Company Update
LucidPipe Installed
Lemona Booster Station - Riverside, CA
Key Attributes:
System Economics:
LCOE 3-5/KWH
Site Conditions
PIPELINE CONDITIONS
Pipe diameter: 24 to 96+ inches
Pressure Drop: 5-10 PSI when operating; <1 PSI when stopped
SITE CONDITIONS
Behind-the-meter or grid connection nearby
Gravity-fed or excess pressure
PRV usage
FPS = Feet per second
CFS = Cubic feet per second
PSI = Pounds per square inch
7
200
50
900-1200 MWH
$1,319,337
3.2 cents
12.1%
Economic Summary
Capacity Factor
IRR*
LCOE
Payback
Northwest
(5 KWH)
California
(14 KWH)
60-85%
60-85%
12%
22%
3.2 cents
3.2 cents
5 years
3 years
* Unlevered
Customer Engagement
Northwest
Pipe
A&E Firms*
Renewable
Energy
Developers
ESCOs
Performance
Contracts
Industrial
Effluent Emitters
A&E Firms
Construction
Firms
10
Sales Process
PATH TO
MARKET
ROLES
BENEFITS
Manufacture and
assemble system
Joint sell, support,
service
Revenue, growth
Sell project
Design, install, O&M,
and finance
Revenue-generating asset
Reduced energy costs
Access to capital to finance
infrastructure
Operational benefits
Production
Fab-less Mass Production
Procure Components Globally
Assemble locally
Build all sizes and volumes
12
Thank You!
Gregg Semler
Questions?
Gregg.Semler@LucidEnergy.com
503-341-0004