Вы находитесь на странице: 1из 2

APPROVAL BEFORE PUTTY WORK

Project:

Date:

Contractor:

No.:

Building / item(s)
According to Drawing No.

Date:

RHV Inspection Report


Description

Accept

Time:
No

N.A

Remark

Inspection works
Purity (do not stick dust, moss, oil)
Even (do not have raveling, asperity
Dry surface
Smoothness
Plaster surface( have no cracking, asperity)
Bead, site of wall (even, sharp)
Wall sites are orthogonal (check by square)
Covered the door frame and door leaves
Covered installed equipment
Evenness (design allowance is checked by 2m rule)
Your submission for approval is subject to following conditions:


Approved

 Amend and resubmit

Approved on condition as noted


Not approved as noted

Note:

Date: Jan. 2008


Rev.: 01

Code: TEC-00-16-A3

Witnessed by Owner

Name:
Position:
Date:

Date: Jan. 2008


Rev.: 01

Approved by Consultant
Royal HaskoningDHV

Name:
Position:
Date:

Requested by Contractor

Name:
Position:
Date:

Code: TEC-00-16-A3

Вам также может понравиться