Вы находитесь на странице: 1из 27

PROJECT :

PLTU KEBAN AGUNG


(2 X 135 MW)
LAHAT

CALCULATION SHEET OF
COAL SHED

FOR APPROVAL
REV.

DATE

DESCRIPTION

PREP.

CHECK

APPROVAL

CONSULTANT :

OWNER'S DWG NO. :


CONTRACTOR :

VENDOR :

PROJECT :

PROJECT :
PLTU KEBAN AGUNG
(2 X 135 MW)
LAHAT
DATE

SIGNATURE

DRAWN
JOB NO.
DOC NO.
PREP.

SCALE
NONE
REV.

CHECK

APPV.

INT. REV.

SHEET OF

.
1 General
1.1 Scope
This document presents design calculation of Coal Shed Foundation
Analysis for steel structure had calculated by vendor
Structure Spesification:

1.2 Codes, Standards & Refferences


1 SNI.03-2847-2002 " Tata Cara Perhitungan Struktur Beton Untuk Bangunan Gedung".
2 SNI.03-1726-2012 " Tata Cara Perencanaa Ketahanan Gempa Untuk Bangunan Gedung".
3 ACI 318 -2005" Building Code Requirements for Structural Concrete & Commentary"
4 PPIUG-1983 "Peraturan Pembebanan Indonesia Untuk Gedung"
1.3 Quality of Material
No Material
1 Deformed reinforcing
steel bar (fy)
2 Plain reinforcing
steel bar (fy)

Description

Value

Unit

yield strength

4000

Kg/cm2

yield strength

2400

Kg/cm2

1.4 Unit Weight of Material


No
Material
1 Steel Structure
2 Structural Concrete

Value
7850
2400

Unit
kg/m3
kg/m3

.
2 LOADING DESIGN
The following loads and forces are considered in the design of Foundation
2.1 Load Type
2.1.1
Dead Load
2.1.2
Live Load
2.1.3
Wind Load X+
2.1.4
Wind Load X2.1.5
Wind Load Y+
2.1.6
Wind Load Y2.1.7
Earthquake Load X+ (100%) & Y+ (30%)
2.1.8
2.1.9
2.1.10
2.1.11
2.1.12
2.1.13
2.1.14

Earthquake Load X+ (100%) & Y- (30%)


Earthquake Load X- (100%) & Y+ (30%)
Earthquake Load X- (100%) & Y- (30%)
Earthquake Load Y+ (100%) & X+ (30%)
Earthquake Load Y+ (100%) & X- (30%)
Earthquake Load Y- (100%) & X+ (30%)
Earthquake Load Y- (100%) & X- (30%)

2.2 Load Calculation


Load had calculated by steel structure vendor
2.3 Load Combination
2.3.1
1DL + 0.3LL
2.3.2
1.4DL + 1.7LL
2.3.3
1.1DL + 1.3LL + 1.3WL Y+
2.3.4
1.1DL + 1.3LL + 1.3WL Y2.3.5
1.1DL + 1.3LL + 1.4 (7)
2.3.6
1.1DL + 1.3LL + 1.4 (8)
2.3.7
1.1DL + 1.3LL + 1.4 (9)
2.3.8
1.1DL + 1.3LL + 1.4 (10)
2.3.9
1.1DL + 1.3LL + 1.4 (11)
2.3.10 1.1DL + 1.3LL + 1.4 (12)
2.3.11 1.1DL + 1.3LL + 1.4 (13)
2.3.12 1.1DL + 1.3LL + 1.4 (14)

.
3 STRUCTURAL ANALYSIS AND DESIGN

Reaction summary
Fx max dan My max
Fx min dan My min
Fy max, Mx min & P
Fy min dan Mx max

Node
23
12
1
14

L/C
1.1DL + 1.3LL + 1.4 (9)
1.1DL + 1.3LL + 1.4 (8)
1.4DL + 1.7LL
1.4DL + 1.7LL

Fx
Fy
P
79.698 -159.38 267.325
-105.39 141.168 250.967
-11.026 287.679 447.23
-11.052 -286.48 446.091

Mx
My
398.446 199.244
-352.922 -263.47
-719.196 -27.565
716.197 -27.63

LLLLLLL LLLLLLL
Fx min dan My min
Fy max, Mx min & P

Node
L/C
Fx
Fy
P
Mx
My
12 1.1DL + 1.3LL + 1.4 (8) 105.387 -141.17 -186.21 -352.922 -263.47
1 1.4DL + 1.7LL
11.0262 -287.68 -364.81 -719.196 -27.565

L L L L L L L L L L L L L L L L L L L L L LLLLLLL LLLL LLLLLL

LLLLL LLLL LLLL LLLLLLL LLLLLLL LLLL LLLLLL

Project
Location
File
Subject
Load
Unit

: Jembatan PDAM
: BSD - Tanggerang
: pdam delatinos 02.edb
: Support Reactions
: Working Loads For Pile Design
: ton meter

Lokasi
Story
Point
(-)
(-)
BASE
6
BASE
7
BASE
8
BASE
9
BASE
10
BASE
11
BASE
12
BASE
13
BASE
14
BASE
15
BASE
16
BASE
17
BASE
18
BASE
19
BASE
20
BASE
21
BASE
22
BASE
23
BASE
24
BASE
25
BASE
26
BASE
27
BASE
28

FX
ton
0.22
0.56
1.35
0.71
0.34
0.12
-2.91
-0.77
-0.70
-1.27
-0.24
0.25
0.00
-0.13
0.12
0.58
0.03
5.76
-0.43
0.76
1.01
0.84
0.01

FY
ton
0.33
0.22
0.61
-0.35
2.54
-0.08
-7.05
7.33
-1.81
-1.61
-2.12
-1.95
0.74
2.67
1.76
0.43
1.39
1.17
-1.16
-0.15
0.12
-0.11
-1.77

Pembebanan Tetap
FZ
MX
ton
tonm
1,354.64 -0.33
1,267.13 -0.21
1,331.87 -0.61
1,473.18 0.26
1,494.02 -2.32
1,391.44 0.00
1,361.29 -39.69
1,341.45 39.66
1,496.85 1.53
1,559.19 1.36
1,442.93 1.86
1,506.86 1.71
1,438.32 -0.68
1,111.83 -2.43
1,461.41 -1.61
1,528.21 -0.43
3,185.63 -1.38
3,207.29 9.39
293.82
1.11
440.79
0.14
443.36
-0.12
434.44
0.10
298.93
1.69

MY
tonm
0.21
0.55
1.27
0.64
0.30
0.15
11.98
-4.69
-0.65
-1.10
-0.18
0.32
-0.06
-0.15
0.13
0.54
0.20
-24.93
-0.40
0.73
0.97
0.81
0.01

MZ
tonm
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.01
0.00
0.00
0.00
-0.01
-0.01
0.00
0.00
0.00
0.01
0.00
0.00
0.00
0.00
0.00
0.00

FX
ton
0.22
0.56
1.35
0.71
0.34
0.12
-2.91
-0.77
-0.70
-1.27
-0.24
0.25
0.00
-0.13
0.12
0.58
0.03
5.76
-0.43
0.76
1.01
0.84
0.01

Pembebanan Sementara Gempa X


FY
FZ
MX
MY
ton
ton
tonm
tonm
0.33 1,354.64 -0.33
0.21
0.22 1,267.13 -0.21
0.55
0.61 1,331.87 -0.61
1.27
-0.35 1,473.18 0.26
0.64
2.54 1,494.02 -2.32
0.30
-0.08 1,391.44 0.00
0.15
-7.05 1,361.29 -39.69
11.98
7.33 1,341.45 39.66
-4.69
-1.81 1,496.85 1.53
-0.65
-1.61 1,559.19 1.36
-1.10
-2.12 1,442.93 1.86
-0.18
-1.95 1,506.86 1.71
0.32
0.74 1,438.32 -0.68
-0.06
2.67 1,111.83 -2.43
-0.15
1.76 1,461.41 -1.61
0.13
0.43 1,528.21 -0.43
0.54
1.39 3,185.63 -1.38
0.20
1.17 3,207.29 9.39
-24.93
-1.16 293.82
1.11
-0.40
-0.15 440.79
0.14
0.73
0.12
443.36
-0.12
0.97
-0.11
434.44
0.10
0.81
-1.77 298.93
1.69
0.01

MZ
tonm
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.01
0.00
0.00
0.00
-0.01
-0.01
0.00
0.00
0.00
0.01
0.00
0.00
0.00
0.00
0.00
0.00

FX
ton
0.22
0.56
1.35
0.71
0.34
0.12
-2.91
-0.77
-0.70
-1.27
-0.24
0.25
0.00
-0.13
0.12
0.58
0.03
5.76
-0.43
0.76
1.01
0.84
0.01

Pembebanan Sementara Gempa Y


FY
FZ
MX
MY
ton
ton
tonm
tonm
0.33 1,354.64 -0.33
0.21
0.22 1,267.13 -0.21
0.55
0.61 1,331.87 -0.61
1.27
-0.35 1,473.18
0.26
0.64
2.54 1,494.02 -2.32
0.30
-0.08 1,391.44
0.00
0.15
-7.05 1,361.29 -39.69
11.98
7.33 1,341.45 39.66
-4.69
-1.81 1,496.85
1.53
-0.65
-1.61 1,559.19
1.36
-1.10
-2.12 1,442.93
1.86
-0.18
-1.95 1,506.86
1.71
0.32
0.74 1,438.32 -0.68
-0.06
2.67 1,111.83 -2.43
-0.15
1.76 1,461.41 -1.61
0.13
0.43 1,528.21 -0.43
0.54
1.39 3,185.63 -1.38
0.20
1.17 3,207.29
9.39
-24.93
-1.16 293.82
1.11
-0.40
-0.15 440.79
0.14
0.73
0.12
443.36
-0.12
0.97
-0.11
434.44
0.10
0.81
-1.77 298.93
1.69
0.01

MZ
tonm
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.01
0.00
0.00
0.00
-0.01
-0.01
0.00
0.00
0.00
0.01
0.00
0.00
0.00
0.00
0.00
0.00

Project
Location
File
Subject
Load
Unit

: Jembatan PDAM
: BSD - Tanggerang
: pdam delatinos 02.edb
: Support Reactions
: Ultimate Loads For Pile Cap Design
: ton meter

Lokasi
Story
Point
(-)
(-)
BASE
6
BASE
7
BASE
8
BASE
9
BASE
10
BASE
11
BASE
12
BASE
13
BASE
14
BASE
15
BASE
16
BASE
17
BASE
18
BASE
19
BASE
20
BASE
21
BASE
22
BASE
23
BASE
24
BASE
25
BASE
26
BASE
27
BASE
28

FX
ton
0.3
-0.3
0.8
1.0
0.5
0.1
-4.1
-0.6
-1.0
-1.8
-0.4
-0.2
0.5
-0.2
0.2
0.8
-0.5
9.2
0.5
1.1
1.4
1.2
0.0

Pembebanan Tetap 1
FY
FZ
MX
MY
ton
ton tonm tonm
0.5
### -0.5
0.3
0.9
### -0.8
-0.3
0.3
### -0.3
0.7
1.0
### -0.9
0.9
2.1
### -2.0
0.5
1.3
### -1.3
0.1
-11.3 ### -54.3 16.7
11.7 ### 54.2
-6.0
-1.1 ###
0.9
-0.8
-0.8 ###
0.6
-1.5
-1.5 ###
1.3
-0.3
-1.2 ###
1.1
-0.1
-0.4 ###
0.4
0.5
2.3
### -2.1
-0.1
1.0
### -1.0
0.2
-0.8 ###
0.7
0.7
0.5
### -0.6
-0.3
2.2
### 12.6 -33.9
-2.2 405
2.1
0.5
-0.2 617
0.2
1.0
0.2
621 -0.2
1.4
-0.2 608
0.1
1.1
-2.5 419
2.4
0.0

MZ
tonm
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

FX
ton
0.3
1.0
1.9
0.8
0.4
0.2
-3.5
-1.1
-0.8
-1.5
-0.3
0.4
-0.1
-0.2
0.1
0.7
0.2
6.6
-0.8
0.9
1.2
1.0
0.0

Pembebanan Tetap 2
FY
FZ
MX
MY
ton
ton tonm tonm
0.4
### -0.4
0.3
0.1
### -0.1
1.0
0.9
### -0.9
1.8
-0.8 ###
0.7
0.7
3.5
### -3.2
0.3
-0.5 ###
0.4
0.2
-8.0 ### -48.0 14.4
8.4
### 48.0
-5.8
-2.6 ###
2.2
-0.8
-2.3 ###
2.0
-1.3
-3.0 ###
2.6
-0.2
-2.8 ###
2.4
0.5
1.3
### -1.2
-0.2
3.6
### -3.3
-0.2
2.5
### -2.3
0.2
0.9
### -0.9
0.7
2.1
### -2.0
0.4
1.2
### 11.4 -30.2
-1.2 354
1.2
-0.8
-0.2 529
0.2
0.9
0.1
532 -0.1
1.2
-0.1 521
0.1
1.0
-2.1 359
2.0
0.0

MZ
tonm
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

Pembebanan Sementara Gempa X


FX
FY
FZ
MX
MY
MZ
ton
ton
ton tonm tonm tonm
0.3
0.4 ### -0.4
0.3
0.0
0.1
0.5 ### -0.5
0.1
0.0
1.1
0.5 ### -0.5
1.0
0.0
0.9
0.3 ### -0.3
0.8
0.0
0.4
2.3 ### -2.1
0.4
0.0
0.1
0.6 ### -0.6
0.1
0.0
-3.5
-9.2 ### -47.0 14.3
0.0
-0.7
9.5 ### 46.9 -5.3
0.0
-0.8
-1.4 ###
1.2
-0.7
0.0
-1.5
-1.2 ###
1.0
-1.3
0.0
-0.3
-1.8 ###
1.6
-0.2
0.0
0.0
-1.6 ###
1.4
0.1
0.0
0.3
0.1 ### -0.2
0.2
0.0
-0.1
2.5 ### -2.3
-0.1
0.0
0.1
1.4 ### -1.3
0.2
0.0
0.7
-0.2 ###
0.1
0.6
0.0
-0.2
0.9 ### -1.0
0.0
0.0
7.5
1.7 ### 11.0 -29.4 0.0
0.0
-1.7 349
1.6
0.0
0.0
0.9
-0.2 529
0.2
0.9
0.0
1.2
0.1 532 -0.1
1.2
0.0
1.0
-0.1 521
0.1
1.0
0.0
0.0
-2.1 359
2.0
0.0
0.0

Pembebanan Sementara Gempa Y


FX
FY
FZ
MX
MY
MZ
ton
ton
ton tonm tonm tonm
0.3
0.4 ### -0.4
0.3
0.0
0.1
0.5 ### -0.5
0.1
0.0
1.1
0.5 ### -0.5
1.0
0.0
0.9
0.3 ### -0.3
0.8
0.0
0.4
2.3 ### -2.1
0.4
0.0
0.1
0.6 ### -0.6
0.1
0.0
-3.5
-9.2 ### -47.0 14.3
0.0
-0.7
9.5 ### 46.9 -5.3
0.0
-0.8
-1.4 ###
1.2
-0.7
0.0
-1.5
-1.2 ###
1.0
-1.3
0.0
-0.3
-1.8 ###
1.6
-0.2
0.0
0.0
-1.6 ###
1.4
0.1
0.0
0.3
0.1 ### -0.2
0.2
0.0
-0.1
2.5 ### -2.3
-0.1
0.0
0.1
1.4 ### -1.3
0.2
0.0
0.7
-0.2 ###
0.1
0.6
0.0
-0.2
0.9 ### -1.0
0.0
0.0
7.5
1.7 ### 11.0 -29.4 0.0
0.0
-1.7 349
1.6
0.0
0.0
0.9
-0.2 529
0.2
0.9
0.0
1.2
0.1 532 -0.1
1.2
0.0
1.0
-0.1 521
0.1
1.0
0.0
0.0
-2.1 359
2.0
0.0
0.0

Faktor Beban
Kombinasi
Beban
Dead
Working
1
Ultimate
1.4
1.2

Pembebanan Tetap
Live
Spec 1
1
0
0
0
1.6
0

Reaksi Tumpuan Dari Analisa Struktur


Lokasi
Story
Point
FX
FY
(-)
(-)
ton
ton
BASE
6
0.22
0.33
BASE
7
-0.23
0.61
BASE
8
0.56
0.22
BASE
9
0.73
0.68
BASE
10
0.36
1.51
BASE
11
0.10
0.96
BASE
12
-2.93
-8.09
BASE
13
-0.41
8.39
BASE
14
-0.68
-0.77
BASE
15
-1.27
-0.58
BASE
16
-0.26
-1.09
BASE
17
-0.11
-0.89
BASE
18
0.36
-0.32
BASE
19
-0.11
1.63
BASE
20
0.12
0.73
BASE
21
0.56
-0.60
BASE
22
-0.33
0.33
BASE
23
6.55
1.56
BASE
24
0.36
-1.55
BASE
25
0.76
-0.15
BASE
26
1.01
0.12
BASE
27
0.84
-0.11
BASE
28
0.01
-1.77

Spec 2
0
0
0

Dead
1
1.2
1.2

Pembebanan Mati
FZ
MX
ton
tonm
1,354.64
-0.33
1,262.44
-0.58
1,327.18
-0.23
1,462.57
-0.65
1,483.41
-1.41
1,380.87
-0.92
1,350.72
-38.78
1,330.22
38.72
1,486.28
0.62
1,548.59
0.45
1,432.32
0.95
1,495.63
0.77
1,427.09
0.26
1,101.26
-1.52
1,450.81
-0.69
1,517.60
0.48
3,174.40
-0.44
3,202.60
9.01
289.13
1.49
440.79
0.14
443.36
-0.12
434.44
0.10
298.93
1.69

Pembebanan Sementara
Live
Spec 1
1
1
0.5
1.1
0.5
0.33

MY
tonm
0.21
-0.19
0.52
0.67
0.34
0.09
11.92
-4.28
-0.59
-1.10
-0.22
-0.09
0.34
-0.09
0.13
0.51
-0.20
-24.18
0.35
0.73
0.97
0.81
0.01

MZ
tonm
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Spec 2
0.3
0.33
1.1

FX
ton
0.00
0.79
0.79
-0.02
-0.02
0.02
0.02
-0.36
-0.02
0.00
0.02
0.36
-0.36
-0.02
0.00
0.02
0.36
-0.79
-0.79
0.00
0.00
0.00
0.00

Pembebanan Hidup
FY
FZ
MX
ton
ton
tonm
0.00
0.00
0.00
-0.39
4.69
0.38
0.39
4.69
-0.38
-1.03
10.61
0.91
1.03
10.61
-0.91
-1.04
10.57
0.91
1.04
10.57
-0.91
-1.06
11.23
0.94
-1.04
10.57
0.91
-1.03
10.60
0.91
-1.03
10.61
0.91
-1.06
11.23
0.94
1.06
11.23
-0.94
1.04
10.57
-0.91
1.03
10.60
-0.91
1.03
10.61
-0.91
1.06
11.23
-0.94
-0.39
4.69
0.38
0.39
4.69
-0.38
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

MY
tonm
0.00
0.75
0.75
-0.04
-0.04
0.06
0.06
-0.41
-0.06
0.00
0.04
0.41
-0.41
-0.06
0.00
0.04
0.41
-0.75
-0.75
0.00
0.00
0.00
0.00

MZ
tonm
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.01
0.00
0.00
0.00
-0.01
-0.01
0.00
0.00
0.00
0.01
0.00
0.00
0.00
0.00
0.00
0.00

FX
ton
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Pembebanan Gempa Arah X


FY
FZ
MX
MY
ton
ton
tonm
tonm
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

MZ
tonm
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

FX
ton
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Pembebanan Gempa Arah Y


FY
FZ
ton
ton
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Pembebanan Gempa Arah Y


MX
MY
tonm
tonm
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

MZ
tonm
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Project
Location
File
Subject
Load
Unit

: Jembatan PDAM
: BSD - Tanggerang
: pdam delatinos 02.edb
: Support Reactions
: Processing Data of Spectra Direction X and Y
: ton meter

Lokasi
Story
Point
(-)
(-)
BASE
6
BASE
7
BASE
8
BASE
9
BASE
10
BASE
11
BASE
12
BASE
13
BASE
14
BASE
15
BASE
16
BASE
17
BASE
18
BASE
19
BASE
20
BASE
21
BASE
22
BASE
23
BASE
24
BASE
25
BASE
26
BASE
27
BASE
28

FX
ton
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Pembebanan Gempa Total Arah X


FY
FZ
MX
MY
ton
ton
tonm
tonm
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

MZ
tonm
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

FX
ton
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Pembebanan Gempa Total Arah Y


FY
FZ
MX
MY
ton
ton
tonm
tonm
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

MZ
tonm
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Diameter atau lebar Tiang

0.4 m

Distribusi
Tiang
nix

Tipe
Pile Cap
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16

Jumlah
Tiang
1
2
3
4
5
5
6
6
7
7
8
8
9
10
11
12

(3)
0
0
0
0
0
0
0
0
0
0
0
0
0
1
2
0

Sisi Bawah
(2)
0
0
0
0
0
0
0
0
1
0
2
0
0
2
1
3

Distribusi
Tiang
Zix

Tipe
Pile Cap
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16

Jarak
Terluar
0
0.6
0.693
0.6
0.6
1.04
1.2
0.6
1.2
1.04
1.2
1.04
1.2
1.8
1.8
1.8

(3)
0
0
0
0
0
0
0
0
0
0
0
0
0
1.8
1.8
0

Sisi Bawah
(2)
(1)
0
0
0
0.6
0
0.347
0
0.6
0
0.6
0
1.04
0
1.2
0
0.6
1.2
0.6
0
1.04
1.2
0.6
0
1.04
0
1.2
1.2
0.6
1.2
0.6
1.8
0.6

(1)
0
1
2
2
2
2
2
3
2
2
1
3
3
1
2
3

Tengah
(0)
1
0
0
0
1
1
2
0
1
3
2
2
3
2
1
0

Sisi Atas
(2)
(3)
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
1
0
0
0
2
0
0
0
0
0
2
1
1
2
3
0

Distribusi
Tiang
niy

Tipe
Jumlah
Pile Cap Tiang (3)
1
1
0
2
2
0
3
3
0
4
4
0
5
5
0
6
5
0
7
6
0
8
6
0
9
7
0
10
7
0
11
8
0
12
8
0
13
9
0
14
10
0
15
11
0
16
12
0

Sisi Kiri
(2)
(1)
0
0
0
0
0
1
0
2
0
2
0
2
0
3
0
2
0
2
1
2
0
3
2
1
0
3
0
3
0
4
0
4

Tengah
(0)
1
2
1
0
1
1
0
2
3
1
2
2
3
4
3
4

Sisi Kanan
(1)
(2) (3)
0
0
0
0
0
0
1
0
0
2
0
0
2
0
0
2
0
0
3
0
0
2
0
0
2
0
0
2
1
0
3
0
0
1
2
0
3
0
0
3
0
0
4
0
0
4
0
0

Tengah
Sisi Atas
(0)
(1)
(2)
(3)
0
0
0
0
0
0.6
0
0
0
0.693
0
0
0
0.6
0
0
0
0.6
0
0
0
1.04
0
0
0
1.2
0
0
0
0.6
0
0
0
0.6
1.2
0
0
1.04
0
0
0
0.6
1.2
0
0
1.04
0
0
0
1.2
0
0
0
0.6
1.2
1.8
0
0.6
1.2
1.8
0
0.6
1.8
0

Distribusi
Tiang
Ziy

Tipe
Pile Cap
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16

Sisi Kiri
(2)
(1)
0
0
0
0
0
0.6
0
0.6
0
1.04
0
0.6
0
0.6
0
1.2
0
1.04
1.2
0.6
0
1.04
1.2
0.6
0
1.2
0
1.04
0
1.04
0
1.2

Tengah
(0)
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Sisi Kanan
(1)
(2) (3)
0
0
0
0
0
0
0.6
0
0
0.6
0
0
1.04
0
0
0.6
0
0
0.6
0
0
1.2
0
0
1.04
0
0
0.6
1.2
0
1.04
0
0
0.6
1.2
0
1.2
0
0
1.04
0
0
1.04
0
0
1.2
0
0

(1)
0
1
1
2
2
2
2
3
2
2
1
3
3
1
2
3

Jarak
Terluar (3)
0
0
0
0
0.6
0
0.6
0
1.04
0
0.6
0
0.6
0
1.2
0
1.04
0
1.2
0
1.04
0
1.2
0
1.2
0
1.04
0
1.04
0
1.2
0

Tipe
Spasi Antar Pile
Efisiensi

Pile Cap
Arah-X
Arah-Y
m
n
1
1.2
1.2
18.43
1.00
1.00
2
1.2
1.2
18.43
1.00
2.00
3
1.2
1.2
18.43
3.00
1.00
4
1.2
1.2
18.43
2.00
2.00
5
1.2
1.04
19.74
2.50
2.00
6
1.04
1.2
19.74
2.00
2.50
7
1.2
1.2
18.43
3.00
2.00
8
1.2
1.2
18.43
2.00
3.00
9
1.2
1.04
19.74
2.33
3.00
10
1.04
1.2
19.74
3.00
2.33
11
1.2
1.2
18.43
2.67
3.00
12
1.04
1.2
19.74
3.00
2.67
13
1.2
1.2
18.43
3.00
3.00
14
1.2
1.04
19.74
3.33
3.00
15
1.2
1.04
19.74
3.67
3.00
16
1.2
1.2
18.43
4.00
3.00
dimana :
-
= tan -1 (Diameter/Spasi) dalam derajat
-m
= Jumlah rata-rata baris tiang
-n
= Jumlah rata-rata kolom tiang
Jenis
Tiang
Bor
Bor
Bor
Bor
Bor

Ukuran Penampang
Dimensi
Kode
400
400
500
500
600
600
700
700
800
800

Pijin
(ton)
40
57
76
88
110

Ptarik
(ton)
2.23
3.03
3.77
4.33
4.75

Hlateral
(ton)
1
1.5
2
2.5
3

1.000
0.900
0.900
0.900
0.900
0.900
0.900
0.900
0.900
0.900
0.900
0.900
0.900
0.900
0.900
0.900

PERENCANAAN PONDASI TIANG PENDUKUNG


JEMBATAN PDAM DELATINOS
BSD - TANGGERANG
File

: pdam delatinos 02.edb

A. Data Masukan
Material tiang (1 = beton, 2 = baja)
Mutu beton KPenampang tiang (1=lingk, 2=segiempat, 3=segitiga)
Panjang tiang tertanam
Reduksi R ijin tekan akibat berat sendiri (1=ya, 2=tidak)
Efisiensi Pile Group
Diameter penampang tiang
Berat jenis tanah rata-rata
Persentase ijin terhadap daya dukung
- Pembebanan tetap
- Pembebanan Sementara
B. Data Keluaran
Daya dukung ijin vertkal tekan
Berat jenis material tiang
Modulus elastisitas tiang
Momen Inersia
Kekakuan tiang ( EI )
Panjang tiang
Berat sendiri tiang
Berat tanah yang dipindahkan
R ijin tekan
R ijin tarik
R1 = ( Fz / n ) + ( Mx Y / Y2 ) + ( My X / X2 )
R2 = ( Fz / n ) - ( Mx Y / Y2 ) - ( My X / X2)
Data Masukan
Properti Tipe Pile Group
No. Label
Tipe
Jumlah Jrk Maks.
M. Lawan
Support
Group
Tiang
X
Y Xi2 Yi2

=
=
=
=
=
=
=
=

1
300
1
4
2
1.00
0.6
1.70

=
=

100%
150%

=
=
=
=
=
=
=
=
=
=

76
2.4
2.E+06
6.E-03
1.E+04
4
0.00
0.00
76.00
-3.77

Kg/cm2
m

m
ton/m3

ton
ton/m3
ton/m2
m4
tonm2
m
ton
ton
ton
ton

Fx

Fy

Tetap
Fz
Mx

1 - 16

Buah

m2

m2

ton

ton

ton

6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33

5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
8
8
1
1
1
1
1
1
1
1
1
1

5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
6
6
1
1
1
1
1
1
1
1
1
1

0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

1.04
1.04
1.04
1.04
1.04
1.04
1.04
1.04
1.04
1.04
1.04
1.04
1.04
1.04
1.04
1.04
1.20
1.20
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

1.44
1.44
1.44
1.44
1.44
1.44
1.44
1.44
1.44
1.44
1.44
1.44
1.44
1.44
1.44
1.44
2.16
2.16
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

4.33
4.33
4.33
4.33
4.33
4.33
4.33
4.33
4.33
4.33
4.33
4.33
4.33
4.33
4.33
4.33
5.76
5.76
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.2
0.6
1.4
0.7
0.3
0.1
-2.9
-0.8
-0.7
-1.3
-0.2
0.3
0.0
-0.1
0.1
0.6
0.0
5.8
-0.4
0.8
0.8
0.8
0.8
0.8
0.8
0.8
0.8
0.8

0.3
0.2
0.6
-0.4
2.5
-0.1
-7.1
7.3
-1.8
-1.6
-2.1
-2.0
0.7
2.7
1.8
0.4
1.4
1.2
-1.2
-0.2
-0.2
-0.2
-0.2
-0.2
-0.2
-0.2
-0.2
-0.2

tonm

Pembebanan Working Pada Pile Cap


Sementara : Tetap + Gempa X
Fx
Fy
Fz
Mx
My
Mz
Fx

Sementara 2 : Tetap + Gempa Y


Fy
Fz
Mx
My

My

Mz

tonm

tonm

ton

ton

ton

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

0.2
0.6
1.4
0.7
0.3
0.1
-2.9
-0.8
-0.7
-1.3
-0.2
0.3
0.0
-0.1
0.1
0.6
0.0
5.8
-0.4
0.8
0.8
0.8
0.8
0.8
0.8
0.8
0.8
0.8

0.3
0.2
0.6
-0.4
2.5
-0.1
-7.1
7.3
-1.8
-1.6
-2.1
-2.0
0.7
2.7
1.8
0.4
1.4
1.2
-1.2
-0.2
-0.2
-0.2
-0.2
-0.2
-0.2
-0.2
-0.2
-0.2

1,354.6
1,267.1
1,331.9
1,473.2
1,494.0
1,391.4
1,361.3
1,341.5
1,496.9
1,559.2
1,442.9
1,506.9
1,438.3
1,111.8
1,461.4
1,528.2
3,185.6
3,207.3
293.8
440.8
440.8
440.8
440.8
440.8
440.8
440.8
440.8
440.8

1,354.6 -0.3 0.2


1,267.1 -0.2 0.6
1,331.9 -0.6 1.3
1,473.2 0.3 0.6
1,494.0 -2.3 0.3
1,391.4 0.0 0.2
1,361.3 -39.7 12.0
1,341.5 39.7 -4.7
1,496.9 1.5 -0.7
1,559.2 1.4 -1.1
1,442.9 1.9 -0.2
1,506.9 1.7 0.3
1,438.3 -0.7 -0.1
1,111.8 -2.4 -0.1
1,461.4 -1.6 0.1
1,528.2 -0.4 0.5
3,185.6 -1.4 0.2
3,207.3 9.4 -24.9
293.8
1.1 -0.4
440.8
0.1 0.7
440.8
0.1 0.7
440.8
0.1 0.7
440.8
0.1 0.7
440.8
0.1 0.7
440.8
0.1 0.7
440.8
0.1 0.7
440.8
0.1 0.7
440.8
0.1 0.7

Tetap

Kontrol Terhadap Daya Dukung Tiang


Kontrol
Sementara 1
R1
R2
DDT

Mz

R1

R2

tonm tonm tonm

ton

ton

ton

tonm

tonm

tonm

ton

ton

R1

R2

ton

ton

-0.3
-0.2
-0.6
0.3
-2.3
0.0
-39.7
39.7
1.5
1.4
1.9
1.7
-0.7
-2.4
-1.6
-0.4
-1.4
9.4
1.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1

0.2
0.6
1.4
0.7
0.3
0.1
-2.9
-0.8
-0.7
-1.3
-0.2
0.3
0.0
-0.1
0.1
0.6
0.0
5.8
-0.4
0.8
0.8
0.8
0.8
0.8
0.8
0.8
0.8
0.8

0.3
0.2
0.6
-0.4
2.5
-0.1
-7.1
7.3
-1.8
-1.6
-2.1
-2.0
0.7
2.7
1.8
0.4
1.4
1.2
-1.2
-0.2
-0.2
-0.2
-0.2
-0.2
-0.2
-0.2
-0.2
-0.2

1,354.6
1,267.1
1,331.9
1,473.2
1,494.0
1,391.4
1,361.3
1,341.5
1,496.9
1,559.2
1,442.9
1,506.9
1,438.3
1,111.8
1,461.4
1,528.2
3,185.6
3,207.3
293.8
440.8
440.8
440.8
440.8
440.8
440.8
440.8
440.8
440.8

-0.3
-0.2
-0.6
0.3
-2.3
0.0
-39.7
39.7
1.5
1.4
1.9
1.7
-0.7
-2.4
-1.6
-0.4
-1.4
9.4
1.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1

0.2
0.6
1.3
0.6
0.3
0.2
12.0
-4.7
-0.7
-1.1
-0.2
0.3
-0.1
-0.1
0.1
0.5
0.2
-24.9
-0.4
0.7
0.7
0.7
0.7
0.7
0.7
0.7
0.7
0.7

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

270.94
253.61
266.76
294.96
298.37
278.35
267.71
275.87
299.47
311.71
288.96
301.92
287.47
221.72
291.95
305.76
530.71
529.58
293.82
440.79
440.79
440.79
440.79
440.79
440.79
440.79
440.79
440.79

270.92
253.24
265.99
294.31
299.24
278.23
276.81
260.71
299.27
311.97
288.21
300.83
287.85
223.01
292.62
305.52
531.17
539.52
293.82
440.79
440.79
440.79
440.79
440.79
440.79
440.79
440.79
440.79

No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No

No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No

270.94
253.61
266.76
294.96
298.37
278.35
267.71
275.87
299.47
311.71
288.96
301.92
287.47
221.72
291.95
305.76
530.71
529.58
293.82
440.79
440.79
440.79
440.79
440.79
440.79
440.79
440.79
440.79

270.92
253.24
265.99
294.31
299.24
278.23
276.81
260.71
299.27
311.97
288.21
300.83
287.85
223.01
292.62
305.52
531.17
539.52
293.82
440.79
440.79
440.79
440.79
440.79
440.79
440.79
440.79
440.79

0.2
0.6
1.3
0.6
0.3
0.2
12.0
-4.7
-0.7
-1.1
-0.2
0.3
-0.1
-0.1
0.1
0.5
0.2
-24.9
-0.4
0.7
0.7
0.7
0.7
0.7
0.7
0.7
0.7
0.7

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

PERENCANAAN PONDASI TIANG PENDUKUNG


JEMBATAN PDAM DELATINOS
BSD - TANGGERANG
File

: pdam delatinos 02.edb


34

0.00 0.00 0.00

0.00

0.8

-0.2

440.8

0.1

0.7

0.0

0.8

-0.2

440.8

0.1

0.7

0.0

0.8

-0.2

440.8

0.1

0.7

0.0

440.79

440.79

No

No

440.79

440.79

NCANAAN PONDASI TIANG PENDUKUNG


JEMBATAN PDAM DELATINOS
BSD - TANGGERANG

Kontrol Terhadap Daya Dukung Tiang


Kontrol
DDT

Sementara 2
R1
R2

Kontrol
DDT

R1

R2

ton

ton

R1

R2

No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No

No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No

270.94
253.61
266.76
294.96
298.37
278.35
267.71
275.87
299.47
311.71
288.96
301.92
287.47
221.72
291.95
305.76
530.71
529.58
293.82
440.79
440.79
440.79
440.79
440.79
440.79
440.79
440.79
440.79

270.92
253.24
265.99
294.31
299.24
278.23
276.81
260.71
299.27
311.97
288.21
300.83
287.85
223.01
292.62
305.52
531.17
539.52
293.82
440.79
440.79
440.79
440.79
440.79
440.79
440.79
440.79
440.79

No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No

No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No

Resume
Akhir
Design
(-)
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO

NCANAAN PONDASI TIANG PENDUKUNG


JEMBATAN PDAM DELATINOS
BSD - TANGGERANG

No

No

440.79 440.79

No

No

NO

A.

INPUT DATA

Halaman
Y

Column Property :
Concrete grade of Column K -

Concrete Type (1 = light, 2 = normal)

Steel grade of Column rebar

400 MPa

Column longitudinal rebar diameter

16 mm

Concrete cover of column

40 mm

Section Property (1=rectang, 2=circle)

- width of column x dir

900 mm

- width of column y dir

900 mm

b1

d/2

300 Kg/cm2
2
2,400 Kg/m3
400 MPa
2
70 mm
0.6
0.8
800 mm
Y axis
13 mm
16 mm

one way action

b2

Concrete grade of cap K =


Concrete Type (1 = light, 2 = normal)
=
Density
=
Steel grade of Cap rebar
=
rebar protection (1 = coated, 2 = uncoated)
=
Concrete cover of Cap
=
Shear strength reduction
=
Bending strength reduction
=
thickness of pile cap
=
Bar position
X axis
Top reinforcement
13 mm
Bottom reinforcement
16 mm
Pile property :
Property (1=Circle, 2=rectang, 3=triangle)
=
Diameter
=
Type of Foundation P
=

Pile configuration default (unit : meter)


No. of pile per group
Pile
Bottom side row X axis
Distribution
(3)
(2)
(1)
nos
0
0
1
Zx
0
0
0.6
dx
0.00
0.00
0.15
Pile
Left side row Y axis
Distribution
(3)
(2)
(1)
nos
0
0
0
Zy
0
0
0
dy
0.00
0.00
0.00

bx

Pile Cap Property :

OUTPUT DATA
effective depth of pile cap, d

Permanent Load
Live
Spec 1
1
0
0
0
1.6
0

L2

by

b1

a1

a1
L1

1
400 mm
2

723.5 mm

=
middle
(0)
0
0
0.00
middle
(0)
2
0
0.00

2 pile
Top side row X axis
(1)
(2)
(3)
1
0
0
0.6
0
0
0.15
0.00
0.00
Right side row Y axis
(1)
(2)
(3)
0
0
0
0
0
0
0.00
0.00
0.00

Pile cap dimension:


a1
a2
L1
b1
b2
L2

Punch shear plane properties - rectang column (posisi) and Circle Column
Column position
Critical section
1 - dir
2 - dir
Description
code
bo
Ac
J/c
J / c'
J/c
J / c'
(-)
(-)
(mm)
(mm2)
(mm3)
(mm3)
(mm3)
(mm3)
Interior
1
6,494
4,698,409 2.7E+09 2.7E+09 2.7E+09 2.7E+09
Exterior 1
2
4,871
3,523,807 2.1E+09 1.0E+09 2.3E+09 2.3E+09
Exterior 2
3
4,871
3,523,807 2.3E+09 2.3E+09 2.1E+09 1.0E+09
Corner
4
3,247
2,349,205 1.7E+09 5.7E+08 1.7E+09 5.7E+08
Circle
5
0
0
0.0E+00 0.0E+00 0.0E+00 0.0E+00
Load Combination :
Type
L/C
Dead
Working
1
Ultimate
1.4
1.2

two way action

300 Kg/cm2

1=interior,2=exterior 1,3=exterior 2,4=corner,5=c=

B.

- 01

Spec 2
0
0
0

Pile cap concrete property :


Concrete strength, f'c = { 0.76 + 0.20 Log ('bk/150) } 'bk
Equivalent compressive stress block, 1
Concrete modulus elastisity, E c

Temporary Load
Live
Spec 1
1
1
0.5
1.1
0.5
0.33

Dead
1
1.2
1.2

=
=
=

Spec 2
0.3
0.33
1.1

24.61 MPa
0.85
25,079 MPa

=
=
=
=
=
=

500
0
1000
500
1200
2200

ok
ok
ok
ok
ok
ok

B.1.

Pile Design

Halaman

Pv

447

kN

Mz1

719

kNm

Pv max

Pv

n
x max

1.20

Sx2

B.2.

71.90

tm

- 02

Sx2
m

Pv
Mz

( pile number )

1.2^2

1.44

44.70 +

ton

Mz * x max

71.9 * 1.2

2
Pv max

44.70

82.27

1.44
ton

<

103 ton

(OK)

Pile cap thickness design

B.2.1. Shear strength provide by concrete


1. One way shear
Concrete shear strength :
Vc
, Shear X axis
Vc
, Shear Y axis

=
=

431 ton
947 ton

2. Two way shear


bx
: Shear width X direction
=
by
: Shear width Y direction
=
c
: Rasio of clear span
=
bo
: Shear plane perimeter
=
Ac
: Shear section area
=
v
: shear percentage due to transfer moment =
f
: bending percentage due to transfer momen =
s
: index column position
=
Vu max
: maximum punch tension undereinfored
=
Concrete shear strength :
Vc1
=
Vc2
=
Vc3
=
Vc
=

1623.5
1623.5
1
6,494
4.7E+06
40%
60%
40
9,789

mm
mm

8,390
9,029
5,594
5,594

ton
ton
ton
ton

mm
mm2

ton

B.2.2. Pile Cap thickness check


Selfweight of pile cap
One way shear
X dir
Y dir
pile =
0
0
Label number
joint
Reaction
(-)
12
1

Ultimate load
maximum condition
Fx
Fy
Fz
Htotal
(ton)
(ton)
(ton)
(ton)
-10.5
-1.1

14.1
28.8

4.22 ton

Shear
Punch
2

25
45

17.62
28.79

Loading for each pile


maximum condition
Fx
Fy
Fz
(ton)
(ton)
(ton)
-5
-1

7
14

12.5
22.4

Pile Cap width check


One way shear
Two way shear
Vux
Vuy
Cek
Vu
Cek
(ton)
(ton)
(-)
(ton)
(-)
0
0

0
0

Oke
Oke

25.1
44.7

Ok
Ok

B.3.

PILE CAP REINFORCEMENT

bal =

0.85 x f'c

fy

Halaman

cu x Es
cu x Es + fy

max = 0.75 x bal

0.0018 x 400
or 0.0014, whichever the bigger
fy

min susut&suhu =

Smax critical section = 2 x thickness


Smax shrinkage & temperature = 5 x thickness or 500 mm, whichever the smaller
Mu

= x fy x bw x d2 x ( 1 - 0.59 x x fy / f'c )
Mu

( 0.59 x fy2 / f'c ) x 2 - ( fy ) x +

x bw x d2

=0

Quadratic Constant :
a = ( 0.59 x fy2 / f'c )
b = - fy
Mu
c=
x bw x d2
Pu column

Formula Joint Check

Pcu1 = 0.85 fc A1

Pu column
Column
dowels

Ld1

Joint
Ld2
1V:2H

Pcu2 = Pc1 (A2/A1)


Pcu2 max = Pcu1 x 2

Ld2

Ps = Pu - Pcu

cap/footing
Reinforcement calculation fixed variable
bal
: Balanced reinforcement ratio
max
: Maximum reinforcement ratio for undereinforced design
min
: minimum rebar ratio
Smax
: maximum space for rebar moment
Smax ss
: maximum space of shringkage rebar
a
: Quadratic constant to calculate required reinforcement
b
: Quadratic constant to calculate required reinforcement
Vu / pile
: maximum ultimate force for each pile

=
=
=
=
=
=
=
=

2.667%
2.000%
0.180%
500 mm
500 mm
3,836
-400
223,615 Newton

B.3.1. Reinforcement calculation tabel

Arah X

Mu
Nmm
0.00E+00

bw
mm
2,200

Arah Y

3.4E+07

1000

Resume :
X axis
Y axis
where :
Mu
bw
c
perlu
As perlu
D tulangan
Sperlu

As required D reinforcement S required


Reinforcement required ratio
1
2
required
mm2
mm
mm
10.426% 0.180% 0.180%
2,865
16
146
2,865
13
100
0.08
10.406% 0.180% 0.180%
1,302
16
142
1,302
13
100
c
0.00

Bottom reinforcement
Top reinforement
Bottom reinforcement
Top reinforement

D
D
D
D

16
13
16
13

: Ultimate moment strength


: Section width
: Quadratic constant to calculate required reinforcement
: rebar required ratio
: rebar area required
: rebar diameter
: rebar spacing required

100
100
100
100

0.278%
0.183%
0.278%
0.183%

Ok
Ok
Ok
Ok

- 03

B.3.2. Development of reinforcement

Halaman
Ld

rebar or deformed wire in tension =

db

fy

40 f'c ( c + Ktr ) / db

Deformed bars in compression = Ld = 0.020 x db x fy / f'c, 0.0003 x db x fy, 200 mm

Fixed variable :

: reinforcement location factor

: coating factor

: rebar size factor for X direction

0.8

: rebar size factor for Y direction

0.8

: Concrete types factors

1. Tension reinforcement
X dir
Y dir
c, (mm)
50
50
(c+Ktr)/db
2.5
2.5
Ld req, mm
300
300
Ld ada, mm
-20
580
Resume

2. Compression reinforcement
X dir
Y dir
Ld req, mm
200
200
Ld ada, mm
-20
580
Resume
c
: spacing or cover dimension
( c + Ktr ) / db, for simplying and safety use Ktr = 0

- 04

B.4. Calculation Sketch

Halaman

- 05

PERENCANAAN PONDASI P-2


Y
A
CL
b1

Column
Column reinforcement
Top reinforcement

b2L2

b1

Bottom reinforcement
Pile

a1

a1
L1
L2

Foundation Layout

Section A - A

A. Material Properties:
Unit
Pile Cap
Kolom
Concrete Strength Design Kg/cm2
300
300
Concrete type
Normal
Normal
Yield Strength of Steel
MPa
400
400
Concrete cover
mm
70
40
* Yield Strength of Steel 400 MPa = BJTD 40 (Deformed)
B. Section properties :
a1
a2
L1
b1
b2
L2
H
Pile Diameter
Long of pile
Pile
Allowable bearing capacity vertical
Pile group efficiency

=
=
=
=
=
=
=
=
=
=
=
=

500
0
1000
500
1200
2200
800
400
4
2
40
0.90

mm
mm
mm
mm
mm
mm
mm
mm
m
tiang
ton

C. Pile Cap Reinforcement :


Pile ultimate vertical force
=
Position
Reinforcement in X dir
Bottom
D 16
Top
D 13
* Side bar use diameter D13 mm

22.36 ton
100
100

reinforcement in Y dir
D 16
D 13
-

100
100

Bore
BH -4
Pile Dimension
Perimeter
Area

square :
:
:

Depth
Toe

Nspt

No

Nspt
Average

1
2
3
4
5
6
7
8

1.8
3.5
4.7
6.8
7.7
9.5
10.4
12.0

14
7
4
0.67
50
50
33
33

14.00
10.50
8.33
6.42
15.13
20.95
22.67
23.96

Note :

maximum value 0.2 N


maximum value Nb

40
1.60 m
0.16000 m2

Toe
89.60
44.80
25.60
4.29
320.00
320.00
211.20
211.20

square : 40
Meyerhoft
0.2 N
Frictions
Q all
2.80
8.06
35.24
2.10
11.76
22.77
1.67
12.53
16.89
1.28
13.96
10.74
3.03
37.29
131.53
4.19
63.67
149.12
4.53
75.44
120.69
4.79
92.00
131.73

=
=

10 ton/m2
40

Toe
70.34
35.17
20.10
3.37
251.20
251.20
165.79
165.79

circle

40
1.26 m
0.12560 m2

circle 40
Meyerhoft
0.2 N
Frictions
Q all
2.80
6.33
27.67
2.10
9.23
17.88
1.67
9.84
13.26
1.28
10.96
8.43
3.03
29.27
103.25
4.19
49.98
117.06
4.53
59.22
94.74
4.79
72.22
103.41

Вам также может понравиться