AGENDA
Track Record
Main Tecnological Features
Application to the Ultra Deep
Waters in the GoM
Page 2
Piranema Spirit
Hummingbird Spirit
Voyageur Spirit
Goliat
Sevan Louisiana
Sevan Developer
4 Drilling Units
Sevan Driller
Sevan Brasil
3 Accommodation Units
Arendal Spirit
Page 3
Stavanger Spirit
Nantong Spirit
WIDP
Field operator:
FPSO owner:
Hull:
Topside integration:
Location:
Water depth:
Hull size:
Oil processing:
Gas process/ injection:
Page 4
Petrobras
Teekay Petrojarl
Yantai Raffles
Keppel Verolme
Offshore Aracaju, Brasil
1000m
Sevan300
30 000 bod. (4800m3/d)
3.6 mill Sm3/d (130 mill
scfd) @ 280 bar
FPSO Goliat
Field operator:
Location:
Water depth:
Yard:
Hull size:
Oil processing:
Water injection:
Gas compression:
Oil storage:
Power feed from shore:
Page 5
Eni
Norwegian Barents Sea
400m (Harsh and sub-arctic)
Hyundai Heavy Industries
Sevan1000
100 000 bod (15.900 m3/d)
125 000 bwd (19.900 m3/d)
140 Mill Scfd
1 000 000 bbls (159.000 m2)
60 MW
DESIGN/HULL TYPE
Sevan 300-FAU design
Yard: COSCO Nantong / Qidong
ACCOMMODATION
500 beds in 294 cabins
4 single, 238 double, 4 quadruple
DP SYSTEM
DYNPOS AUTRO (DP3)
Azipod thrusters (underwater detachable) 6 X 4.4 MW
Service Speed
7 knots
Power generation
33 MW
Page 6
Sevan Louisiana
Page 7
AGENDA
Track Record
Main Tecnological Features
Application to the Ultra Deep
Waters in the GoM
Page 8
Geo-stationary hull
Main benefits
Axio-symetric hull
No weathervaning - Hull facing environment with
same shape in all directions no need to rotate >
Eliminating turret and swivel
WAVES
Sevan shape
Page 9
Page 10
Ship-shaped
FPSO
Fatigue
FPSO
Sevan
Peak periods (s)
Page 11
Page 12
Page 13
AGENDA
Track Record
Main Tecnological Features
Application to the Ultra Deep
Waters in the GoM
Page 14
Ship-shaped FPSO
Non ship-shaped cylindrical FPSO (represented by SEVAN 1000)
Non ship-shaped hemispherical FPSO (represented by SSP 320 Plus)
Deep draft semi-submersible FPSO (represented by Octabuoy 1 MMbbls)
Basis of Design
Page 16
Field:
Water depth:
2,500m
Sea State:
Storage capacity:
1,000,000 bbls
Oil production:
Water production:
60,000 bopd
Gas processing:
60 mmscfd
Motions:
No. of risers:
Page 17
FWPSO
Flexible solution
Mooring lines
Drill pipe
Risers
Template
Hull Design
Main Particulars
Hull Diameter
Bilge box Diameter
Bilge box plate Diameter
Main Deck Diameter
Process Deck Diameter
93
124
138
103
109
m
m
m
m
m
42 m
48 m
Draft, Ballast
Draft, Loaded
Freeboard to MD, Ballast
Freeboard to MD, Loaded
22
31
22
11
Topsides Payload
Cargo Oil Storage
Page 19
m
m
m
m
30.000 t
1mmbbls
GoM 1 yr operating
GoM 1000y
1000 yrHurricane
Hurricane
25
15
10
0
0
10
15
20
Page 20
25
30
Motions
Heave motion
Heave Motion
Loaded draft
Ballast draft
Hs
[m]
Tp
[s]
Sign
Amp
[m]
MPM Amp
[m]
Sign Amp
[m]
MPM Amp
[m]
1 yr Operating Condition
3.7
9.1
0.09
0.16
0.14
0.26
10 yr Operating Condition
6.0
11.5
0.27
0.50
0.42
0.78
8.0
13.0
0.47
0.86
0.73
1.34
13.4
14.9
1.12
2.02
1.59
2.89
17.0
16.0
1.94
3.46
2.41
4.33
Wave condition
Motions
Heave accelerations
Vertical Acceleration
Loaded draft
Hs
[m]
Tp
[s]
3.7
Ballast draft
Sign Amp
[m/s2]
MPM Amp
[m/s2]
Sign Amp
[m/s2]
MPM Amp
[m/s2]
9.1
0.13
0.25
0.22
0.41
6.0
11.5
0.27
0.49
0.39
0.73
8.0
13.0
0.34
0.64
0.49
0.92
13.4
14.9
0.51
0.95
0.73
1.34
17.0
16.0
0.60
1.11
0.84
1.56
Wave condition
Mooring System
Layout
Page 23
Mooring System
Calculations
Page 24
Mooring System
Offset
Offset
100y Cond.
1000y Cond
Page 25
Ballast Condition
Loaded Condition
Direction
In-line
Intermed.
In-Betw.
In-line
Intermed.
In-Betw.
Heading*
+/- 30
+/- 60
+/- 30
+/- 60
Static
1.4
1.9
2.2
1.3
1.8
2.1
LF
1.3
1.6
1.9
1.0
1.3
1.4
WF
0.3
0.3
0.3
0.3
0.3
0.3
Tot
2.9
3.7
4.3
2.5
3.2
3.6
Allowed
5.0
5.0
5.0
5.0
5.0
5.0
Static
2.7
4.0
4.4
2.5
3.7
4.2
LF
1.7
2.1
2.5
1.3
1.6
1.8
WF
0.4
0.4
0.4
0.4
0.4
0.4
Tot
4.7
6.3
6.9
4.1
5.6
6.3
Allowed
7.0
7.0
7.0
7.0
7.0
7.0
Hull Design
Tank Arrangement
WB Tanks
Cofferdam
Page 26
Topside Layout
Moonpool
Lifeboats
Offloading
Blast wall
Page 27
Moonpool Arrangement
Offloading
Accommodation
Bilgebox
Mooring lines
Risers
Page 28
Lower Tertiary
Up to VLLC
LOOP:
Suezmax or VLLC
30 hrs.
15 hrs.
30 hrs.
Total:
90 hrs.
Offloading
Source: Remora
Page 31
Sevan FPSO
Page 32
Courtesy of Cefront
Conventional Loading System, similar to Bow Loading System (BLS)
Conventional Offloading reel with floating hose located on aft deck (SDS)
Mooring hawser for keeping tanker in position
Transportation friendly
Thank you
Page 38