QC~PLAN.

Project No. & Name:


Name of Client/ Consultant:
SL

ACTIVITY

No.
1 Check for all
concealed service
conduits

CONTROLLING

NATURE & EXTENT

DOCUMENT
Drawing
Contract Specs.
BS 8000 Part 11
BS 5385
Drawing
Contract Specs.
BS 8000 Part 11
BS 5385

OF INSP./TEST
Verification, 100%

ACCEPTANCE CRITERIA

PERSON RESP.

-Pre tiling check signed by respective


service discipline Engineer/ Foremen (if
appilcable)

AT LOCATION
Engineer /
Foremen/
Quality Engineer

Visual, 100%

- Background free from contamination &


loose material
- Dry & sound

Engineer /
Foremen/
Quality Engineer

- Minimum cutting of tiles


- Uniform joint width in vertical & horizontal
- Cut courses shall be kept minimum
- Tile rows truly horizontal / vertical
- Establish datum levels
- The conduits, electrical cables & electrical
boxes and sanitary fixture sleeves
are fixed secuely in position
- Incorporate movement joints
- Bedding materials and methods as
per specification
- Proportioning and mixing of cement sand
mortar and adhesives as per specification /
manufacturer's instructions
Bedding Materials
- Adhesives
- Cement based
Bedding methods
- Notched trowelling
- Cement sand mortar
- Semi-dry mix

Engineer /
Foremen/
Quality Engineer

Preparation of background/substrate/
backing/base

Setting out

Drawing
Contract Specs.
BS 8000 Part 11
BS 5385

Visual, 100%

Bedding materials and


methods

Drawing
Contract Specs.
BS 8000 Part 11
BS 5385
Mfr's. data sheet

Visual, 100%

Engineer /
Foremen/
Quality Engineer

QC~PLAN.
Project No. & Name:
Name of Client/ Consultant:
SL

ACTIVITY

No.
5 Laying of tiles

CONTROLLING

NATURE & EXTENT

DOCUMENT
Drawing
Contract Specs.
BS 8000 Part 11
BS 5385
Mfr's. data sheet

OF INSP./TEST
Visual, 100%

Curing

Drawing
Contract Specs.

Visual, 100%

Grouting

Drawing
Contract Specs.
BS 8000 Part 11
BS 5385
Mfr's. data sheet

Visual, 100%

ACCEPTANCE CRITERIA
- Appropriate bedding methods
- Proportioning and mixing of cement / organic
based adhesives as per spec. / mfr's.
instructions
- Control overall level of finished floor with
series of spot levels
- Line up floor tile joints with joints in
skirting tiles
- Where adjoining surfaces are in different
plane ensure the joints are continuous
- Stopping strips & divider strips installed
at change of floors
- Cut tiles neatly and accurately
- Joints made good around pipes & floor
drains
- Avoid cut courses
- Provide cut courses as wide as possible
- Surface irregularity within 3 mm
-Cure for period required
(3 days if not specified)

- Joints free from loose material


- Jointing mortar stiff, slump free &
workable
- Joints filling material for wall shall be stiff
and self supporting
- Tiles not disturbed
- No air trapped
- Surplus jointing material cleaned from tile
- Finish joints neatly & face of tile cleaned
and polished
- Use coloured grout if specified

PERSON RESP.
AT LOCATION
Engineer /
Foremen/
Quality Engineer

Engineer /
Foremen/
Quality Engineer
Engineer /
Foremen/
Quality Engineer

QC~PLAN.
Project No. & Name:
Name of Client/ Consultant:
SL

ACTIVITY

No.
8 Movement joint

CONTROLLING

NATURE & EXTENT

ACCEPTANCE CRITERIA

PERSON RESP.

DOCUMENT
Drawing
Contract Specs.
BS 8000 Part 11
BS 5385
Mfr's. data sheet

OF INSP./TEST
Visual, 100%

Protection

Drawing
Contract Specs.
BS 8000 Part 11
BS 5385
Mfr's. data sheet

Visual, 100%

- Protected from rain & dust


- No traffic permitted for 24 hours
- Light foot traffic allowed after 24 hours
- Normal traffic allowed after 7 days
-Covered with polyethene sheet/ paper
board sheet/ plywood etc.

Engineer /
Foremen/
Quality Engineer

10 Final Inspection

Drawing
Contract Specs.

Visual, 100%

- Pattern, slope & finishing to match


drawings
- Free from stains & spatter

Engineer /
Foremen/
Quality Engineer

- Appropriate sealant
- Fixing of sealant as per manufacturer's
data sheet
Tolerances
- Less than 6 mm wide 1 mm
- 6 mm or more 2 mm

AT LOCATION
Engineer /
Foremen/
Quality Engineer

QC~PLAN.
Ceramic Tiling (Wall & Floor)
Doc.No.CIVIL QC~Plan- 017/ REV. 0
RECORD
Daily tiling log
CIVIL QC~Form- 016-01/ REV 0
Ceramic Tiling (Wall & Floor)
CIVIL QC~Form- 017-01/ REV 0
Daily tiling log
CIVIL QC~Form- 016-01/ REV 0
Ceramic Tiling (Wall & Floor)
CIVIL QC~Form- 017-01/ REV 0
Daily tiling log
CIVIL QC~Form- 016-01/ REV 0
Ceramic Tiling (Wall & Floor)
CIVIL QC~Form- 017-01/ REV 0

Daily tiling log


CIVIL QC~Form- 016-01/ REV 0
Ceramic Tiling (Wall & Floor)
CIVIL QC~Form- 017-01/ REV 0

QC~PLAN.
Ceramic Tiling (Wall & Floor)
Doc.No.CIVIL QC~Plan- 017/ REV. 0
RECORD
Daily tiling log
CIVIL QC~Form- 016-01/ REV 0
Ceramic Tiling (Wall & Floor)
CIVIL QC~Form- 017-01/ REV 0

--

Daily tiling log


CIVIL QC~Form- 016-01/ REV 0
Ceramic Tiling (Wall & Floor)
CIVIL QC~Form- 017-01/ REV 0

QC~PLAN.
Ceramic Tiling (Wall & Floor)
Doc.No.CIVIL QC~Plan- 017/ REV. 0
RECORD
Daily tiling log
CIVIL QC~Form- 016-01/ REV 0
Ceramic Tiling (Wall & Floor)
CIVIL QC~Form- 017-01/ REV 0

Daily tiling log


CIVIL QC~Form- 016-01/ REV 0
Ceramic Tiling (Wall & Floor)
CIVIL QC~Form- 017-01/ REV 0

Ceramic Tiling (Wall & Floor)


CIVIL QC~Form- 017-01/ REV 0