V100R004C00SPC220
01
Date
2011-12-06
Notice
The purchased products, services and features are stipulated by the commercial contract made between
Huawei and the customer. All or partial products, services and features described in this document may
not be within the purchased scope or the usage scope. Unless otherwise agreed by the contract, all
statements, information, and recommendations in this document are provided "AS IS" without warranties,
guarantees or representations of any kind, either express or implied.
The information in this document is subject to change without notice. Every effort has been made in the
preparation of this document to ensure accuracy of the contents, but all statements, information, and
recommendations in this document do not constitute a warranty of any kind, express or implied.
Website:
http://www.huawei.com
Email:
support@huawei.com
Issue 01 (2011-12-06)
Date
2011-12-06
Reviewed by
Date
2011-12-06
Tested by
Date
2011-12-06
Approved by
Zhang Shuangguo
(employee ID: 00118903)
Date
2011-12-06
Organization
The upgrade risk check package is used in the Software Management Expert (SME) on the
iManager M2000 Mobile Element Management System (referred to as M2000) for checking
whether a network element (NE) meets the upgrade requirements. The functions of the
upgrade risk check package include the upgrade feasibility check and upgrade risk check.
Read this document before using the 3900 Series LTE eNodeB upgrade risk check package.
This document is organized as follows:
Chapter
Description
Issue 01 (2011-12-06)
ii
Contents
Contents
1 Upgrade Feasibility Check.............................................................1
2 Upgrade Risk Check......................................................................2
Issue 01 (2011-12-06)
iii
Upgrade path of an NE
The upgrade feasibility check is a prerequisite for the upgrade. You can perform the upgrade
feasibility check by creating an upgrade feasibility check task in the SME.
Figure 1.1 lists the upgrade feasibility check items.
Figure 1.1 Upgrade feasibility check items
Item
Description
Issue 01 (2011-12-06)
The upgrade risk check is used to check the upgrade risks that may occur during the upgrade.
Corresponding preventive measures can be taken based on the checking result. You can
perform the upgrade risk check by creating an upgrade risk check task in the SME. This
version has no upgrade risk.
Issue 01 (2011-12-06)