Вы находитесь на странице: 1из 10

1) How often should above-grade visual surveillance of a buried pipeline

right-of-way be made?
b)
c)
d)
e)

Once a month
Approximately 6 month intervals
Once a year
Once every 3 months

2) How often should poorly coated pipes with inconsistent cathodic


protection potentials have a pipe-to-soil potential survey made ?
b)
c)
d)
e)

Yearly
Every 2 years
Every 5 years
Every 7 years

3) On buried piping, what is the frequency of pipe coating holiday surveys?


b)
c)
d)
e)

The frequency is governed by the leak test interval of the pipe


It is usually based on indications that other forms of corrosion
control are ineffective.
Surveys are normally made every 5 years
Pipe coating holiday surveys are made when the pipe is
excavated.

4) After excavation of buried piping, if inspection reveals damaged coating


or corroded piping:
b)
c)
d)
e)

The condition should be noted in the records and the


inspection interval shortened
The complete piping system must be day-lighted (excavated)
for repair or replacement.
The damaged coating or corroded piping must be repaired or
replaced
Additional piping shall be excavated until the extent of the
condition is identified.

5) An alternative or supplement to inspection of buried piping is leak


testing with liquid at a pressure at least __________ % greater than the
maximum operating pressure
b)
5
c)
10

d)
e)

25
50

6) The leak test for a 8" diameter buried piping system is 300 psi. After 7
hours, the pressure reacts 273 psi. What should the inspector do?
b)
c)
d)
e)

Nothing is required. The loss of pressure is negligible and will


not affect the test. The loss can be disregarded.
The system should be re-pressurised to the original leak test
pressure and the test should begin again.
The test charts and the temperature should be reviewed to
determine if any change in temperature caused the pressure
drop.
The piping should be visually inspected externally and / or
inspected internally to find the leak and assess the extent of
corrosion.

7) If buried piping leaks are clamped and reburied:


b)
c)
d)
e)

No further action is required unless the piping leaks again


The date of installation shall be marked on the clamp for
future identification
A record of the location and the date of installation shall be
maintained
The clamped line shall be leak tested.

8) Which of the inspection agencies listed below is not an Authorised


Inspection Agency as defined in API 570.
b)
c)
d)
e)

Jurisdictional inspection organisation


Owner-user inspection organisation
ASTM inspection organisation
Independent inspection organisation

9) CUI stands for:


b)
c)
d)

Control unit inspector


Corrosion under insulation
Corrected unobtrusive inserts

e)

Corroded underground installation

10) Deadlegs legs of a piping system are:


b)
c)
d)
e)

The upstream piping of control valve manifolds


Supports attached to a pipeline that has no product in them
The upstream part of an orifice runs
Sections that normally have no significant flow

11) A defect is an imperfection of a type or magnitude exceeding the


__________ criteria.
b)
c)
d)
e)

Non-specific
Imprecise
General
Acceptable

12) An examiner is a person who __________ the inspector


b)
c)
d)
e)

Supplants
Assists
Supervises
Directs

13) Hold point is a point in the repair or alteration process beyond which
work may not proceed until the __________ has been performed and
documented
b)
c)
d)
e)

PWHT required
Required inspection
RT required
Ultrasonic testing

14) What is an imperfection?


b)
c)

It is a flaw or discontinuity noted during inspection that may


be subject to acceptance.
It is a defect noted during inspection that is unacceptable.

d)
e)

It is a weld flaw noted during an inspection that may be


subject to repair
It is a blemish that is only cosmetic and acceptable under all
conditions.

15) __________ is a response or evidence resulting from the application of a


non-destructive evaluation technique
b)
c)
d)
e)

Indication
Imperfection
Breach
Division

16) What are points where chlorine is introduced in reformers, water is


added in overhead systems, etc. called
b)
c)
d)
e)

Primary process points


Level bridle points
Injection points
Test points

17) A test point is an area defined by a circle having a diameter not greater
than __________ inches for a line diameter not exceeding 10 inches or not
greater than __________ inches for larger lines.
b)
c)
d)
e)

3, 4
2, 3
1, 2
3/4, 1

Practice questions API-570 course


ANSWER KEY CLOSED BOOK
1

3
4

b
a

10

11

12

13

14

15

16

17

18

19

20

API 570,
1.1.3
API 570,
4.3.4
API 570, 4.1
API 570,
A.2.1
API 570,
5.3.1
API 570,
5.3.1
API 570,
5.3.1
API 570,
5.3.1
API 570,
5.3.1
API 570,
5.3.2
API 570,
5.3.2
API 570,
5.3.3
API 570,
5.3.3.1
API 570,
5.3.4
API 570,
5.3.5
API 570,
5.3.6
API 570,
5.3.6
API 570,
5.3.7
API 570,
5.3.9
API 570,
5.3.9

21

22

23

24

25
26

d
b

27

28

29

30

31

32

33

34

35

36
37
38
39
40
41
42
43
44
45
46
47

b
d
c
d
c
d
d
b
c
b
a
d

48

API 570,
5.3.9
API 570,
5.3.10
API 570,
5.3.11
API 570,
5.3.12
API 570,
API 570,
5.4.2
API 570,
5.4.2
API 570,
5.4.3
API 570,
5.5.1
API 570,
5.5.2
API 570,
5.5.2
API 570,
5.5.2
API 570,
5.5.3
API 570,
5.5.3
API 570,
5.5.3
API 570,
API 570,
API 570,
API 570,
API 570,
API 570,
API 570,
API 570,
API 570,
API 570,
API 570,
API 570,
6.1.1
API 570,
6.1.2

5.4

5.6
5.6
5.7
5.7
5.7
5.9
5.10
5.11
5.11
6.2
6.1

49

50
51
52
53
54
55
56

b
b
a
a
c
d
b

57
58
59
60

a
b
a
b

61

62

63

64

65

66

67

68

69
70
71

d
c
a

72

73

74

75

76

API 570,
6.2.3
API 570,
API 570,
API 570,
API 570,
API 570,
API 570,
API 570,
7.1.2
API 570,
API 570,
API 570,
API 570,
8.1.1
API 570,
8.1.1
API 570,
8.1.2
API 570,
8.1.2
API 570,
8.1.3.1
API 570,
8.1.3.1
API 570,
8.1.3.1
API 570,
8.1.3.2
API 570,
8.1.4
API 570,
API 570,
API 570,
8.2.1
API 570,
8.2.1
API 570,
8.2.2.1
API 570,
8.2.3
API 570,
8.2.3
API 570,

6.2
6.2
6.4
6.3
6.3
6.4

7.2
7.6
8.1

8.2
8.2

77

78

79

80

81

82

83

84

85

86

87

88

89

90
91
92
93
94
95
96
97
98
99

c
b
d
d
b
b
a
a
c
b

8.2.6
API 570,
8.2.6
API 570,
8.2.6
API 570,
9.1.2
API 570,
9.1.3
API 570,
9.1.5
API 570,
9.1.6
API 570,
9.2.1
API 570,
9.2.2
API 570,
9.2.3
API 570,
9.2.6
API 570,
9.2.7
API 570,
9.2.7
API 570,
9.3.2 & 9.4
API 570, 3.4
API 570, 3.8
API 570, 3.9
API 570, 3.10
API 570, 3.12
API 570, 3.13
API 570, 3.14
API 570, 3.15
API 570, 3.16
API 570, 3.46

Practice questions API-570 course


API 570 PRACTICE QUESTIONS
(OPEN BOOK)

Вам также может понравиться