ENI (E&P)

LIBYAN BRANCH

WESTERN LIBYA GAS PROJECT


Plant: MELLITAH PLANT: WLGP Additional
Exploitation Phase 1 Production Enhancement

WLGP Job N

WLGP Doc. N

20100/LIPR008

P-60-S-M-0001 00

CTR Job No.

CTR Doc. No.

F12290

F12290-A-PAC-SPC-0002

Location
GSPLAJ

Sh. 2 of 11

Rev.

D1

INDEX

1.

GENERAL..............................................................................................................................................................................3
1.1.
1.2.

2.

SCOPE..............................................................................................................................................................................3
DEFINITION .....................................................................................................................................................................3

DEFINITION OF THE SUPPLY .........................................................................................................................................3


2.1.
2.2.
2.3.
2.4.

3.

SCOPE OF SUPPLY ...........................................................................................................................................................3


EQUIPMENT LIST ............................................................................................................................................................3
EXTENT OF SUPPLY .........................................................................................................................................................3
EXCLUSION FROM SUPPLY..............................................................................................................................................3

TECHNICAL REQUIREMENTS........................................................................................................................................3
3.1.
3.2.
3.3.
3.4.
3.5.

APPLICABLE CODES AND STANDARDS ...........................................................................................................................3


WIND ...............................................................................................................................................................................3
EARTHQUAKE .................................................................................................................................................................3
UNIT OF MEASUREMENT ................................................................................................................................................3
WET H2S SERVICE .........................................................................................................................................................3

4.

SUPPLEMENTARY REQUIREMENTS ............................................................................................................................3

5.

INSPECTIONS AND TESTS ...............................................................................................................................................3

6.

DOCUMENTATION DELIVERY.......................................................................................................................................3

7.

QA/QC REQUIREMENTS...................................................................................................................................................3

8.

BIDDING PROCEDURE......................................................................................................................................................3

9.

SPARE PARTS AND SPECIAL TOOLS............................................................................................................................3


9.1.
9.2.
9.3.
9.4.

10.
10.1.
10.2.
10.3.
10.4.
10.5.

SPARE PARTS FOR COMMISSIONING AND ERECTION (INCLUDED IN THE SUPPLY) ......................................................3
SPARE PARTS FOR TWO YEARS OPERATION (QUOTED SEPARATELY) .........................................................................3
EQUIPMENT SPARE PARTS DATABASE ..........................................................................................................................3
PRESERVATION ...............................................................................................................................................................3
REFERENCE DOCUMENT............................................................................................................................................3
AGIP SPECIFICATIONS AND STANDARDS ......................................................................................................................3
CONTRACTOR SPECIFICATIONS AND STANDARDS ...................................................................................................3
PROJECT SPECIFICATION AND DRAWINGS ....................................................................................................................3
ORDER OF PRECEDENCE ................................................................................................................................................3
ADHERENCE TO SPECIFICATIONS ..................................................................................................................................3

_______________________________
Form code: MDT.GG.QUA.0004 Sh. 01/Rev. 3.96
Data file: P-60-S-M-0001 00
rev D1 PE3 S G Cooler Techn spc 310308.doc
This document is CONFIDENTIAL and the sole property of the AGIP GAS BV. It shall neither be shown to third parties nor used for other purposes than those for
which it has been issued/sent. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.

ENI (E&P)
LIBYAN BRANCH

WESTERN LIBYA GAS PROJECT


Plant: MELLITAH PLANT: WLGP Additional
Exploitation Phase 1 Production Enhancement

WLGP Job N

WLGP Doc. N

20100/LIPR008

P-60-S-M-0001 00

CTR Job No.

CTR Doc. No.

F12290

F12290-A-PAC-SPC-0002

Location
GSPLAJ

1.

Sh. 3 of 11

Rev.

D1

GENERAL

COMPANY intends to debottleneck Mellitah and Wafa Coastal Plants, built by Agip Gas BV Libyan
Branch at GSPLAJ and located on the west side of Libyan Coast.
The Production Enhancement is the first step versus an expansion of the two Plants, targeting the
increasing of current production rates, processing additional feedstock from Bouri and increasing the
current feedstock from Sabratha and Wafa Desert.
This first step of the global project is officially referred to as: WLGP Additional Exploitation Phase 1
Production Enhancement
The previous project phase, called Production Enhancement Phase 3 (PE3), aimed at confirming Gas
Production increase, identifying and detailing the impacts involved by such an increase on material and
equipment.
The EPC phase covers all activities required from the EPC CONTRACTOR to endorse the above
production commitment, to implement these modifications throughout the plants and to demonstrate the
results by running the successful Performance tests.
One result of this study is the new Sweet gas cooler heat exchangers to replace the existing heat
exchangers.

1.1.

Scope

This specification with all attachments and referenced documentation defines the supply and covers the
minimum requirements for the mechanical design, material, fabrication, assembly, inspection, testing,
painting and preparation for shipping of the Sweet gas cooler heat exchangers, to be installed in Mellitah
Plant, for wich the Vendor shall be fully responsible.
1.2.

Definition

COMPANY

MELLITAH GAS

EPC CONTRACTOR

The party in charge of Engineering, Procurement, Supply,


Construction and Commissioning of the WLGP Additional Phase 1
Production Enhancement. In this Document may also be refrred to
as Purchaser.

VENDOR

Equipment supplier

SUB-VENDOR

Supplier to Manufacturer of some Components of the


equipment

PROJECT

Western Libya Gas Project


_______________________________

Form code: MDT.GG.QUA.0004 Sh. 01/Rev. 3.96


Data file: P-60-S-M-0001 00
rev D1 PE3 S G Cooler Techn spc 310308.doc
This document is CONFIDENTIAL and the sole property of the AGIP GAS BV. It shall neither be shown to third parties nor used for other purposes than those for
which it has been issued/sent. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.

ENI (E&P)
LIBYAN BRANCH

WESTERN LIBYA GAS PROJECT


Plant: MELLITAH PLANT: WLGP Additional
Exploitation Phase 1 Production Enhancement

WLGP Job N

WLGP Doc. N

20100/LIPR008

P-60-S-M-0001 00

CTR Job No.

CTR Doc. No.

F12290

F12290-A-PAC-SPC-0002

Location
GSPLAJ

PLANT

Sh. 4 of 11

Rev.

D1

WAFA COASTAL MELLITAH COMPLEX

2.

DEFINITION OF THE SUPPLY

2.1.

Scope of supply
Vendors scope of work shall includes, but not limited to: design, material, manufacture, testing,
shop inspection, spares (for two years of operation and commissioning), certification, packing,
supply of goods, services and documentation for the material fully in accordance with the
Specifications, data sheets, drawings and other attachments listed herein.
The Vendor shall have overall responsibility for the coordination with subsupplier, and proper
completion of the equipment delivery and services defined herein.

2.2.

Equipment List
This specification cover the supply of equipments listed below.

2.3.

ITEM

SERVICE

TYPE

QUANTITY

51-330-HA-002
52-330-HA-002
53-330-HA-002

Sweet gas cooler

BEM

Extent of supply
The supply shall include all the equipments with all the appurtenances and accessories (internal
and external) necessary for testing, shipment, erection, operation and maintenance.
In particular the supply shall include the following:

2.3.1

Main parts
- Complete heat exchanger including supports, nozzles, blind flange with gaskets, stud and
nuts, etc.
- All parts shown on applicable standards and drawings

2.3.2

External and Accessories


- Other parts welded on the exchanger (baffles, earthing lugs, etc.)
- eye bolts and tie-rods
- surface preparation/coating
- lifting lugs
- nameplate and relevant supports,
- all necessary devices for transport
- painting primer plus final,
- spare parts for two years of operation,
- spare parts for commissioning
and start-up,
_______________________________

Form code: MDT.GG.QUA.0004 Sh. 01/Rev. 3.96


Data file: P-60-S-M-0001 00
rev D1 PE3 S G Cooler Techn spc 310308.doc
This document is CONFIDENTIAL and the sole property of the AGIP GAS BV. It shall neither be shown to third parties nor used for other purposes than those for
which it has been issued/sent. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.

ENI (E&P)
LIBYAN BRANCH

WESTERN LIBYA GAS PROJECT


Plant: MELLITAH PLANT: WLGP Additional
Exploitation Phase 1 Production Enhancement

WLGP Job N

WLGP Doc. N

20100/LIPR008

P-60-S-M-0001 00

CTR Job No.

CTR Doc. No.

F12290

F12290-A-PAC-SPC-0002

Location
GSPLAJ

2.3.3

Rev.

D1

connections for pressure and temperature,


Inspection and Test

2.4.

Sh. 5 of 11

Shop inspection and tests


Third party inspection
ASME code STAMP

Exclusion from supply


-

Anchor bolts
Civil work
Installation at site

3.

TECHNICAL REQUIREMENTS

3.1.

Applicable Codes and Standards


Design & Construction: -

ASME VIII Div. 1 or 2 Edition 2007


ASME II Part A-B-C-D Edition 2007
ASME V
Edition 2007
ASME IX
Edition 2007
TEMA R
Edition 9TH
ANSI B 1.1
ANSI 16.11
ANSI B 16.20
ANSI B 16.21
ANSI B 16.5
ANSI B 16.25
ASME B 36.10.M
ASME B 36.19 M
WRC Bulls N. 107 and 297
UBC 97
NACE MR 0175 Edition 99

ASME U stamp is requested for the Sweet gas coolers.


3.2.

Wind
See project design specification G 50 S M 0001 00.

3.3.

Earthquake
See project design specification G 50 S M 0001 00.
_______________________________

Form code: MDT.GG.QUA.0004 Sh. 01/Rev. 3.96


Data file: P-60-S-M-0001 00
rev D1 PE3 S G Cooler Techn spc 310308.doc
This document is CONFIDENTIAL and the sole property of the AGIP GAS BV. It shall neither be shown to third parties nor used for other purposes than those for
which it has been issued/sent. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.

ENI (E&P)
LIBYAN BRANCH

WESTERN LIBYA GAS PROJECT


Plant: MELLITAH PLANT: WLGP Additional
Exploitation Phase 1 Production Enhancement

WLGP Job N

WLGP Doc. N

20100/LIPR008

P-60-S-M-0001 00

CTR Job No.

CTR Doc. No.

F12290

F12290-A-PAC-SPC-0002

Location
GSPLAJ

3.4.

Sh. 6 of 11

Rev.

D1

Unit of Measurement
The measure system will be in principle by International System (S.I.):
-

3.5.

Pressure
Piping
Capacity
Weight :
Moment
Density
Bolts treated

:
:
:
:
:
:
:

Bar
INCH
m3
KN
Nm
Kg/m3
for std. flanges ANSI B1.1
no std. flanges Metric

Wet H2S Service


The Sweet gas coolers are under Wet H2S service on tube side.
The materials shall be in accordance with NACE MR 0175 and G-50-S-Z-0001 00
Specification.

4.

SUPPLEMENTARY REQUIREMENTS

Vendor shall, under his own responsability, perform all mechanical calculations
of all parts
o (either pressure or non pressure parts) in order to meet the design codes
and the
o documentation listed in this specification and guarantee the equipment
stability.

The M.D.M.T. (Minimum Design Metal Temp.) shall be indicated on vendors


drawings.

All flanges and flange fittings shall be according to ANSI B.16.5, and to the
applicable piping
o specification

Vendor shall supply a welding map showing the WPS used (for each welding).
WPSs shall be supported by relevant PQRs certified by an official organization
recognized by CONTRACTOR.

Bolt centres of flanges shall evenly straddle vertical axis.

Vendor shall provide the heat exchanger with vents, drains, pressure gage and
thermometer connections, positioned in accordance to TEMA std.
_______________________________

Form code: MDT.GG.QUA.0004 Sh. 01/Rev. 3.96


Data file: P-60-S-M-0001 00
rev D1 PE3 S G Cooler Techn spc 310308.doc
This document is CONFIDENTIAL and the sole property of the AGIP GAS BV. It shall neither be shown to third parties nor used for other purposes than those for
which it has been issued/sent. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.

ENI (E&P)
LIBYAN BRANCH

WESTERN LIBYA GAS PROJECT


Plant: MELLITAH PLANT: WLGP Additional
Exploitation Phase 1 Production Enhancement

WLGP Job N

WLGP Doc. N

20100/LIPR008

P-60-S-M-0001 00

CTR Job No.

CTR Doc. No.

F12290

F12290-A-PAC-SPC-0002

Location
GSPLAJ

Rev.

D1

All gaskets (jacketed or spiral wound) shall be with asbestos- free compound.

No welding is permitted after postweld heat treatment. Add this note on


equipment fabrication
o drawings. The vessel shall be clearly marked POSTWELD HEAT
TREATED. DO NOT BURN,
WELD OR HAMMER.

Local loads on nozzles due to piping system shall be considered in the design by
the Supplier. The magnitude of forces and moments shall be according to G-50S-M-0020-00.

Materials of construction shall be per ASME / ASTM standard. All parts welded
to shell shall
o be the same material as shell.
o The heat exchangers shall be supplied with one installed set of gasket. (
not included in
o commissioning spare parts).

The Vendor shall be responsible for the detailed design and fabrication of lifting
lugs, if
necessary, for exchanger erection. This shall include the
calculations of localized stresses
caused by lifting.

Vendor shall provide Inspection and Test Plans for review and approval by the
Contractor;
during ITP review and approval phase, Contractor shall have the right to make
Witness and
Hold points on as required basis, as indicated on CONTRACTORs
Inspection Data Sheet (IDS).

5.

Sh. 7 of 11

INSPECTIONS AND TESTS

The extent of inspection activities by Purchaser and Third Party (approval and/or review of documents,
random and/or complete inspection of material, spot and/or complete witnessing of tests) is specified on
the Inspection Data Sheet (I.D.S.).
Vendor and SubVendorwill be subject to quality surveillance by the CONTRACTOR and/or any Inspection
Agency employed by COMPANY.

6.

DOCUMENTATION DELIVERY

The documentation and drawings to be submitted by Vendor are listed in the hereto attached document
Required Documentation Data Sheet (R.D.D.S.).
_______________________________
Form code: MDT.GG.QUA.0004 Sh. 01/Rev. 3.96
Data file: P-60-S-M-0001 00
rev D1 PE3 S G Cooler Techn spc 310308.doc
This document is CONFIDENTIAL and the sole property of the AGIP GAS BV. It shall neither be shown to third parties nor used for other purposes than those for
which it has been issued/sent. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.

ENI (E&P)
LIBYAN BRANCH

WESTERN LIBYA GAS PROJECT


Plant: MELLITAH PLANT: WLGP Additional
Exploitation Phase 1 Production Enhancement

WLGP Job N

WLGP Doc. N

20100/LIPR008

P-60-S-M-0001 00

CTR Job No.

CTR Doc. No.

F12290

F12290-A-PAC-SPC-0002

Location
GSPLAJ

7.

Sh. 8 of 11

Rev.

D1

QA/QC REQUIREMENTS

Vendor shall have and shall implement a quality management system which fully addresses the elements
of ISO 9000:1994 series Standards, as applicable.
In particular for the scope of work described in this specification Vendor shall meet the project quality
requirements defined in the attached specification Project QA/QC Requirements for Vendors and SubContractors doc. G-64-P-Q-8005 00
8.

BIDDING PROCEDURE

The Bidder quotation shall conform in all respect with the requirements of this specification and applicable
documents listed in. Any deviation or alternative shall be detailed in Bidders offer.
Changes or derogation from Contractors specifications, if any, shall be clearly pointed out and submitted
to Contractor for approval.
If no deviations are stated, the quotation submitted by the Vendor, will be considered fully complying with
this Supply Specification.
The Bidder shall include in the Offer:
-

A detailed description of the supply, including materials, PWHT, limits of supply,


inspections, testings, etc.;
Thicknesses and estimated weight.
Shipping dimensions and weight.
Two years and commissioning spare parts cards duly filled.
Time scheduling of activities.

9.

SPARE PARTS AND SPECIAL TOOLS

9.1.

Spare Parts for Commissioning and Erection (included in the Supply)


- Gaskets for main flanges, covers and blinded nozzles (each type installed:200 %)
- Stud bolts/nuts for main flanges, covers and blinded nozzles (each type installed :10% min.
5 pieces)

9.2.

Spare Parts for Two Years Operation (quoted separately)


- Gaskets for main flanges, covers and blinded nozzles (each type installed:200 %)
- Stud bolts/nuts for main flanges, covers and blinded nozzles (each type installed :10% min.
5 pieces)

9.3.

Equipment Spare Parts Database


As an activity related to spare parts, Vendor shall populate the Equipment Spare Parts
Database using the format of Companys MIAP software.
MIAP software on CD Rom, along with instruction, will be provided by Contractor to the
selected Vendor through a_______________________________
web site.

Form code: MDT.GG.QUA.0004 Sh. 01/Rev. 3.96


Data file: P-60-S-M-0001 00
rev D1 PE3 S G Cooler Techn spc 310308.doc
This document is CONFIDENTIAL and the sole property of the AGIP GAS BV. It shall neither be shown to third parties nor used for other purposes than those for
which it has been issued/sent. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.

ENI (E&P)
LIBYAN BRANCH

WESTERN LIBYA GAS PROJECT


Plant: MELLITAH PLANT: WLGP Additional
Exploitation Phase 1 Production Enhancement

WLGP Job N

WLGP Doc. N

20100/LIPR008

P-60-S-M-0001 00

CTR Job No.

CTR Doc. No.

F12290

F12290-A-PAC-SPC-0002

Location
Sh. 9 of 11

GSPLAJ

Rev.

D1

Populated database, including sub-vendors spares, shall be duly completed by Vendor 21


calendar days before delivery date.
9.4.

Preservation
Spare parts and special tools shall be preserved for long term storage in a marine
atmosphere, and they shall be corrosion protected and packed in such a way that damage
during transportation and storage is avoided.

10.

REFERENCE DOCUMENT

The reference documents to be considered as an integral part of this specification for the various
components, are listed here be.
10.1.

AGIP Specifications and Standards


Specifications/Stds
AGIP 20000 VAR.PAI.FUN
07101 EQP.MEC.STD
07103 EQP.MEC.STD
07104 EQP.MEC.STD
07107 EQP.MEC.STD
07108 EQP.MEC.STD
07109 EQP.MEC.STD
07112 EQP.MEC.STD
07113 EQP.MEC.STD
07114 EQP.MEC.STD
AGIP 05883 VAR. GEN. SPC.
AGIP 03588 MAT.COR.PRG

10.2.

Title
Protective treatments and galvanizing
Channel detail vents and drains on partition plates
Tube sheet for heat exchanger Expanding detail
Lifting lugs and eye bolts for heat exchangers
Heat exchangers nameplate
Nameplate holder for heat exchanger
Heat exchangers nameplate indicating thermod. design
by AGIP
Joints and tolerances for flanged items
Hydraulic tests on shell and tubes heat exchangers
Lug supports for vertical heat exchangers
Packing for the dispatching of materials and equipments
Materials and material selection criteria

CONTRACTOR Specifications and Standards


Specifications/Stds
MM.GEN 0094

10.3.

Title
SPECIAL SUPPLY CONDITIONS

Project Specification and Drawings


G-50-S-M-0001-00

On-Shore Project design spec. for pressure & atmospheric equipment

G-50-S-M-0006-00

On-Shore Project general spec. for shell and tube heat exchangers

G-64-S-M-0096 -00

Saddles for heat exchangers


_______________________________

Form code: MDT.GG.QUA.0004 Sh. 01/Rev. 3.96


Data file: P-60-S-M-0001 00
rev D1 PE3 S G Cooler Techn spc 310308.doc
This document is CONFIDENTIAL and the sole property of the AGIP GAS BV. It shall neither be shown to third parties nor used for other purposes than those for
which it has been issued/sent. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.

ENI (E&P)
LIBYAN BRANCH

WESTERN LIBYA GAS PROJECT


Plant: MELLITAH PLANT: WLGP Additional
Exploitation Phase 1 Production Enhancement

WLGP Job N

WLGP Doc. N

20100/LIPR008

P-60-S-M-0001 00

CTR Job No.

CTR Doc. No.

F12290

F12290-A-PAC-SPC-0002

Location
GSPLAJ

Sh. 10 of 11 Rev.

D1

G-64-S-M-0097 -00
G-50-S-M-0020 -00

Specification for nozzles loads on static equipment

G-50-S-Z-0001-00

Materials requirements for steel product in wet H2S service

G-50-S-Z-0004-00

On-shore gen. spec. For spare parts

G -50-S-P-0011-00

General project specification for painting and hot dip galvanizing

G -50-S-P-0015-00

Ids for external blasting and painting of equipments

G-50-S-S-0006 00

Reinforced concrete works instructios for anchor bolts use

G-50-S-S-0007 00

Reinforced concrete works anchor bolts

G-50-S-S-0008 00

Reinforced concrete works anchor bolts type A & B

G-50-S-S-0009 00

Reinforced concrete works anchor bolts type C

G-00-P-Z-0006 00

Document and Items Coding and Numbering Procedures

G-64-P-Z-8006 00

Vendors documentation requirements and procedure

G-64-P-Q-8005 00

Project QA/QC Requirements for Vendors & Sub-Contractors

G-50-P-Y-0002 00

CAD Procedure

G-64-P-Z-8017 00

Project Spare Parts Procedure

G-64-P-S-8001 00

Packing & Marking Specification

G-64-S-M-021300

IDS

G-50-S-M-0102 00

RDDS

G-50-S-M-002000

Specification for Nozzle Loads on Static Equipment


DATA SHEET LIST
Sweet gas cooler

G-65-X-M-4111-01

10.4.

51-330-HA-002
52-330-HA-002
53-330-HA-002

Order of Precedence
In the case of conflict between documents relating to the inquiry or purchaser order, the
following priority of documents shall apply:
First priority
Second priority
Third priority
Fourth priority
Fifth priority
Sixt priority

:
:
:
:
:
:

Purchase order
This specification
Data sheet
General Project Specification
COMPANY standards and specification TPIT standards
International Codes & Standards

_______________________________
Form code: MDT.GG.QUA.0004 Sh. 01/Rev. 3.96
Data file: P-60-S-M-0001 00
rev D1 PE3 S G Cooler Techn spc 310308.doc
This document is CONFIDENTIAL and the sole property of the AGIP GAS BV. It shall neither be shown to third parties nor used for other purposes than those for
which it has been issued/sent. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.

ENI (E&P)
LIBYAN BRANCH

WESTERN LIBYA GAS PROJECT


Plant: MELLITAH PLANT: WLGP Additional
Exploitation Phase 1 Production Enhancement

WLGP Job N

WLGP Doc. N

20100/LIPR008

P-60-S-M-0001 00

CTR Job No.

CTR Doc. No.

F12290

F12290-A-PAC-SPC-0002

Location
GSPLAJ

10.5.

Sh. 11 of 11 Rev.

D1

Adherence to Specifications
Vendor is deemed to be in full compliance with all specifications applicable to this project.
Any exception or deviation shall be submitted as itemized list for the Contractors approval
understanding and acceptance.
This specification shall in no way release the Vendor from final guarantee for materials,
apparatus, workmanship and performance of the equipment.

_______________________________
Form code: MDT.GG.QUA.0004 Sh. 01/Rev. 3.96
Data file: P-60-S-M-0001 00
rev D1 PE3 S G Cooler Techn spc 310308.doc
This document is CONFIDENTIAL and the sole property of the AGIP GAS BV. It shall neither be shown to third parties nor used for other purposes than those for
which it has been issued/sent. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.

Вам также может понравиться