DIREKTORAT OPERASIONAL

CHECK LIST - STRUKTUR

AC SPLITE
*
1
2
3
4
NO.

DIVISI
REVISI
TANGGAL
HALAMAN

:
:
:
:

GEDUNG
01
18-12-2014
1/2

DOKUMEN YANG MENJADI DASAR STANDAR PENERIMAAN :


SHOP DRAWING
NO : .
APPROVAL MATERIAL/ SPEC'S NO/ HAL : .
METHOD STATEMENT
NO : .
STANDAR CODE, ETC

DAFTAR PEMERIKSAAN & STANDAR PENERIMAAN

CL - 1 CL - 2
Y T Y T

1
MATERIAL / Ac Split
1.1
Indoor Unit ( FCU )
1.1.
Merk / Brosur
1.1.
Jenis/Type
1.1.
Capacity
1.1.
Phase
1.2
OUTDOOR Unit ( CU )
1.2.
Merk / Brosur
1.2.
Jenis/Type
1.2.
Capacity
1.2.
Phase
1.3
COPPER TUBE PIPE
1.3.
Merk / Brosur/Contoh Material
1.3.
1.3.
Jenis/Type
1.3.
Contoh Material
1.3.
ASTM
1.3.
Isulation
1.3.
Merk / Brosur
1.3.
Type
1.3.
Dinsity
1.4
Cable
1.4.1
Merk / Brosur
1.4.
Jenis/Type
1.4.
Contoh Material
1.4.3
Diameter
1.5
Panel Power
1.5.
Merk
1.5.
Jenis/Type
1.5.
Tebal Plate
1.5.
Mock up Cat
1.5.
Komponen Panel
1.5.
Brosur
2
Installation Preparation
2.1
Installation Permite
2.2
Shop Drawing
2.3
Tools
2.4
Labour
2.4.
Teknician
2.4.
Helper

Field Coordinator :

Inspector :

CATATAN

CHECK LIST - STRUKTUR

DIREKTORAT OPERASIONAL

NO.

AC SPLITE

DAFTAR PEMERIKSAAN & STANDAR PENERIMAAN

CL - 1 CL - 2
Y T Y T

2.5
Safety
2.5.
Helmet
2.5.
Shoes
2.5.
K3
2.5.
Fire Fighting
3
Installation
3.1
List of Procedure ( RKS & Manual )
3.2
FCU
3.3
CU
3.4
Pipe
3.5
Isulition
3.6
Panel Power
3.7
Grounding
3.8
Test & Commissioning
3.8.
Test Procedure
3.8.
Leackage Pipe
3.8.
FCU
3.8.
CU
3.8.
Panel Power
4
Final Result
4.1
Certifacte for Operation
4.2
As Built Drawing
4.3
Manual Operation
4.4
Tarinning

Field Coordinator :

Inspector :

DIVISI
REVISI
TANGGAL
HALAMAN

:
:
:
:

GEDUNG
01
18-12-2014
2/2

CATATAN

CHECK LIST - STRUKTUR

DIREKTORAT OPERASIONAL

NO.

AC SPLITE

DAFTAR PEMERIKSAAN & STANDAR PENERIMAAN

Field Coordinator :

CL - 1 CL - 2
Y T Y T

Inspector :

DIVISI

: GEDUNG

REVISI

: 01

TANGGAL

: 18-12-2014

HALAMAN

: 2/2

CATATAN

CHECK LIST - STRUKTUR

DIREKTORAT OPERASIONAL

NO.

AC SPLITE

DAFTAR PEMERIKSAAN & STANDAR PENERIMAAN

Field Coordinator :

CL - 1 CL - 2
Y T Y T

Inspector :

DIVISI

: GEDUNG

REVISI

: 01

TANGGAL

: 18-12-2014

HALAMAN

: 2/2

CATATAN