HIGHLIGHTS
REVISION NO. 37 May 01/03
Pages which have been revised are outlined below, together with the Highlights of the
Revision
-------------------------------------------------------------------------------------CH/SE/SU C
REASON FOR CHANGE
EFFECTIVITY
PAGES
-------------------------------------------------------------------------------------CHAPTER 10
__________

L.E.P. 1- 1 REVISED TO REFLECT THIS REVISION INDICATING


NEW,REVISED, AND/OR DELETED PAGES
10-30-00
CORRECTION/ADDITION/AMPLIFICATION
605- 606, DELETED OPRATIONAL TEST OF CARGO-COMPARTEMENT
608- 609, VENTILATION SYSTEM
620- 633
TITLE OF TASK(S) DATA UPDATED

ALL
ALL

10-HIGHLIGHTS Page
REVISION NO. 37
MXA

1 of
1
May 01/03

CHAPTER 10
__________
PARKING, MOORING, STORAGE & RETURN TO SERVIC
LIST OF EFFECTIVE PAGES
_______________________
N, R or D indicates pages which are New, Revised or Deleted respectively
Remove and insert the affected pages and complete the Record of Revisions and
the Record of Temporary Revisions as necessary
CH/SE/SU

PAGE

DATE

RECORD
OF TEMP.
REVISION
L.E.P.
T. of C.
T. of C.

R 1- 1 May01/03
1 May01/02
2 Nov01/01

10-00-00

1 Feb01/96

10-10-00

1 Feb01/96

10-11-00
10-11-00
10-11-00
10-11-00
10-11-00
10-11-00
10-11-00
10-11-00
10-11-00
10-11-00
10-11-00
10-11-00
10-11-00
10-11-00
10-11-00
10-11-00
10-11-00
10-11-00
10-11-00
10-11-00
10-11-00
10-11-00
10-11-00
10-11-00
10-11-00
10-11-00
10-11-00
10-11-00
10-11-00

201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
229

May01/00
May01/00
May01/00
Feb01/98
May01/00
Feb01/97
Feb01/98
Feb01/98
May01/00
May01/00
May01/02
Nov01/97
Nov01/97
May01/02
May01/02
May01/02
May01/02
May01/02
May01/02
May01/02
May01/02
May01/00
Nov01/97
Nov01/97
May01/00
May01/02
Nov01/97
Nov01/97
May01/02

CH/SE/SU

PAGE

DATE

10-12-00
10-12-00
10-12-00
10-12-00
10-12-00
10-12-00
10-12-00
10-12-00
10-12-00
10-12-00
10-12-00
10-12-00
10-12-00
10-12-00
10-12-00
10-12-00
10-12-00
10-12-00
10-12-00
10-12-00
10-12-00
10-12-00
10-12-00
10-12-00
10-12-00
10-12-00
10-12-00
10-12-00
10-12-00
10-12-00
10-12-00
10-12-00
10-12-00
10-12-00
10-12-00
10-12-00

201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
601
602
603
604
605
606
607
608
609
610
611
612

May01/02
May01/01
May01/02
May01/02
May01/01
May01/01
May01/02
May01/01
Nov01/01
Nov01/01
Nov01/02
Nov01/02
May01/02
May01/02
Nov01/02
May01/02
May01/01
May01/01
May01/01
May01/01
May01/02
May01/02
May01/02
May01/01
Feb01/96
Feb01/96
Feb01/96
May01/99
May01/02
May01/02
May01/02
May01/02
May01/02
May01/02
Feb01/96
Feb01/96

10-20-00
10-20-00
10-20-00
10-20-00
10-20-00

201
202
203
204
205

Feb01/96
Nov01/02
Nov01/02
Feb01/96
Feb01/96

CH/SE/SU

PAGE

DATE

10-20-00
10-20-00

206 Feb01/96
207 Feb01/96

10-30-00
10-30-00
10-30-00
10-30-00
10-30-00
10-30-00
10-30-00
10-30-00
10-30-00
10-30-00
10-30-00
10-30-00
10-30-00
10-30-00
10-30-00
10-30-00
10-30-00
10-30-00
10-30-00
10-30-00
10-30-00
10-30-00
10-30-00
10-30-00
10-30-00
10-30-00
10-30-00
10-30-00
10-30-00
10-30-00
10-30-00
10-30-00
10-30-00

601
602
603
604
605
606
607
608
609
610
611
612
613
614
615
616
617
618
619
620
621
622
623
624
625
626
627
628
629
630
631
632
633

R
R
R
R

R
R
R
R
R
R
R
R
R
R
R
R
R
R

May01/02
May01/02
May01/02
May01/02
May01/03
May01/03
May01/02
May01/03
May01/03
May01/02
May01/02
May01/02
May01/02
May01/02
May01/02
May01/02
May01/02
May01/02
May01/02
May01/03
May01/03
May01/03
May01/03
May01/03
May01/03
May01/03
May01/03
May01/03
May01/03
May01/03
May01/03
May01/03
May01/03

10-L.E.P. Page
1
May 01/03
MXA

CHAPTER 10
__________
PARKING, MOORING, STORAGE & RETURN TO SERVICE
TABLE OF CONTENTS
_________________
_______
SUBJECT
PARKING, MOORING, STORAGE & RETURN TO
_____________________________________
SERVICE - GENERAL
_________________
DESCRIPTION AND OPERATION
General

________
CH/SE/SU
10-00-00

_______________
PARKING/STORAGE
DESCRIPTION AND OPERATION
General

10-10-00

PARKING
MAINTENANCE PRACTICES
Parking Procedure (Not More Than 2
Days)
Return to operation (Parking of
Not More Than 2 days)
Parking Procedure (Not More Than
12 Weeks) - Aircraft in
Flight-Ready Condition
Periodic Ground Check (At 7-Day
Intervals) - Parking Not More Than
12 Weeks (Aircraft in Flight-Ready
Condition)
Periodic Ground Check (At 15-Day
Intervals) - Parking Not More Than
12 weeks (Aircraft in Flight-Ready
Condition)
Return to Operation (Parking of
Not More Than 12 Weeks - Aircraft
in Flight-Ready Condition)

10-11-00

STORAGE
MAINTENANCE PRACTICES
Storage Procedure (not more than 1
month)
Storage procedure (up to 2 years)

10-12-00

STORAGE
INSPECTION/CHECK
Inspection Checklist: Weekly Check
or Check after the Aircraft is in
Wind/Wind gusts of More than 35
Knots (65 km per Hour)
Inspection Checklist: 15-days
Check
Inspection Checklist: 1-month

10-12-00

C
_

PAGE ___________
____
EFFECTIVITY
1
1

ALL
ALL

1
1

ALL
ALL

201
201

ALL
ALL

210

ALL

213

ALL

219

ALL

220

ALL

226

ALL

201
201

ALL
ALL

210

ALL

601
601

ALL
ALL

602

ALL

604

ALL

10-CONTENTS
R
MXA

Page 1
May 01/02

CHAPTER 10
__________
PARKING, MOORING, STORAGE & RETURN TO SERVICE
TABLE OF CONTENTS
_________________
_______
SUBJECT
Check
Inspection Checklist: 3-months
Check

CH/SE/SU
________

_______
MOORING
MAINTENANCE PRACTICES
Mooring of the Aircraft

10-20-00

_________________
RETURN
TO SERVICE
INSPECTION/CHECK
Return to Service (Storage Period
Up to 2 years)
Return to Service (Storage Period
not More than 1 month)

10-30-00

C
_

PAGE ___________
____
EFFECTIVITY
608

ALL

201
201

ALL
ALL

601
601

ALL
ALL

620

ALL

10-CONTENTS
R
MXA

Page 2
Nov 01/01

_______________________________________________________
PARKING,
MOORING, STORAGE & RETURN TO SERVICE - GENERAL
DESCRIPTION AND OPERATION
_________________________
1. _______
General
This chapter covers:
- Parking/Storage (Ref. ATA 10-10),
- Mooring (Ref. ATA 10-20),
- Return to Service (Ref. ATA 10-30).

CDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDE

FEFF :
ALL
F 10-00-00
F
F
F
FMXA

F
F

Page 1
Feb 01/96

PARKING/STORAGE - DESCRIPTION AND OPERATION


___________________________________________
1. _______
General
This section provides information related to the parking and storage of the
aircraft.
It is divided as follows:
- PARKING (Ref. ATA 10-11),
- STORAGE (Ref. ATA 10-12).

CDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDE

FEFF :
ALL
F 10-10-00
F
F
F
FMXA

F
F

Page 1
Feb 01/96

PARKING - MAINTENANCE PRACTICES


_______________________________
TASK 10-11-00-555-001
Parking Procedure (Not More Than 2 Days)
R
1. __________________
Reason for the Job
This procedure gives the preservation steps for a parking period of not more
than 2 days
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific
IAE1N20008
IAE1N20400
98A10001005000
98A10001013000
98A10001500000
98D10003001000
98D10003003000
98D10007512000
98D10007513000
98D10103500001

2
2
3
2
3
2
3
1
1
2

wheel chocks
COVER, COMMON NOZZLE
COVER-INLET COWL
COVER - SLIP-ON PITOT PROBE
COVER - SLIP-ON, TOTAL TEMPERATURE SENSOR
COVER - SLIP-ON, ANGLE OF ATTACK SENSOR
COVER-INLET COWL ENGINE
COVER - SLIP-ON, AOA
COVER - EXHAUST DUCT, APU
COVER - OILCOOLER OUTLET, APU
COVER-STATIC PROBE

R
B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------05-57-00-200-001
10-11-00-554-001
10-20-00-556-001
12-31-21-660-001
12-31-24-660-001
12-31-25-660-001
12-31-27-660-001
12-31-28-660-001

Aircraft Stability
Return to operation (Parking of Not More Than 2 days)
Mooring of the Aircraft
Cold Weather Maintenance - Air Conditioning
Cold Weather Maintenance - Electrical Power
Cold Weather Maintenance - Equipment/Furnishings
Cold Weather Maintenance - Flight Controls
Cold Weather Maintenance - Fuel

CDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDE

FEFF :
ALL
F 10-11-00
F
F
F
FMXA

F
F

Page 201
May 01/00

------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------12-31-31-660-001
12-31-32-660-001
12-31-35-660-001
12-31-38-660-001
12-31-49-660-001
12-31-51-660-001
12-31-52-660-001
12-31-71-660-001
12-34-24-869-002
24-41-00-861-002
24-41-00-862-002
32-00-00-481-001
10-11-00-991-001-A
10-11-00-991-006
10-11-00-991-004
10-11-00-991-007

Cold Weather Maintenance - Indicating/Recording


systems and Navigation
Cold Weather Maintenance - Landing Gear
Cold Weather Maintenance - Oxygen System
Cold Weather Maintenance - Water/Waste
Cold Weather Maintenance - Auxiliary Power Unit
Cold Weather Maintenance - Structure
Cold Weather Maintenance - Doors
Cold Weather Maintenance - Power Plant
Aircraft Grounding for the Maintenance Operations
Energize the Aircraft Electrical Circuits from the
External Power
De-energize the Aircraft Electrical Circuits Supplied
from the External Power
Installation of the Safety Devices on the Landing
Gears
Fig. 201
Fig. 202
Fig. 203
Fig. 204

3. __________
Job Set-up
Subtask 10-11-00-860-051
A. General.
(1) This section gives the data for the parking of the aircraft in normal
weather conditions. Also :
- If the aircraft is parked in high wind conditions, check the
aircraft stability (Ref. TASK 05-57-00-200-001) and moor the
aircraft if necessary (Ref. TASK 10-20-00-556-001).
- If the aircraft is parked in cold weather conditions, do the cold
weather maintenance procedures: (Ref. TASK 12-31-21-660-001),
(Ref. TASK 12-31-24-660-001), (Ref. TASK 12-31-25-660-001),
(Ref. TASK 12-31-27-660-001), (Ref. TASK 12-31-28-660-001),
(Ref. TASK 12-31-31-660-001), (Ref. TASK 12-31-32-660-001),
(Ref. TASK 12-31-35-660-001), (Ref. TASK 12-31-38-660-001),
(Ref. TASK 12-31-49-660-001), (Ref. TASK 12-31-51-660-001),
(Ref. TASK 12-31-52-660-001), (Ref. TASK 12-31-71-660-001).

CDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDE

FEFF :
ALL
F 10-11-00
F
F
R F
FMXA

F
F

Page 202
May 01/00

4. Procedure
_________
Subtask 10-11-00-481-050
A. Safety Precautions
(1) Park the aircraft on a flat surface. Make sure that the wheel of the
nose landing gear is on the aircraft axis and the aircraft points
into the wind.
(2) Install the safety devices on the landing gears (Ref. TASK 32-00-00481-001).
(3) Make sure that the flaps, the slats, the spoilers, the speed brakes
and the thrust reversers are retracted.
(4) Make sure that the THS is set to neutral.
(5) Put the wheel chocks in front of and behind the wheels of the main
and the nose landing gears.
NOTE : The wheel chocks on the nose landing gear and the parking
____
brake give more safety in bad weather.
(6) Ground the aircraft (Ref. TASK 12-34-24-869-002).
R

Subtask 10-11-00-555-052-B

B. Protection of the Aircraft

R
R
R
R
R
R
R
R

WARNING : USE ONLY THE SPECIFIED TOOLS FOR THE PROTECTION OF THE
_______
AIRCRAFT. DO NOT APPLY ADHESIVE TAPE ON THE PROBES, DUCTS,
SENSORS (STATIC, PITOT, TAT, AOA).
THE SPECIFIED TOOLS :
- GIVE THE CORRECT PROTECTION TO THE AIRCRAFT EQUIPMENT,
- ARE EASY TO SEE FROM THE GROUND. MAKE AN ENTRY IN THE
AIRCRAFT LOG BOOK OR ATTACH A TAG ON THE CAPTAIN SIDE STICK TO
TELL THE CREW THAT PROTECTION COVERS/DEVICES ARE INSTALLED.

R
R

(1) Installation of the Protection Devices on the fuselage


(Ref. Fig. 201/TASK 10-11-00-991-001-A)

R
R
R

(a) Protection of the 2 total temperature sensors


- Put the COVER - SLIP-ON, TOTAL TEMPERATURE SENSOR
(98A10001013000) in position.

CDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDE

FEFF :
ALL
F 10-11-00
F
F
F
FMXA

F
F

Page 203
May 01/00

Protective Equipment
Figure 201/TASK 10-11-00-991-001-A
CDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDE

FEFF :
ALL
F 10-11-00
F
F
R F
FMXA

F
F

Page 204
Feb 01/98

R
R
R

(b) Protection of the 3 pitot probes


- Put the COVER - SLIP-ON PITOT PROBE (98A10001005000) in
position.

R
R
R
R

(c) Protection of the 3 angle-of-attack sensors


- Put the COVER - SLIP-ON, ANGLE OF ATTACK SENSOR
(98A10001500000) or COVER - SLIP-ON, AOA (98D10003003000) in
position.

R
R

(d) Protection of the 6 static probes


- Put the COVER-STATIC PROBE (98D10103500001) in position.

R
R

(2) Installation of the Protection Devices on the APU area


(Ref. Fig. 202/TASK 10-11-00-991-006)

R
R

(a) Protection of the APU exhaust duct


- Put the COVER - EXHAUST DUCT, APU (98D10007512000) in position.

R
R
R

(b) Protection of the outlet duct of the APU oil cooler


- Put the COVER - OILCOOLER OUTLET, APU (98D10007513000) in
position.

R
R

(3) Installation of the Protection Devices on the engines


(Ref. Fig. 203/TASK 10-11-00-991-004, 204/TASK 10-11-00-991-007)

R
R
R

(a) Protection of the engine air intakes


- Put the COVER-INLET COWL (IAE1N20400) or COVER-INLET COWL
ENGINE (98D10003001000) in position.

R
R

(b) Protection of the engine exhaust nozzles


- Put the COVER, COMMON NOZZLE (IAE1N20008) in position.
Subtask 10-11-00-860-050

C. Aircraft Maintenance Configuration


(1) Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861002).
(2) On the CABIN PRESS panel 25VU:
(a) Push the DITCHING pushbutton switch to close:
- the outflow valves (10HL),
- the avionic ventilation skin air inlet and outlet valves (15HQ
and 22HQ).

CDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDE

FEFF :
ALL
F 10-11-00
F
F
F
FMXA

F
F

Page 205
May 01/00

Protective Equipment
Figure 202/TASK 10-11-00-991-006
CDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDE

FEFF :
ALL
F 10-11-00
F
F
R F
FMXA

F
F

Page 206
Feb 01/97

Protective Equipment
Figure 203/TASK 10-11-00-991-004
CDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDE

FEFF :
ALL
F 10-11-00
F
F
R F
FMXA

F
F

Page 207
Feb 01/98

Protective Equipment
Figure 204/TASK 10-11-00-991-007
CDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDE

FEFF :
ALL
F 10-11-00
F
F
R F
FMXA

F
F

Page 208
Feb 01/98

(3) De-energize the aircraft electrical circuits (Ref. TASK 24-41-00-862002).


(4) Make sure that the windows of the cockpit are closed.
5. Close-up
________
Subtask 10-11-00-942-050
A. Close-up.
(1) Make an entry in the aircraft log book or attach a tag on the captain
side stick to tell the crew that protection covers/devices are
installed.
(2) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.
(3) Make sure that you close all access/doors.
(4) For return in operation, do the Return in Operation Procedure
(Ref. TASK 10-11-00-554-001).

CDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDE

FEFF :
ALL
F 10-11-00
F
F
R F
FMXA

F
F

Page 209
May 01/00

TASK 10-11-00-554-001
Return to operation (Parking of Not More Than 2 days)
1. __________________
Reason for the Job
this procedure gives the data for the reactivation of the aircraft after a
period of not more than 2 days.
2. ______________________
Job Set-up Information
A. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------12-34-24-869-002
24-41-00-861-002
24-41-00-862-002

Aircraft Grounding for the Maintenance Operations


Energize the Aircraft Electrical Circuits from the
External Power
De-energize the Aircraft Electrical Circuits Supplied
from the External Power

3. __________
Job Set-up
Subtask 10-11-00-860-056
A. Aircraft Configuration
(1) Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861002).
(2) On the CABIN PRESS panel 25VU:
(a) Release the DITCHING pushbutton switch to open:
- the outflow valve (10HL),
- the avionic ventilation skin air inlet and outlet valves (15HQ
and 22HQ).
NOTE : Make sure that the avionics ventilation continues to
____
operate correctly.
(3) De-energize the aircraft electrical circuits (Ref. TASK 24-41-00-862002).

CDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDE

FEFF :
ALL
F 10-11-00
F
F
R F
FMXA

F
F

Page 210
May 01/00

4. Procedure
_________
Subtask 10-11-00-020-055
A. Removal of the protective equipment from the fuselage and the APU area.
(1) Remove the COVER - EXHAUST DUCT, APU (98D10007512000) and the COVER OILCOOLER OUTLET, APU (98D10007513000) from the APU area.
(2) Remove the COVER - SLIP-ON, TOTAL TEMPERATURE SENSOR (98A10001013000)
from the 2 total temperature sensors.
(3) Remove the COVER - SLIP-ON PITOT PROBE (98A10001005000) from the 3
pitot probes.
(4) Remove the COVER - SLIP-ON, ANGLE OF ATTACK SENSOR (98A10001500000)
or COVER - SLIP-ON, AOA (98D10003003000) from the 3 angle-of-attack
sensors.
(5) Remove the COVER-STATIC PROBE (98D10103500001) from the 6 static
probes.
(6) Do a visual inspection of all the probes and sensors and make sure
that they are clean and not clogged.

Subtask 10-11-00-020-056
B. Removal of the protective equipment from the engines.
(1) Remove the COVER-INLET COWL (IAE1N20400) or the COVER-INLET COWL
ENGINE (98D10003001000) and the COVER, COMMON NOZZLE (IAE1N20008)
from the engines.
Subtask 10-11-00-860-057
C. aircraft configuration
(1) Do a general visual inspection of the airframe from the ground for
correct condition.
(a) Make sure that there are no leaks from:
- the wings
- the lower fuselage
- the landing gears
- the engines
- the APU
- the horizontal and vertical stabilizer.

CDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDE

FEFF :
ALL
F 10-11-00
F
F
F
FMXA

F
F

Page 211
May 01/02

R
R

(2) Remove the ground cables from the aircraft (Ref. TASK 12-34-24-869002).

(3) Remove the wheel chocks from the main and the nose landing gears.

5. Close-up
________

Subtask 10-11-00-860-058

A. Close-up

R
R

(1) Remove the tag from the captain side stick or write in the log book
that the protection covers/devices are no longer installed.

R
R

(2) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.

CDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDE

FEFF :
ALL
F 10-11-00
F
F
F
FMXA

F
F

Page 212
Nov 01/97

TASK 10-11-00-555-003

Parking Procedure (Not More Than 12 Weeks) - Aircraft in Flight-Ready Condition

R
R

CAUTION : YOU MUST CONTINUE TO DO THE SCHEDULED MAINTENANCE DURING THE PARKING
_______
PERIOD.

R
R

CAUTION : BEFORE YOU CAN DO THIS PARKING PROCEDURE AGAIN, THE AIRCRAFT MUST
_______
FIRST DO A FULL FLIGHT CYCLE.

1. __________________
Reason for the Job

R
R

This procedure gives the preservation steps for a parking period of not more
than 12 weeks (aircraft in flight-ready condition).

R
R
R
R

NOTE : The purpose of this procedure is to keep the aircraft in flight-ready


____
condition during the parking period.
We recommend that there is no cannibalization or removal of parts
during this parking period.

2. ______________________
Job Set-up Information

A. Fixtures, Tools, Test and Support Equipment

R
R
R

------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
-------------------------------------------------------------------------------

No specific

adhesive tape

B. Consumable Materials

R
R
R

------------------------------------------------------------------------------REFERENCE
DESIGNATION
-------------------------------------------------------------------------------

R
R
R
R

Material No. 05-043


Material No. 15-002

VARNISH P.T.F.E SPRAY (Ref. 20-31-00)


USA MIL-B-131
TYPE I
BARRIER MATERIAL WATER VAPOR PROOF (Ref. 20-31-00)

CDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDE

FEFF :
ALL
F 10-11-00
F
F
F
FMXA

F
F

Page 213
Nov 01/97

C. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------10-11-00-554-002
R
10-11-00-555-001
10-11-00-555-004
R
10-11-00-555-005
R
12-11-28-650-003

Return to Operation (Parking of Not More Than 12


Weeks - Aircraft in Flight-Ready Condition)
Parking Procedure (Not More Than 2 Days)
Periodic Ground Check (At 7-Day Intervals) - Parking
Not More Than 12 Weeks (Aircraft in Flight-Ready
Condition)
Periodic Ground Check (At 15-Day Intervals) - Parking
Not More Than 12 weeks (Aircraft in Flight-Ready
Condition)
Pressure Refuel with Automatic Control

R
R
R

12-16-38-613-001
12-24-38-680-001
12-32-28-281-001
24-38-51-000-001
24-41-00-861-002
24-41-00-862-002

R
R
R
R

32-12-00-010-001
32-12-00-410-001
32-22-00-010-001
32-22-00-410-001
34-10-00-170-001
34-10-00-170-002
34-10-00-170-003
49-00-00-860-003
49-00-00-860-004
52-10-00-010-001
52-10-00-410-001
52-30-00-860-001
52-30-00-860-002
71-00-00-710-018
71-00-00-710-043
78-31-00-710-041

Servicing of the Toilet System


Draining of the Potable Water System (with Electrical
Power)
Drain Water Content
Removal of the Batteries (2PB1, 2PB2)
Energize the Aircraft Electrical Circuits from the
External Power
De-energize the Aircraft Electrical Circuits Supplied
from the External Power
Open the Main Gear Doors for Access
Close the Main Gear Doors after Access
Nose Gear Doors - Ground Doors Opening
Nose Gear Doors - Ground Doors Closing
Flushing of the Principal Total Pressure Lines
Flushing of the Principal Static Pressure Lines
Draining and Flushing of the Standby Static and
Standby Total Pressure Lines
APU Start by External Power (GTCP 36-300)
APU Shutdown by External Power (GTCP 36-300)
Opening of the Passenger/Crew Door
Closing of the Passenger/Crew Door
Open the FWD or AFT Cargo-Compartment Door with the
Yellow Electric Pump
Close the FWD or AFT Cargo-Compartment Door with the
Yellow Electric Pump
Discontinued Start, Restart and Shutdown Procedures
Normal Engine Automatic Start Procedure
Operational Test of the Thrust Reverser System with
the CFDS

CDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDE

FEFF :
ALL
F 10-11-00
F
F
F
FMXA

F
F

Page 214
May 01/02

3. __________
Job Set-up
Subtask 10-11-00-650-051
A. Aircraft Configuration
(1) Make sure that the fuel tanks are 90% full (minimum). If necessary,
refuel the tanks (Ref. TASK 12-11-28-650-003).
Subtask 10-11-00-861-050
B. Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861-002).
4. Procedure
_________
Subtask 10-11-00-710-050
A. Protection of the Engines and APU
NOTE : You can ignore this step if the last flight cycle was in the last
____
24 hours (engines and APU operated). In these conditions, the
parking period starts from the end of this last flight cycle.
(1) Start the APU and operate it for at least 5 mn at no load governed
speed (Ref. TASK 49-00-00-860-003).
(2) Stop the APU (Ref. TASK 49-00-00-860-004).
(3) Start the engines and let them become stable at ground idle for 15 to
20 mn (Ref. TASK 71-00-00-710-043).
(4) Do a thrust reverser full cycle (Ref. TASK 78-31-00-710-041).
(5) Stop the engines (Ref. TASK 71-00-00-710-018).
Subtask 10-11-00-680-051
B. Protection of the Water and Toilet System
(1) Potable water system
(a) Make sure that the system is empty and dry. If necessary:
- drain, flush and dry the system (Ref. TASK 12-24-38-680-001).

CDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDE

FEFF :
ALL
F 10-11-00
F
F
F
FMXA

F
F

Page 215
May 01/02

(2) Toilet system


(a) Make sure that the system is empty. If necessary:
- drain, flush and use disinfectant to clean the system
(Ref. TASK 12-16-38-613-001).
Subtask 10-11-00-170-050
C. Protection of the Air Data System
(1) Flush the total pressure line of the Air Data Module (Ref. TASK 3410-00-170-001).
(2) Flush the static pressure line of the Air Data Module (Ref. TASK 3410-00-170-002).
(3) Drain and flush the standby static and standby total pressure lines
of the Air Data Module (Ref. TASK 34-10-00-170-003).
Subtask 10-11-00-281-050
D. Protection of the Fuel System
(1) Drain water from all the fuel tanks (Ref. TASK 12-32-28-281-001).
NOTE : You must wait for one hour after refueling is completed before
____
you do the water drain procedure.
Subtask 10-11-00-620-055
E. Protection of the Seats
(1) We recommend to do the protection of the cockpit and passenger seats
with STORAGE PRESERVATION (Material No. 15-002). This is to prevent
discoloration by the sun during a long parking period.
Subtask 10-11-00-020-051
F. Protection of the Electrical System
(1) Remove or disconnect the batteries (Ref. TASK 24-38-51-000-001).

CDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDE

FEFF :
ALL
F 10-11-00
F
F
R F
FMXA

F
F

Page 216
May 01/02

Subtask 10-11-00-620-056
G. Protection of the Doors
(1) Open the FWD and AFT passenger/crew doors (Ref. TASK 52-10-00-010001).
(2) Open the FWD and AFT cargo compartment doors (Ref. TASK 52-30-00-860001).
(3) Open the landing gear doors (Ref. TASK 32-12-00-010-001) and
(Ref. TASK 32-22-00-010-001).
(4) Open all the pressurized access doors.
(5) Apply SPECIAL MATERIALS (Material No. 05-043) on the seals of all the
doors.
(6) Close the FWD and AFT cargo compartment doors (Ref. TASK 52-30-00860-002).
(7) Close the landing gear doors (Ref. TASK 32-22-00-410-001) and
(Ref. TASK 32-12-00-410-001).
5. Close-up
________
Subtask 10-11-00-862-050
A. De-energize the aircraft electrical circuits (Ref. TASK 24-41-00-862002).
Subtask 10-11-00-555-054
B. Put the Aircraft in Parking Configuration
(1) Make sure that all the external structural drain holes are not
clogged.
(2) Make sure that all the engine drains are not clogged.
(3) Do the full parking procedure (Ref. TASK 10-11-00-555-001).
(4) Close all the pressurized access doors.
(5) Close the FWD and AFT passenger/crew doors (Ref. TASK 52-10-00-410001).

CDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDE

FEFF :
ALL
F 10-11-00
F
F
R F
FMXA

F
F

Page 217
May 01/02

(6) Seal the air conditioning/ventilation inlets and outlets with STORAGE
PRESERVATION (Material No. 15-002) and adhesive tape.
(7) Put tarpaulins on the MLG wheels.
Subtask 10-11-00-555-055
C. Periodic Checks and Return in Operation
(1) During the parking period, do the periodic checks:
- at 7-day intervals (Ref. TASK 10-11-00-555-004)
- at 15-day intervals (Ref. TASK 10-11-00-555-005).
(2) For return to operation, do the Return to Operation procedure
(Ref. TASK 10-11-00-554-002).

CDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDE

FEFF :
ALL
F 10-11-00
F
F
R F
FMXA

F
F

Page 218
May 01/02

TASK 10-11-00-555-004
R

Periodic Ground Check (At 7-Day Intervals) - Parking Not More Than 12 Weeks
(Aircraft in Flight-Ready Condition)
CAUTION : YOU MUST CONTINUE TO DO THE SCHEDULED MAINTENANCE DURING THE PARKING
_______
PERIOD.
1. __________________
Reason for the Job
This procedure gives the periodic check (at 7-day intervals) for a parking
period of not more than 12 weeks (aircraft in flight-ready condition).
2. ______________________
Job Set-up Information
Not Applicable
3. __________
Job Set-up
Subtask 10-11-00-860-052
A. Not Applicable
4. Procedure
_________
Subtask 10-11-00-210-053
A. Check of Aircraft Condition
(1) Make sure that the protection covers/plugs are correctly installed.
(2) Do a general visual inspection of the airframe from the ground for
correct condition.
(a) Make sure that there are no leaks from:
- the wings
- the lower fuselage
- the landing gears
- the engines
- the APU
- the horizontal and vertical stabilizer.

CDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDE

FEFF :
ALL
F 10-11-00
F
F
F
FMXA

F
F

Page 219
May 01/02

TASK 10-11-00-555-005
R
R

Periodic Ground Check (At 15-Day Intervals) - Parking Not More Than 12 weeks
(Aircraft in Flight-Ready Condition)
CAUTION : YOU MUST CONTINUE TO DO THE SCHEDULED MAINTENANCE DURING THE PARKING
_______
PERIOD.
1. __________________
Reason for the Job

This procedure gives the periodic check (at 15 day-intervals) for a parking
period of not more than 12 weeks (aircraft in flight-ready condition).
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific

adhesive tape

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 15-002

USA MIL-B-131
TYPE I
BARRIER MATERIAL WATER VAPOR PROOF (Ref. 20-31-00)

C. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------10-11-00-555-001
12-32-28-281-001
24-38-51-000-001
24-38-51-400-001
24-41-00-861-002
24-41-00-862-002

Parking Procedure (Not More Than 2 Days)


Drain Water Content
Removal of the Batteries (2PB1, 2PB2)
Installation of the Batteries (2PB1, 2PB2)
Energize the Aircraft Electrical Circuits from the
External Power
De-energize the Aircraft Electrical Circuits Supplied
from the External Power

CDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDE

FEFF :
ALL
F 10-11-00
F
F
F
FMXA

F
F

Page 220
May 01/02

------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------29-10-00-200-001
30-11-00-710-001
30-21-00-710-001
32-41-00-210-003
32-42-00-710-001
32-43-00-710-001
32-51-00-720-003
32-51-00-720-004
R
R

36-11-00-710-003
49-00-00-860-003
49-00-00-860-004
71-00-00-710-018
71-00-00-710-043
78-31-00-710-041

Check Fluid Level on Main Hydraulic Reservoir


Indicators
Operational Test of the Wing Ice-Protection System
Operational Test of the Engine Air Intake Ice
Protection
Inspection/Check of the Pressure of Tires
Operational Test of the Normal Braking System
Operational Test of Alternate Braking System
Functional Test of the Nose Wheel Steering with the
Handwheel.
Functional Test of the Nose Wheel Steering with the
Pedals.
Operational Test of the Bleed Air System
APU Start by External Power (GTCP 36-300)
APU Shutdown by External Power (GTCP 36-300)
Discontinued Start, Restart and Shutdown Procedures
Normal Engine Automatic Start Procedure
Operational Test of the Thrust Reverser System with
the CFDS

3. __________
Job Set-up
Subtask 10-11-00-020-052
A. Removal of Protections
(1) Remove all protection covers/plugs from the fuselage, the engines and
the APU area.
(2) Remove the tarpaulins from the MLG wheels.
(3) Remove the adhesive tape and foil from the air
conditioning/ventilation inlets and outlets.
NOTE : Make sure that no adhesive stays on the aircraft skin.
____
Subtask 10-11-00-420-050
B. Installation or Connection of the Batteries
(1) Install or connect the batteries and make sure that the battery
charge is correct (Ref. TASK 24-38-51-400-001).

CDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDE

FEFF :
ALL
F 10-11-00
F
F
F
FMXA

F
F

Page 221
May 01/02

Subtask 10-11-00-860-053
C. Aircraft Configuration
(1) Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861002).
(2) On the CABIN PRESS panel 25VU:
(a) Release the DITCHING pushbutton switch to open:
- the outflow valve (10HL),
- the avionic ventilation skin air inlet and outlet valves (15HQ
and 22HQ).
NOTE : Make sure that the avionics ventilation continues to
____
operate correctly.
4. Procedure
_________
Subtask 10-11-00-210-054
A. Inspection
CAUTION : CAREFULLY CLEAN ALL BIRD EXCREMENT FROM THE AIRCRAFT, BIRD
_______
EXCREMENT IS CORROSIVE.
(1) Do a general visual inspection of the airframe from the ground for
correct condition.
(a) Make sure that there are no leaks from:
- the wings
- the lower fuselage
- the landing gears
- the engines
- the APU
- the horizontal and vertical stabilizer.
(b) Make sure that there are no signs of bird nesting in all areas of
the aircraft to which birds have access.
(c) Do a check of the outer skin for contamination that is not usual.
(2) Make sure that the extension of the landing gear shock absorbers is
correct.
(3) Do a check of the tire pressure (Ref. TASK 32-41-00-210-003).
(4) Do a check of the hydraulic reservoir level (Ref. TASK 29-10-00-200001).

CDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDE

FEFF :
ALL
F 10-11-00
F
F
R F
FMXA

F
F

Page 222
May 01/00

Subtask 10-11-00-281-052

R
R

B. Drain water from all the fuel tanks (Ref. TASK 12-32-28-281-001).
Subtask 10-11-00-700-050

C. System Test

R
R
R

(1) Do the functional test of the nose wheel steering with the handwheel
and with the pedals (Ref. TASK 32-51-00-720-003) and (Ref. TASK 3251-00-720-004).

R
R
R

(2) Do the operational test of the Normal braking system and Alternate
braking system (Ref. TASK 32-42-00-710-001) and (Ref. TASK 32-43-00710-001).

(3) Operate the APU and the engines.

(a) Start the APU (Ref. TASK 49-00-00-860-003).

R
R

(b) Start the engines with APU bleed and operate them at idle power
(Ref. TASK 71-00-00-710-043).

(c) Operate the air conditioning system.

Subtask 10-11-00-866-050

D. Flight Controls Movement

R
R

(1) Operate all the flight control surfaces on full travel and make sure
that they operate correctly.

R
R

(a) Move the flap and slat control lever one time from 0 to FULL and
back to extend and retract the slats and the flaps.

R
R

(b) Push the left then the right pedal until it touches the
mechanical stop, to operate the rudder.

R
R
R
R

(c) Move the side stick to:


- the left and right roll position to operate the spoilers and
the ailerons
- the nose down and nose up position to operate the elevators.

R
R

(d) Move the pitch trim control wheel to the nose up and nose down
position to operate the THS.

NOTE : Put the THS in the 0 to 2 position after operation.


____

CDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDE

FEFF :
ALL
F 10-11-00
F
F
F
FMXA

F
F

Page 223
Nov 01/97

Subtask 10-11-00-710-051

E. Operational Tests

R
R
R

(1) Do the operational test of the bleed air system (Ref. TASK 36-11-00710-003) and make sure that the related BLEED PRESS and BLEED TEMP
indications are satisfactory.

R
R

(2) Do the operational test of the wing-ice protection system (Ref. TASK
30-11-00-710-001).

R
R

(3) Do the operational test of the engine air intake ice protection
(Ref. TASK 30-21-00-710-001).

(4) Do a thrust reverser cycle (Ref. TASK 78-31-00-710-041).

(5) Stop the engines (Ref. TASK 71-00-00-710-018).

(6) Stop the APU (Ref. TASK 49-00-00-860-004).

Subtask 10-11-00-584-050

F. Movement of the Aircraft

(1) Move the aircraft.

R
R

NOTE : You can ignore this step if you moved the aircraft for the
____
engine run-up.

R
R
R

(a) Remove the wheel chocks and turn the MLG wheels a quarter turn to
move the aircraft (this is to prevent damage to the tires and
brinelling of the bearings).

(b) Install the wheel chocks in front of and behind the wheels.

Subtask 10-11-00-020-053

G. Removal or Disconnection of the Batteries

(1) Remove or disconnect the batteries (Ref. TASK 24-38-51-000-001).

CDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDE

FEFF :
ALL
F 10-11-00
F
F
F
FMXA

F
F

Page 224
Nov 01/97

Subtask 10-11-00-860-054
H. Aircraft Configuration
(1) On the CABIN PRESS panel 25VU:
(a) Push the DITCHING pushbutton switch to close:
- the outflow valve (10HL),
- the avionic ventilation skin air inlet and outlet valves (15HQ
and 22HQ).
(2) De-energize the aircraft electrical circuits (Ref. TASK 24-41-00-862002).
5. Close-up
________
Subtask 10-11-00-555-056
A. Put the aircraft in parking configuration.
(1) Let the engines and the APU become cool and install protection
covers/plugs on the fuselage, the engines and the APU area (Ref. TASK
10-11-00-555-001).
(2) Seal the air conditioning/ventilation inlets and outlets with STORAGE
PRESERVATION (Material No. 15-002) and adhesive tape.
(3) Record any discrepancy in the log book.
(4) Close all access doors opened in this procedure.
(5) Install tarpaulins on the MLG wheels.

CDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDE

FEFF :
ALL
F 10-11-00
F
F
R F
FMXA

F
F

Page 225
May 01/00

TASK 10-11-00-554-002
R
R

Return to Operation (Parking of Not More Than 12 Weeks - Aircraft in


Flight-Ready Condition)
1. __________________
Reason for the Job
This procedure gives the data for the reactivation of the aircraft after a
parking period of not more than 12 weeks (aircraft in flight-ready
condition).
2. ______________________
Job Set-up Information
A. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------10-11-00-554-001
12-14-32-614-003
12-14-32-614-004
12-32-28-281-001
24-38-51-400-001
29-10-00-200-001

R
R

32-12-00-010-001
32-12-00-410-001
32-22-00-010-001
32-22-00-410-001
32-41-00-210-002
32-41-00-210-003
34-10-00-170-001
34-10-00-170-002
34-10-00-170-003
52-10-00-010-001
52-10-00-410-001
52-30-00-860-001
52-30-00-860-002

Return to operation (Parking of Not More Than 2 days)


Check Charge Pressure of Main Landing Gear Shock
Absorber
Check Charge Pressure of Nose Landing Gear Shock
Absorber
Drain Water Content
Installation of the Batteries (2PB1, 2PB2)
Check Fluid Level on Main Hydraulic Reservoir
Indicators
Open the Main Gear Doors for Access
Close the Main Gear Doors after Access
Nose Gear Doors - Ground Doors Opening
Nose Gear Doors - Ground Doors Closing
Inspection/Check of the Wheels and Tires
Inspection/Check of the Pressure of Tires
Flushing of the Principal Total Pressure Lines
Flushing of the Principal Static Pressure Lines
Draining and Flushing of the Standby Static and
Standby Total Pressure Lines
Opening of the Passenger/Crew Door
Closing of the Passenger/Crew Door
Open the FWD or AFT Cargo-Compartment Door with the
Yellow Electric Pump
Close the FWD or AFT Cargo-Compartment Door with the
Yellow Electric Pump

CDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDE

FEFF :
ALL
F 10-11-00
F
F
F
FMXA

F
F

Page 226
May 01/02

3. __________
Job Set-up

Subtask 10-11-00-020-054

A. Removal of the Protections

R
R

(1) Do the full Return to Operation procedure (Ref. TASK 10-11-00-554001)

(2) Remove the tarpaulins from the MLG wheels.

R
R

(3) Remove the adhesive tape and foil from the air
conditioning/ventilation inlets and outlets.

R
R

NOTE : Make sure that no adhesive stays on the aircraft skin.


____
Subtask 10-11-00-420-051

B. Installation or Connection of the Batteries

R
R

(1) Install or connect the batteries and make sure that the battery
charge is correct (Ref. TASK 24-38-51-400-001).

4. Procedure
_________

Subtask 10-11-00-210-055

A. Inspection

R
R

CAUTION : CAREFULLY CLEAN ALL BIRD EXCREMENT FROM THE AIRCRAFT, BIRD
_______
EXCREMENT IS CORROSIVE.

(1) Do a general visual inspection of the airframe for correct condition.

R
R
R
R
R
R
R

(a) Make sure that there are no leaks from:


- the wings
- the lower fuselage
- the engines
- the APU
- the landing gear
- the horizontal and vertical stabilizer.

R
R

(b) Make sure that there are no signs of bird nesting in all areas of
the aircraft to which birds have access.

(c) Do a check of the outer skin for contamination that is not usual.

CDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDE

FEFF :
ALL
F 10-11-00
F
F
F
FMXA

F
F

Page 227
Nov 01/97

R
R

(2) Do a check of the charge pressure of the NLG and MLG shock absorbers
(Ref. TASK 12-14-32-614-004) and (Ref. TASK 12-14-32-614-003).

(3) Do a check of the tire pressure (Ref. TASK 32-41-00-210-003).

(4) Do a check of the tire condition (Ref. TASK 32-41-00-210-002).

R
R

(5) Do a check of the hydraulic reservoir level (Ref. TASK 29-10-00-200001).

Subtask 10-11-00-281-051

B. Draining of Water from the Fuel Tanks

R
R

(1) Drain water from all the fuel tanks (Ref. TASK 12-32-28-281-001).
Subtask 10-11-00-170-051

C. Flushing of the Air Data System

R
R

(1) Flush the total pressure line of the Air Data Module (Ref. TASK 3410-00-170-001).

R
R

(2) Flush the static pressure line of the Air Data Module (Ref. TASK 3410-00-170-002).

R
R

(3) Drain and flush the standby static and standby total pressure lines
of the Air Data Module (Ref. TASK 34-10-00-170-003).

Subtask 10-11-00-210-056

D. Inspection of the Doors

R
R
R
R
R
R
R
R
R

(1) Open and close these doors and make sure that they operate correctly:
- the FWD and AFT passenger/crew doors: (Ref. TASK 52-10-00-010-001)
and (Ref. TASK 52-10-00-410-001)
- the FWD and AFT cargo compartment doors: (Ref. TASK 52-30-00-860001) and (Ref. TASK 52-30-00-860-002)
- the NLG and MLG doors: (Ref. TASK 32-22-00-010-001), (Ref. TASK 3222-00-410-001), (Ref. TASK 32-12-00-010-001) and (Ref. TASK 32-1200-410-001)
- all the pressurized access doors.

CDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDE

FEFF :
ALL
F 10-11-00
F
F
F
FMXA

F
F

Page 228
Nov 01/97

5. Close-up
________
Subtask 10-11-00-942-052
R

A. Return to Operation
(1) Do a check of the log book and make sure that the aircraft is
serviceable.
(2) Do the operator standard daily pre-flight check.

CDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDE

FEFF :
ALL
F 10-11-00
F
F
F
FMXA

F
F

Page 229
May 01/02

STORAGE - MAINTENANCE PRACTICES


_______________________________
TASK 10-12-00-553-004
Storage Procedure (not more than 1 month)
CAUTION : - WHILE THE AIRCRAFT IS IN STORAGE, MAKE SURE THAT YOU DO THE
_______
MAINTENANCE CHECKS SPECIFIED FOR STORAGE.
- BEFORE YOU PUT THE AIRCRAFT BACK INTO SERVICE, WE RECOMMEND THAT
YOU MAKE SURE THAT ALL THE CALENDAR TASKS SCHEDULED FOR THE PERIOD
DURING WHICH THE AIRCRAFT WAS IN STORAGE ARE COMPLETED (REFER TO THE
MAINTENANCE PROGRAM).
- DO NOT CHANGE OR STOP THE MAINTENANCE PROGRAM WITHOUT APPROVAL FROM
YOUR LOCAL AUTHORITIES.
1. __________________
Reason for the Job
R
R

This procedure gives the preservation steps for a storage period of not more
than 1 month.
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific
No specific
No specific

adhesive tape
circuit breaker(s) safety clip(s)
fine nylon netting

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 05-027
R
R

USA MIL-L-81309
RUST INHIBITOR(FOR CORROSION USE 15-004)
(Ref. 20-31-00)

Material No. 05-043


Material No. 15-002

VARNISH P.T.F.E SPRAY (Ref. 20-31-00)


USA MIL-B-131
TYPE I
BARRIER MATERIAL WATER VAPOR PROOF (Ref. 20-31-00)

CDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDE

FEFF :
ALL
F 10-12-00
F
F
F
FMXA

F
F

Page 201
May 01/02

C. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------10-11-00-555-001
10-12-00-200-002
10-12-00-200-003
10-30-00-554-002

R
R
R
R
R
R
R
R

12-11-28-650-003
12-11-28-650-004
12-16-38-613-001
12-21-11-615-001
12-21-12-100-002
12-21-12-100-003
12-21-12-100-004
12-21-12-100-005
12-21-12-100-006
12-21-12-100-007
12-21-12-100-008
12-21-12-100-009
12-22-27-640-003
12-22-27-640-004
12-22-27-640-005
12-22-27-640-006
12-24-38-680-001
12-32-28-281-001
24-38-51-000-001
25-30-00-920-001
32-12-00-010-001
32-12-00-410-001
32-22-00-010-001
32-22-00-410-001
32-41-00-210-003
34-10-00-170-001
34-10-00-170-002
34-10-00-170-003

Parking Procedure (Not More Than 2 Days)


Inspection Checklist: Weekly Check or Check after the
Aircraft is in Wind/Wind gusts of More than 35 Knots
(65 km per Hour)
Inspection Checklist: 15-days Check
Return to Service (Storage Period not More than 1
month)
Pressure Refuel with Automatic Control
Pressure Refuel with Manual Control
Servicing of the Toilet System
External Cleaning
Cockpit Equipment
Carpets and Non-Textile Floor (NTF) Covering
Plastic Surfaces and Mirrors
Seat Covers and Curtains
Light Alloy and Steel
Cargo Compartments
Monitors and Display Screens in the Cabin
Plastic Wash Basin in the Lavatories
Lubrication of Trimmable Horizontal Stabilizer
Actuator Ball Screw Nut
Lubrication of all Flap Track Carriage Rollers
Lubrication of Spoiler No 1 to 5 Servo Control
Bearings
Lubrication of all Slat Track Rollers, Pinion
Bearings, Pinions and Rack Teeth
Draining of the Potable Water System (with Electrical
Power)
Drain Water Content
Removal of the Batteries (2PB1, 2PB2)
Remove and Discard Air-Filter Element
Open the Main Gear Doors for Access
Close the Main Gear Doors after Access
Nose Gear Doors - Ground Doors Opening
Nose Gear Doors - Ground Doors Closing
Inspection/Check of the Pressure of Tires
Flushing of the Principal Total Pressure Lines
Flushing of the Principal Static Pressure Lines
Draining and Flushing of the Standby Static and
Standby Total Pressure Lines

CDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDE

FEFF :
ALL
F 10-12-00
F
F
F
FMXA

F
F

Page 202
May 01/01

------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------49-20-00-600-001

Preservation / Storage / De-preservation of the


Engine (GTCP 36-300)
Opening of the Passenger/Crew Door
Closing of the Passenger/Crew Door
Special Precautions before Work on the Passenger/Crew
Door
Servicing of the FWD Passenger/Crew Door.
Servicing of the AFT Passenger/Crew Doors
Open the FWD or AFT Cargo-Compartment Door with the
Yellow Electric Pump
Close the FWD or AFT Cargo-Compartment Door with the
Yellow Electric Pump
Inspect Rubber Flap Drain Valve Holes in Pressure
Floor from Main Landing Gear Bay
Inspect Single Drain Pipe at FR70 from Outside
Inspection of the Pylon Drains and the CAF4 Sealant
in the Cantilever Zone NAN
Preservation of the Engine
Fig. 201

52-10-00-010-001
52-10-00-410-001
52-10-00-860-001
52-11-00-610-001
52-13-00-610-001
52-30-00-860-001
52-30-00-860-002
53-39-00-210-001
53-59-00-210-001
54-50-00-200-001
71-00-00-550-010
10-12-00-991-001
3. __________
Job Set-up
Subtask 10-12-00-615-052

A. Cleaning of the Aircraft.


(1) Clean
(Ref.
(Ref.
(Ref.
(Ref.
(Ref.
(Ref.
(Ref.
(Ref.
(Ref.

R
R
R
R
R
R

internally the aircraft


TASK 25-30-00-920-001)
TASK 12-21-12-100-002)
TASK 12-21-12-100-003)
TASK 12-21-12-100-004)
TASK 12-21-12-100-005)
TASK 12-21-12-100-006)
TASK 12-21-12-100-007)
TASK 12-21-12-100-008)
TASK 12-21-12-100-009)

(2) Clean externally the aircraft if necessary (Ref. TASK 12-21-11-615001).

CDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDE

FEFF :
ALL
F 10-12-00
F
F
F
FMXA

F
F

Page 203
May 01/02

4. Procedure
_________
Subtask 10-12-00-010-055
A. Get Access
R

(1) Open the AFT and FWD passenger/crew doors (Ref. TASK 52-10-00-010001)
(2) Open the AFT and FWD cargo compartment doors (Ref. TASK 52-30-00-860001)
(3) Open the landing gear doors (Ref. TASK 32-12-00-010-001) (Ref. TASK
32-22-00-010-001)
(4) Open all the pressurized access doors.
Subtask 10-12-00-481-053
B. Safety Precautions
(1) Secure the door slide arming lever, and disarm the passenger/crew
emergency mechanism (Ref. TASK 52-10-00-860-001).
Subtask 10-12-00-916-065
C. Protection.
(1) Apply SPECIAL MATERIALS (Material No. 05-043) on all the seals of the
doors
(2) Apply SPECIAL MATERIALS (Material No. 05-027) on the passenger/crew
door emergency mechanism (Ref. TASK 52-11-00-610-001) (Ref. TASK 5213-00-610-001)
Subtask 10-12-00-210-064
D. Visual Inspection of the Drains.
(1) Make sure that all structural drain holes are clear (Ref. TASK 53-3900-210-001) (Ref. TASK 53-59-00-210-001) (Ref. TASK 54-50-00-200001).

CDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDE

FEFF :
ALL
F 10-12-00
F
F
F
FMXA

F
F

Page 204
May 01/02

Subtask 10-12-00-170-050
E. Flushing of the Air Data System
(1) Flush the total pressure line of the Air Data Module (Ref. TASK 3410-00-170-001).
(2) Flush the static pressure line of the Air Data Module (Ref. TASK 3410-00-170-002).
(3) Drain and flush the standby static and standby total pressure lines
of the Air Data Module (Ref. TASK 34-10-00-170-003).
Subtask 10-12-00-640-051
F. Lubrication.
(1) Lubricate the flight controls (Ref. TASK 12-22-27-640-003),
(Ref. TASK 12-22-27-640-004) (Ref. TASK 12-22-27-640-005) (Ref. TASK
12-22-27-640-006).
Subtask 10-12-00-620-062
G. Preservation of the Engine.
(1) Preserve the engine (Ref. TASK 71-00-00-550-010).
Subtask 10-12-00-620-063
H. Preservation of the APU.
(1) Preserve the APU (Ref. TASK 49-20-00-600-001).
Subtask 10-12-00-620-064
J. Protection of the Fuel System.
(1) Refuel (Ref. TASK 12-11-28-650-003), (Ref. TASK 12-11-28-650-004):
- all the fuel tanks at 90% of their total capacity
- all the fuel system lines.
Make the vent surges wet so that the sealants do not become dry and
crack.
(2) Operate the water drains one hour after you refuel (Ref. TASK 12-3228-281-001).

CDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDE

FEFF :
ALL
F 10-12-00
F
F
R F
FMXA

F
F

Page 205
May 01/01

Subtask 10-12-00-916-066
K. Protection.
(1) Apply SPECIAL MATERIALS (Material No. 05-027) for the protection of
the solenoids of the hydraulic flap manifold.
Subtask 10-12-00-210-065
L. Check of the Inflation Pressure of the Tires.
(1) Check the inflation (Ref. TASK 32-41-00-210-003).
Subtask 10-12-00-614-050
M. Protection of the Oxygen System.
(1) Close the valve of the oxygen storage cylinder (5750HM).
(2) Bleed the oxygen system:
(a) In the cockpit on the panel 21VU, push the OXYGEN/CREW SUPPLY
pushbutton switch. The OFF legend goes off.
(b) On the oxygen box, operate the PRESS TO TEST AND RESET slide a
sufficient number of times to make the system empty.
(c) On the panel 21VU, release the OXYGEN/CREW SUPPLY pushbutton
switch the OFF legend comes on.
Subtask 10-12-00-620-065
N. Protection of the Water/Waste System.
(1) Make sure that the potable water, and water waste systems are empty,
dry with air if necessary (Ref. TASK 12-24-38-680-001).
(2) Drain, clean and deodorize the toilets (Ref. TASK 12-16-38-613-001).

CDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDE

FEFF :
ALL
F 10-12-00
F
F
R F
FMXA

F
F

Page 206
May 01/01

Subtask 10-12-00-865-051
P. Open, safety and tag this(these) circuit breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------121VU APU/FIRE/EXTIG/SQUIB/B
2WF
L39
121VU APU/FIRE/EXTIG/SQUIB/A
1WF
L38
121VU APU/FIRE/LP VALVE/NORM
4WF
M42
121VU APU/FIRE/LP VALVE/STBY
3WF
M41
121VU ENGINE/ENG1 AND 2 FIRE EXTIG/BTL1/SQUIB/B
2WE1
Q44
121VU ENGINE/ENG1 AND 2 FIRE EXTIG/BTL1/SQUIB/A
1WE1
Q43
121VU ENGINE/ENG1 AND 2 FIRE EXTIG/BTL2/SQUIB/B
2WE2
Q42
121VU ENGINE/ENG1 AND 2 FIRE EXTIG/BTL2/SQUIB/A
1WE2
Q41
Subtask 10-12-00-550-050
Q. On the DMU front face, set the switch to STORAGE or to OFF position.
Subtask 10-12-00-020-059
R. Remove the Batteries.
(1) Disconnect and remove the batteries 2PB1 and 2PB2 (Ref. TASK 24-3851-000-001)
Subtask 10-12-00-620-066
S. Protection
(Ref. Fig. 201/TASK 10-12-00-991-001)
(1) Seal the NACA air intakes (6) with fine nylon netting attached with
adhesive tape (record the locations).
(2) Seal with STORAGE PRESERVATION (Material No. 15-002) attached with
adhesive tape (record the locations):
- the air conditioning pack inlets and outlets (3)
- the precooler outlets (5)
- the battery venturi (4)
- the anti-ice discharge vent/access door(2)
- the scoops (1)

CDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDE

FEFF :
ALL
F 10-12-00
F
F
F
FMXA

F
F

Page 207
May 01/02

identification of Areas to be Protected


Figure 201/TASK 10-12-00-991-001
CDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDE

FEFF :
ALL
F 10-12-00
F
F
R F
FMXA

F
F

Page 208
May 01/01

Subtask 10-12-00-410-054
R

T. Close Access
(1) Close all window shades.
(2) Close all the pressurized access doors.
(3) Close all the doors (Ref. TASK 52-10-00-410-001) (Ref. TASK 52-30-00860-002) (Ref. TASK 32-12-00-410-001) (Ref. TASK 32-22-00-410-001).
Subtask 10-12-00-555-054

U. Parking of the Aircraft.


(1) do the full parking procedure (Ref. TASK 10-11-00-555-001) .
5. Close-up
________
Subtask 10-12-00-942-054
A. close-up
(1) Make sure that you close all access/doors
(2) Make sure that the work area is clean and clear of tool(s) and other
items.
(3) During the storage period, do the periodic checks:
- at 7-day intervals (Ref. TASK 10-12-00-200-002)
- at 15-day intervals (Ref. TASK 10-12-00-200-003)
(4) For return to service, do the Return to Service procedure (Ref. TASK
10-30-00-554-002).

CDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDE

FEFF :
ALL
F 10-12-00
F
F
F
FMXA

F
F

Page 209
Nov 01/01

TASK 10-12-00-553-001
Storage procedure (up to 2 years)
R
R
R
R
R
R
R
R

CAUTION : - WHILE THE AIRCRAFT IS IN STORAGE, MAKE SURE THAT YOU DO THE
_______
MAINTENANCE CHECKS SPECIFIED FOR STORAGE.
- BEFORE YOU PUT THE AIRCRAFT BACK INTO SERVICE, WE RECOMMEND THAT
YOU MAKE SURE THAT ALL THE CALENDAR TASKS SCHEDULED FOR THE PERIOD
DURING WHICH THE AIRCRAFT WAS IN STORAGE ARE COMPLETED (REFER TO THE
MAINTENANCE PROGRAM).
- DO NOT CHANGE OR STOP THE MAINTENANCE PROGRAM WITHOUT APPROVAL FROM
YOUR LOCAL AUTHORITIES.
1. __________________
Reason for the Job
This procedure gives the preservation measures for a storage period up to 2
years.
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No
No
No
No
No

specific
specific
specific
specific
specific

adhesive tape
circuit breaker(s) safety clip(s)
fine nylon netting
talcum
tarpaulins

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 02-003
Material No. 04-001
Material No. 04-011

USA BMS 3-11F


HYDRAULIC FLUID (PHOSPHATE ESTER BASE)
(Ref. 20-31-00)
F
AIR-4205
WHEEL BEARING MINERAL GREASE (Ref. 20-31-00)
USA MIL-G-4343
SILICONE GREASE PNEUMATIC SYST AND SEALS
(Ref. 20-31-00)

CDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDE

FEFF :
ALL
F 10-12-00
F
F
F
FMXA

F
F

Page 210
Nov 01/01

------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 04-012
Material No. 05-005
Material No. 05-027

USA VV-P-236
PURE MINERALVASELINE OR PETRO- LATUM (Ref. 20-31-00)
USA MIL-C-16173
GRADE II
CORROSION PREVENTIVE (Ref. 20-31-00)
USA MIL-L-81309
RUST INHIBITOR(FOR CORROSION USE 15-004)
(Ref. 20-31-00)

Material No. 05-043


Material No. 08-052
Material No. 15-002

VARNISH P.T.F.E SPRAY (Ref. 20-31-00)


USA MIL-T-23397
AND/OR L-T-80B
SELF ADHESIVEALUMINIUM TAPE (Ref. 20-31-00)
USA MIL-B-131
TYPE I
BARRIER MATERIAL WATER VAPOR PROOF (Ref. 20-31-00)

Material No. 17-003


BIOCIDE/FUEL ADDITIVE (Ref. 20-31-00)
C. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------10-11-00-555-001
10-12-00-200-002
10-12-00-200-003
10-12-00-200-004
10-12-00-200-005
10-30-00-554-001
12-11-28-650-003
12-11-28-650-004
12-13-27-612-002
12-13-27-612-003
12-16-38-613-001
12-21-11-615-001
12-21-12-100-002
12-21-12-100-003
12-21-12-100-004
12-21-12-100-005
12-21-12-100-006
12-21-12-100-007
12-21-12-100-008

Parking Procedure (Not More Than 2 Days)


Inspection Checklist: Weekly Check or Check after the
Aircraft is in Wind/Wind gusts of More than 35 Knots
(65 km per Hour)
Inspection Checklist: 15-days Check
Inspection Checklist: 1-month Check
Inspection Checklist: 3-months Check
Return to Service (Storage Period Up to 2 years)
Pressure Refuel with Automatic Control
Pressure Refuel with Manual Control
Oil Replenishment of the Flap PCU (6201CM) Gearbox
Oil Replenishment of the Slat PCU (6001CM) Gearbox
Servicing of the Toilet System
External Cleaning
Cockpit Equipment
Carpets and Non-Textile Floor (NTF) Covering
Plastic Surfaces and Mirrors
Seat Covers and Curtains
Light Alloy and Steel
Cargo Compartments
Monitors and Display Screens in the Cabin

CDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDE

FEFF :
ALL
F 10-12-00
F
F
R F
FMXA

F
F

Page 211
Nov 01/02

------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------12-21-12-100-009
12-22-27-640-003
12-22-27-640-004
12-22-27-640-005
12-22-27-640-006
R

12-22-27-640-007
12-22-27-640-008
12-22-32-640-001
12-22-32-640-002
12-22-53-640-001
12-22-55-640-001
12-24-38-680-001
12-32-28-281-001
20-24-11-100-001
23-71-35-000-001
24-38-51-000-001
25-30-00-920-001
25-61-41-000-001
25-62-42-000-001
25-62-44-000-002
25-65-51-920-001
26-21-41-000-001
26-21-41-000-004
26-22-41-000-001
26-22-42-000-001
26-23-41-000-004
26-23-41-000-005

Plastic Wash Basin in the Lavatories


Lubrication of Trimmable Horizontal Stabilizer
Actuator Ball Screw Nut
Lubrication of all Flap Track Carriage Rollers
Lubrication of Spoiler No 1 to 5 Servo Control
Bearings
Lubrication of all Slat Track Rollers, Pinion
Bearings, Pinions and Rack Teeth
Lubrication of the THS Mechanical Control Chains
Remove Flap Rotary Actuators For Regreasing
Lubrication of the MLG and Doors
Lubrication of the NLG and Doors
Lubrication of Trimmable Horizontal Stabilizer
Bearings and Attachment Fittings
Lubrication of the Rudder Bearing No. 6
Draining of the Potable Water System (with Electrical
Power)
Drain Water Content
Cleaning and Protection of the Cables
Removal of the Cockpit Voice Recorder (CVR) 1RK
Removal of the Batteries (2PB1, 2PB2)
Remove and Discard Air-Filter Element
Removal of the Captain/First Officer Emergency
Descent Device
Offwing Escape-Slide - Removal
Escape-Slide Pack-Assembly - Removal
Replacement of the Megaphone Batteries
Removal of the Engine Fire-Extinguisher Bottle
(6WE1,8WE1,6WE2,8WE2)
Removal of the Cartridge of the Engine
Fire-Extinguisher Bottle
Removal of the Fire Extinguisher Bottle (11WF)
Removal of the Fire-Extinguisher Bottle Cartridge
(12WF)
Removal of the Cargo Fire-Extinguisher Bottle
(4005WX)
Removal of the Cartridge of the Cargo
Fire-Extinguisher Bottle

CDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDE

FEFF :
ALL
F 10-12-00
F
F
F
FMXA

F
F

Page 212
Nov 01/02

------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------27-21-00-210-002
27-41-00-220-001
27-41-00-220-002
28-11-00-600-007
29-00-00-280-001
29-00-00-280-002
29-00-00-280-003
29-00-00-280-004
29-10-00-680-001
29-10-00-680-002
29-10-00-680-003
30-45-00-040-002
30-45-52-000-002
30-45-53-000-001
31-33-55-000-001
32-12-00-010-001
32-12-00-410-001
32-22-00-010-001
32-22-00-410-001
32-40-00-100-001
32-40-00-200-001
32-41-00-210-003
32-41-11-400-006
32-41-12-400-001
32-48-51-000-005

Detailed Visual Inspection of the Rudder Mechanical


Control Cables
Check of the Cable Tension Regulator of the THS Trim
Control (Pointer in the Limits)
Check of the Correct Tension of the THS Mechanical
Control Cables
Introduce Biobor Biocide into Fuel - With Fuel Mixed
with Biocide Additive
Check of the Internal Leakage of the Green Hydraulic
System
Check of the Internal Leakage of the Blue Hydraulic
System
Check of the Internal Leakage of the Yellow Hydraulic
System
Check of the Internal Leakage of the Power Transfer
Unit (PTU)
Drainage of the Reservoir of the Green Hydraulic
System
Drainage of the Reservoir of the Yellow Hydraulic
System
Drainage of the Reservoir of the Blue Hydraulic
System
Deactivation of the Rain Repellent System
Removal of the Wiper Arm (306DM, 307DM)
Removal of the Wiper Blade
Removal of the Digital Flight Data Recorder (DFDR)
Open the Main Gear Doors for Access
Close the Main Gear Doors after Access
Nose Gear Doors - Ground Doors Opening
Nose Gear Doors - Ground Doors Closing
Cleaning/Painting of the Wheels and Brakes
Inspection/Check of the Wheels & Brakes
Inspection/Check of the Pressure of Tires
Installation of the MLG Wheel
(2649GM,2650GM,2651GM,2652GM)
Installation of the NLG Wheel (2659GM,2660GM)
Removal of the Fan Assy (7GS,8GS,9GS,10GS)

R
33-51-38-000-001
34-10-00-170-001
34-10-00-170-002
34-10-00-170-003

Removal of the Emergency Power-Supply Unit (EPSU)


Flushing of the Principal Total Pressure Lines
Flushing of the Principal Static Pressure Lines
Draining and Flushing of the Standby Static and
Standby Total Pressure Lines

CDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDE

FEFF :
ALL
F 10-12-00
F
F
F
FMXA

F
F

Page 213
May 01/02

------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------34-22-23-000-001
34-22-24-000-001
35-11-41-000-001
35-12-41-000-001
49-20-00-200-001
49-20-00-600-001

Removal of the Standby Compass (2FN)


Removal of the Standby Horizon Indicator (7FN)
Removal of the Crew Oxygen-Storage Cylinder (5750HM)
Removal of the Oxygen-Mask Stowage-Box
Inspection/Check of the Engine (4005KM) (GTCP 36-300)
Preservation / Storage / De-preservation of the
Engine (GTCP 36-300)
Wax and Polish Protection on Unpainted Light Alloy
Areas
Opening of the Passenger/Crew Door
Closing of the Passenger/Crew Door
Special Precautions before Work on the Passenger/Crew
Door
Servicing of the FWD Passenger/Crew Door.
Servicing of the AFT Passenger/Crew Doors
Open the FWD or AFT Cargo-Compartment Door with the
Yellow Electric Pump
Close the FWD or AFT Cargo-Compartment Door with the
Yellow Electric Pump
Close the Avionics Compartment Doors after Access
Inspect Rubber Flap Drain Valve Holes in Pressure
Floor from Main Landing Gear Bay
Inspect Single Drain Pipe at FR70 from Outside
Inspection of the Pylon Drains and the CAF4 Sealant
in the Cantilever Zone NAN
Preservation of the Engine
Removal of the Power Plant

51-21-00-916-001
52-10-00-010-001
52-10-00-410-001
52-10-00-860-001
52-11-00-610-001
52-13-00-610-001
52-30-00-860-001
52-30-00-860-002
R

52-41-00-410-002
53-39-00-210-001
53-59-00-210-001
54-50-00-200-001
71-00-00-550-010
71-00-20-000-040
3. __________
Job Set-up
Subtask 10-12-00-615-050

A. Cleaning of the Aircraft.


(1) Clean
(Ref.
(Ref.
(Ref.
(Ref.
(Ref.
(Ref.
(Ref.
(Ref.

internally the aircraft


TASK 25-30-00-920-001)
TASK 12-21-12-100-002),
TASK 12-21-12-100-003)
TASK 12-21-12-100-004).
TASK 12-21-12-100-005),
TASK 12-21-12-100-006),
TASK 12-21-12-100-007)
TASK 12-21-12-100-008).

CDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDE

FEFF :
ALL
F 10-12-00
F
F
F
FMXA

F
F

Page 214
May 01/02

(Ref. TASK 12-21-12-100-009),


(2) Clean externally the aircraft if necessary (Ref. TASK 12-21-11-615001).
4. Procedure
_________
Subtask 10-12-00-010-050-A
A. Get Access
(1) Open the AFT and FWD passenger/crews doors (Ref. TASK 52-10-00-010001)
(2) Open the AFT and FWD cargo compartment doors (Ref. TASK 52-30-00-860001)
(3) Open the landing gear doors (Ref. TASK 32-12-00-010-001) (Ref. TASK
32-22-00-010-001)
(4) Open all the pressurized access doors 811 812 822 824 827 833 834 843
844.
Subtask 10-12-00-481-050
B. Safety Precautions
(1) Secure the door slide arming lever and disarm the passenger/crew
emergency mechanism (Ref. TASK 52-10-00-860-001)
Subtask 10-12-00-916-050
C. Protection
(1) Apply SPECIAL MATERIALS (Material No. 05-043) on all the doors seals
R
R

(2) Do the servicing of the FWD Passenger/Crew doors and of the AFT
passenger/Crew Doors (Ref. TASK 52-11-00-610-001) (Ref. TASK 52-1300-610-001)

R
Subtask 10-12-00-210-051
D. Visual inspection of the drains.
(1) Make sure that all structural drain holes are clear (Ref. TASK 53-3900-210-001) (Ref. TASK 53-59-00-210-001) (Ref. TASK 54-50-00-200001).

CDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDE

FEFF :
ALL
F 10-12-00
F
F
F
FMXA

F
F

Page 215
Nov 01/02

Subtask 10-12-00-680-050
E. Deactivation of the rain repellent system
(1) Do the deactivation of the rain repellent system (Ref. TASK 30-45-00040-002)
Subtask 10-12-00-170-051
F. Protection of the Air Data System
(1) Flush the total pressure line of the Air Data Module (Ref. TASK 3410-00-170-001).
(2) Flush the static pressure line of the Air Data Module (Ref. TASK 3410-00-170-002).
(3) Drain and flush the standby static and standby total pressure lines
of the Air Data Module (Ref. TASK 34-10-00-170-003).
Subtask 10-12-00-640-050
G. Lubrication
R
R
R
R

(1) Lubricate the flight controls (Ref. TASK 12-22-27-640-003) (Ref. TASK
12-22-27-640-004) (Ref. TASK 12-22-27-640-005) (Ref. TASK 12-22-27640-006) (Ref. TASK 12-22-53-640-001) (Ref. TASK 12-22-55-640-001)
(Ref. TASK 12-22-27-640-007) (Ref. TASK 12-22-27-640-008).
Subtask 10-12-00-916-051
H. Protection
(1) Protect all the unpainted light-alloy areas. (Ref. TASK 51-21-00-916001)
In the non-pressurized areas, protect with SPECIAL MATERIALS
(Material No. 05-005) or COMMON GREASE (Material No. 04-012) the
steel parts that are not painted and the mechanical rods.
(2) Apply SPECIAL MATERIALS (Material No. 05-027)
(a) To the cases, electrical connectors, solenoids, brackets, screw
and bolt heads in the APU compartment.
(b) In all the holes specially in the area which can have
condensation (for the wings, apply SPECIAL MATERIALS (Material
No. 05-005).

CDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDE

FEFF :
ALL
F 10-12-00
F
F
F
FMXA

F
F

Page 216
May 01/02

(c) To the hinge arm of the horizontal stabilizer and apply SPECIAL
MATERIALS (Material No. 05-005) after.
(d) The rear section of the fuselage
Subtask 10-12-00-620-051
J. Protection of the engines.
(1) For a period of 0 to 6 months
(a) Preserve the engine (Ref. TASK 71-00-00-550-010)
(2) For a period of 6 months to 2 years
(a) Remove the engine (Ref. TASK 71-00-20-000-040)
Subtask 10-12-00-210-054
K. Inspection of the APU
(1) Do an inspection of the APU for preservation. (Ref. TASK 49-20-00200-001)
Subtask 10-12-00-620-054
L. Protection of the APU.
(1) Preserve the APU (Ref. TASK 49-20-00-600-001)
Subtask 10-12-00-620-059
M. Protection of the fuel system
(1) Refuel (Ref. TASK 12-11-28-650-003) (Ref. TASK 12-11-28-650-004):
- all the fuel tanks at 90 % of their total capacity
- the fuel system lines.
Make the vent surges wet so that the sealants do not become dry and
crack.
(2) Mix MICROBIOLOGICAL CONTAMIN. PROTECT. MATERIALS (Material No. 17003) with the fuel for prevention (Ref. TASK 28-11-00-600-007).
(3) Operate the water drains one hour after you refuel (Ref. TASK 12-3228-281-001)
(4) Do a check for fuel leakage of all fuel tanks.

CDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDE

FEFF :
ALL
F 10-12-00
F
F
R F
FMXA

F
F

Page 217
May 01/01

(5) Apply SPECIAL MATERIALS (Material No. 05-027) to the switches on the
REFUEL/DEFUEL panel 800VU.
NOTE : On the panel 800VU the REFUEL VALVES switches are set to
____
normal (the ON legend is OFF).
Subtask 10-12-00-620-058
N. Protection of the hydraulic system.
(1) Do a check to make sure that there is no internal hydraulic leaks
(Ref. TASK 29-00-00-280-001) (Ref. TASK 29-00-00-280-002) (Ref. TASK
29-00-00-280-003) (Ref. TASK 29-00-00-280-004)
(2) Decrease
liters
- in the
- on the
- in the
(3) Apply
- all
- the
- the
- the
- the

the level of HYDRAULIC FLUIDS (Material No. 02-003) to 10


Green hydraulic reservoir (Ref. TASK 29-10-00-680-001)
Yellow hydraulic reservoir (Ref. TASK 29-10-00-680-002)
Blue hydraulic reservoir (Ref. TASK 29-10-00-680-003)

SPECIAL MATERIALS (Material No. 05-005) on


the hydraulic unions in the NLG and MLG compartments.
trailing edge of the wing
bolt heads of the hydraulic reservoirs (Blue, Green, Yellow)
input lever of the flap unit
pipe clamps

(4) Apply SPECIAL MATERIALS (Material No. 05-027) for the protection of
the solenoids of the hydraulic flap manifold.
Subtask 10-12-00-210-055
P. Inspection of the flight controls.
(1) Examine all the parts of the flight control cables (Ref. TASK 27-2100-210-002) (Ref. TASK 27-41-00-220-002) (Ref. TASK 27-41-00-220-001)
If necessary protect the cables (Ref. TASK 20-24-11-100-001)
(2) Make sure that the oil level of the flap PCU gearbox (6201 CM) and of
the slat PCU gearbox (6001 CM) is correct. (Ref. TASK 12-13-27-612002) (Ref. TASK 12-13-27-612-003)

CDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDE

FEFF :
ALL
F 10-12-00
F
F
R F
FMXA

F
F

Page 218
May 01/01

Subtask 10-12-00-620-060-A
Q. Protection of landing gears
(1) Apply COMMON GREASE (Material No. 04-011) on the sliding tube of the
shock absorber and the actuator rods of the main and the nose landing
gear.
Apply talcum to all the rubber parts (except tires)
(2) Remove the debris guard, the impeller and the shroud (Ref. TASK 3248-51-000-005)
- Apply SPECIAL MATERIALS (Material No. 05-027) on the removed parts.
(3) Make sure that there is no corrosion in the brakes and the each
half-wheel (Ref. TASK 32-40-00-200-001)
- If there is corrosion, remove it (Ref. TASK 32-40-00-100-001)
Subtask 10-12-00-551-051
R. Storage of the tires
(1) For a period of 0 to 2 months
Check the inflation pressure. (Ref. TASK 32-41-00-210-003)
(2) For a period greather than 2 months
(a) It is recommended to install the old tires (or wheels with old
tires) on the NLG and the MLG. (Ref. TASK 32-41-11-400-006)
(Ref. TASK 32-41-12-400-001)
(b) When you keep the aircraft, the inflation pressure of the tires
is related to the weight of the aircraft.
You can find the inflation pressure of the tires:
Normal tire pressure
at the maximum
the weight of
ramp weight, with
X
the kept
the aircraft on
aircraft
Tire pressure when
the ground
you keep the aircraft. =
--------------------------------------------Maximum ramp weight of the
aircrfat.

CDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDE

FEFF :
ALL
F 10-12-00
F
F
R F
FMXA

F
F

Page 219
May 01/01

Subtask 10-12-00-620-061
S. Protection and lubrication of the landing gear.
(1) Apply a layer of SPECIAL MATERIALS (Material No. 05-027) for the
external protection of the electrical components (microswitches,
connectors, proximely detectors) , and apply COMMON GREASE (Material
No. 04-001) to the fittings for the towing and the debugging
operations.
(2) Lubricate (Ref. TASK 12-22-32-640-001) (Ref. TASK 12-22-32-640-002)
(3) Put tarpaulins on the bottom sections of the landing gears (this
includes the tires and the brakes).
Subtask 10-12-00-020-051
T. Removal of components:
(1) the standby compass 2FN and the IND standby horizon 7FN (Ref. TASK
34-22-23-000-001) (Ref. TASK 34-22-24-000-001)
and
(2) the flight data recorder (Ref. TASK 31-33-55-000-001) and the cockpit
recorder (Ref. TASK 23-71-35-000-001)
(3) Apply SPECIAL MATERIALS (Material No. 05-027) on all the connectors
of the removed equipment
(4) Install blanking caps, on the connectors (related wires bundles
harness or racksof the equipment) to prevent corrosion.
(5) Apply SPECIAL MATERIALS (Material No. 05-027) on the skin temperature
sensor 28HQ
(6) Remove the fire extinguisher bottles (Ref. TASK 26-21-41-000-001)
(Ref. TASK 26-22-41-000-001) (Ref. TASK 26-23-41-000-004)
(7) Remove the cartridges (Ref. TASK 26-23-41-000-005) (Ref. TASK 26-2141-000-004) (Ref. TASK 26-22-42-000-001)
(8) Remove the wiper arms and the blades (Ref. TASK 30-45-52-000-002)
(Ref. TASK 30-45-53-000-001)
(9) Remove the flight crew oxygen equipment (Ref. TASK 35-11-41-000-001)
(Ref. TASK 35-12-41-000-001)
Put blanking plugs on the open parts

CDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDE

FEFF :
ALL
F 10-12-00
F
F
R F
FMXA

F
F

Page 220
May 01/01

(10) Remove the flight crew portable oxygen equipment.


R
R

(11) Remove emergency exit light batteries (Ref. TASK 33-51-38-000-001)


(12) Remove the batteries of the megaphone. (Ref. TASK 25-65-51-920-001)
(13) Remove the first-aid kits and the emergency lacator beacon and keep
it
(14) Remove the Escape Slide (raft) and the Emergency Escape Slide
(Ref. TASK 25-61-41-000-001) (Ref. TASK 25-62-42-000-001) (Ref. TASK
25-62-44-000-002)
(15) Remove the portable and toilet fire extinguishers
Subtask 10-12-00-620-057
U. Protection of the water/waste system
(1) Make sure that the potable water, and water waste systems are empty,
dry with air if necessary (Ref. TASK 12-24-38-680-001).

(2) Drain, clean and deodorize the toilets (Ref. TASK 12-16-38-613-001).
Subtask 10-12-00-010-052
V. Protection
(1) For a period of 0 to 2 months
(a) Open the cockpit and cabin window shades,
(b) Cover the cockpit and passenger seat with a STORAGE PRESERVATION
(Material No. 15-002).
(2) For a period of 0 to 2 years
(a) Open the cockpit and cabin window shades,
(b) Cover the cockpit and passenger seat with a STORAGE PRESERVATION
(Material No. 15-002),
(c) Apply a BONDING AND ADHESIVE COMPOUNDS (Material No. 08-052) on
the cockpit and cabin windows.

CDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDE

FEFF :
ALL
F 10-12-00
F
F
F
FMXA

F
F

Page 221
May 01/02

Subtask 10-12-00-865-050
W. Open, safety and tag this(these) circuit breaker(s):

------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------105VU FLIGHT CONTROLS/ELAC2/STBY SPLY
16CE2
A02
105VU FLT CTL/ELAC1/STBY SPLY
16CE1
A01
105VU ADIRS/ADIRU1/28VDC
6FP1
C02
105VU ELEC/CSM/G /EV AUTO/SPLY
7XE
C01
105VU ELEC/HOT BUS/702PP SPLY
5PB2
D02
105VU ELEC/HOT BUS/701PP SPLY
5PB1
D01
105VU ELEC/HOT BUS/702PP SPLY
12PB2
E02
105VU ELEC/HOT BUS/701PP SPLY
12PB1
E01
105VU ELEC/STAT INV/CNTOR/CTL
14XB
G02
105VU ELEC/BAT REF/BCL1
9PB1
AS01
105VU ELEC/BAT REF/BCL2
9PB2
AS01
106VU CSM/G /EV/MAN/SPLY
6XE
B04
Subtask 10-12-00-020-055
X. Removal of the batteries.
(1) Disconnect and remove the batteries 2PB1 and 2PB2 (Ref. TASK 24-3851-000-001)
Subtask 10-12-00-620-050
Y. Protection .
(1) Blank of the NACA air intakes with fine nylon netting attached with
adhesive tape (record the locations).
(2) Blank of the air conditioning pack inlets and oulets , the precooler
outlets , the battery venturi , the anti-ice discharge vent/access
door located on the nacelle , the scoops with STORAGE PRESERVATION
(Material No. 15-002) attached with adhesive tape (record the
locations).
(3) Attach the two sprays nozzle with plastic bags or films, fixed on the
structure with adhesive tape (record the locations).
(4) Blank of all the apertures communicating with the passengers or
flight crew compartment or cargo compartment, APU, engines, main and
nose landing gears and cockpit with STORAGE PRESERVATION (Material
No. 15-002) attached with adhesive tape (record the locations).

CDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDE

FEFF :
ALL
F 10-12-00
F
F
F
FMXA

F
F

Page 222
May 01/02

NOTE : Use adhesive tape as little as possible to prevent the


____
discoloration of paint or the transfer of colors.
Subtask 10-12-00-410-050-A
Z. Close Access
(1) Close all the pressurized access doors 811 812 822 827 833 834 843
844.
R

(2) Close the access door 824 (Ref. TASK 52-41-00-410-002)


(3) Close all the doors (Ref. TASK 52-10-00-410-001) (Ref. TASK 52-30-00860-002) (Ref. TASK 32-12-00-410-001) (Ref. TASK 32-22-00-410-001).
Subtask 10-12-00-555-052

AA. Parking of the aircraft


(1) Do the full Parking procedure (Ref. TASK 10-11-00-555-001)
5. Close-up
________
Subtask 10-12-00-210-050
A. Inspection
(1) Make sure that all the doors, the panels are closed.
Subtask 10-12-00-942-050
B. Close-up
(1) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.
(2) Write the work done in the Technical Log Book of the aircraft.
Start of Storage
Date : ...........
Time : ...........
(3) During the storage period, do the periodic checks:
- at 7-day intervals (Ref. TASK 10-12-00-200-002)
- at 15-day intervals (Ref. TASK 10-12-00-200-003)
- at 1-month intervals (Ref. TASK 10-12-00-200-004)
- at 3-month intervals (Ref. TASK 10-12-00-200-005)

CDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDE

FEFF :
ALL
F 10-12-00
F
F
F
FMXA

F
F

Page 223
May 01/02

(4) For return to service, do the Return to Service procedure (Ref. TASK
10-30-00-554-001).

CDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDE

FEFF :
ALL
F 10-12-00
F
F
F
FMXA

F
F

Page 224
May 01/01

STORAGE - INSPECTION/CHECK
__________________________
TASK 10-12-00-200-002
Inspection Checklist: Weekly Check or Check after the Aircraft is in Wind/Wind
gusts of More than 35 Knots (65 km per Hour)
1. __________________
Reason for the Job
To do a check of the condition of the aircraft.
2. ______________________
Job Set-up Information
Not Applicable
3. __________
Job Set-up
Subtask 10-12-00-860-056
A. Not Applicable
4. Procedure
_________
Subtask 10-12-00-210-052
A. Inspection
(1) Make sure that the covers and the plugs are correctly installed.
(2) Make sure that there is no leakage from:
- the wings,
- the lower fuselage,
- the engines,
- the APU,
- the horizontal stabiliser,
- the vertical stabilizer.

CDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDE

FEFF :
ALL
F 10-12-00
F
F
F
FMXA

F
F

Page 601
Feb 01/96

TASK 10-12-00-200-003
Inspection Checklist: 15-days Check
1. __________________
Reason for the Job
To do a check of the condition of the aircraft.
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific

chocks

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------09-10-00-584-002
12-14-32-614-002

Towing with the Nose Gear from the Front


Nitrogen Filling of the Yellow Hydraulic System,
Brake Pressure Accumulator

3. __________
Job Set-up
Subtask 10-12-00-860-052
A. Not Applicable
4. Procedure
_________
Subtask 10-12-00-584-050
A. Move the aircraft
(1) Move the aircraft by a 1/4 turn of the MLG wheels (this is to prevent
damage to the tires and brinelling of the bearings) (Ref. TASK 09-1000-584-002). Put the chocks in position.

CDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDE

FEFF :
ALL
F 10-12-00
F
F
F
FMXA

F
F

Page 602
Feb 01/96

Subtask 10-12-00-210-053
B. Visual Inspection
CAUTION : CAREFULLY CLEAN ALL BIRD EXCREMENT FROM THE AIRCRAFT, BIRD
_______
EXCREMENT IS CORROSIVE.
(1) Examine all the areas of the aircraft that birds can get access to.
Make sure that there are no signs of bird nesting.
(2) Make sure that there is no leakage at the engine drain masts.
(3) Examine the condition of the wheels.
(4) Make sure that there is no hydraulic leakage.
(5) Make sure that the shock absorber extension is correct.
(6) Do a tire pressure check.
The correct tire pressure is the pressure specified for the aircraft
storage weight.
(7) Inflate the tires if necessary (Ref. TASK 12-14-32-614-002).

CDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDE

FEFF :
ALL
F 10-12-00
F
F
F
FMXA

F
F

Page 603
Feb 01/96

TASK 10-12-00-200-004
Inspection Checklist: 1-month Check
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 05-043
VARNISH P.T.F.E SPRAY (Ref. 20-31-00)
B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------12-24-34-600-001
21-21-00-710-001
21-26-00-710-001
21-28-00-710-006
R
R
R
R

24-41-00-861-002
24-41-00-862-002
28-24-00-710-002
30-11-00-710-001
30-21-00-710-001
32-12-00-010-001
32-12-00-410-001
32-22-00-010-001
32-22-00-410-001
52-10-00-010-001

Bleeding of the Standby Air Data System


Operational Test of the Cabin Recirculation Fans 14HG
and 15HG.
Operational Test of the Avionics Equipment
Ventilation from the Multipurpose Control and Display
Unit (MCDU)
Operational Test of the AFT Cargo-Compartment
Ventilation-System
Energize the Aircraft Electrical Circuits from the
External Power
De-energize the Aircraft Electrical Circuits Supplied
from the External Power
Operational Test of the ENG 1(2) LP Fuel Valve 12QM
(13QM)
Operational Test of the Wing Ice-Protection System
Operational Test of the Engine Air Intake Ice
Protection
Open the Main Gear Doors for Access
Close the Main Gear Doors after Access
Nose Gear Doors - Ground Doors Opening
Nose Gear Doors - Ground Doors Closing
Opening of the Passenger/Crew Door

CDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDE

FEFF :
ALL
F 10-12-00
F
F
F
FMXA

F
F

Page 604
May 01/99

------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------52-10-00-410-001
52-30-00-860-001
52-30-00-860-002

Closing of the Passenger/Crew Door


Open the FWD or AFT Cargo-Compartment Door with the
Yellow Electric Pump
Close the FWD or AFT Cargo-Compartment Door with the
Yellow Electric Pump
Close the Avionics Compartment Doors after Access

52-41-00-410-002
3. __________
Job Set-up
Subtask 10-12-00-860-054

A. Aircraft Configuration
R

(1) Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861002).


(2) On the CABIN PRESS panel 25VU:
(a) Release the DITCHING pushbutton switch to open:
- the outflow valve (10HL),
- the avionic ventilation skin air inlet and outlet valves (15HQ
and 22HQ).
NOTE : Make sure that the avionics ventilation continues to
____
operate correctly.
4. Procedure
_________
Subtask 10-12-00-010-053-A
A. Get Access
(1) Open the AFT and FWD passenger/crews doors (Ref. TASK 52-10-00-010001)
(2) Open the AFT and FWD cargo compartment doors (Ref. TASK 52-30-00-860001)
(3) Open the landing gear doors (Ref. TASK 32-12-00-010-001) (Ref. TASK
32-22-00-010-001)
(4) Open all the pressurized access doors 811 812 822 824 827 833 834 843
844.

CDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDE

FEFF :
ALL
F 10-12-00
F
F
F
FMXA

F
F

Page 605
May 01/02

Subtask 10-12-00-916-058
B. Protection
(1) Make sure that all the doors operate correctly.
(2) Apply SPECIAL MATERIALS (Material No. 05-043) on all the doors seals.
Subtask 10-12-00-680-051
C. Bleeding of the standby Air Data System.
(1) Bleed the standby air data system (Ref. TASK 12-24-34-600-001).
Subtask 10-12-00-710-050
D. Operational tests
(1) Do an operational test of the avionics equipement ventilation
(Ref. TASK 21-26-00-710-001).
(2) Do an operational test of the cargo ventilation system (Ref. TASK 2128-00-710-006).
(3) Do an operational test of the cabin recirculation fans (Ref. TASK 2121-00-710-001).
(4) Do an operational test of the wing ice protection system (Ref. TASK
30-11-00-710-001).
(5) Do an operational test of the air intakes ice protection system
(Ref. TASK 30-21-00-710-001).
(6) Do an operational test of the ENG 1(2) LP Fuel Valve 12QM (13QM)
(Ref. TASK 28-24-00-710-002).
Subtask 10-12-00-869-053
E. Aircraft Configuration
(1) On the CABIN PRESS panel 25VU:
(a) Push the DITCHING pushbutton switch to close:
- the outflow valve (10HL),
- the avionic ventilation skin air inlet and outlet valves (15HQ
and 22HQ).

CDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDE

FEFF :
ALL
F 10-12-00
F
F
R F
FMXA

F
F

Page 606
May 01/02

(2) De-energize the aircraft electrical circuits (Ref. TASK 24-41-00-862002).


5. Close-up
________
Subtask 10-12-00-410-051-A
A. Close Access
(1) Close all the pressurized access doors 811 812 822 827 833 834 843
844.
R

(2) Close the access door 824 (Ref. TASK 52-41-00-410-002)


(3) Close all the doors (Ref. TASK 52-10-00-410-001) (Ref. TASK 52-30-00860-002) (Ref. TASK 32-12-00-410-001) (Ref. TASK 32-22-00-410-001).
Subtask 10-12-00-942-051
B. Close -Up
(1) Make sure that the work area is clean and clear of tool(s) and other
items.

CDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDE

FEFF :
ALL
F 10-12-00
F
F
F
FMXA

F
F

Page 607
May 01/02

TASK 10-12-00-200-005
Inspection Checklist: 3-months Check
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 02-003
Material No. 05-005
Material No. 05-027
R
R

USA BMS 3-11F


HYDRAULIC FLUID (PHOSPHATE ESTER BASE)
(Ref. 20-31-00)
USA MIL-C-16173
GRADE II
CORROSION PREVENTIVE (Ref. 20-31-00)
USA MIL-L-81309
RUST INHIBITOR(FOR CORROSION USE 15-004)
(Ref. 20-31-00)

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------R
R
R

07-11-00-581-001
07-11-00-586-002
10-20-00-556-001
12-11-28-650-003
12-11-28-650-004
12-32-28-281-001
27-14-00-710-001
27-24-00-710-001
27-34-00-710-001
27-54-00-710-001
27-64-00-710-001
27-84-00-710-001
28-15-00-710-001
28-16-00-710-002
28-21-00-710-002

Lifting for Aircraft Maintenance Operations


Lowering of the Aircraft for Maintenance Operations
Mooring of the Aircraft
Pressure Refuel with Automatic Control
Pressure Refuel with Manual Control
Drain Water Content
Operational Test of the Aileron and Hydraulic
Actuation
Operational Test of the Rudder Hydraulic Actuation
Operational Test of the Elevator and Hydraulic
Actuation
Operational Test of the Flap System
Operational Test of the Spoiler Hydraulic Actuation
Operational Test of the Slat System
Operational Test of the Intercell Transfer Valves
Operational Test of Pylon Check Valve to Ensure Valve
has not Failed Open
Operational Test of the Wing Tank Pump Pressure Sense
Line Check valves

CDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDE

FEFF :
ALL
F 10-12-00
F
F
F
FMXA

F
F

Page 608
May 01/02

------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------28-21-00-710-003
28-21-00-710-004
28-24-00-710-002
28-29-00-710-001
32-11-00-200-001
32-21-00-200-002
53-39-00-210-001
53-59-00-210-001
54-50-00-200-001

Operational Test of the Center-Tank Pump-Canister


Check-Valves
Operational Test of the Suction and the Air Release
Valves
Operational Test of the ENG 1(2) LP Fuel Valve 12QM
(13QM)
Operational Test of the APU Low Pressure Fuel Valve
using each individual Motor in turn
Inspection/Check of the Main Gear
General Visual Inspection of the Nose Landing Gear
Inspect Rubber Flap Drain Valve Holes in Pressure
Floor from Main Landing Gear Bay
Inspect Single Drain Pipe at FR70 from Outside
Inspection of the Pylon Drains and the CAF4 Sealant
in the Cantilever Zone NAN

3. __________
Job Set-up
Subtask 10-12-00-860-053
A. Not Applicable
4. Procedure
_________
Subtask 10-12-00-210-060
A. Do a visual inspection of the aircraft for:
- inpacts by foreign objects
- fluid leakages (hydraulic fluid, fuel)
- missing parts
- obstruction
- corrosion.
of:
(1) The top and bottom of the wings
(2) The nacelles and the pylons
(3) The external surfaces of the fuselage
(4) The trailing edge of the horizontal and vertical stabilizers
(5) The external skin of the passenger/crew doors, the cargo doors and
the frame around the doors
(6) The outer handle of the passenger/crew doors
(7) Toilet areas
CDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDE

FEFF :
ALL
F 10-12-00
F
F
R F
FMXA

F
F

Page 609
May 01/02

(8) The drains (Ref. TASK 53-39-00-210-001) (Ref. TASK 53-59-00-210-001)


(Ref. TASK 54-50-00-200-001)
Subtask 10-12-00-916-059
B. Protection
(1) Apply SPECIAL MATERIALS (Material No. 05-027) in all the holes
specially in the area which can have condensation (for the wings,
apply SPECIAL MATERIALS (Material No. 05-005).
Subtask 10-12-00-680-052
C. Draining of fuel tanks
(1) Drain water from the fuel tanks (Ref. TASK 12-32-28-281-001).
(2) If necessary refuel all the fuel tanks at least 90 % level and the
fuel system lines. Make the vent surges wet so that the sealants do
not become dry and crack. (Ref. TASK 12-11-28-650-003) (Ref. TASK 1211-28-650-004)
Subtask 10-12-00-210-061
D. Inspection of hydraulic system.
(1) Check that the minimum level of 10 liters of HYDRAULIC FLUIDS
(Material No. 02-003) is
- in the Green hydraulic reservoir
- on the Yellow hydraulic reservoir
- in the Blue hydraulic reservoir.
Subtask 10-12-00-210-062
E. Inspection of the landing gear.
(1) Make a general visual inspection of the main and nose landing gears
(Ref. TASK 32-11-00-200-001) (Ref. TASK 32-21-00-200-002)
R
R

(2) Remove the tool installed during the mooring procedure and the
tarpaurlins.

(3) Put the aircraft on jacks (Ref. TASK 07-11-00-581-001)

R
R

(4) Turn the wheels by hand to make sure that there are no defect on
bearings.

(5) Put the aircraft on its wheels (Ref. TASK 07-11-00-586-002)

R
R

(6) Put the aircraft in the mooring condition (Ref. TASK 10-20-00-556001)

CDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDE

FEFF :
ALL
F 10-12-00
F
F
F
FMXA

F
F

Page 610
May 01/02

Subtask 10-12-00-710-055
F. Operational test
(1) Do an operational test of the intercell transfer valves (Ref. TASK
28-15-00-710-001) .
(2) Do an operational test of the fuel recirculation check valve
122QM(123QM) (Ref. TASK 28-16-00-710-002).
(3) Do an operational test of the wing tank pressure sense line check
valve (Ref. TASK 28-21-00-710-002).
(4) Do an operational test of the center tank pump canister check valves
(Ref. TASK 28-21-00-710-003).
(5) Do an operational test of the suction air and release valves
(Ref. TASK 28-21-00-710-004).
(6) Do an operational test of the engine 1(2) LP valves 12QM(13QM)
(Ref. TASK 28-24-00-710-002).
(7) Do an operational test of the APU LP shut-off valves (Ref. TASK 2829-00-710-001).
(8) Do an operational test of the aileron and hydraulic actuation
(Ref. TASK 27-14-00-710-001).
(9) Do an operational test of the elevator and hydraulic actuation
(Ref. TASK 27-34-00-710-001).
(10) Do an operational test of the rudder hydraulic actuation (Ref. TASK
27-24-00-710-001).
(11) Do an operational test of the flap system (Ref. TASK 27-54-00-710001).
(12) Do an operational test of the spoiler hydraulic actuation (Ref. TASK
27-64-00-710-001).
(13) Do an operational test of the slat system (Ref. TASK 27-84-00-710001).

CDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDE

FEFF :
ALL
F 10-12-00
F
F
F
FMXA

F
F

Page 611
Feb 01/96

5. Close-up
________
Subtask 10-12-00-942-052
A. Close-Up
(1) Make sure that the work area is clean and clear of tool(s) and other
items.

CDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDE

FEFF :
ALL
F 10-12-00
F
F
F
FMXA

F
F

Page 612
Feb 01/96

MOORING - MAINTENANCE PRACTICES


_______________________________
TASK 10-20-00-556-001
Mooring of the Aircraft
CAUTION : THE LAST FEET OF ALL TAXIING AND TOWING OPERATIONS MUST BE IN A
_______
STRAIGHT LINE. THIS IS TO PREVENT FORCE ON THE TIRES AND THE MAIN
LANDING GEAR.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
WARNING : MAKE SURE THAT THE WHEEL CHOCKS ARE IN POSITION.
_______
1. __________________
Reason for the Job
The purpose of mooring is to prevent damage to the aircraft on the ground in
high wind conditions.
For wind speeds less than 50 Kts:
- mooring is not necessary if the aircraft configuration is in the limits
given in chapter 05-57-00.
If the aircraft points into the wind and wind speed is:
- between 50 and 70 Kts, moor the aircraft at the NLG,
- more than 70 Kts, moor the aircraft at the NLG and MLG.
If the aircraft does not point into the wind or the direction of the wind
is not stable:
- for wind speeds or gusts more than 50 Kts, moor the aircraft at the NLG
and the MLG.
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific
98D10203500004

NLG shackles
1 MOORING KIT - NLG

CDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDE

FEFF :
ALL
F 10-20-00
F
F
F
FMXA

F
F

Page 201
Feb 01/96

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------R

05-57-00-200-001
10-11-00-555-001
10-20-00-991-002
10-20-00-991-003
10-20-00-991-001

Aircraft Stability
Parking Procedure (Not More Than 2 Days)
Fig. 201
Fig. 202
Fig. 203

3. __________
Job Set-up
Subtask 10-20-00-860-050
A. Aircraft Maintenance Configuration
(1) Put the aircraft in position on a flat surface with the mooring
points and make sure it is parked into the wind and the wheel of the
nose landing gear is on the aircraft axis.
Subtask 10-20-00-869-050
B. Stability of the Aircraft
(1) Make sure the aircraft is stable (Ref. TASK 05-57-00-200-001).
Subtask 10-20-00-555-050
C. Parking of the aircraft
(1) Put the aircraft in the parking configuration (Ref. TASK 10-11-00555-001).
Subtask 10-20-00-210-050
D. Visual Inspection
(1) Make sure that the flaps, the slats, the spoilers, the speed brakes
and the thrust reverser are retracted.
(2) Make sure that the THS is set to neutral.
(3) Make sure that the sliding windows of the cockpit are closed.

CDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDE

FEFF :
ALL
F 10-20-00
F
F
F
FMXA

F
F

Page 202
Nov 01/02

(4) Make sure that the passenger/crew doors and the cargo compartment
doors are closed.
4. Procedure
_________
Subtask 10-20-00-481-050
R

A. Mooring of the Nose Landing Gear

(1) With the Mooring Kit

(a) Put the MOORING KIT - NLG (98D10203500004) in position.

R
R

(2) Or with Ropes


(Ref. Fig. 201/TASK 10-20-00-991-002, 202/TASK 10-20-00-991-003)

R
R
R

(a) Attach the short ropes (1) of a diameter of 50.8 mm (2.0000 in.)
in position on the towing lug of the nose landing gear with the
NLG shackles.

R
R

NOTE : If manila or sisal rope is used, allow sufficient slack


____
for contraction in wet weather.

(b) Attach the other ropes (2) of a diameter of 50.8 mm (2.0000 in.).

R
R
R

(c) Attach all the ropes on the ground with the mooring points. Put
tension on this assembly.
Subtask 10-20-00-481-052

B. Mooring of the Main Landing Gear with Ropes


(Ref. Fig. 202/TASK 10-20-00-991-003, 203/TASK 10-20-00-991-001)
(1) Attach the ropes (3) and (4) of a diameter of 50.8 mm (2.0000 in.) on
the towing lug and the debogging lug of the main landing gear.
NOTE : If manila or sisal rope is used, allow sufficient slack for
____
contraction in wet weather.
(2) Attach the ropes on the ground with the mooring points. Put the
tension on this assembly.

CDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDE

FEFF :
ALL
F 10-20-00
F
F
F
FMXA

F
F

Page 203
Nov 01/02

Attachment of the Mooring Ropes on the Nose Landing Gear


Figure 201/TASK 10-20-00-991-002
CDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDE

FEFF :
ALL
F 10-20-00
F
F
F
FMXA

F
F

Page 204
Feb 01/96

Position of the Mooring Ropes


Figure 202/TASK 10-20-00-991-003
CDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDE

FEFF :
ALL
F 10-20-00
F
F
F
FMXA

F
F

Page 205
Feb 01/96

Attachment of the Mooring Ropes on the Main Landing Gear


Figure 203/TASK 10-20-00-991-001
CDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDE

FEFF :
ALL
F 10-20-00
F
F
F
FMXA

F
F

Page 206
Feb 01/96

5. Close-up
________
Subtask 10-20-00-942-050
A. Put the aircraft back to its initial configuration.
(1) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.
(2) Make sure that the work area is clean and clear of tool(s) and other
items.

CDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDE

FEFF :
ALL
F 10-20-00
F
F
F
FMXA

F
F

Page 207
Feb 01/96

RETURN TO SERVICE - INSPECTION/CHECK


____________________________________
TASK 10-30-00-554-001
Return to Service (Storage Period Up to 2 years)
1. __________________
Reason for the Job
This section contains the necessary data for the reactivation of the
aircraft after a storage period up to 2 years.
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific
No specific
No specific

adjustable access platform


tarpaulin
warning notice

B. Consumable Materials
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------Material No. 05-027
R
R

USA MIL-L-81309
RUST INHIBITOR(FOR CORROSION USE 15-004)
(Ref. 20-31-00)

CDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDE

FEFF :
ALL
F 10-30-00
F
F
F
FMXA

F
F

Page 601
May 01/02

C. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------05-21-20-200-001
05-21-20-200-003
05-21-20-200-005
10-11-00-554-001
12-12-29-611-001
12-12-29-611-002
R
R
R
R
R
R

12-13-24-612-011
12-13-24-680-010
12-13-80-600-010
12-13-80-600-011
12-14-32-614-001
12-21-11-615-001
12-21-12-100-001
12-22-32-640-001
12-22-32-640-002
12-32-28-281-001
12-32-28-281-003
12-32-29-281-001
21-21-00-710-001
21-21-41-000-001
21-21-41-400-001
21-26-00-710-001
21-26-43-000-002
21-26-43-000-003
21-26-43-400-002
21-26-43-400-003
21-28-00-710-006

Zonal Inspection of the FWD Avionics Compartment


(Zones 121 and 122)
Zonal Inspection of the Lateral Avionics Compartment
Zonal Inspection of the AFT Avionics Compartment
(Zones 127 and 128)
Return to operation (Parking of Not More Than 2 days)
Fill the Hydraulic Fluid Reservoir with a Hand Pump
Fill the Hydraulic Fluid Reservoir with a Hydraulic
Service Cart
IDG Servicing - Filling of the IDG with Oil or
Addition of Oil after a Level Check
Draining of the Oil from the IDG
Replenish Starter Oil System
Drain and Replenish Starter Oil System
Nitrogen Filling of the Tires
External Cleaning
SPARE TASK - FOR LATER USE
Lubrication of the MLG and Doors
Lubrication of the NLG and Doors
Drain Water Content
Sample Fuel for Microbiological Contamination
Analysis
Hydraulic Fluid Sample of Green,Blue and Yellow
Systems for Analysis
Operational Test of the Cabin Recirculation Fans 14HG
and 15HG.
Removal of the Recirculation Filter 4012HM (4013HM)
Installation of the Recirculation Filter 4012HM
(4013HM)
Operational Test of the Avionics Equipment
Ventilation from the Multipurpose Control and Display
Unit (MCDU)
Removal of the Filter Assembly (2081HM,2082HM,2083HM)
Removal of the Filter Assembly (2082HM,2083HM)
Installation of the Filter Assembly
(2081HM,2082HM,2083HM)
Installation of the Filter Assembly (2082HM,2083HM)
Operational Test of the AFT Cargo-Compartment
Ventilation-System

CDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDE

FEFF :
ALL
F 10-30-00
F
F
F
FMXA

F
F

Page 602
May 01/02

------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------23-61-00-200-001
23-71-35-400-001
24-26-00-710-001
24-38-51-400-001
25-30-00-920-001
25-61-41-400-001
R

25-62-42-400-001
25-62-44-400-001
25-65-51-920-001
26-12-00-710-001
26-21-00-720-003
26-21-41-280-001
26-21-41-280-002
26-21-41-400-004
26-22-00-210-001
26-22-00-710-001
26-22-00-710-003
26-22-41-280-001
26-22-41-400-001
26-22-42-400-001
26-23-00-200-001
26-23-00-710-001
26-23-41-280-001
26-23-41-400-004
26-23-41-400-005

- Check Resistance of Tip to Retainer - Check Bonding


of Retainer to Structure
Installation of the Cockpit Voice Recorder (CVR) 1RK
Operational Test of the Manual and Automatic Shedding
of the Galleys
Installation of the Batteries (2PB1, 2PB2)
Remove and Discard Air-Filter Element
Installation of the Captain/First Officer Emergency
Descent Device
Offwing Escape-Slide - Installation
Escape-Slide Pack-Assembly - Installation
Replacement of the Megaphone Batteries
Operational Test of the Engine Fire and Overheat
Detection (Loop/Squib)
Check of the Engine Fire Extinguishing Distribution
Piping for Leakage and Obstruction.
Weight Check of the Engine Fire-Extinguisher Bottle
(6WE1,6WE2,8WE1,8WE2)
Hydrostatic Test of the Engine Fire-Extinguisher
Bottle and Check of Pressure Switch Setting
Installation of the Cartridge of the Engine
Fire-Extinguisher Bottle
Inspection of the APU Fire-Extinguishing Distribution
Piping
Operational Test of the APU Fire-Extinguishing
Loop/Squib
Operational Test of the Low-Pressure Indicating
Circuit of the APU Fire-Extinguishing Bottle
Remove and Check the Weight of the APU Fire
Extinguisher Bottle (11WF)
Installation of the Fire Extinguisher Bottle (11WF)
Installation of the Fire Extinguisher Bottle
Cartridge (12WF)
Check of the Cargo-Compartment Fire-Extinguishing
Distribution-Piping for Leakage and Obstruction
Operational Test of the Cargo-Compartment
Fire-Extinguishing System
Weight Check of the Cargo Compartment
Fire-Extinguisher Bottle (4005WX)
Installation of the Cargo Fire-Extinguisher Bottle
(4005WX)
Installation of the Cartridge of the Cargo
Fire-Extinguisher Bottle

CDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDE

FEFF :
ALL
F 10-30-00
F
F
F
FMXA

F
F

Page 603
May 01/02

------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------26-24-00-210-001
26-24-00-210-002
27-14-00-710-001
27-24-00-710-001
27-34-00-710-001
27-54-00-710-001
27-64-00-710-001
27-84-00-710-001
28-11-00-600-003
28-11-00-790-001
28-11-00-790-002
28-11-00-790-003
28-11-00-790-004
28-15-00-710-001
28-16-00-710-002
28-21-00-710-002
28-21-00-710-003
28-21-00-710-004
28-24-00-790-003
29-10-00-710-001
29-30-00-200-002
30-11-00-710-001
30-21-00-710-001
30-45-00-440-002
30-45-52-400-002
30-45-53-400-001
31-33-55-400-002
32-11-00-200-001
32-12-00-010-001

Inspection/Check of the Portable Fire Extinguishers


Inspection/Check of the Portable Fire Extinguisher
Pressure Gauge
Operational Test of the Aileron and Hydraulic
Actuation
Operational Test of the Rudder Hydraulic Actuation
Operational Test of the Elevator and Hydraulic
Actuation
Operational Test of the Flap System
Operational Test of the Spoiler Hydraulic Actuation
Operational Test of the Slat System
Removal of Microbiological Particles
Leak Test with Fuel of the Wing-Tank Outer-Cell
Leak Test with Fuel of the Wing-Tank Outer and Inner
Cells
Leak Test of the Center Tank
Leak Test with Fuel of the Vent Surge Tank
Operational Test of the Intercell Transfer Valves
Operational Test of Pylon Check Valve to Ensure Valve
has not Failed Open
Operational Test of the Wing Tank Pump Pressure Sense
Line Check valves
Operational Test of the Center-Tank Pump-Canister
Check-Valves
Operational Test of the Suction and the Air Release
Valves
Operational Test of Engine Low Pressure Shut Off
Valves and Their Controls to Ensure No Flow When
Selected Closed With Booster Pumps On
Operational Test of the Hydraulic Fire Shut-Off
Valves
Check of the Reservoir Quantity Indication on the
ECAM Display Unit
Operational Test of the Wing Ice-Protection System
Operational Test of the Engine Air Intake Ice
Protection
Reactivation of the Rain Repellent System
Installation of the Wiper Arm (306DM, 307DM)
Installation of the Wiper Blade
Installation of the Digital Flight Data Recorder
(DFDR)
Inspection/Check of the Main Gear
Open the Main Gear Doors for Access

CDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDE

FEFF :
ALL
F 10-30-00
F
F
R F
FMXA

F
F

Page 604
May 01/02

------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------32-12-00-410-001
32-21-00-200-001
32-21-00-200-002
32-22-00-010-001
32-22-00-410-001
32-31-00-720-002
32-41-00-210-002
32-41-00-210-003
32-41-11-400-006
32-41-12-400-001
32-42-27-210-001
32-44-11-200-001
32-48-51-400-005
33-51-11-400-001
33-51-16-400-001
33-51-17-400-001
33-51-38-400-001

R
R

34-10-00-170-001
34-10-00-170-002
34-10-00-170-003
34-21-00-790-001
34-22-23-400-001
34-22-24-400-001
35-11-41-400-001
35-12-41-400-001
35-30-00-210-004
38-12-00-710-001
38-12-00-710-002
38-14-00-710-001
38-31-00-710-002
38-32-00-710-002
49-00-00-710-004
49-00-00-860-003
49-00-00-860-004

Close the Main Gear Doors after Access


General Visual Inspection of the Nose-Gear Downlock
Springs
General Visual Inspection of the Nose Landing Gear
Nose Gear Doors - Ground Doors Opening
Nose Gear Doors - Ground Doors Closing
Functional Test of the Normal Extension and
Retraction of the Landing Gear
Inspection/Check of the Wheels and Tires
Inspection/Check of the Pressure of Tires
Installation of the MLG Wheel
(2649GM,2650GM,2651GM,2652GM)
Installation of the NLG Wheel (2659GM,2660GM)
Inspection/Check of the Brake with the Wheel
Installed.
Check of the Nitrogen Fill Pressure of the Brake
Accumulator (Shown on the Gauge)
Installation of the Fan Assy (7GS,8GS,9GS,10GS)
Installation of the Cabin Emergency Light
Installation of the Emergency Exit Sign
Installation of the Emergency Exit Location-Sign
Installation of the Emergency Power-Supply Unit
(EPSU)
Flushing of the Principal Total Pressure Lines
Flushing of the Principal Static Pressure Lines
Draining and flushing of standby pneumatic circuits
Low range leak test of standby pneumatic circuits
Installation of the Standby Compass (2FN)
Installation of the Standby Horizon Indicator (7FN)
Installation of the Crew Oxygen-Storage Cylinder
(5750HM)
Installation of the Oxygen-Mask Stowage-Box
Check Pressure on Portable Oxygen Cylinders Gauge
Operational Test of the Potable Water-Distribution
System (with the APU)
Operational Test of the Potable Water-Distribution
System (with a Ground Air-Supply Cart)
Operational Test of the Potable Water Drain-System
Operational Test of the Vacuum Toilet System
Operational Test of the Waste/Water Drain System
Operational Test of the APU (4005KM) (GTCP 36-300)
APU Start by External Power (GTCP 36-300)
APU Shutdown by External Power (GTCP 36-300)

CDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDE

FEFF :
ALL
F 10-30-00
F
F
F
FMXA

F
F

Page 605
May 01/03

------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------49-11-11-400-001
49-20-00-200-001
49-90-00-600-002
51-74-11-300-002
51-74-11-300-003
52-10-00-010-001
52-10-00-410-001
52-30-00-860-001
52-30-00-860-002
52-41-00-410-002
53-39-00-210-001
53-59-00-210-001
54-50-00-200-001
R

71-00-00-550-011
71-00-00-710-012
71-00-00-710-028
71-00-00-710-043
71-00-00-710-047
71-00-20-400-040

Installation of the Auxiliary Power Unit (APU) 4005KM (GTCP 36-300)


Inspection/Check of the Engine (4005KM) (GTCP 36-300)
Oil Change (GTCP 36-300)
Removal of the Corrosion on Unpainted Light Alloy
Removal of the Corrosion on Window Frames
Opening of the Passenger/Crew Door
Closing of the Passenger/Crew Door
Open the FWD or AFT Cargo-Compartment Door with the
Yellow Electric Pump
Close the FWD or AFT Cargo-Compartment Door with the
Yellow Electric Pump
Close the Avionics Compartment Doors after Access
Inspect Rubber Flap Drain Valve Holes in Pressure
Floor from Main Landing Gear Bay
Inspect Single Drain Pipe at FR70 from Outside
Inspection of the Pylon Drains and the CAF4 Sealant
in the Cantilever Zone NAN
Depreservation of the Power Plant
Test No.3 : Idle Leak Check
Engine Shutdown
Normal Engine Automatic Start Procedure
Normal Engine Manual Start Procedure
Installation of the Power Plant

3. __________
Job Set-up
Subtask 10-30-00-941-051
A. Safety Precautions
(1) Put an adjustable access platform in position near the aircraft.
(2) Put a warning notice in position in the cockpit to tell persons not
to operate the systems while you prepare the aircraft for operation.

CDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDE

FEFF :
ALL
F 10-30-00
F
F
F
FMXA

F
F

Page 606
May 01/03

Subtask 10-30-00-554-052
B. Preparation of the Aircraft for Operation
(1) Do the full Return to Operation procedure (Ref. TASK 10-11-00-554001)
(2) Remove the tarpaulins from the MLG wheels.
4. Procedure
_________
Subtask 10-30-00-630-051
A. Removal of the Protections
(1) Remove the protections and the adhesive tape (refer to locations
recorded at the installation) from:
(a) The NACA air intakes.
(b) The air conditioning pack inlets and oulets.
(c) The precooler outlets.
(d) The battery venturi.
(e) The anti-ice discharge vent/access door located on the nacelle.
(f) The scoops.
(g) The two sprays nozzle.
(h) All the apertures communicating with the passengers or flight
crew compartment or cargo compartment, APU, engines, main and
nose landing gears cockpit.
(2) Drain and flush The pressure lines (Ref. TASK 34-10-00-170-001),
(Ref. TASK 34-10-00-170-002) and (Ref. TASK 34-10-00-170-003).
CAUTION : FLUSH AND DRAIN THE PITOT PRESSURE LINE IF:
_______
-THE WEATHER CONDITIONS ARE BAD (HIGH WIND, HEAVY RAIN)
-THE COVERS ARE NOT CORRECTLY INSTALLED.
WATER AND/ OR DIRT IN THE PRESSURE LINE CAN CAUSE DAMAGE TO
THE SYSTEM.

CDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDE

FEFF :
ALL
F 10-30-00
F
F
R F
FMXA

F
F

Page 607
May 01/02

Subtask 10-30-00-010-053
B. Get Access
(1) Open:
- the aft and FWD passenger/crew doors (Ref. TASK 52-10-00-010-001),
- the aft and FWD cargo-compartment doors (Ref. TASK 52-30-00-860001),
- the landing gear doors (Ref. TASK 32-12-00-010-001) (Ref. TASK 3222-00-010-001).
(2) Open all the pressurized access doors 811, 812, 822, 824, 827, 833,
834, 843, 844.
(3) Make sure that all the doors operate correctly.
Subtask 10-30-00-420-054
C. Installation of the Batteries
(1) Install the batteries 2PB1 and 2PB2 (Ref. TASK 24-38-51-400-001).
Subtask 10-30-00-630-057
D. Cockpit and Passenger Compartment
(1) Remove all the protections from :
- the cockpit and the passenger seats,
- the cockpit and the cabin windows.
Subtask 10-30-00-865-050
E. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):

------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------105VU FLIGHT CONTROLS/ELAC2/STBY SPLY
16CE2
A02
105VU FLT CTL/ELAC1/STBY SPLY
16CE1
A01
105VU ADIRS/ADIRU1/28VDC
6FP1
C02
105VU ELEC/CSM/G /EV AUTO/SPLY
7XE
C01
105VU ELEC/HOT BUS/702PP SPLY
5PB2
D02
105VU ELEC/HOT BUS/701PP SPLY
5PB1
D01
105VU ELEC/HOT BUS/702PP SPLY
12PB2
E02
105VU ELEC/HOT BUS/701PP SPLY
12PB1
E01
105VU ELEC/BAT REF/BCL2
9PB2
F02

CDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDE

FEFF :
ALL
F 10-30-00
F
F
F
FMXA

F
F

Page 608
May 01/03

------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------105VU ELEC/BAT REF/BCL1
9PB1
F01
105VU ELEC/STAT INV/CNTOR/CTL
14XB
G02

R
106VU CSM/G /EV/MAN/SPLY

6XE

B04

Subtask 10-30-00-210-051
F. Visual Inspection of the Aircraft
(1) Do a visual inspection of the aircraft for impacts by foreign
objects, fluid leakages (hydraulic fluid, fuel), missing parts,
obstruction, corrosion of:
(a) The top and bottom of the wings.
(b) The nacelles and the pylons.
(c) The external surfaces of the fuselage.
(d) The trailing edge of the horizontal and vertical stabilizers.
(e) The external skin of the passenger/crew doors, the cargo doors
and the frame around the doors.
(f) The outer control handle of the passenger/crew doors.
(g) Toilet areas.
(h) The drains (Ref. TASK 53-39-00-210-001) (Ref. TASK 53-59-00-210001) (Ref. TASK 54-50-00-200-001).
(2) If you find corrosion in an outer or inner structural area (cargocompartment, avionics compartment, landing gear wells etc...) remove
it (Ref. TASK 51-74-11-300-002) (Ref. TASK 51-74-11-300-003).
(3) Make sure that all the communication and navigation antennas are
installed on the aircraft and that they are in the correct condition.
(4) Make sure that all the static dischargers are installed on the
aircraft and that they are in the correct condition (Ref. TASK 23-6100-200-001).
(5) Do an inspection of the avionics-compartment (Ref. TASK 05-21-20-200001), (Ref. TASK 05-21-20-200-003), (Ref. TASK 05-21-20-200-005).

CDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDE

FEFF :
ALL
F 10-30-00
F
F
F
FMXA

F
F

Page 609
May 01/03

(6) Make sure that there are no bird nests in the rudder bearing area.
If there are nests you must remove them. For this, remove the panels
to get access to them.
(7) Do a check for bird excrement.
If there are bird excrement, remove and clean, as required (Ref. TASK
12-21-11-615-001).
Subtask 10-30-00-615-050
G. Removal of the Protective Material
(1) Remove the protections from:
- all the unpainted light alloy areas
- all the holes and apply SPECIAL MATERIALS (Material No. 05-027) on
the holes, especially on the areas which can have condensation.
Subtask 10-30-00-410-053
H. Close Access
(1) Close all the pressurized access doors 811, 812, 822, 827, 833, 834,
843 844.
R

(2) Close the access door 824 (Ref. TASK 52-41-00-410-002)


(3) Close the aft and FWD cargo-compartment doors (Ref. TASK 52-30-00860-002).
Subtask 10-30-00-420-065
J. Installation of the Fire Protection Components
(1) Make sure that the extinguisher bottles are in the correct condition
and that there are no leaks (Ref. TASK 26-21-41-280-001) (Ref. TASK
26-21-41-280-002) (Ref. TASK 26-22-41-280-001) (Ref. TASK 26-23-41280-001) (Ref. TASK 26-24-00-210-001).
(2) Install the fire extinguisher bottles (Ref. TASK 26-22-41-400-001)
(Ref. TASK 26-23-41-400-004).
(3) Install the cartridges (Ref. TASK 26-23-41-400-005) (Ref. TASK 26-2141-400-004) (Ref. TASK 26-22-42-400-001).
(4) Do a check of the fire extinguisher distribution piping for leakage
and obstruction (Ref. TASK 26-21-00-720-003).

CDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDE

FEFF :
ALL
F 10-30-00
F
F
F
FMXA

F
F

Page 610
May 01/02

(5) Do a check of the APU fire extinguishing distribution piping


(Ref. TASK 26-22-00-210-001).
(6) Do a check of the cargo compartment fire extinguishing discharge
tubes (Ref. TASK 26-23-00-200-001).
(7) Do an operational test of the engine fire extinguisher bottles low
pressure.
(8) Do an operational test of the low pressure indicating circuit of the
APU fire extinguishing bottle (Ref. TASK 26-22-00-710-003).
(9) Do an operational test of the low pressure indicating circuit of the
cargo compartment fire extinguisher bottle (Ref. TASK 26-23-00-710001).
(10) Do an operational test of the engine fire and overheat detection
(Loop Squib) (Ref. TASK 26-12-00-710-001).
(11) Do an operational test of the APU fire extinguishing system
(Ref. TASK 26-22-00-710-001)>.
(12) Do an operational test of the cargo compartment fire extinguishing
system (Ref. TASK 26-23-00-710-001)>.
Subtask 10-30-00-420-053
K. Installation of the APU
(1) Install the APU if removed (Ref. TASK 49-11-11-400-001).
Subtask 10-30-00-220-053
L. Inspection of the APU
(1) Do an inspection of the APU (Ref. TASK 49-20-00-200-001).
(2) Do a check of the APU oil quantity indication on the ECAM display
Unit.
- Do a check of the reservoir quantity indication on the ECAM display
unit (Ref. TASK 29-30-00-200-002).

CDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDE

FEFF :
ALL
F 10-30-00
F
F
R F
FMXA

F
F

Page 611
May 01/02

Subtask 10-30-00-710-052
M. Starting of the APU
(1) Start and operate the APU (Ref. TASK 49-00-00-860-003), (Ref. TASK
49-00-00-710-004).
(2) Shut down the APU (Ref. TASK 49-00-00-860-004).
(3) After you operate the APU, change the oil (Ref. TASK 49-90-00-600002).
Subtask 10-30-00-630-053
N. Preparation of the Engine Operation
(1) Install the engines if removed (Ref. TASK 71-00-20-400-040).
(2) Depreserve the engine (Ref. TASK 71-00-00-550-011).
Subtask 10-30-00-610-050
P. Check of the IDG and the Pneumatic Starter
(1) Do a check of the oil quantity:
R

(a) Check of the IDG (Ref. TASK 12-13-24-612-011).


(b) Check of the pneumatic starter (Ref. TASK 12-13-80-600-010).
Subtask 10-30-00-710-050
Q. Engine Operation
(1) Start the engines, make them turn for one minute (Ref. TASK 71-00-00710-043) (Ref. TASK 71-00-00-710-047).
(2) Do an engine run-up for the two engines (Ref. TASK 71-00-00-710-012).
(3) Shut down the engines (Ref. TASK 71-00-00-710-028).
(4) After shutdown, do a check of the engines for oil, hydraulic and fuel
leakages.

CDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDE

FEFF :
ALL
F 10-30-00
F
F
F
FMXA

F
F

Page 612
May 01/02

Subtask 10-30-00-612-050
R. Change of the Oil of the IDG and Pneumatic Starter
(1) Change the oil of the IDG (Ref. TASK 12-13-24-680-010), (Ref. TASK
12-13-24-612-011).
(2) Change the oil of the pneumatic starter (Ref. TASK 12-13-80-600-011).
Subtask 10-30-00-281-052
S. Check of the Fuel System
(1) Do a check for water (Ref. TASK 12-32-28-281-001).
(2) Do a check for microbiological contamination (Ref. TASK 12-32-28-281003).
(3) Eliminate contamination, if necessary: (Ref. TASK 28-11-00-600-003).
Subtask 10-30-00-610-052
T. Filling of the Hydraulic Reservoir
(1) Fill the hydraulic fluid reservoirs (Ref. TASK 12-12-29-611-001)
(Ref. TASK 12-12-29-611-002).
Subtask 10-30-00-710-053
U. Test of the Fuel System
(1) Do an operational test of the intercell transfer valves (Ref. TASK
28-15-00-710-001).
(2) Do an operational test of the fuel recirculation check valves 122QM
(123QM) (Ref. TASK 28-16-00-710-002)
(3) Do an operational test of the wing tank pressure sense line check
valve (Ref. TASK 28-21-00-710-002).
(4) Do an operational test of the center tank pump canister check valves
(Ref. TASK 28-21-00-710-003).
(5) Do an operational test of the suction air and release valves
(Ref. TASK 28-21-00-710-004).

CDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDE

FEFF :
ALL
F 10-30-00
F
F
R F
FMXA

F
F

Page 613
May 01/02

(6) Do an operational test of the engine 1(2) LP valves 12QM(13QM)


(Ref. TASK 28-24-00-790-003).
Subtask 10-30-00-790-050
V. Inspection for Fuel Leakage
(1) Do a check for fuel leakage (Ref. TASK 28-11-00-790-001) (Ref. TASK
28-11-00-790-002) (Ref. TASK 28-11-00-790-003) (Ref. TASK 28-11-00790-004).
Subtask 10-30-00-210-059
W. Inspection of the Landing Gear
(1) Remove the tarpaulin from the bottom section of the main landing
gear.
(2) Do a general visual inspection of the main and nose landing gears
(Ref. TASK 32-11-00-200-001) (Ref. TASK 32-21-00-200-002).
Subtask 10-30-00-420-056
X. Landing Gear Component Installation
(1) Install the debris guard, the impeller and the shroud (Ref. TASK 3248-51-400-005).
Subtask 10-30-00-210-060
Y. Inspection of the Braking System
(1) Do a inspection of the brakes for correct condition (Ref. TASK 32-4227-210-001).
(2) Do the check of the pressure of the MLG brake accumulators (Ref. TASK
32-44-11-200-001).
Subtask 10-30-00-640-051
Z. Lubrication of the Landing Gear
(1) Lubricate all the grease points of the nose landing gear (Ref. TASK
12-22-32-640-002).
(2) Lubricate all the grease points of the main landing gear (Ref. TASK
12-22-32-640-001).

CDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDE

FEFF :
ALL
F 10-30-00
F
F
R F
FMXA

F
F

Page 614
May 01/02

Subtask 10-30-00-554-050
AA. Removal of the Tires from Storage
(1) If the aircraft was stored with old tires:
(a) Install new tires (Ref. TASK 32-41-11-400-006) (Ref. TASK 32-4112-400-001).
(b) Make sure that the tires are inflated to the nominal pressure for
the aircraft weight (Ref. TASK 32-41-00-210-003) (Ref. TASK 1214-32-614-001).
(2) If the aircraft was stored with new tires:
(a) Inflate the tires to the nominal pressure (Ref. TASK 12-14-32614-001).
(b) Make sure that there are no cracks on the tires (Ref. TASK 32-4100-210-002).
Subtask 10-30-00-720-050
AB. Extension and Retraction of the Landing Gears
(1) Do the fonctional test of the extension and retraction of the landing
gear (Ref. TASK 32-31-00-720-002).
Subtask 10-30-00-210-061
AC. Visual Inspection of the Landing Gears
(1) Do a check for hydraulic leakage at the main landing gear (Ref. TASK
32-11-00-200-001).
(2) Do a check for hydraulic leakage at the nose gear (Ref. TASK 32-2100-200-001).
Subtask 10-30-00-710-055
AD. Hydraulic System Operation
(1) Do an operational test of the elevator and hydraulic actuation
(Ref. TASK 27-34-00-710-001).
(2) Do an operational test of the hydraulic shut off valve (Ref. TASK 2910-00-710-001).

CDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDE

FEFF :
ALL
F 10-30-00
F
F
R F
FMXA

F
F

Page 615
May 01/02

Subtask 10-30-00-710-056
AE. Operation of the Flight Controls
(1) Do an operational test of the aileron and hydraulic actuation
(Ref. TASK 27-14-00-710-001).
(2) Do an operational test of the elevator and hydraulic actuation
(Ref. TASK 27-34-00-710-001).
(3) Do an operational test of the rudder hydraulic actuation (Ref. TASK
27-24-00-710-001).
(4) Do an operational test of the flap system (Ref. TASK 27-54-00-710001).
(5) Do an operational test of the spoiler hydraulic actuation (Ref. TASK
27-64-00-710-001).
(6) Do an operational test of the slat system (Ref. TASK 27-84-00-710001).
Subtask 10-30-00-281-053
AF. Hydraulic Fluid Analysis
(1) Make an analysis of the hydraulic fluid (Ref. TASK 12-32-29-281-001).
Subtask 10-30-00-710-057
AG. Operation of the Ventilation System
(1) Remove the recirculation filter (Ref. TASK 21-21-41-000-001)
(2) Install a new recirculation filter (Ref. TASK 21-21-41-400-001)
(3) Remove the filter assembly (Ref. TASK 21-26-43-000-002) or (Ref. TASK
21-26-43-000-003).
(4) Install a new filter assembly (Ref. TASK 21-26-43-400-002) or
(Ref. TASK 21-26-43-400-003).
(5) Do an operational test of the ventilation system of the avionics
equipement ventilation (Ref. TASK 21-26-00-710-001).
(6) Do an operational test of the cargo ventilation system (Ref. TASK 2128-00-710-006).

CDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDE

FEFF :
ALL
F 10-30-00
F
F
R F
FMXA

F
F

Page 616
May 01/02

(7) Do an operational test of the cabin recirculation fans (Ref. TASK 2121-00-710-001).
Subtask 10-30-00-710-058-A
AH. Operation of the Water/Waste and Potable Water System
R

(1) Do an operational test of the potable water distribution system


(Ref. TASK 38-12-00-710-001) or (Ref. TASK 38-12-00-710-002).

(2) Do an operational test of the water drain system (Ref. TASK 38-14-00710-001).

(3) Do an operational test of the recirculation toilet system (Ref. TASK


38-31-00-710-002).

(4) Do an operational test of the water waste drain system (Ref. TASK 3832-00-710-002).
Subtask 10-30-00-710-054
AJ. Operation of the Shedding of the Galleys
(1) Do the operational test of the manual and automatic shedding of the
galleys (Ref. TASK 24-26-00-710-001).
Subtask 10-30-00-210-057
AK. Check of the Standby Air Data System
(1) Do a check of the standby air data system (Ref. TASK 34-21-00-790001)
Subtask 10-30-00-420-055
AL. Installation of Components
(1) Install the standby compass 2FN and the standby horizon indicator 7FN
(Ref. TASK 34-22-23-400-001) (Ref. TASK 34-22-24-400-001).
(2) Install the flight data recorder (Ref. TASK 31-33-55-400-002).
(3) Install the cockpit voice recorder (Ref. TASK 23-71-35-400-001).
(4) Install the wiper arms and the blades (Ref. TASK 30-45-52-400-002),
(Ref. TASK 30-45-53-400-001).

CDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDE

FEFF :
ALL
F 10-30-00
F
F
F
FMXA

F
F

Page 617
May 01/02

(5) Do the reactivation of the rain repellent system (Ref. TASK 30-45-00440-002)
(6) Install the oxygen equipment for the flight crew and the portable
oxygen equipment (Ref. TASK 35-11-41-400-001) (Ref. TASK 35-12-41400-001).
Subtask 10-30-00-210-073
AM. Fire Extinguisher Inspection
(1) Do a check of the portable fire extinguisher pressure gauge
(Ref. TASK 26-24-00-210-002).
(2) Do a check of the portable oxygen cylinder for correct pressure
(Ref. TASK 35-30-00-210-004).
Subtask 10-30-00-100-050
AN. Cleaning of the Lavatories and the Galleys
(1) If necessary, clean the lavatories and the galleys (Ref. TASK 25-3000-920-001) (Ref. TASK 12-21-12-100-001).
(2) Open all the window shades.
Subtask 10-30-00-210-062
AP. Check of the Components
(1) Make sure that the microphone handsets, the headsets, the boomsets
and the oxygen mask microphones are installed in the aircraft and
make sure that they are in the correct condition.
Subtask 10-30-00-420-066
AQ. Installation of the Components
(1) Install the batteries of the megaphones (Ref. TASK 25-65-51-920-001).
(2) Install all the emergency ceiling lights (Ref. TASK 33-51-11-400-001)
(Ref. TASK 33-51-16-400-001) (Ref. TASK 33-51-17-400-001).

CDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDE

FEFF :
ALL
F 10-30-00
F
F
R F
FMXA

F
F

Page 618
May 01/02

(3) Install the batteries of the emergency exit lights (Ref. TASK 33-5138-400-001).
NOTE : THE EMERGENCY EXIT LIGHTS MUST NOT OPERATE FOR MORE THAN THREE
____
MINUTES.
(4) Install the first-aid kits and the emergency locator beacon and
examine them.
(5) Install the new batteries in the flashlights and make sure that they
operate correctly.
(6) Install the escape slide/raft and the emergency escape slides
(Ref. TASK 25-61-41-400-001), (Ref. TASK 25-62-42-400-001),
(Ref. TASK 25-62-44-400-001).
(7) Install the portable and toilet fire extinguishers and the life
vests.
Subtask 10-30-00-710-115
AR. Operation of Ice Protection System
(1) Do an operational test of the wing ice protection system (Ref. TASK
30-11-00-710-001).
(2) Do an operational test of the air intakes ice protection system
(Ref. TASK 30-21-00-710-001).
5. Close-up
________
Subtask 10-30-00-942-050
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Close the aft and FWD Passenger/crew doors (Ref. TASK 52-10-00-410001).
(3) Close the gear doors (Ref. TASK 32-22-00-410-001) (Ref. TASK 32-1200-410-001).

CDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDE

FEFF :
ALL
F 10-30-00
F
F
R F
FMXA

F
F

Page 619
May 01/02

TASK 10-30-00-554-002
Return to Service (Storage Period not More than 1 month)
1. __________________
Reason for the Job
This procedure gives the reactivation measures after a prolonged parking
period up to 1 month.
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
------------------------------------------------------------------------------REFERENCE
QTY DESIGNATION
------------------------------------------------------------------------------No specific
No specific

adjustable access platform


warning notice

B. Referenced Information
------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------05-21-20-200-001
05-21-20-200-003
05-21-20-200-005
10-11-00-554-001
12-13-24-610-010
12-13-24-612-011

Zonal Inspection of
(Zones 121 and 122)
Zonal Inspection of
Zonal Inspection of
(Zones 127 and 128)
Return to operation

the FWD Avionics Compartment


the Lateral Avionics Compartment
the AFT Avionics Compartment
(Parking of Not More Than 2 days)

12-13-24-680-010
12-13-80-600-010
12-13-80-600-011
12-21-11-615-001
12-24-34-600-001
12-32-28-281-001
21-26-00-710-001

IDG Servicing - Filling of the IDG with Oil or


Addition of Oil after a Level Check
Draining of the Oil from the IDG
Replenish Starter Oil System
Drain and Replenish Starter Oil System
External Cleaning
Bleeding of the Standby Air Data System
Drain Water Content
Operational Test of the Avionics Equipment
Ventilation from the Multipurpose Control and Display
Unit (MCDU)

23-61-00-200-001

- Check Resistance of Tip to Retainer - Check Bonding


of Retainer to Structure

CDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDE

FEFF :
ALL
F 10-30-00
F
F
F
FMXA

F
F

Page 620
May 01/03

------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------24-26-00-710-001
24-38-51-400-001
25-62-00-210-001
25-65-51-710-002
26-12-00-710-001
26-21-00-710-002
26-22-00-710-001
26-22-00-710-003
26-23-00-710-001
26-24-00-210-002
27-14-00-710-001
27-24-00-710-001
27-34-00-710-001

R
R

27-54-00-710-001
27-64-00-710-001
27-84-00-710-001
28-15-00-710-002
28-16-00-710-002
28-21-00-710-002
28-21-00-710-003
28-21-00-710-004
28-24-00-790-003
28-29-00-710-001
29-10-00-710-001

Operational Test of the Manual and Automatic Shedding


of the Galleys
Installation of the Batteries (2PB1, 2PB2)
Check Pressure at Door Escape-Slide/Slide Raft
Pressure Gage (if not connected to CIDS)
Operational Test of the Megaphone
Operational Test of the Engine Fire and Overheat
Detection (Loop/Squib)
Operational Test of the Engine Fire-Extinguisher
Bottles Low-Pressure Indicating Circuit.
Operational Test of the APU Fire-Extinguishing
Loop/Squib
Operational Test of the Low-Pressure Indicating
Circuit of the APU Fire-Extinguishing Bottle
Operational Test of the Cargo-Compartment
Fire-Extinguishing System
Inspection/Check of the Portable Fire Extinguisher
Pressure Gauge
Operational Test of the Aileron and Hydraulic
Actuation
Operational Test of the Rudder Hydraulic Actuation
Operational Test of the Elevator and Hydraulic
Actuation
Operational Test of the Flap System
Operational Test of the Spoiler Hydraulic Actuation
Operational Test of the Slat System
Operational Test of Individual Transfer Valves to
Ensure Drive Shaft Rotates Valve to Open Position
Operational Test of Pylon Check Valve to Ensure Valve
has not Failed Open
Operational Test of the Wing Tank Pump Pressure Sense
Line Check valves
Operational Test of the Center-Tank Pump-Canister
Check-Valves
Operational Test of the Suction and the Air Release
Valves
Operational Test of Engine Low Pressure Shut Off
Valves and Their Controls to Ensure No Flow When
Selected Closed With Booster Pumps On
Operational Test of the APU Low Pressure Fuel Valve
using each individual Motor in turn
Operational Test of the Hydraulic Fire Shut-Off
Valves

CDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDE

FEFF :
ALL
F 10-30-00
F
F
F
FMXA

F
F

Page 621
May 01/03

------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------30-11-00-710-001
30-21-00-710-001
32-11-00-200-001
32-12-00-010-001
32-12-00-410-001
32-21-00-200-002
32-22-00-010-001
32-22-00-410-001
32-41-00-210-003
32-42-27-210-001
33-51-00-710-001
33-51-00-710-002

34-10-00-170-001
34-10-00-170-002
34-10-00-170-003
35-30-00-210-004
38-12-00-710-001
38-12-00-710-002
38-14-00-710-001
38-31-00-710-002
38-32-00-710-002
49-00-00-710-004
51-74-11-300-002
51-74-11-300-003
52-10-00-010-001
52-10-00-410-001
52-30-00-860-001
52-30-00-860-002
52-41-00-410-002
53-39-00-210-001
53-59-00-210-001
54-50-00-200-001

71-00-00-550-011

Operational Test of the Wing Ice-Protection System


Operational Test of the Engine Air Intake Ice
Protection
Inspection/Check of the Main Gear
Open the Main Gear Doors for Access
Close the Main Gear Doors after Access
General Visual Inspection of the Nose Landing Gear
Nose Gear Doors - Ground Doors Opening
Nose Gear Doors - Ground Doors Closing
Inspection/Check of the Pressure of Tires
Inspection/Check of the Brake with the Wheel
Installed.
Operational Test of Emergency Lights by RTEST EMER
LIGHT SYSR Pushbutton
Operational Test of Emergency Escape-Path
Marking-Lights
Flushing of the Principal Total Pressure Lines
Flushing of the Principal Static Pressure Lines
Draining and flushing of standby pneumatic circuits
Check Pressure on Portable Oxygen Cylinders Gauge
Operational Test of the Potable Water-Distribution
System (with the APU)
Operational Test of the Potable Water-Distribution
System (with a Ground Air-Supply Cart)
Operational Test of the Potable Water Drain-System
Operational Test of the Vacuum Toilet System
Operational Test of the Waste/Water Drain System
Operational Test of the APU (4005KM) (GTCP 36-300)
Removal of the Corrosion on Unpainted Light Alloy
Removal of the Corrosion on Window Frames
Opening of the Passenger/Crew Door
Closing of the Passenger/Crew Door
Open the FWD or AFT Cargo-Compartment Door with the
Yellow Electric Pump
Close the FWD or AFT Cargo-Compartment Door with the
Yellow Electric Pump
Close the Avionics Compartment Doors after Access
Inspect Rubber Flap Drain Valve Holes in Pressure
Floor from Main Landing Gear Bay
Inspect Single Drain Pipe at FR70 from Outside
Inspection of the Pylon Drains and the CAF4 Sealant
in the Cantilever Zone NAN
Depreservation of the Power Plant

CDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDE

FEFF :
ALL
F 10-30-00
F
F
F
FMXA

F
F

Page 622
May 01/03

------------------------------------------------------------------------------REFERENCE
DESIGNATION
------------------------------------------------------------------------------71-00-00-710-012
71-00-00-710-028
71-00-00-710-043
71-00-00-710-047
71-00-20-400-040
10-30-00-991-001

Test No.3 : Idle Leak Check


Engine Shutdown
Normal Engine Automatic Start Procedure
Normal Engine Manual Start Procedure
Installation of the Power Plant
Fig. 601

3. __________
Job Set-up
Subtask 10-30-00-941-052
A. Safety Precautions
(1) Put an adjustable access platform in position near the aircraft.
(2) Put a warning notice in position in the cockpit to tell persons not
to operate the systems while you prepare the aircraft for operation.
Subtask 10-30-00-554-051
B. Preparation of the Aircraft for Operation
(1) Do the full Return to Operation procedure (Ref. TASK 10-11-00-554001)
(2) Remove the tarpaulins from the MLG wheels.
4. Procedure
_________
Subtask 10-30-00-630-059
A. Removal of the Protections
(Ref. Fig. 601/TASK 10-30-00-991-001)
(1) Remove the the protections and the adhesive tape (refer to locations
recorded at installation) from:
(a) The NACA air intakes (6)
(b) The air conditioning pack inlets and outlets (3)
(c) The precooler outlets (5)

CDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDE

FEFF :
ALL
F 10-30-00
F
F
R F
FMXA

F
F

Page 623
May 01/03

Identification of Areas to be Protected


Figure 601/TASK 10-30-00-991-001
CDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDE

FEFF :
ALL
F 10-30-00
F
F
R F
FMXA

F
F

Page 624
May 01/03

(d) The battery venturi (4)


(e) The anti-ice discharge vent/access door (2).
(f) The scoops (1)
(2) Drain and flush the pressure lines (Ref. TASK 34-10-00-170-001),
(Ref. TASK 34-10-00-170-002) and (Ref. TASK 34-10-00-170-003).
CAUTION : FLUSH AND DRAIN THE PITOT PRESSURE LINE IF:
_______
-THE WEATHER CONDITIONS ARE BAD (HIGH WIND, HEAVY RAIN)
-THE COVERS ARE NOT CORRECTLY INSTALLED.
WATER AND/ OR DIRT IN THE PRESSURE LINE CAN CAUSE DAMAGE TO
THE SYSTEM.
Subtask 10-30-00-010-054
B. Get Access
(1) Open:
- the aft and FWD passenger/crew doors (Ref. TASK 52-10-00-010-001),
- the aft and FWD cargo-compartment doors (Ref. TASK 52-30-00-860001),
- the landing gear doors (Ref. TASK 32-12-00-010-001) (Ref. TASK 3222-00-010-001).
(2) Open all the pressurized access doors 811, 812, 822, 824, 827, 833,
834, 843, 844.
(3) Make sure that all the doors operate correctly.
Subtask 10-30-00-420-061
C. Installation of the Batteries
(1) Install the batteries 2PB1 and 2PB2 (Ref. TASK 24-38-51-400-001).
Subtask 10-30-00-630-058
D. Cockpit and passenger compartment
(1) Remove all the protections from :
- the cockpit and the passenger seats,
- the cockpit and the cabin windows.

CDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDE

FEFF :
ALL
F 10-30-00
F
F
R F
FMXA

F
F

Page 625
May 01/03

Subtask 10-30-00-865-052
E. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
------------------------------------------------------------------------------PANEL DESIGNATION
IDENT. LOCATION
------------------------------------------------------------------------------121VU APU/FIRE/EXTIG/SQUIB/B
2WF
L39
121VU APU/FIRE/EXTIG/SQUIB/A
1WF
L38
121VU APU/FIRE/LP VALVE/NORM
4WF
M42
121VU APU/FIRE/LP VALVE/STBY
3WF
M41
121VU ENGINE/ENG1 AND 2 FIRE EXTIG/BTL1/SQUIB/B
2WE1
Q44
121VU ENGINE/ENG1 AND 2 FIRE EXTIG/BTL1/SQUIB/A
1WE1
Q43
121VU ENGINE/ENG1 AND 2 FIRE EXTIG/BTL2/SQUIB/B
2WE2
Q42
121VU ENGINE/ENG1 AND 2 FIRE EXTIG/BTL2/SQUIB/A
1WE2
Q41
Subtask 10-30-00-210-065
F. Visual Inspection of the Aircraft
(1) Do a visual inspection of the aircraft. Do a check for impact damage,
fluid leakage (hydraulic fluid, fuel), missing parts, obstruction,
corrosion of:
(a) The top and bottom of the wings.
(b) The nacelles and the pylons.
(c) The external surfaces of the fuselage.
(d) The trailing edge of the horizontal and vertical stabilizers.
(e) The external skin of the passenger/crew doors, the cargo doors
and the frame around the doors.
(f) The outer control handle of the passenger/crew doors.
(g) Toilet areas.
(h) The drains (Ref. TASK 53-39-00-210-001) (Ref. TASK 53-59-00-210001) (Ref. TASK 54-50-00-200-001).
(2) If you find corrosion in an outer or inner structural area (cargocompartment, avionics compartment, landing gear wells etc...) remove
it (Ref. TASK 51-74-11-300-002) (Ref. TASK 51-74-11-300-003).

CDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDE

FEFF :
ALL
F 10-30-00
F
F
R F
FMXA

F
F

Page 626
May 01/03

(3) Make sure that all the communication and navigation antennas are
installed on the aircraft and that they are in the correct condition.
(4) Make sure that all the static dischargers are installed on the
aircraft and that they are in the correct condition (Ref. TASK 23-6100-200-001).
(5) Do an inspection of the avionics compartment (Ref. TASK 05-21-20-200001) (Ref. TASK 05-21-20-200-003) (Ref. TASK 05-21-20-200-005).
(6) Make sure that there are no bird nests in the rudder bearing area.
If there are nests you must remove them. For this, remove the panels
to get access to them.
(7) Do a check for bird excrement.
If there are bird excrement, remove and clean, as required (Ref. TASK
12-21-11-615-001).
Subtask 10-30-00-220-054
G. Inspection of the Landing Gear
(1) Do a check of:
(a) the main and nose landing gears (Ref. TASK 32-11-00-200-001)
(Ref. TASK 32-21-00-200-002),
(b) the brakes (Ref. TASK 32-42-27-210-001),
(c) the tire pressure (Ref. TASK 32-41-00-210-003).
Subtask 10-30-00-680-050
H. Draining
(1) Drain water from the fuel tanks (Ref. TASK 12-32-28-281-001).
(2) Bleed the standby air data system (Ref. TASK 12-24-34-600-001).
Subtask 10-30-00-710-062
J. Operation of the Fire Protection Components
(1) Do an operational test of:
(a) The low pressure indicating circuit of the engine
fire-extinguisher bottles (Ref. TASK 26-21-00-710-002).

CDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDE

FEFF :
ALL
F 10-30-00
F
F
R F
FMXA

F
F

Page 627
May 01/03

(b) The low pressure indicating circuit of the APU fire extinguishing
bottle (Ref. TASK 26-22-00-710-003).
(c) The low pressure indicating circuit of the cargo compartment fire
extinguisher bottle.
(d) The engine fire and overheat detection (Loop Squib) (Ref. TASK
26-12-00-710-001).
(e) The APU fire extinguishing system (Ref. TASK 26-22-00-710-001).
(f) The cargo compartment fire extinguishing system (Ref. TASK 26-2300-710-001).
Subtask 10-30-00-614-051
K. Opening of the Oxygen Storage Cylinder Valve
(1) Open the valve of the oxygen storage cylinder.
(a) On the panel 21VU, push the OXYGEN/CREW SUPPLY pushbutton switch.
The OFF legend goes off.
(b) Very slowly open the valve of oxygen cylinder (5750HM) 3 to 4
turns, and let the pressure become stable. This occurs after
approximately 90 seconds.
(c) Fully open the valve.
(d) On the panel 21VU, release the OXYGEN/CREW SPLY pushbutton
switch. The OFF legend comes on.
(e) On the oxygen box, operate the PRESS TO TEST AND RESET control
slide a sufficient number of times to make the system empty.
(f) On the lower ECAM display unit, on the DOOR/OXY page, the OXY LO
PR message comes on amber.
NOTE : The OXY LO PR message goes off when the LP oxygen supply
____
solenoid valve (3HT) is open.

CDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDE

FEFF :
ALL
F 10-30-00
F
F
R F
FMXA

F
F

Page 628
May 01/03

Subtask 10-30-00-210-068
L. Visual Inspection of the Pressure Indication of the Escape Slide
Inflation Reservoir
(1) Do a visual inspection of the pressure indication of the escape slide
inflation reservoir (Ref. TASK 25-62-00-210-001).
Subtask 10-30-00-410-051
M. Close Access
(1) Close all the pressurized access doors 811, 812, 822, 827, 833, 834,
843.
(2) Close the access door 824 (Ref. TASK 52-41-00-410-002)
(3) Close the aft and FWD cargo-compartment doors (Ref. TASK 52-30-00860-002) 844.
Subtask 10-30-00-630-055
N. Preparation of the Engine Operation
(1) Install the engines if removed (Ref. TASK 71-00-20-400-040).
(2) Depreserve the engine (Ref. TASK 71-00-00-550-011).
Subtask 10-30-00-610-053
P. Check of the IDG and the Pneumatic Starter
(1) Do a check of the oil quantity
(a) Check the IDG (Ref. TASK 12-13-24-610-010).
(b) Check the pneumatic starter (Ref. TASK 12-13-80-600-010).
Subtask 10-30-00-710-063
Q. Engine Operation
(1) Start the engines, make them turn for one minute (Ref. TASK 71-00-00710-043) (Ref. TASK 71-00-00-710-047).
(2) Do an engine run-up for the two engines (Ref. TASK 71-00-00-710-012).

CDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDE

FEFF :
ALL
F 10-30-00
F
F
R F
FMXA

F
F

Page 629
May 01/03

(3) Shut down the engines (Ref. TASK 71-00-00-710-028).


(4) After shutdown, do a check of the engines for oil, hydraulic and fuel
leakage.
Subtask 10-30-00-612-053
R. Change of the Oil of the IDG and Pneumatic Starter
(1) Change the oil of the IDG (Ref. TASK 12-13-24-680-010), (Ref. TASK
12-13-24-612-011).
(2) Change the oil of the pneumatic starter (Ref. TASK 12-13-80-600-011).
Subtask 10-30-00-710-066
S. Starting of the APU
(1) Start and operate the APU (Ref. TASK 49-00-00-710-004).
Subtask 10-30-00-710-067
T. Hydraulic System Operation
(1) Do an operational test of the hydraulic shut off valve (Ref. TASK 2910-00-710-001).
Subtask 10-30-00-710-068
U. Operation of the Flight Controls
(1) Do an operational test of the aileron and hydraulic actuation
(Ref. TASK 27-14-00-710-001).
(2) Do an operational test of the elevator and hydraulic actuation
(Ref. TASK 27-34-00-710-001).
(3) Do an operational test of the rudder hydraulic actuation (Ref. TASK
27-24-00-710-001).
(4) Do an operational test of the flap system (Ref. TASK 27-54-00-710001).
(5) Do an operational test of the spoiler hydraulic actuation (Ref. TASK
27-64-00-710-001).

CDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDE

FEFF :
ALL
F 10-30-00
F
F
R F
FMXA

F
F

Page 630
May 01/03

(6) Do an operational test of the slat system (Ref. TASK 27-84-00-710001).


Subtask 10-30-00-710-074
V. Operation of the Ventilation System
(1) Do an operational test of the ventilation system of the avionics
equipement ventilation (Ref. TASK 21-26-00-710-001).
R
Subtask 10-30-00-710-076-A
W. Operation of the Water/Waste and Potable Water System
(1) Do an operational test of the potable water distribution system
(Ref. TASK 38-12-00-710-001) or (Ref. TASK 38-12-00-710-002).
(2) Do an operational test of the water drain system (Ref. TASK 38-14-00710-001).
(3) Do an operational test of the vacuum toilet system (Ref. TASK 38-3100-710-002).
(4) Do an operational test of the water waste drain system (Ref. TASK 3832-00-710-002).
Subtask 10-30-00-710-080
X. Test of the Fuel System
(1) Do an operational test of the intercell transfer valves (Ref. TASK
28-15-00-710-002).

(2) Do an operational test of the fuel recirculation check valves 122QM


(123QM) (Ref. TASK 28-16-00-710-002)
(3) Do an operational test of the wing tank pressure sense line check
valve (Ref. TASK 28-21-00-710-002).
(4) Do an operational test of the center tank pump canister check valves
(Ref. TASK 28-21-00-710-003).
(5) Do an operational test of the suction air and release valves
(Ref. TASK 28-21-00-710-004).

CDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDE

FEFF :
ALL
F 10-30-00
F
F
F
FMXA

F
F

Page 631
May 01/03

(6) Do an operational test of the engine 1(2) LP valves 12QM(13QM)


(Ref. TASK 28-24-00-790-003).
Subtask 10-30-00-710-086
Y. Test of the APU Shut-off Valves
(1) Do an operational test of the APU LP shut-off valves (Ref. TASK 2829-00-710-001).
Subtask 10-30-00-710-087
Z. Operation of the Shedding of the Galleys
(1) Do the operational test of the manual and automatic shedding of the
galleys (Ref. TASK 24-26-00-710-001).
Subtask 10-30-00-710-088
AA. Operational Test of the Emergency Lights
(1) Do an operational test of the emergency lights (Ref. TASK 33-51-00710-001).
(2) Do an operational test of the emergency escape path marking system
lights (Ref. TASK 33-51-00-710-002).
Subtask 10-30-00-710-089
AB. Operation of Ice Protection System
(1) Do an operational test of the wing ice protection system (Ref. TASK
30-11-00-710-001).
(2) Do an operational test of the air intakes ice protection system
(Ref. TASK 30-21-00-710-001).
Subtask 10-30-00-710-091
AC. Operational Test of the Megaphone
(1) Do an operational test of the megaphone (Ref. TASK 25-65-51-710-002).

CDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDE

FEFF :
ALL
F 10-30-00
F
F
R F
FMXA

F
F

Page 632
May 01/03

Subtask 10-30-00-210-069
AD. Fire Extinguisher Inspection
(1) Check the portable fire extinguisher pressure gauge (Ref. TASK 26-2400-210-002).
(2) Check the portable oxygen cylinder for correct pressure (Ref. TASK
35-30-00-210-004).
5. Close-up
________
Subtask 10-30-00-942-051
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Close the aft and FWD Passenger/crew doors (Ref. TASK 52-10-00-410001).
(3) Close the gear doors (Ref. TASK 32-12-00-410-001) (Ref. TASK 32-2200-410-001).

CDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDE

FEFF :
ALL
F 10-30-00
F
F
R F
FMXA

F
F

Page 633