Project:
Date:
Contractor:
No.:
Building / item(s)
According to Drawing No.
Date:
Accept
Time:
No
N.A
Remark
Inspection works
Purity (do not stick dust, moss, oil)
Even (do not have raveling, asperity
Dry surface
Smoothness
Plaster surface( have no cracking, asperity)
Bead, site of wall (even, sharp)
Wall sites are orthogonal (check by square)
Covered the door frame and door leaves
Covered installed equipment
Evenness (design allowance is checked by 2m rule)
Your submission for approval is subject to following conditions:
Approved
Note:
Code: TEC-00-16-A3
Witnessed by Owner
Name:
Position:
Date:
Approved by Consultant
Royal HaskoningDHV
Name:
Position:
Date:
Requested by Contractor
Name:
Position:
Date:
Code: TEC-00-16-A3