STATUS REPORT
Organisation:
Period:
Date of Report:
11 Oct 2016
PART A
Technical Developments during the past year:
1. Launched the first TV news programme from Radio Newsroom through setting up
video news production facilities including video presentation room, server rooms,
master control and video ingestion room, post-production storage and
workstations;
2
2. Launched the broadcasting of visualized radio programme on TV channel;
3. Initiated the setup of software defined storage as cross-platform central archive
storage for video and audio productions;
4. Launched the Facebook Live for visualized radio programme and live video news;
5. Launched the broadcasting of two Analogue TV channels via 40 analogue TV
transmitting stations in Hong Kong;
6. Launched the live video transmission of Road Traffic Condition over RTHK
backbone network;
7. Refurbished TV studio including replacement of studio lighting grid and
suspension system.
Research projects
1.
2.
3.
Coverage %
Programme
Channels
Studios
Transmitters
Radio
Television
99% (AM/FM)
85 % (DTT)
83% (DAB)
99 % (Analogue TV)
3 (FM)
4 (AM)
3 (DTT, High
Definition)
5 (DAB+)
2 (Analogue)
R/N/D
SDTV
R/N/D
N/A
HDTV
R/N/D
UHDTV
R/N/D
N/A
HF
R/N/D
N/A
MF
R/N/D
FM
R/N/D
TV
R/N/D
Internet Services
R/N/D
R/N
R/N
Mobile Services
R/N/D
N/A
N/A
R = Replacement/upgrade
N = New
D = Discontinued
PART B
CURRENT ACTIVITIES
Activities
Area
Brief Details:
Challenges/Problems Faced:
1. Objectives
1. Lack of resources
2. Progress to date
2. Lack of know-how
Solutions Implemented/Type of
assistance requirement from
ABU
Development
projects/Upgrading
facilities/Training
l To provide management of
common site facilities for the
co-site users of the TV
transmitting stations
l Commenced the site clearance
of the leftover properties from
the previous site owners and
site facilities refurbishment.
DTT Transmission
l establishment of five
more fill-in stations
l relocation of two
principal stations
2.
3.
Conversion of TV studio
Participation in ABU
Activities
Area
Level of Participation
Activity 1
4
Activities
Area
Brief Details:
Challenges/Problems Faced:
1. Objectives
1. Lack of resources
2. Progress to date
2. Lack of know-how
3. Others (e.g. up-skilling)
information flows
Activity 2
Activity 3
Solutions Implemented/Type of
assistance requirement from
ABU