I.D No.:
PROJECT NAME:
LOCATION:
I.)
16FF0056
Cluster-II (CY-2016 Basic Education Facilities Fund (BEFF) - Batch 9)
Caramoan, Camarines Sur
Construction of 1 Storey 3 Classroom with toilet attached School Building, Daraga Elementary School,Caramoan,
Camarines Sur
37.98
cu.m
Construction Foreman
Common Laborer
@
@
P
P
510.00 /day
355.00 /day
1,530.00
6,390.00
7,920.00
Direct Cost
Indirect Cost
Vat
Item Cost
Unit cost
7,920.00
1,108.80
451.44
9,480.24
249.61
62.92
cu.m
A. MATERIALS
28.49 cu.m
days)
750.00 /cu.m
21,367.50
21,367.50
B. LABOR
(for
1
Skilled Laborer
410.00 /day
1,640.00
Common Laborer
355.00 /day
11,360.00
13,000.00
Direct Cost
Indirect Cost
Vat
Item Cost
Unit cost
ITEM 403 - METAL STRUCTURES (STEEL WORKS)
Estd. Qty.
=
A. MATERIALS
1,246.00
kgs.
410.80
kgs.
82.16
kgs.
246.50
kgs.
103.00
kgs.
28.70
kgs.
45.60
kgs.
41.10
kgs.
57.06
kgs.
23.00
kgs.
27.50
kgs.
20.90
kgs.
boxes
4.00
34,367.50
4,811.45
1,958.95
41,137.90
653.81
7,264.52 kgs.
1 of 33
51.00 /kg.
63,546.00
51.00 /kg.
20,950.80
51.00 /kg.
4,190.16
51.00 /kg.
12,571.50
51.00 /kg.
5,253.00
51.00 /kg.
1,463.70
51.00 /kg.
2,325.60
51.00 /kg.
2,096.10
51.00 /kg.
2,910.06
51.00 /kg.
1,173.00
152.00 /kg.
4,180.00
152.00 /kg.
3,176.80
570.00 /box
2,280.00
3,069.00
kgs.
133.37
kgs.
957.90
kgs.
236.16
kgs.
93.15
kgs.
24.00
kgs.
16.62
kgs.
227.40
24.00
73.80
kgs.
kgs.
kgs.
73.80
kgs
18.00
gals
40.00 /kg.
122,760.00
50.00 /kg.
6,668.50
40.00 /kg.
38,316.00
50.00 /kg.
11,808.00
115.00 /kg.
10,712.25
115.00 /kg.
2,760.00
115.00 /kg.
1,911.30
P
P
P
115.00 /kg.
90.00 /kg.
51.00 /kg.
26,151.00
2,160.00
3,763.80
51.00 /kg.
3,763.80
625.00 /gal
11,250.00
368,141.37
B. LABOR
(for
1
3
7
16
days)
Construction Foreman
Skilled Laborer
Common Laborer
@
@
@
P
P
P
510.00 /day
410.00 /day
355.00 /day
Direct Cost
Indirect Cost
Vat
Item Cost
8,160.00
19,680.00
39,760.00
67,600.00
435,741.37
61,003.79
24,837.26
521,582.42
Unit cost P
ITEM 404 - REINFORCING STEEL
Estd. Qty.
A. MATERIALS
7,928.37
152
kgs.
kgs.
71.80
7,928.37 kgs.
Reinforcing Steel
G.I. Tie Wire
@
@
P
P
48.00 /kg.
85.00 /kg
380,561.76
12,920.00
393,481.76
B. LABOR
1
6
(for
-
23
days)
Construction Foreman
Skilled Laborer
@
@
P
P
510.00 /day
410.00 /day
Common Laborer
355.00 /day
65,320.00
133,630.00
Direct Cost
Indirect Cost
Vat
Item Cost
Unit cost
ITEM 405 - STRUCTURAL CONCRETE
Estd. Qty.
60.90
11,730.00
56,580.00
527,111.76
73,795.65
30,045.37
630,952.78
79.58
cu.m
A. MATERIALS
555.00
61.00
25.00
31.00
bags
cu.m
cu.m
cu.m
Portland Cement
Crushed Gravel G-1
Crushed Gravel G-3/4
Washed Sand
@
@
@
@
P
P
P
P
245.00
730.00
765.00
530.00
/bag
/cu.m
/cu.m
/cu.m
135,975.00
44,530.00
19,125.00
16,430.00
216,060.00
B. LABOR
1
6
(for
-
12 days)
Construction Foreman
Skilled Laborer
@
@
P
P
510.00 /day
410.00 /day
Common Laborer
355.00 /day
Direct Cost
Indirect Cost
Vat
2 of 33
6,120.00
29,520.00
34,080.00
69,720.00
285,780.00
40,009.20
16,289.46
Item Cost
Unit cost
342,078.66
5,617.06
191.50 sq.m
A. MATERIALS
369.00
2,454.00
23.00
524.07
13.00
204.00
bags
pcs
cu.m
kgs
kgs
pcs
(for
17
Portland Cement
6" CHB
Washed Sand
10mmx6m RSB
GI Tie Wire
Silicon Sealant
@
@
@
@
@
@
P
P
P
P
P
P
245.00
13.00
530.00
40.00
85.00
96.00
/bag
/pc.
/cu.m
/kg
/kg
/pc.
90,405.00
31,902.00
12,190.00
20,962.80
1,105.00
19,584.00
176,148.80
B. LABOR
1
3
5
days)
Construction Foreman
Skilled Laborer
Common Laborer
@
@
@
P
P
P
510.00 /day
410.00 /day
355.00 /day
Direct Cost
Indirect Cost
Vat
8,670.00
20,910.00
30,175.00
59,755.00
235,903.80
33,026.53
13,446.52
Item Cost
Unit cost
282,376.85
1,474.55
275.61
sq.m
A. MATERIALS
275.61
B. LABOR
1
sq.m
(for
-
Soil Poisoning
1 day)
Skilled Laborer
14.25 /sq.m
3,927.44
410.00 /day
410.00
410.00
Direct Cost
Indirect Cost
Vat
Item Cost
Unit cost
ITEM 1003 - CARPENTRY WORKS
Estd. Qty.
4,337.44
607.24
247.23
5,191.92
18.84
270.78 sq.m
A. MATERIALS
150.00
pcs.
48.00
pcs.
240.00
pcs.
240.00
84.00
pcs.
pcs.
750.00
8.00
pcs.
pcs.
84.00
pcs.
/pc.
35,700.00
/pc
11,424.00
/pc
1,200.00
/pc.
/pc
2,400.00
34,440.00
/pc.
/pc
1,147.50
3,720.00
/pc.
20,160.00
110,191.50
B. LABOR
(for
1
2
4
10
days)
Construction Foreman
Skilled Laborer
Common Laborer
@
@
@
3 of 33
P
P
P
510.00 /day
410.00 /day
355.00 /day
5,100.00
8,200.00
14,200.00
27,500.00
Direct Cost
137,691.50
Indirect Cost
19,276.81
Vat
Item Cost
Unit cost
7,848.42
164,816.73
608.67
LM
12.00
LM
14.00
LM
5,300.00
pcs.
4.00
B. LABOR
lit.
(for
15
465.00 /LM
144,522.00
308.00 /LM
3,696.00
237.25 /LM
3,321.50
3.37 /pc.
17,861.00
237.25 /lit.
949.00
P
170,349.50
7,650.00
18,450.00
days)
1
3
Construction Foreman
Skilled Laborer
@
@
P
P
510.00 /day
410.00 /day
Common Laborer
355.00 /day
31,950.00
58,050.00
Direct Cost
Indirect Cost
Vat
Item Cost
Unit cost
228,399.50
31,975.93
13,018.77
273,394.20
879.65
241.02 sq.m
A. MATERIALS
70.00 bags
6.00
pcs.
B. LABOR
(for
Cement
day)
@
@
P
P
245.00 /bag
1,282.00 /pc
Skilled Laborer
410.00 /day
Common Laborer
355.00 /day
Direct Cost
Indirect Cost
Vat
17,150.00
7,692.00
24,842.00
3,690.00
4,260.00
7,950.00
Item Cost
Unit cost
32,792.00
4,590.88
1,869.14
39,252.02
162.86
744.56 sq.m
A. MATERIALS
20.00
22.00
22.00
22.00
8.00
0.25
5.00
8.00
3.00
3.00
3.00
3.00
3.00
qrts.
gal.
gal.
gal.
qrts.
roll
pcs.
pcs.
gal.
gal.
gal.
lit.
pcs.
Neutralizer
Flat Latex
Patching Compound
Latex semi-gloss
Acri color
Sand Paper
9" Roller bush
4" Paint brush
Flat Wall Enamel
Glazing putty
Enamel semi gloss
Paint thinner
Painy Tray
@
@
@
@
@
@
@
@
@
@
@
@
@
P
P
P
P
P
P
P
P
P
P
P
P
P
31.00
540.00
305.00
158.00
157.00
1,500.00
66.00
56.00
585.00
470.00
585.00
100.00
45.00
/qrt.
/gal.
/gal.
/gal.
/qrt.
/roll
/pc.
/pc.
/gal
/gal
/gal
/lit.
/pc.
3.00
pail
Epoxy enamel
3,135.00 /pail
P
B. LABOR
(for
days)
4 of 33
620.00
11,880.00
6,710.00
3,476.00
1,256.00
375.00
330.00
448.00
1,755.00
1,410.00
1,755.00
300.00
135.00
9,405.00
39,855.00
1
3
Construction Foreman
Skilled Laborer
@
@
P
P
510.00 /day
410.00 /day
Common Laborer
355.00 /day
6,390.00
16,830.00
Direct Cost
Indirect Cost
Vat
Item Cost
Unit cost
3,060.00
7,380.00
56,685.00
5,101.65
4,547.24
66,333.89
89.09
B. LABOR
(for
35
25,000.00
LUMPSUM
days)
First Aider
410.00 /day
14,350.00
19,075.00
545.00 /day
33,425.00
Direct Cost
Indirect Cost
Vat
Total Cost
Unit cost
58,425.00
8,179.50
3,330.23
69,934.73
69,934.73
SPL-II - FORMWORKS
Estd. Qty.
A. MATERIALS
2,900.00 bd.ft.
50.00 pcs
35.00 kgs
262.23 sq.m
Coco lumber
Plywood Ordinary, " x 4' x 8'
CWN, Assorted
@
@
P
P
17.00 /bdft.
305.00 /pc.
70.00 /kg.
49,300.00
15,250.00
2,450.00
67,000.00
P
B. LABOR
1
2
(for
-
7 days)
Construction Foreman
Skilled Laborer
@
@
P
P
510.00 /day
410.00 /day
5,740.00
12,425.00
Common Laborer
355.00 /day
18,165.00
Direct Cost
Indirect Cost
Vat
Item Cost
Unit cost
SPL-III - ELECTRICAL WORKS
Estd. Qty.
A. MATERIALS
Conduit Boxes
107.00
146.00
3.00
5.00
32.00
46.00
30.00
31.00
5.00
2.00
1.00
3.00
& Fittings
pcs.
pcs.
pc.
pc.
mts.
pcs.
pcs.
pcs.
pcs.
pcs.
pc.
can
85,165.00
11,923.10
4,854.41
101,942.51
388.75
1.00 lot
5 of 33
63.00
3.00
123.00
14.00
6.50
9.50
13.00
22.00
17.00
1,376.00
33.00
303.00
/pc.
/pc.
/pc.
/pc.
/m
/pc.
/pc.
/pc.
/pc.
/pc.
/pc.
/can
6,741.00
438.00
369.00
70.00
208.00
437.00
390.00
682.00
85.00
2,752.00
33.00
909.00
4.00 pcs.
Electrical tape
23.00 /pc.
21.00
21.00
35.00
35.00
105.00
72.00
105.00 /set
92.00
/m
/m
/m
/m
/set
/set
13,206.00
16,254.00
11,130.00
280.00
490.00
1,260.00
432.00
630.00
30,476.00
P
Lighting Fixtures
8.00 sets
18.00 sets
Panel Boards
1.00 assy/s
Panel:
Main:
Brs:
Brs:
200.00 /set
230.00 /set
DP
40AT/50AF, 2P, 240V ,60Hz, 18KAIC, B.O.
1- 15AT/60AF, 2P, 240V, 60Hz, 10KAIC, B.O.
1- 20AT/60AF, 2P, 240V, 60Hz, 10KAIC, B.O.
P
P
1,600.00
4,140.00
5,740.00
4,750.00
4,750.00
54,172.00
1,530.00
3,690.00
4,750.00 /assy.
B. LABOR
1
3
(for
-
3 days)
Construction Foreman
Skilled Laborer
@
@
P
P
510.00 /day
410.00 /day
Common Laborer
355.00 /day
7,455.00
12,675.00
Direct Cost
Indirect Cost
Vat
Total Cost
Unit cost
SPL-IV - FABRICATED MATERIALS AND HARDWARE
Estd. Qty.
=
6.00
sets
3.00
sets
9.00
sets
3.00
sets
3.00
sets
1.00
6.00
9.00
21.00
24.00
3.00
lot
pcs
kg
kg
pcs
set
(for
14
B. LABOR
66,847.00
9,358.58
3,810.28
80,015.86
80,015.86
31.60 sq.m
/set
45,552.00
/set
18,504.00
/set
25,605.00
/set
7,350.00
/set
2,175.00
/lot
/pc
/kg
/kg
/pc
/set
664.00
1,710.00
630.00
1,365.00
336.00
420.00
P
104,311.00
7,140.00
22,960.00
days)
1
4
Construction Foreman
Skilled Laborer
@
@
P
P
510.00 /day
410.00 /day
Common Laborer
355.00 /day
Direct Cost
Indirect Cost
6 of 33
29,820.00
59,920.00
P
164,231.00
22,992.34
Vat
9,361.17
Item Cost
Unit cost
SPL-V - Plumbing/ Sanitary Works
Estd. Qty.
196,584.51
6,221.03
1.00 lot
A. MATERIALS
3.00
3.00
6.00
6.00
6.00
6.00
5.00
3.00
4.00
9.00
4.00
9.00
3.00
5.00
6.00
9.00
1.00
3.00
1.00
3.00
6.00
25.44
3.00
3.00
B. LABOR
set
set
pc.
pc.
pc.
pc.
pc.
pc.
pc.
pc.
pc.
pc.
pc.
pc.
pc.
pc.
can
rolls
pc.
pc.
sq.m
sq.m
pc.
sq. ft.
1
2
(for
-
5
days)
Construction Foreman
Skilled Laborer
Common Laborer
6,610.00
6,000.00
608.00
425.00
125.00
22.00
70.00
280.00
60.00
135.00
23.00
26.00
105.00
70.00
87.00
38.00
184.00
9.00
235.00
150.00
345.00
735.00
300.00
175.00
/set
/set
/pc.
/pc.
/pc.
/pc.
/pc.
/pc.
/pc.
/pc.
/pc.
/pc.
/pc.
/pc.
/pc.
/pc.
/can
/rolls
/pc.
/pc.
/pc.
/pc.
/pc.
/sq. ft.
510.00 /day
410.00 /day
19,830.00
18,000.00
3,648.00
2,550.00
750.00
132.00
350.00
840.00
240.00
1,215.00
92.00
234.00
315.00
350.00
522.00
342.00
184.00
27.00
235.00
450.00
2,070.00
18,698.40
900.00
525.00
72,499.40
2,550.00
4,100.00
355.00 /day
7,100.00
13,750.00
Direct Cost
Indirect Cost
Vat
Item Cost
Unit cost
86,249.40
12,074.92
4,916.22
103,240.53
103,240.53
EQUIPMENT RENTAL
1
1
1
1
1
1
1
1
unit
unit
unit
unit
unit
unit
unit
unit
No. of Days
Rate/Day
15.00
1,300.00
14.00
1,100.00
2.00
1,700.00
2.00
2,700.00
2.00
900.00
2.00
3,000.00
3.00
1,000.00
2.00
250.00
Lumpsum
Direct Cost
Vat
Total Cost
HAULING COST
Lumpsum
Sub-total I
II.)
19,500.00
15,400.00
3,400.00
5,400.00
1,800.00
6,000.00
3,000.00
500.00
2,000.00
57,000.00
57,000.00
2,850.00
59,850.00
90,000.00
3,078,165.73
Construction of 1 Storey 3 Classroom with toilet attached School Building, Gogon Elementary School,Caramoan,
Camarines Sur
7 of 33
37.98
cu.m
Construction Foreman
510.00 /day
Common Laborer
355.00 /day
Direct Cost
Indirect Cost
Vat
Item Cost
1,530.00
6,390.00
7,920.00
Unit cost
7,920.00
1,108.80
451.44
9,480.24
249.61
62.92
cu.m
A. MATERIALS
28.49 cu.m
B. LABOR
(for
1
8
days)
Skilled Laborer
Common Laborer
750.00 /cu.m
21,367.50
21,367.50
@
@
P
P
410.00 /day
355.00 /day
1,640.00
11,360.00
13,000.00
Direct Cost
Indirect Cost
Vat
Item Cost
Unit cost
ITEM 403 - METAL STRUCTURES (STEEL WORKS)
Estd. Qty.
=
A. MATERIALS
1,246.00
kgs.
410.80
kgs.
82.16
kgs.
246.50
kgs.
103.00
kgs.
28.70
kgs.
45.60
kgs.
41.10
kgs.
57.06
kgs.
23.00
kgs.
27.50
kgs.
20.90
kgs.
boxes
kgs.
133.37
kgs.
957.90
kgs.
236.16
kgs.
93.15
kgs.
4.00
3,069.00
34,367.50
4,811.45
1,958.95
41,137.90
653.81
7,264.52 kgs.
8 of 33
51.00 /kg.
63,546.00
51.00 /kg.
20,950.80
51.00 /kg.
4,190.16
51.00 /kg.
12,571.50
51.00 /kg.
5,253.00
51.00 /kg.
1,463.70
51.00 /kg.
2,325.60
51.00 /kg.
2,096.10
51.00 /kg.
2,910.06
51.00 /kg.
1,173.00
152.00 /kg.
4,180.00
152.00 /kg.
3,176.80
@
@
P
P
570.00 /box
40.00 /kg.
2,280.00
122,760.00
50.00 /kg.
6,668.50
@
6.0m.
@
40.00 /kg.
38,316.00
50.00 /kg.
11,808.00
115.00 /kg.
10,712.25
24.00
kgs.
16.62
kgs.
227.40
24.00
73.80
kgs.
kgs.
kgs.
73.80
kgs
18.00
gals
115.00 /kg.
2,760.00
115.00 /kg.
1,911.30
@
@
@
P
P
P
115.00 /kg.
90.00 /kg.
51.00 /kg.
26,151.00
2,160.00
3,763.80
51.00 /kg.
3,763.80
625.00 /gal
11,250.00
368,141.37
B. LABOR
(for
1
3
7
16
days)
Construction Foreman
Skilled Laborer
Common Laborer
@
@
@
P
P
P
510.00 /day
410.00 /day
355.00 /day
8,160.00
19,680.00
39,760.00
67,600.00
Direct Cost
Indirect Cost
Vat
Item Cost
Unit cost P
ITEM 404 - REINFORCING STEEL
Estd. Qty.
A. MATERIALS
7,928.37
152
kgs.
kgs.
435,741.37
61,003.79
24,837.26
521,582.42
71.80
7,928.37 kgs.
Reinforcing Steel
G.I. Tie Wire
@
@
P
P
48.00 /kg.
85.00 /kg
380,561.76
12,920.00
393,481.76
B. LABOR
1
6
(for
-
23
days)
Construction Foreman
Skilled Laborer
@
@
P
P
510.00 /day
410.00 /day
Common Laborer
355.00 /day
65,320.00
133,630.00
Direct Cost
Indirect Cost
Vat
Item Cost
Unit cost
ITEM 405 - STRUCTURAL CONCRETE
Estd. Qty.
60.90
11,730.00
56,580.00
527,111.76
73,795.65
30,045.37
630,952.78
79.58
cu.m
A. MATERIALS
555.00
61.00
25.00
31.00
bags
cu.m
cu.m
cu.m
Portland Cement
Crushed Gravel G-1
Crushed Gravel G-3/4
Washed Sand
@
@
@
@
P
P
P
P
245.00
730.00
765.00
530.00
/bag
/cu.m
/cu.m
/cu.m
135,975.00
44,530.00
19,125.00
16,430.00
216,060.00
B. LABOR
1
6
(for
-
12 days)
Construction Foreman
Skilled Laborer
@
@
P
P
510.00 /day
410.00 /day
Common Laborer
355.00 /day
34,080.00
69,720.00
Direct Cost
Indirect Cost
Vat
Item Cost
Unit cost
6,120.00
29,520.00
285,780.00
40,009.20
16,289.46
342,078.66
5,617.06
191.50 sq.m
A. MATERIALS
369.00
bags
Portland Cement
9 of 33
245.00 /bag
90,405.00
2,454.00
23.00
524.07
13.00
204.00
pcs
cu.m
kgs
kgs
pcs
(for
17
6" CHB
Washed Sand
10mmx6m RSB
GI Tie Wire
Silicon Sealant
@
@
@
@
@
P
P
P
P
P
13.00
530.00
40.00
85.00
96.00
/pc.
/cu.m
/kg
/kg
/pc.
31,902.00
12,190.00
20,962.80
1,105.00
19,584.00
176,148.80
B. LABOR
1
3
5
days)
Construction Foreman
Skilled Laborer
Common Laborer
@
@
@
P
P
P
510.00 /day
410.00 /day
355.00 /day
8,670.00
20,910.00
30,175.00
59,755.00
Direct Cost
Indirect Cost
Vat
Item Cost
Unit cost
235,903.80
33,026.53
13,446.52
282,376.85
1,474.55
275.61
sq.m
A. MATERIALS
275.61
B. LABOR
1
sq.m
(for
-
Soil Poisoning
1 day)
Skilled Laborer
14.25 /sq.m
3,927.44
410.00 /day
410.00
410.00
Direct Cost
Indirect Cost
Vat
Item Cost
Unit cost
ITEM 1003 - CARPENTRY WORKS
Estd. Qty.
4,337.44
607.24
247.23
5,191.92
18.84
270.78 sq.m
A. MATERIALS
150.00
pcs.
48.00
pcs.
240.00
pcs.
240.00
84.00
pcs.
pcs.
750.00
8.00
pcs.
pcs.
84.00
pcs.
/pc.
35,700.00
/pc
11,424.00
/pc
1,200.00
/pc.
/pc
2,400.00
34,440.00
/pc.
/pc
1,147.50
3,720.00
/pc.
20,160.00
110,191.50
B. LABOR
(for
1
2
4
10
days)
Construction Foreman
Skilled Laborer
Common Laborer
@
@
@
P
P
P
510.00 /day
410.00 /day
355.00 /day
5,100.00
8,200.00
14,200.00
27,500.00
Direct Cost
Indirect Cost
Vat
Item Cost
Unit cost
ITEM 1013 - CORRUGATED METAL ROOFING (PRE-PAINTED)
Estd. Qty.
=
310.80 sq.m
A. MATERIALS
10 of 33
137,691.50
19,276.81
7,848.42
164,816.73
608.67
310.80
LM
12.00
LM
14.00
LM
5,300.00
pcs.
4.00
B. LABOR
lit.
(for
1
3
6
15
465.00 /LM
144,522.00
308.00 /LM
3,696.00
237.25 /LM
3,321.50
3.37 /pc.
17,861.00
237.25 /lit.
949.00
P
170,349.50
7,650.00
18,450.00
31,950.00
days)
Construction Foreman
Skilled Laborer
Common Laborer
@
@
@
P
P
P
510.00 /day
410.00 /day
355.00 /day
58,050.00
Direct Cost
Indirect Cost
Vat
Item Cost
Unit cost
228,399.50
31,975.93
13,018.77
273,394.20
879.65
241.02 sq.m
A. MATERIALS
70.00 bags
6.00
pcs.
B. LABOR
(for
Cement
day)
@
@
P
P
245.00 /bag
1,282.00 /pc
Skilled Laborer
410.00 /day
Common Laborer
355.00 /day
Direct Cost
Indirect Cost
Vat
17,150.00
7,692.00
24,842.00
3,690.00
4,260.00
7,950.00
Item Cost
Unit cost
32,792.00
4,590.88
1,869.14
39,252.02
162.86
744.56 sq.m
A. MATERIALS
20.00
22.00
22.00
22.00
8.00
0.25
5.00
8.00
3.00
3.00
3.00
3.00
3.00
3.00
B. LABOR
qrts.
gal.
gal.
gal.
qrts.
roll
pcs.
pcs.
gal.
gal.
gal.
lit.
pcs.
pail
Neutralizer
Flat Latex
Patching Compound
Latex semi-gloss
Acri color
Sand Paper
9" Roller bush
4" Paint brush
Flat Wall Enamel
Glazing putty
Enamel semi gloss
Paint thinner
Paint Tray
Epoxy enamel
(for
days)
@
@
@
@
@
@
@
@
@
@
@
@
@
@
P
P
P
P
P
P
P
P
P
P
P
P
P
P
31.00
540.00
305.00
158.00
157.00
1,500.00
66.00
56.00
585.00
470.00
585.00
100.00
45.00
3,135.00
/qrt.
/gal.
/gal.
/gal.
/qrt.
/roll
/pc.
/pc.
/gal
/gal
/gal
/lit.
/pc.
/pail
1
3
Construction Foreman
Skilled Laborer
@
@
P
P
510.00 /day
410.00 /day
Common Laborer
355.00 /day
Direct Cost
Indirect Cost
Vat
11 of 33
620.00
11,880.00
6,710.00
3,476.00
1,256.00
375.00
330.00
448.00
1,755.00
1,410.00
1,755.00
300.00
135.00
9,405.00
39,855.00
3,060.00
7,380.00
6,390.00
16,830.00
56,685.00
5,101.65
4,547.24
Item Cost
Unit cost
66,333.89
89.09
B. LABOR
(for
35
25,000.00
LUMPSUM
days)
First Aider
410.00 /day
14,350.00
19,075.00
545.00 /day
33,425.00
Direct Cost
Indirect Cost
Vat
Total Cost
Unit cost
58,425.00
8,179.50
3,330.23
69,934.73
69,934.73
SPL-II - FORMWORKS
Estd. Qty.
A. MATERIALS
2,900.00 bd.ft.
50.00 pcs
35.00 kgs
B. LABOR
1
(for
-
2
5
262.23 sq.m
Coco lumber
Plywood Ordinary, " x 4' x 8'
CWN, Assorted
@
@
@
P
P
P
17.00 /bdft.
305.00 /pc.
70.00 /kg.
49,300.00
15,250.00
2,450.00
67,000.00
7 days)
Construction Foreman
510.00 /day
5,740.00
Skilled Laborer
Common Laborer
@
@
P
P
410.00 /day
355.00 /day
12,425.00
18,165.00
Direct Cost
Indirect Cost
Vat
Item Cost
Unit cost
SPL-III - ELECTRICAL WORKS
Estd. Qty.
A. MATERIALS
Conduit Boxes
107.00
146.00
3.00
5.00
32.00
46.00
30.00
31.00
5.00
2.00
1.00
3.00
4.00
& Fittings
pcs.
pcs.
pc.
pc.
mts.
pcs.
pcs.
pcs.
pcs.
pcs.
pc.
can
pcs.
85,165.00
11,923.10
4,854.41
101,942.51
388.75
1.00 lot
12 of 33
63.00
3.00
123.00
14.00
6.50
9.50
13.00
22.00
17.00
1,376.00
33.00
303.00
23.00
21.00
21.00
35.00
35.00
105.00
72.00
/pc.
/pc.
/pc.
/pc.
/m
/pc.
/pc.
/pc.
/pc.
/pc.
/pc.
/can
/pc.
/m
/m
/m
/m
/set
/set
6,741.00
438.00
369.00
70.00
208.00
437.00
390.00
682.00
85.00
2,752.00
33.00
909.00
92.00
13,206.00
16,254.00
11,130.00
280.00
490.00
1,260.00
432.00
6.00 sets
Lighting Fixtures
8.00 sets
18.00 sets
Panel Boards
1.00 assy/s
B. LABOR
1
3
7
(for
-
105.00 /set
30,476.00
1,600.00
4,140.00
5,740.00
4,750.00
4,750.00
54,172.00
510.00 /day
410.00 /day
355.00 /day
1,530.00
3,690.00
7,455.00
200.00 /set
230.00 /set
Panel: DP
Main: 40AT/50AF, 2P, 240V ,60Hz, 18KAIC, B.O.
Brs:
1- 15AT/60AF, 2P, 240V, 60Hz, 10KAIC, B.O.
Brs:
1- 20AT/60AF, 2P, 240V, 60Hz, 10KAIC, B.O.
w/ ground bus & plastic engraved nameplate
3 days)
Construction Foreman
Skilled Laborer
Common Laborer
@
@
@
P
P
P
630.00
P
4,750.00 /assy.
12,675.00
Direct Cost
Indirect Cost
Vat
Total Cost
Unit cost
SPL-IV - FABRICATED MATERIALS AND HARDWARE
Estd. Qty.
=
6.00
sets
3.00
sets
9.00
sets
3.00
sets
3.00
sets
1.00
6.00
9.00
21.00
24.00
3.00
lot
pcs
kg
kg
pcs
set
66,847.00
9,358.58
3,810.28
80,015.86
80,015.86
31.60 sq.m
/set
45,552.00
/set
18,504.00
/set
25,605.00
/set
7,350.00
/set
2,175.00
/lot
/pc
/kg
/kg
/pc
/set
664.00
1,710.00
630.00
1,365.00
336.00
420.00
(for
14
1
4
Construction Foreman
Skilled Laborer
@
@
P
P
510.00 /day
410.00 /day
Common Laborer
355.00 /day
104,311.00
7,140.00
22,960.00
29,820.00
59,920.00
Direct Cost
Indirect Cost
Vat
Item Cost
Unit cost
SPL-V - Plumbing/ Sanitary Works
Estd. Qty.
P
days)
1.00 lot
A. MATERIALS
13 of 33
164,231.00
22,992.34
9,361.17
196,584.51
6,221.03
3.00
3.00
6.00
6.00
6.00
6.00
5.00
3.00
4.00
9.00
4.00
9.00
3.00
5.00
6.00
9.00
1.00
3.00
1.00
3.00
6.00
25.44
3.00
3.00
B. LABOR
1
2
4
set
set
pc.
pc.
pc.
pc.
pc.
pc.
pc.
pc.
pc.
pc.
pc.
pc.
pc.
pc.
can
rolls
pc.
pc.
sq.m
sq.m
pc.
sq. ft.
(for
-
5
days)
Construction Foreman
Skilled Laborer
Common Laborer
6,610.00
6,000.00
608.00
425.00
125.00
22.00
70.00
280.00
60.00
135.00
23.00
26.00
105.00
70.00
87.00
38.00
184.00
9.00
235.00
150.00
345.00
735.00
300.00
175.00
/set
/set
/pc.
/pc.
/pc.
/pc.
/pc.
/pc.
/pc.
/pc.
/pc.
/pc.
/pc.
/pc.
/pc.
/pc.
/can
/rolls
/pc.
/pc.
/pc.
/pc.
/pc.
/sq. ft.
510.00 /day
410.00 /day
355.00 /day
19,830.00
18,000.00
3,648.00
2,550.00
750.00
132.00
350.00
840.00
240.00
1,215.00
92.00
234.00
315.00
350.00
522.00
342.00
184.00
27.00
235.00
450.00
2,070.00
18,698.40
900.00
525.00
72,499.40
2,550.00
4,100.00
7,100.00
13,750.00
Direct Cost
Indirect Cost
Vat
Item Cost
Unit cost
86,249.40
12,074.92
4,916.22
103,240.53
103,240.53
EQUIPMENT RENTAL
1
1
1
1
1
1
1
1
unit
unit
unit
unit
unit
unit
unit
unit
No. of Days
Rate/Day
15.00
1,300.00
14.00
1,100.00
2.00
1,700.00
2.00
2,700.00
2.00
900.00
2.00
3,000.00
3.00
1,000.00
2.00
250.00
Power Consumption
19,500.00
15,400.00
3,400.00
5,400.00
1,800.00
6,000.00
3,000.00
500.00
Lumpsum
Direct Cost
Vat
Total Cost
HAULING COST
Lumpsum
Sub-total I
Total Bid Amount
Submitted by:
JERRY LUZ
Proprietor
14 of 33
2,000.00
57,000.00
57,000.00
2,850.00
59,850.00
90,000.00
3,078,165.73
6,156,331.46
15 of 33
I.)
16FF0056
Cluster-II (CY-2016 Basic Education Facilities Fund (BEFF) - Batch 9)
Caramoan, Camarines Sur
Construction of 1 Storey 3 Classroom with toilet attached School Building, Daraga Elementary School, Caramoan,
Camarines Sur
28.49 cu.m
1,246.00 kgs.
410.80
kgs.
82.16
kgs.
246.50
kgs.
103.00
kgs.
28.70
kgs.
45.60
kgs.
41.10
kgs.
57.06
kgs.
23.00
kgs.
27.50
kgs.
20.90
kgs.
4.00 boxes
3,069.00 kgs.
133.37
kgs.
957.90
kgs.
236.16
kgs.
93.15
kgs.
24.00
kgs.
16.62
kgs.
227.40
24.00
73.80
kgs.
kgs.
kgs.
73.80
kgs
gals
kgs.
kgs.
bags
cu.m
cu.m
cu.m
bags
pcs
cu.m
kgs
kgs
pcs
sq.m
pcs.
18.00
7,928.37
152
555.00
61.00
25.00
31.00
369.00
2,454.00
23.00
524.07
13.00
204.00
275.61
150.00
16 of 33
750.00 /cu.m
57.00 /kg.
57.00 /kg.
57.00 /kg.
57.00 /kg.
57.00 /kg.
57.00 /kg.
57.00 /kg.
57.00 /kg.
57.00 /kg.
57.00 /kg.
152.00 /kg.
152.00 /kg.
570.00 /box
40.00 /kg.
50.00 /kg.
40.00 /kg.
50.00 /kg.
115.00 /kg.
115.00 /kg.
115.00 /kg.
115.00 /kg.
90.00 /kg.
57.00 /kg.
57.00 /kg.
625.00
44.00
85.00
245.00
730.00
765.00
530.00
245.00
13.00
530.00
40.00
85.00
96.00
14.25
238.00
/gal
/kg.
/kg
/bag
/cu.m
/cu.m
/cu.m
/bag
/pc.
/cu.m
/kg
/kg
/pc.
/sq.m
/pc.
48.00
pcs.
240.00
pcs.
240.00
84.00
pcs.
pcs.
750.00
8.00
pcs.
pcs.
84.00
pcs.
310.80
LM
12.00
LM
14.00
LM
5,300.00
pcs.
4.00
lit.
70.00 bags
6.00
20.00
22.00
22.00
22.00
8.00
0.25
5.00
8.00
3.00
3.00
3.00
3.00
3.00
3.00
pcs.
qrts.
gal.
gal.
gal.
qrts.
roll
pcs.
pcs.
gal.
gal.
gal.
lit.
pcs.
pail
238.00 /pc
5.00 /pc
10.00 /pc.
410.00 /pc
1.50 /pc.
465.00 /pc
240.00 /pc.
465.00 /LM
308.00 /LM
237.25 /LM
3.35 /pc.
237.25 /lit.
245.00 /bag
1,282.00
31.00
540.00
305.00
158.00
157.00
1,500.00
66.00
56.00
585.00
470.00
585.00
100.00
Neutralizer
Flat Latex
Patching Compound
Latex semi-gloss
Acri color
Sand Paper
9" Roller bush
4" Paint brush
Flat Wall Enamel
Glazing putty
Enamel semi gloss
Paint thinner
Painy Tray
Epoxy enamel
/pc
/qrt.
/gal.
/gal.
/gal.
/qrt.
/roll
/pc.
/pc.
/gal
/gal
/gal
/lit.
3,135.00 /pail
17 of 33
18 of 33
25,000.00
17.00 /bdft.
305.00 /pc.
70.00 /kg.
63.00
3.00
123.00
14.00
6.50
9.50
13.00
22.00
17.00
1,376.00
33.00
303.00
/pc.
/pc.
/pc.
/pc.
/m
/pc.
/pc.
/pc.
/pc.
/pc.
/pc.
/can
23.00 /pc.
21.00
21.00
35.00
35.00
105.00
72.00
105.00
/m
/m
/m
/m
/set
/set
/set
200.00 /set
230.00 /set
4,750.00 /assy.
7,592.00 /set
6,168.00 /set
2,845.00 /set
2,450.00 /set
725.00 /set
664.00
285.00
70.00
65.00
14.00
140.00
/lot
/pc
/kg
/kg
/pc
/set
6,610.00
6,000.00
608.00
425.00
125.00
22.00
70.00
280.00
60.00
135.00
/set
/set
/pc.
/pc.
/pc.
/pc.
/pc.
/pc.
/pc.
/pc.
4.00
9.00
3.00
5.00
6.00
9.00
1.00
3.00
1.00
3.00
6.00
25.44
3.00
3.00
II.)
pc.
pc.
pc.
pc.
pc.
pc.
can
rolls
pc.
pc.
sq.m
sq.m
pc.
sq. ft.
23.00
26.00
105.00
70.00
87.00
38.00
184.00
9.00
235.00
150.00
345.00
735.00
300.00
175.00
/pc.
/pc.
/pc.
/pc.
/pc.
/pc.
/can
/rolls
/pc.
/pc.
/pc.
/pc.
/pc.
/sq. ft.
Construction of 1 Storey 3 Classroom with toilet attached School Building, Gogon Elementary School, Caramoan,
Camarines Sur
28.49 cu.m
1,246.00 kgs.
410.80
kgs.
82.16
kgs.
246.50
kgs.
103.00
kgs.
28.70
kgs.
45.60
kgs.
41.10
kgs.
57.06
kgs.
23.00
kgs.
27.50
kgs.
20.90
kgs.
4.00 boxes
3,069.00 kgs.
133.37
kgs.
957.90
kgs.
236.16
kgs.
93.15
kgs.
24.00
kgs.
16.62
kgs.
227.40
24.00
73.80
kgs.
kgs.
kgs.
73.80
kgs
gals
kgs.
kgs.
bags
cu.m
cu.m
cu.m
18.00
7,928.37
152
555.00
61.00
25.00
31.00
19 of 33
750.00 /cu.m
57.00 /kg.
57.00 /kg.
57.00 /kg.
57.00 /kg.
57.00 /kg.
57.00 /kg.
57.00 /kg.
57.00 /kg.
57.00 /kg.
57.00 /kg.
152.00 /kg.
152.00 /kg.
570.00 /box
40.00 /kg.
50.00 /kg.
40.00 /kg.
50.00 /kg.
115.00 /kg.
115.00 /kg.
115.00 /kg.
115.00 /kg.
90.00 /kg.
57.00 /kg.
57.00 /kg.
625.00
44.00
85.00
245.00
730.00
765.00
530.00
/gal
/kg.
/kg
/bag
/cu.m
/cu.m
/cu.m
369.00
2,454.00
23.00
524.07
13.00
bags
pcs
cu.m
kgs
kgs
Portland Cement
6" CHB
Washed Sand
10mmx6m RSB
GI Tie Wire
204.00
pcs
Silicon Sealant
275.61
150.00
sq.m
pcs.
14.25 /sq.m
238.00 /pc.
48.00
pcs.
240.00
pcs.
240.00
84.00
pcs.
pcs.
750.00
8.00
pcs.
pcs.
84.00
pcs.
Soil Poisoning
Metal double furring channel
(Ceiling nailer) 12mm x 38mm x 5m x 0.8mm thk. at 400mm O.C.
Metal carrying channel
(Ceiling joist) 12mm x 38mm x 5m x 0.8mm thk. at 1200mm O.C.
Rod suspension hanger with
adjustment spring
Pre-formed wire clip
Fiber cement ceiling board
(4.5mm. Thk.)
Blind Rivets
Ceiling vent (300mm x 1200mm)
with screen
Wall Angle, 25mm x 25mm x 3m x 0.4mm thk
310.80
LM
465.00 /LM
12.00
LM
14.00
LM
5,300.00
pcs.
4.00
lit.
70.00 bags
6.00
20.00
22.00
22.00
22.00
8.00
0.25
5.00
8.00
3.00
3.00
3.00
3.00
3.00
pcs.
qrts.
gal.
gal.
gal.
qrts.
roll
pcs.
pcs.
gal.
gal.
gal.
lit.
pcs.
245.00
13.00
530.00
40.00
85.00
/bag
/pc.
/cu.m
/kg
/kg
96.00 /pc.
238.00 /pc
5.00 /pc
10.00 /pc.
410.00 /pc
1.50 /pc.
465.00 /pc
240.00 /pc.
308.00 /LM
237.25 /LM
3.35 /pc.
237.25 /lit.
245.00 /bag
1,282.00
31.00
540.00
305.00
158.00
157.00
1,500.00
66.00
56.00
585.00
470.00
585.00
100.00
Neutralizer
Flat Latex
Patching Compound
Latex semi-gloss
Acri color
Sand Paper
9" Roller bush
4" Paint brush
Flat Wall Enamel
Glazing putty
Enamel semi gloss
Paint thinner
Painy Tray
3.00
pail
- Epoxy enamel
MOBILIZATION/TEMPORARY STRUCTURES, UTILITIES
AND SERVICES/DEMOBILIZATION/STANDARD BILLBOARD/
SAFETY & HEALTH
2,900.00 bd.ft.
Coco lumber
50.00 pcs
Plywood Ordinary, " x 4' x 8'
35.00 kgs
CWN, Assorted
Conduit Boxes & Fittings
- 20mm dia. PVC Pipe
107.00 pcs.
- 20mm dia. PVC Connector
146.00 pcs.
- 25mm dia. RSC Pipe
3.00 pc.
- 20mm dia. RSC Connector w/ L & B
5.00 pc.
- 20mm dia. PVC Flexible Conduit
32.00 mts.
- 20mm dia. PVC Straight Connector
46.00 pcs.
- 2" x 4" G.I. Utility Box
30.00 pcs.
- 4" x 4' , G.I Junction Box
31.00 pcs.
- 4" Keyless Receptacle (Porcelain type)
5.00 pcs.
- 16mm x 2.4M Copperclad Ground Rod w/ clamp
2.00 pcs.
- 20mm type "F" Condulet, Weatherhead
1.00 pc.
- PVC Cement
3.00 can
- Electrical tape
4.00 pcs.
Wires and Wiring Devices
- 3.5mm THHN wire (black)
774.00 mts.
- 3.5mm THHN wire (green)
530.00 mts.
- 5.5mm THHN wire (black)
8.00 mts.
20 of 33
/pc
/qrt.
/gal.
/gal.
/gal.
/qrt.
/roll
/pc.
/pc.
/gal
/gal
/gal
/lit.
3,135.00 /pail
25,000.00
17.00 /bdft.
305.00 /pc.
70.00 /kg.
63.00
3.00
123.00
14.00
6.50
9.50
13.00
22.00
17.00
1,376.00
33.00
303.00
23.00
/pc.
/pc.
/pc.
/pc.
/m
/pc.
/pc.
/pc.
/pc.
/pc.
/pc.
/can
/pc.
21.00 /m
21.00 /m
35.00 /m
14.00 mts.
12.00 sets
6.00 set
6.00 sets
Lighting Fixtures
8.00 sets
18.00 sets
Panel Boards
1.00 assy/s
35.00
105.00
72.00
105.00
200.00 /set
230.00 /set
Panel: DP
Main: 40AT/50AF, 2P, 240V ,60Hz, 18KAIC, B.O.
Brs:
1- 15AT/60AF, 2P, 240V, 60Hz, 10KAIC, B.O.
6.00
sets
3.00
sets
9.00
sets
3.00
sets
3.00
sets
1.00
6.00
9.00
21.00
24.00
3.00
lot
pcs
kg
kg
pcs
set
3.00
3.00
6.00
6.00
6.00
6.00
5.00
3.00
4.00
9.00
4.00
9.00
3.00
5.00
6.00
9.00
1.00
3.00
1.00
3.00
6.00
25.44
3.00
3.00
set
set
pc.
pc.
pc.
pc.
pc.
pc.
pc.
pc.
pc.
pc.
pc.
pc.
pc.
pc.
can
rolls
pc.
pc.
sq.m
sq.m
pc.
sq. ft.
Brs:
1- 20AT/60AF, 2P, 240V, 60Hz, 10KAIC, B.O.
w/ ground bus & plastic engraved nameplate
Panel door type hinged door
and fixed glass transom on 50 x 150mm
wood jambs/frames with keyed lever
type lock sets (D-1 = 4.80 sq.m.)
Shutter type windows holder with
clear glass blades and transoms on
50 x 150mm window jambs/frames (W-1 = 7.50 sq.m.)
Shutter type windows holder with
clear glass blades and transoms on
50 x 150mm window jambs/frames (W-2 = 3.60 sq.m.)
Flush type swing door w/ marine
plywood facing inside & ordinary plywood
facing outside w/ hardware & accessories (D-2=2.94 sq.m)
Jalousie windows holder w/ clear
blades on standard jalousie plus
casing on 50 x 150mm window
jambs/frames (W=3=0.75 sq.m)
Door frames and accessories
Lawanit 1/4" thk.
Finishing nail
common wire nail
10mmdia. X 150mm x 50mm anchor bolts
Chalkdust box (120mm x 150mm
x 70mm) w/ 2dia. X 10 x 10mm Meshwire
water closet including fitting & acc.
21 of 33
/m
/set
/set
/set
4,750.00 /assy.
7,592.00 /set
6,168.00 /set
2,845.00 /set
2,450.00 /set
725.00 /set
664.00
285.00
70.00
65.00
14.00
140.00
6,610.00
6,000.00
608.00
425.00
125.00
22.00
70.00
280.00
60.00
135.00
23.00
26.00
105.00
70.00
87.00
38.00
184.00
9.00
235.00
150.00
345.00
735.00
300.00
175.00
/lot
/pc
/kg
/kg
/pc
/set
/set
/set
/pc.
/pc.
/pc.
/pc.
/pc.
/pc.
/pc.
/pc.
/pc.
/pc.
/pc.
/pc.
/pc.
/pc.
/can
/rolls
/pc.
/pc.
/pc.
/pc.
/pc.
/sq. ft.
Project ID:
Project Name:
Project Location:
BILL OF QUANTITIES
ITEM NO.
1. Construction of two (2) Storey six (6) Classroom School Building with comfort room,
803
804
403
404
405
704
1000
1003
1013
1021
1032
22 of 33
Spl-I
Spl-II
Spl-III
Spl-IV
Spl-V
23 of 33
ITEM NO.
1. Construction of two (2) Storey six (6) Classroom School Building with comfort room,
803
804
403
404
405
704
1000
1003
1013
1021
1032
Spl-I
Spl-II
Spl-III
Spl-IV
24 of 33
Spl-V
25 of 33
16FF0047
CY-2016, Basic Educational Facilities Fund (BEFF)-Batch 3 Construction of Two (2) Storey Six (6) Cla
National High School
Garchitorena, Camarines Sur
BILL OF QUANTITIES
DESCRIPTION
QUANTITY
Construction of two (2) Storey six (6) Classroom School Building with comfort room, Bahi National High Sch
Structure Excavation
(Nine thousand, four hundred eighty& 24/100)
37.98
Embankment
(Forty-one thousand, one hundred thirty-seven & 90100)
62.92
Metal Structures
(Steel Works)
(Five hundred twenty-one thousand, five hundred eighty-two pesos
& 42/100)
7,264.52
Reinforcing Steel
(Six hundred thirty thousand, nine hundred fifty-two pesos &
78/100)
7,928.37
Structural Concrete
(Three hundred forty-two thousand, seventy-eight pesos & 66/100)
60.90
Masonry Works
(Two hundred eighty-two thousand, three hundred seventy-sixpesos
& 85/100)
191.50
Soil Poisoning
(Five thousand, one hundred ninety-one pesos & 92/100)
275.61
Carpentry Works
(One hundred sixty-four thousand, eight hundred sixteen pesos &
73/100)
270.78
Metal Roofing
(Pre-Painted)
(Two hundred seventy-three thousand, three hundred ninety-four
pesos & 20/100)
310.80
Finishing Works
(Thirty-nine thousand, two hundred fifty-two pesos & 02/100)
241.02
Painting Works
(Sixty-six thousand, three hundred thirty-three pesos & 89/100)
744.56
26 of 33
27 of 33
1.00
262.23
1.00
31.60
1.00
1.00
1.00
DESCRIPTION
QUANTITY
Construction of two (2) Storey six (6) Classroom School Building with comfort room, Bahi National High Sch
Structure Excavation
(nine thousand, four hundred eighty & 24/100)
37.98
Embankment
(forty-one thousand, one hundred thirty-seven pesos & 90/100)
62.92
Metal Structures
(Steel Works)
(Five hundred twenty-one thousand, five hundred eighty-two pesos
& 42/100)
7,264.52
Reinforcing Steel
(Six hundred thirty thousand, nine hundred fifty-two pesos &
78/100)
7,928.37
Structural Concrete
(Three hundred forty-two thousand, seventy-eight pesos & 66/100)
60.90
Masonry Works
(Two hundred eighty-two thousand, three hundred seventy-six pesos
& 85/100)
191.50
Soil Poisoning
(Five thousand, one hundred ninety-one pesos & 92/100)
275.61
Carpentry Works
(One hundred sixty-four thousand, eight hundred sixteen pesos &
73/100)
270.78
Metal Roofing
(Pre-Painted)
(Two hundred seventy-three thousand, three hundred ninety-four
pesos & 20/100)
310.80
Finishing Works
(Thirty-nine thousand, two hundred fifty-two & 02/100)
241.02
Painting Works
(Sixty-six thousand, three hundred thirty-three pesos & 89/100)
744.56
1.00
Form works
(One hundred one thousand, nine hundred forty-two pesos &
51/100)
Electrical Works
(Eighty thousand, fifteen pesos & 86/100)
Fabricated Materials & Hardware
(One hundred ninety-six thousand, five hundred eighty-four pesos &
94/100)
28 of 33
262.23
1.00
31.60
1.00
Equipment rental
1.00
(Ffty-nine thousand, eight hundred fifty pesos only)
Hauling Cost
1.00
(Ninety thousand pesos only)
GRAND TOTAL IN FIGURE:
GRAND TOTAL IN WORDS: NINE MILLION, TWO HUNDRED FIFTY-ONE THOUSAND, SIXTY-SEVEN
Submitted by:
Name: _______________________________________
Signed ____________________________
Duly authorized to sign the Bid for and in behalf of JM-Cofer Construction & Supply
29 of 33
UNIT
Unit Price
(Pesos)
Amount (Pesos)
249.61
9,480.24
m3
653.81
41,137.90
kg
71.80
521,582.42
kg
79.58
630,952.78
m3
5,617.06
342,078.66
m2
1,474.55
282,376.85
m2
18.84
5,191.92
m2
608.67
164,816.73
m2
879.65
273,394.20
m2
162.86
39,252.02
m2
89.09
66,333.89
30 of 33
Lot
69,934.73
69,934.73
m2
388.75
101,942.51
Lot
80,015.86
80,015.86
Lot
6,221.03
196,584.51
Lot
103,240.53
103,240.53
Lot
59,850.00
59,850.00
Lot
90,000.00
90,000.00
SUB TOTAL I:
3,078,165.73
31 of 33
UNIT
Unit Price
(Pesos)
Amount (Pesos)
249.61
9,480.24
m3
653.81
41,137.90
kg
71.80
521,582.42
kg
79.58
630,952.78
m3
5,617.06
342,078.66
m2
1,474.55
282,376.85
m2
18.84
5,191.92
m2
608.67
164,816.73
m2
879.65
273,394.20
m2
162.86
39,252.02
m2
89.09
66,333.89
Lot
69,934.73
69,934.73
m2
388.75
101,942.51
Lot
80,015.86
80,015.86
Lot
6,221.03
196,584.51
32 of 33
Lot
103,240.53
103,240.53
Lot
59,850.00
59,850.00
Lot
90,000.00
90,000.00
3,078,165.73
pacity of _________________________________
33 of 33