATURE GAUGE AT HEAT EXCHANGER

33

INSTALL NEEDLE VALVE AT PULSATION BOTTLE

34

INSTALL DRAIN VALVE FOR INLET FILTER (VENTING LINE)

35

INSTALL DRAIN VALVE FOR PULSATION BOTTLE (VENTING LINE)

36

INSTALL Y-STRAINER

37

INSTALL PUMP/MOTOR

38

INSTALL HEATER

39

INSTALL THERMOCOUPLE

40

INSTALL FLOAT SWITCH

41

INSTALL GATE VALVE

42

INSTALL HOT WATER TANK

43

INSTALL BALL VALVE (HWS)

44

INSTALL INLET AND OUTLET WATER PIPE COOLER 1

45

INSTALL INLET AND OUTLET WATER PIPE COOLER 2

46

INSTALL INLET AND OUTLET WATER PIPE COOLER 3

47

INSTALL DECANT PANEL COMPONENT

Nazrin
Firdaus

Nazrin
Firdaus
Rofaiza
Rofaiza

48

STAGE 4 (BENDING TUBING)

49

BEND AND INSTALL TUBING 1 INLET BYPASS


BEND AND INSTALL TUBING 1 FROM FILTER TO FLOW METER

50

BEND AND INSTALL TUBING 1 FROM FILTER TO FILTER

51

BEND AND INSTALL TUBING 1 FROM FLOW METER 1ST REGULATOR

52

BEND AND INSTALL TUBING 1 FROM FLOW METER TO BYPASS

53

BEND AND INSTALL TUBING 1" FROM BYPASS TO OUTLET LINE

54

BEND TUBING FROM OUTLET LOW PRESSURE H.E. TO 3RD REGULATOR

55

BEND TUBING 1/2" FROM HIGH PRESSURE H.E. TO SAFETY VALVE 2900PSI

56

BEND TUBING 1/2" FROM LOW PRESSURE H.E. TO SAFETY VALVE 1000PSI

57

BEND TUBING 1/2" FROM PULSATION BOTTLE TO SAFETY VALVE 150PSI

58

BEND TUBING 1/4" FROM DRAIN VALVE FILTER TO EXZOS PIPE

59

BEND TUBING 1/4" FROM VENT VALVE 1ST STAGE REGULATOR TO EXZOS PIPE

60

BEND TUBING 1/4" FROM VENT VALVE 2ND STAGE REGULATOR TO EXZOS PIPE

61

BEND TUBING 1/4" FROM VENT VALVE 3ND STAGE REGULATOR TO EXZOS PIPE

62

STAGE 5 (JUNCTION BOX & ELECTRICAL)

63

INSTALL JUNCTION BOX C/W CABLE GLANDS


INSTALL COIL FOR SOLENOID VALVE

64

INSTALL ESD PUSH BUTTON

65

FABRICATE AND INSTALL TRUNKING CABLE

66

LAY CABLE FROM ESD PUSH BUTTON TO JUNCTION BOX

67

LAY CABLE FROM HEATER TO CONTROL PANEL

68

LAY CABLE FROM THERMOCOUPLE TO CONTROL PANEL

69

LAY CABLE FROM FLOAT TO CONTROL PANEL

70

INSTALL CONTROL PANEL

71

LAY CABLE POWER FROM FLOWMETER TO JUNCTION BOX

72

LAY CABLE SIGNAL FROM FLOWMETER TO JUNCTION BOX

73

TERMINATE CABLES INSIDE JUNCTION BOX

74

STAGE 5 (FAT)

75

SETUP & FAT - UNIT 1

76

STAGE 5 (CRATE) & FUMIGATE


UNIT 1

77

STAGE 5 (PDI)
UNIT 1

78

STAGE 5 (SHIPMENT)
UNIT 1

79
80

Firdaus

Nazrin

Nazrin

Nazrin