Corporate Overview
R&D Strength of Lineage & Operational Experience of Pace offers unique benefits to Customers
Factor of Pride
2004 - 2009
Inception of
TowerCos
Operators outsource
noncore business to
TowerCos for better
asset utilization, quick
rollout & risk
mitigation
Factor of Investment
2009 - 2012
2012 -
TowerCo/
ServCo
TowerCos outsource
non-core activities
such as O&M, Fuel
Filling etc to local
companies for
resource
optimization, cost
benefits & localized
asset SLA
management
Factor of Profitability
TowerCo/ ESCo
TowerCos partner
with reliable Energy
Management
Companies to ensure
efficient Energy
Management through
reliable technology
implementation and
efficient operations
Challenges
DG failed to start
Cost Impact
Diesel filling
records
Issues
Sub-optimal Temperature
And higher utility bills
Temperature effects
On battery life
DG Battery failure
DG Power measurements
Cost
Impact
Key Challenges
1.
2.
3.
4.
Adherence to SLA
Reliable Monitoring & Alarms
Reduction in Power & Fuel
Dependable MIS
Inefficient operations due to lack of focus, experience & appropriate technology utilization
Improved
Products
Better
Services
End-to-end
Solutions
Accountabil
ity
Lesser Energy
Loss
Better
utilization
Comprehensive
O&M
Comprehensive
AMC
Product
Development
Installation &
Commissioning
O&M
Commitment on
SLA
Commitment on
Energy Cost
Reliable MIS
Reduction in
Power Usage
Reduction in
Fuel
Consumption
Reduction in
Leakage
Our Experience
Already offering 600 solar
sites & 100 Li-Ion sites
Achieved targeted
Carbon Footprint
Reduction
Industry has tried various technologies & models; but has not been fully successful
Local Presence
Experience
Tools & Systems
Technology
Operational
Capabilities
Financial
Strength
Scalability
4 Pillars of Success
for ESCO Model
Fund Raising
Cost of Capital
Critical Mass
Management
Logistics
Our Proposal
Flexible solutions based on Customer Expectations Capex, Opex or Fixed Energy Model
Stable Grid
Stable Grid
INDOOR
OUTDOOR
INDOOR
OUTDOOR
OUTDOOR
Optional
Optional
Optional
Tailor made solution based on load, grid availability & environment factors are key for success
Benefits
High Efficiency Even at Part Load
15 KVA Lower Total Cost of Ownership than a
Diesel Genset
MTG
Minimal Maintenance lower TCO
Multi Fuel / Wide Fuel Quality
Tolerance lower theft risk
Uses existing supply chain, minimal
disruption
No Oil or Water lower theft risk
Low Emissions
Low Noise, No Vibration ideal for
urban applications
Less than 1/4 the Size and Weight of
a Diesel Genset lower logistics costs
Remote Monitoring and Control
MTG is the new innovative solution to manage Operational challenges of conventional DGs
11
2 BTS Configuration
3 BTS Configuration
System Configuration:
System Configuration:
System Configuration:
Solar KW
: 3 KW
Solar KW
: 5 KW
Solar KW
: 7 KW
Battery Capacity
: 600AH
Battery Capacity
: 1000AH
Battery Capacity
: 1200AH
No. of BTS
: 1 BTS
No of BTS
: 2 BTS
No. of BTS
: 3 BTS
Grid Connection
: No Grid
Grid Connection
: No Grid
Grid Connection
: No Grid
DG
: 15 KVA
DG
: 15 KVA
DG
: 15 KVA
PSPO
: Outdoor Type
PSPO
: Outdoor Type
PSPO
: Outdoor Type
Load
: 1 Kw
Load
: 2 Kw
Load
: 3 Kw
Efficient control of various sources of power ensures reduction in carbon & Opex costs
12
Hybrid Power
Solutions
Green Energy
Solutions
Energy Management
Solutions
Field Maintenance
Services
Comprehensive
O&M
Remote Monitoring
Services
Capex
Investment
Energy
Service
Model
13
We are flexible
Customer Expectations
Investment Model
Owned by Customer, Operated by
ESCO with Fixed Energy Model
Adherence to SLAs
Benefits to Customers
No impact on
EBITDA, helps better
use of cash reserve
Lesser Capex, helps
better utilisation of
available resource for
growth
Less complicated, and
more focused
14
Industry
Clusterization with
critical mass
Freedom to choose
optimum solution
Sustained pricing
We are ready to offer Win-Win Solution!!! However, we need the Govt. & industry support
Thank You
Empowering Telecom Infrastructure
through environment friendly
solutions