Академический Документы
Профессиональный Документы
Культура Документы
Prepared by:
Checked by:
Approved by:
AFR
AB
MB
Outside Diameter
OD := 6.625 in
Length
L := 10 m
Bottom Width
B := 3 m
Wall Thickness
WT := 12.7 mm
h := 0.3m
Concrete Density
con := 2400 kg m
Nos := 1
sw := 1025 kg m
Total Height
H := h Nos
Wea := 0.4
Mattress per
m2
OD = 168.275 mm
tonne
Volum e of Support
V support :=
Submerged Weight of
Concrete Mattress
Wair
con
-3
= 5 m
1 of 6
-3
Project
: PHE WMO - EPCI - 1
Company : PT. PHE WMO
Contractor : PT. TIMAS SUPLINDO - PT. GUNANUSA CONSORTIUM
Case
: CR56 Concrete Mattress #1ea Stability Check
Prepared by:
Checked by:
Approved by:
C := 2 kPa
sub := 4.7 kN m
:= 0deg
-3
Support Load
Support Load
Fyo := 10.393 kN
Fxo := 3.065 kN
Fyb := 10.634 kN
Fxb := 3.102 kN
Fzo := 1.470 kN
Fzb := 0.257 kN
Hw := 9.16 m
Tw := 9.32sec
vcur := 0.739 m s
-1
2.0 CALCULATIONS
2.1 OVERTURNING STABILITY
Wave Load on Support
Drag Coefficient
CD := 1.0
Inertia Coefficient
CM := 2
Wave Velocity
vwave := 0.4702 m s
Wave Acceleration
awave := 0.3184 m s
Asupport := B L
-1
-2
-1
vcomb = 1.209 m s
Drag Force
Inertia Force
FI = 4895.4 N
Wave Load on Support FH := FD + FI
4
FH = 2.738 10 N
2 of 6
AFR
AB
MB
Project
: PHE WMO - EPCI - 1
Company : PT. PHE WMO
Contractor : PT. TIMAS SUPLINDO - PT. GUNANUSA CONSORTIUM
Case
: CR56 Concrete Mattress #1ea Stability Check
Prepared by:
Checked by:
Approved by:
FHtot = 2.885 10 N
Total Vertical Load
Mo = 1.108 10 N m
Mr := FV 0.5 B
Mr = 1.171 10 N m
Safety Factor
Mr
SF1 :=
Mo
SF1 = 10.566
Checkov :=
"SAFE" if
Mr
Mo
1.5
Checkov = "SAFE"
:= 0.3
Asupport_Sliding := B L
Drag Force
FD_sl = 22480.781 N
FH_sl := FD_sl + FI
FH_sl = 27.376 kN
FHtot_sl = 30.441 kN
FV = 78.055 kN
Ffric := FV
Ffric = 23.416 kN
Hs := C Asupport_Sliding = 60 kN
Ffric + Hs
SF2 :=
FHtot_sl
Checksl :=
SF2 = 2.74
Checksl = "SAFE"
3 of 6
AFR
AB
MB
Project
: PHE WMO - EPCI - 1
Company : PT. PHE WMO
Contractor : PT. TIMAS SUPLINDO - PT. GUNANUSA CONSORTIUM
Case
: CR56 Concrete Mattress #1ea Stability Check
Prepared by:
Checked by:
Approved by:
AFR
AB
MB
Foundation width
B = 3m
FVb = 78.055 kN
Qubearing := 110kN
"SAFE" if
Qubearing
F Vb
> FOS
3.333
Check = "SAFE"
FOS := 2.00
Project
: PHE WMO - EPCI - 1
Company : PT. PHE WMO
Contractor : PT. TIMAS SUPLINDO - PT. GUNANUSA CONSORTIUM
Case
: CR56 Concrete Mattress #1ea Stability Check
Prepared by:
Checked by:
Approved by:
AFR
AB
MB
B = 3m
dim := 7mm
Ftest := 50kN
FVb
FV_set :=
= 23.419 kN (Taken by considering the square section
3.333
of 3m x 3m)
FV_set
dIm_cor := dim
Ftest
5 of 6
dIm_cor = 3.279 mm
Project
: PHE WMO - EPCI - 1
Company : PT. PHE WMO
Contractor : PT. TIMAS SUPLINDO - PT. GUNANUSA CONSORTIUM
Case
: CR56 Concrete Mattress #1ea Stability Check
Prepared by:
Checked by:
Approved by:
AFR
AB
MB
190
B = 3m
FV_set = 23.419 kN
FV_set
dcons_cor := dcons
Ftest
dcons_cor = 88.991 mm
dtotal = 92.27 mm
dtotal_safe := 125mm
6 of 6