Академический Документы
Профессиональный Документы
Культура Документы
Procedure For
Installation Fire and Gas Detection
System
EPCMD-2-QM00-JEP-HV-002
01
06.06.2013
Fluor Comments
Incorporated - Issued for
Implementation
ALJ / PPP
00
09.06.2012
ALJ / PPP
Rev
Date
Revision
Prepared
By
KSS / Rick
Tucker
KSS / EMK
SD (Inst.)
Checked
By
SNS
SNS
Approved
By
Reliance
Contents
1. Purpose
2. Scope ...3
3. References 3
4. Abbreviations and Terms .3
5. Responsibilities .3
6. Methodology 3
EPCMD-2-QM00-JEP-HV-002, Rev:00
Confidential Reliance. All rights reserved
Page 2 of 6
Reliance
1.
Purpose
The purpose of this procedure is to define the inspection, testing method and
criteria for installation work of fire and gas system to achieve mechanical
completion.
2.
Scope
This procedure covers the inspection and test of material and the installation
of fire and gas system in plant and buildings. The equipment covered here in
are: manual call point, toxic gas detector, flammable gas detector, linear heat
detector, IR/UV flame detector, flashing lamp and sounder, smoke detector
and F & G Panels / JB.
Installation of instrument cables shall be in accordance with EPCMD-2-QM00JEP-CI-003.
3.
4.
5.
References
EPCMD-2-QM00-JEP-CI-001
EPCMD-2-QM00-JEP-CI-003
Ultra-violet
IR
Infra-red
F&G
HOD
QMD
DCC
Responsibilities
6.
Methodology
6.1
General Requirements
6.1.1.
All materials received at site shall be inspected, handled and stored upon
receipt.
EPCMD-2-QM00-JEP-HV-002, Rev:00
Confidential Reliance. All rights reserved
Page 3 of 6
Reliance
6.1.2
6.1.3
6.1.4
6.2
Supports
6.2.1.
Prior to site dispatch, the support frame, stand and/or bracket shall be
inspected and checked against the detailed drawing. Ensure all the supports
are surface prepared and painted as per relevant specification.
6.2.2
All rough edges shall have been removed, the assembly primed and painted in
accordance with the specifications.
6.2.3
Verify that "Red-Line" drawings are updated to show new locations of instruments if they
are located in a different location than what is shown on the drawings.
6.2.4
The supports shall be located in accordance with the F & G layout drawings.
The precise location shall be finalized in the field.
6.2.5
6.2.6
The installed support shall be inspected to ensure it is level, vertical and the
whole assembly is rigid. When supports are installed on precast concrete
foundation, the fixings shall be checked to ensure they are tight and secure.
Supports bolted to structural steel shall be checked to ensure all bolts, etc.
are correctly installed and securely fixed. Supports shall not be fixed to hand
railings or similar, non rigid structures. When supports are to be welded to
structural steel, touch up and repair of painting shall be done.
6.3
6.3.1
Installation of panel and racks shall be carried out in accordance with EPCMD2-QM00-JEP-CI-001.
6.3.2
EPCMD-2-QM00-JEP-HV-002, Rev:00
Confidential Reliance. All rights reserved
Page 4 of 6
Reliance
6.4
6.4.1
Toxic and flammable gas detectors will be installed as per item 6.2.1 through
6.2.5.
6.4.2
6.4.3
6.4.4
6.4.5
All toxic gas detectors will be located at low level, as specified in drawing.
6.4.6
6.4.7
Detectors shall be mounted so that they are free from the effect of
and shock.
6.4.8
6.5
6.5.1
Manual call points will be installed as per item 6.2.1 through 6.2.5.
6.5.2
6.5.3
6.6
IR / UV Flame Detectors
6.6.1
6.6.2
IR/UV flame detectors shall be located such that a clear line of sight is
provided to all parts of the risk area.
6.6.3
Detectors shall be mounted so that they are free from the effect of vibration
and shock.
6.6.4
6.6.5
6.7
6.7.1
6.7.2
6.7.3
Detectors shall be mounted so that they are free from the effect of vibration
and shock.
6.7.4
EPCMD-2-QM00-JEP-HV-002, Rev:00
Confidential Reliance. All rights reserved
vibration
Page 5 of 6
Reliance
6.8
6.8.1
6.8.2
6.8.3
6.9
F & G Cables
6.9.1
EPCMD-2-QM00-JEP-HV-002, Rev:00
Confidential Reliance. All rights reserved
Page 6 of 6