What is the normal operating pressure at the seals of the seal oil? (1 mark)
a)
b)
c)
d)
5.
3.5 bar
3.0 bar
2.5 bar
4.0 bar
6.
3.5 bar
3.0 bar
2.5 bar
4.0 bar
h@
3.
The hot gas temperature is the temperature of the hydrogen gas in the generator
before it is cooled by the hydrogen coolers.
The cold gas temperature is the temperature of the hydrogen gas in the generator
after it is cooled by the hydrogen coolers.
ard
sm
it
2.
rich
1.
asi
a.c
om
Questions
20% - 75%
4% - 95%
20% - 95%
4% - 75%
Genesis Energy
8.
1.0 bar
0.6 bar
0.5 bar
1.5 bar
asi
a.c
om
7.
What are the advantages of using hydrogen as the cooling medium in a generator? (5
marks)
Risk of explosion.
A CO2 system has to be installed so that it can be used to displace the hydrogen in
the casing before the casing is opened for inspection or for maintenance.
Additional plant is necessary. Seal oil to maintain a gas tight enclosure, hydrogen
coolers, cooling water pump, alarms and instrumentation
Stator frame built to withstand pressure and possible explosion
ard
sm
it
9.
h@
Please assign 1 mark for each correct answer above up to a maximum of 5 marks
Please assign 1 mark for each correct answer above up to a maximum of 3 marks
10. When purging the generator from hydrogen to CO2, where is the CO2 admitted and
why? (2 marks)
CO2 is admitted in the bottom of the alternator because it is heavier than the H2
and will push the H2 up and out of the alternator
11. What pressure is the generator depressurised to during a de-gas, before purging to CO2
commences. Why is this pressure maintained during the purge process? (2 marks)
The generator is depressurized to 0.5 Bar for a degass.
This pressure is maintained during the purge process to ensure positive pressure
is maintained in the generator hence not allowing any air from outside to mix with
the gas in the generator.
rich
12. What is the function of the electric generator heaters, and when are they turned on? (1
mark)
8014 Written Assessment Marking Schedule.doc
Genesis Energy
The function of the generator electric heaters is to stop the formation of moisture
in the generator when the unit is shutdown.
asi
a.c
om
It is important to maintain hydrogen purity so that the hydrogen in the generator has
no change of entering its explosive range.
The function of the hydrogen drier is to keep the hydrogen in the generator moisture
free. The reason for this is that if moisture is present in the hydrogen then insulation
and corrosion problems will occur in the generator windings.
15. What is the purpose of the lute on the side of the hydrogen dryer? (1 mark)
The purpose of the lute on the side of the hydrogen dryer control cabinet is that it
acts as a water seal for the cabinet which is pressurised with air to stop the ingress
of any flammable gas.
The auto hydrogen system is not used because if the unit develops a leak the
amount of H2 being made up to the unit is not known and could go unnoticed.
rich
ard
sm
it
h@
16. Why is the auto hydrogen make-up system not normally used? (1 mark)
Genesis Energy
17. Referring to the diagram of the seal oil system (Figure 1); (15 marks)
asi
a.c
om
ard
sm
it
h@
(Use the encircled alphabetic reference callouts in your answer to refer to system
features)
Figure 1
rich
A
B
C
D
E
F
G
H
J
K
L
M
Oil is drawn from the seal tank by the A.C. seal oil pump (A) and passed into the
system through non-return valve SO6. Pressure control valve SO52 (B) on the
outlet side of the pump maintains the discharge pressure at approx. 8.6 bar. The oil
then flows through isolating valve SO8, differential pressure throttle control valve
SO9, isolating valve SO14, the seal oil cooler (F) and is discharged through valve
Genesis Energy
rich
ard
sm
it
h@
asi
a.c
om
SO15 into one of the two filters 'A' or 'B' (G), (service and standby), which are
situated downstream of the cooler. A relief valve SO27 operates as a bypass should
the pressure drop across the cooler and filter become excessive. From here the oil is
passed to the hydrogen seals (H, J).
After passing through the hydrogen seals most of the oil discharges outwards from
the seals into separation chambers. This oil then flows through sight glasses and is
returned to the seal oil tank via a loop seal chamber (D) which is provided with a
vapour extractor that evacuates any gas entrained in the oil. Oil which discharges
inwards towards the hydrogen side of the seals is led through sight flow glasses into
the hydrogen detraining chambers (L). Hydrogen released from the oil in the
detraining chambers is returned to the stator casing.
An internal drain line is led from the bottom of each detraining chamber through float
operated valves into the hydrogen gas trap (M) where any hydrogen left in the oil
vents to atmosphere. The oil then flows through the loop seal chamber (D) into the
seal oil tank.
Genesis Energy
ard
sm
it
h@
asi
a.c
om
18. Referring to the diagram of the Seal Oil Gas detraining chambers (Figure 2), briefly
describe its operation. (5 marks)
Figure 2
A chamber is provided for each hydrogen seal. This serves as a vessel where any
hydrogen entrained in the oil, which has drained from the seal, is released and
returned to the generator stator casing.
The oil level in this tank is normally controlled by the float. The pressure inside
the chamber (frame pressure) forces oil out to the gas trap as the level in the
chamber rises due to the continual drainage from the gas side returns of the
hydrogen seal. There is a back up to this float valve in the form of an air
operated, solenoid controlled by-pass valve which opens if the high level
mobrey switch is operated and will close when the low level mobrey switch is
operated. This prevents oil backing up into the frame in the event that the float valve
jams shut.
The high and low mobrey switches also initiate high and low level alarms when
they are operated.
rich
Genesis Energy
asi
a.c
om
20. What does the oil flow from the seal sides tell you and why is it important. State the
implications of too little or too much flow in this sight glass. (4 marks)
The flow of oil from the seal sides tells you how much seal oil is passing through
the seal to the hydrogen side of the generator.
It is essential that the correct amount (3mm diameter trickle max) does flow past the
sight glass so that you can be sure the seal is operating correctly and that there is
also sufficient lubrication.
If there is too little or no flow past the sight glass hydrogen may leak out and the
seal may begin to overheat. If this occurs first check that the seal oil to hydrogen
diff pressure is not low as this will put more hydrogen pressure on the seal and
reduce the flow of seal oil back into the hydrogen side of the seal.
If there is too much seal oil flow past the sight glass the seals may be starting to
fail or have failed. Also an increase in the seal oil to hydrogen diff pressure will
cause more seal oil to pass to the hydrogen side of the seal.
h@
21. Explain the seal oil back-up Oil supply and how it works. (2 marks)
The seal oil back up supply is taken from the lubricating oil discharge of the shaft
driven oil pump. If the discharge pressure from the AC seal oil pump goes low (6.5
Bar) the back up supply control valve (SO28) opens supplying seal oil to the system.
ard
sm
it
The Seal Oil DC pump cuts in when selected to remote on the switch gear and auto
on the CCR panel, if the seal oil / H2 diff drops below 0.34 Bar
23. What are the implications of the D.C. seal oil pump running for an extended time? (2
marks)
The implications of the DC seal oil pump running for an extended time are that when
the DC pump is running the seal oil is supplied directly from the pump to the seals by
passing the cooler and filters, this means the oil is not cooled or filtered which
could in turn overheat the seal or allow impurities to come in contact with the seal
faces.
rich
24. Explain the importance of the differential between seal oil pressure and hydrogen
pressure. (1 mark)
The important of the differential between the seal oil pressure and the hydrogen
pressure is that the seal oil pressure needs to be higher to stop any hydrogen
escaping from the generator.
Genesis Energy
a)
b)
c)
d)
16.5 litre/minute
18.6 lites/minute
20 gallons/minute
5 gallons/minute
asi
a.c
om
26. What is the Stator Coolant flow value that will generate the alarm Stator Coolant Flow
Low? (1 mark)
a)
b)
c)
d)
14.2 litres/minute
14.2 gallons/minute
16.1 litres/minute
20 litres/minute
a)
b)
c)
d)
14.2 litres/minute
14.2 gallons/minute
16.1 litres/minute
20 litres/minute
h@
27. What is the Stator Coolant flow value that will start the standby pump? (1 mark)
28. What is the trip associated with Stator Coolant flow? (1 mark)
ard
sm
it
5.2 litres/minute
16.2 gallons/minute
8.1 litres/minute
14.0 litres/minute
rich
a)
b)
c)
d)
Genesis Energy
29. Referring to the diagram of the stator coolant system (Figure 3). (14 marks)
asi
a.c
om
ard
sm
it
h@
(Use the encircled alphabetic reference callouts in your answer to refer to system
features)
Figure 3
Coarse strainer
Fine strainer
Demineralisation plant
Flow measurement
Stator Coolant Head tank
Supply from WTP
Gas Alarm and Automatic release chamber
Gas Detraining chamber
rich
A
B
C
D
E
F
G
H
Genesis Energy
10
asi
a.c
om
h@
ard
sm
it
30. What types of coolers are used on the stator coolant? (1 mark)
The types of cooler used on the stator system are 100% capacity plate type heat
exchangers.
31. Identify which strainers can be bypassed and for what reason. (1 mark)
The strainer that can be bypassed is the fine strainer so that it can be cleaned with
the plant in service.
32. Explain why the stator coolant system operates at a slightly lower pressure than the
hydrogen system. (1 mark)
The Stator coolant system operates at a slightly lower pressure than the hydrogen
system so that in the event of a leak in the system the hydrogen would leak into
the stator coolant.
rich
Genesis Energy
11
h@
asi
a.c
om
33. Referring to the diagram of the Stator Coolant gas release chamber (Figure 4), describe
operation including alarms and operating timers by completing the sentences provided.
(6 marks)
Figure 4
ard
sm
it
The Gas Release Chamber has three mobrey float switches which are operated as the
stator coolant level lowers (due to gas collecting). The mobreys control the automatic
gas release and initiate alarms as follows.
When the top level switch is operated a 20 minute timer is started.
As level continues to drop due to the gas leak, one of two situations will occur.
Either
a) The timer times out before middle float switch is reached in which case the gas
will be released and a gas in coolant alarm initiated
b) Or if middle float is reached within the timer period and gas in coolant and gas in
coolant excessive alarms will be initiated and gas will be released. (If the "gas in
coolant excessive" alarm is initiated it means that more than 50m/24 hours is
leaking and an inspection should be carried out).
rich
If the bottom Mobrey switch is operated then the Gas in coolant alarm inoperative will
be initiated which means either:a) The solenoid valve has not opened.
b) Or the gas leakage is too much for the solenoid valve to cope with.
The solenoid valve shuts when the level rises above the top Mobrey switch.
Genesis Energy
12
asi
a.c
om
h@
rich
ard
sm
it
Genesis Energy
13
36. Referring to the diagram of the Generator Demin system (Figure 5); (13 marks)
asi
a.c
om
ard
sm
it
h@
(Use the encircled alphabetic reference callouts in your answer to refer to system
features)
Figure 5
rich
A
B
C
D
E
F
G
H
J
Genesis Energy
14
The Demin water system is a closed circuit cooling water circuit which operates
under a static head pressure provided by the demin water make-up/head tank (H).
Demineralised water from the water treatment plant (J) and 1000ton tank common
discharge supplies the make-up water to the demin make-up tank. The outlet from
the make-up tank connects to the system at the demin pumps inlet.
Water is discharged from the i/s pump through a NRV and discharge valve to the i/s
cooler (B).
From the coolers common discharge pipe the demin water travels in parallel paths;
through the seal oil cooler (C), through the i/s stator coolant cooler (D), through the
hydrogen dryer reactivation cooler (E), and through the four hydrogen coolers via the
hydrogen coolers inlet (F) and outlet (G) manifolds.
The seal oil cooler, the stator coolant coolers and the demin coolers all have a
bypass control valve for their systems temperature control. The four parallel
paths meet back up at the demin pumps suction pipe.
asi
a.c
om
37. Where does the make-up to demin system come from? (1 mark)
The make up for the demin system comes from the RFW (WTP) system
h@
The level in the make up tank is controlled by a ball cock on the tank inlet.
rich
ard
sm
it
Genesis Energy