Вы находитесь на странице: 1из 4

RAYADAH INVESTMENT COMPANY

METHOD STATEMENT - PERFORATION OF UPV

SUBJECT

Spec.

Issued by:

I B.O.Q

Code Ref:

CCE

Submittal scheduled Date:

New sub

Re-submitted

i" sub date:

23 March 2010

Present sub date:


Previous
sub date:
,

Item No

DOCUMENT NUMBER

TITLE

REV

01

QMS-29

STATEMENT
OF PERFORATED PIPE' METHOD
ENLARGEMENT OF EXISTING lOMM HOLE INTO 13MM

00

APPROVED CODE

DIA HOLE

Contractor's

Comments:

See Attachment

This

Note:

review

Contractor's

does not

relieve

the

contractor

of

his responsibilities

under

the

terms

of

the contract

nor authorize

additional

Signature:

compensation .
...~.~.".. -'-~'"-,- ....'}

-~

Engr. Georges
Consultant's

Comments:

SrAlt~rnr ~~l~GD \~ (f)\\DinOiJ~LL"

l\CCkPTh1?:tt2'

\-\a.t~

10 D~\Lf OCU~\2.~%i{Xr \t~-.ffCJ\o1J ~Q ro~~ \~~T1ltmu1


~'1 DI\~~
10l~t:. hPf\\t"lW DIN'{\f:1l&..t\Q\t;; \~\llr ~t=.Q.l~tOtD
f\~~\J,

-n~

Project

Core Team's Comments

Status:
Sign & Date

Arch

_0

_CiVil

Consultant

+--------4

~ ::::
o

HVAC

LS/IT

I Client's

Revise and submit.


Core Team

Construction
/

Manager

-r-7

Project

Rejected
Manager

(1t ~

S;g~~VP--

D:;3/3/'2b1 t) D","J. t;,H /(0

D", ~.

oj

(Q

":

~fL Mtl"C6~vtt~
See Attachment
0

Comments:

Sig"~D'v--,~~ C) up

Elect.

Manager

PfLlQR'

No Action
Client

51,"4
,1."

Date:

Doc. Ref: ITCC-DCS-1-20091117


Issue Date: 17-NOV-09

----

COMPANY:

PROJECT:

CCE

Rayadah Investment
ITCC-Convention

Date: 22-03-10

Company

Page I 0[03

Hotel Package - 2

QMS -29
Rev. 00

METHOD STATEMENT
,

METHOD STATEMENT
FOR
PERFORATION

REVIEW
NAME

DISCIPLINE

FOR CLIENT

BY:
SIGNATURE

DATE

CONSTRUCTION
MECHANICAL

Rev.
00

Date
22-03-10

DEPT.

Description
Perforated Pipe - Enlargement
of Existing
10mm hole into 13mm dia hole

Prepared

Approved by

v:

Mechanical

Projects

//11
'.""

File: Method Statement Excavation, Backfillinz & Com action

~or

(-").

.'

COMPANY:

~
CCE

PROJECT:

Rayadah Investment Company


ITCC-Convention

Hotel Package - 2

METHOD STATEMENT

CONTENTS
1. Scope
2. Material
3. Equipments
4. Application Procedure
5. Safety Precaution

File: Method Statement Excavation, Backfillin

& Com action

Date: 22-03-10
Page 20[03
QMS - 29
Rev. 00

Rayadah Investment Company

COMPANY:

~
CCE

PROJECT:

ITCC-Convention
METHOD

Hotel Package - 2
STATEMENT

Date: 22-03 - 10
Page 30[03
QMS - 29
Rev. 00

1. Scope:
This method statement describes the steps to be followed in order to enlarge the
existing hole 10mm into 13mm hole due to the non-availability of required hole
size from supplier.
2. Material:

2.1
2.2
2.3
2.4

UPVC Class 4 Pipe


Drill Bit 12mm
Cutting Blade
Marker

3. Equipments:
3.1
3.2

Drilling Machine with 12mm drill bit


Generator

4. Application Procedure:
4.1
4.2
4.3
4.4
4.5
4.6

Place the pipe well supported on wooden bar


Clean the surface of pipe with cloth
Drill hole on the existing 10mm hole
Clean the rough hole edges with cutting blade
Clean the perforated pipe with cloth and all debris from inside
Measure the dia and slightly polish the hole with the same bit by up &
down movement with hand drill on position in order to have 13mm dia
hole

5. Safety Precautions:
5.1
5.2
5.3
5.4

Pipe to be held firm in position on the wooden bar


Use face shield & PPE during work
Workers should be notified about hazard things during working.
Safety team shall be make sure of wearing all PPE during activity.

File: Method Statement Excavation, Backfillins & Com action