Name of the work : Repair and rewinding of 100KVA,11/0.

433KV copper wound transformer at TP Dam of Onukud


09.10.2015
Sl.No.

Item description

A.
1
2
3
4
5
6

Replacement of accessories & spares:


H.V. Bushing.
L.V. Bushing for 100KVA Trf.
Brass Stud with cap for H.V.Bushing.
Brass Stud with cap for L.V.Bushing.
Breather for 100KVA Transformer.
Gasket for 100KVA Transformer.

7
8
9
10
11
12
13
14

11KV Five position Off-load tap switch with handle


Nuts & Bolts and washers
Spray Painting of 100KVA Transformer.
Tie rod Threaded end
Insulation Pressboard &paper
Arcing Horn
Steel Fabrication Work for Tank(HV& LV terminal)
Misc. Expenditure on items notCovered
sleeving,backlite,cotton tape,adhesive etc
Cost of Winding:
H.V. Coils including phase separators

Cupper new conductor replacement

Cupper winding with coverd conductors


L.V. Coils including phase separators

Cupper new conductor replacement

2
3
C
1
2
3

Cupper winding with exisiting covered conductors


Cost of New Tfr oil
Labour & electricity charges.
For 100KVA Transformer.
Filteration charges of transformer oil

Salvage charges

Cost of Logo and Nameplate on the transformer

Burnt copper
burnt oil retrived

Unit

Qty.

Nos.
Nos.
Nos.
Nos.
Nos.
Set

3
4
3
4
1
1

Nos.

Kg
L.S.
Nos.
Kg
Pair
LS

4
5
0
20
3
1

LS

24 coils in
kg

84

Limb

3coils in
kg
Limb
Ltr

3
320

L.S.
Ltr
Nos.

L.S
320
1

27coils in
kg
Ltr

66

150
150

VAT@ 5% On material cost


ST @14% on labour cost
(Rupees One Lakh thierty one thousand two hundred ninty only)

transformer at TP Dam of Onukudelli, dateUnit rate in Rs.


600.00
300.00
650.00
750.00
600.00
950.00
-

Total Amount
1,800.00
1,200.00
1,950.00
3,000.00
600.00
950.00
-

100.00
300.00
300.00
140.00
80.00
1,500.00

400.00
1,500.00
2,800.00
240.00
1,500.00

2,000.00

2,000.00

700.00

58,800.00

2,000.00

6,000.00

700.00

46,200.00

2,500.00
90.00

7,500.00
28,800.00

10,000.00
7.50
150.00
G. Total
or Say

10,000.00
2,400.00
150.00
177,790.00
177,790.00

300.00

45,000.00

10.00

1,500.00
46,500.00

131,290.00

Name of the work : Repair and rewinding of 100KVA,11/0.433KV Al wound transformer at Winch House of O
Date 16.08.2016
Sl.No.

Item description

Unit

Qty.

Nos.
Nos.
Nos.
Nos.
Nos.
Set
Kg
L.S.
Kg

3
4
3
4
1
1
4
5
20

12 coils in kg

96

Limb

3coils in kg

28

A.
1
2
3
4
5
6
7
8
9

Material:
H.V. Bushing.
L.V. Bushing for 100KVA Trf.
Brass Stud with cap for H.V.Bushing.
Brass Stud with cap for L.V.Bushing.
Breather for 100KVA Transformer.
Gasket for 100KVA Transformer.
Nuts & Bolts and washers
Spray Painting of 100KVA Transformer.
Insulation Pressboard &paper
H.V. Coils including phase separators

Al new conductor replacement

Al winding with coverd conductors


L.V. Coils including phase separators

Al new conductor replacement

2
3

Al winding with exisiting covered conductors


Cost of New Tfr oil

Limb
Ltr

3
250

B
1
2

Labour charges.
For 100KVA Transformer.
Filteration charges of transformer oil

L.S.
Ltr

L.S
250

Salvage charges
Burnt Aluminum

27coils in kg

124

Burnt oil retrived

Ltr

110

VAT@ 5% On material cost


ST @15% on labour cost
Misclenious
Total
(Rupees Ninety nine thousand only)

transformer at Winch House of Onukudelli,


Unit rate in Rs.

Total

Total Amount

600.00
300.00
650.00
750.00
600.00
950.00
100.00
300.00
140.00

1,800.00
1,200.00
1,950.00
3,000.00
600.00
950.00
400.00
1,500.00
2,800.00

340.00

32,640.00

1,500.00

4,500.00

340.00

9,520.00

2,000.00
90.00

6,000.00
22,500.00

10,000.00
7.50
G. Total

10,000.00
1,875.00
101,235.00

60.00

7,440.00

10.00

1,100.00
8,540.00
4,468.00
1,781.25
55.75
99,000.00