Академический Документы
Профессиональный Документы
Культура Документы
7 by
(SNGPL).
1
Pacca
Kacha
x
x
@
2
Pacca
Kacha
56
8
1
1
x
x
56
8
=
=
=
448 Cft
128 Cft
576 Cft.
=
Rs.453
x
x
Per
2
2
x
x
2.42
3
=
=
=
Rs.800
Rs.2,035
Rs.2,291
Rs.1,973
Rs.220
271 Cft
48 Cft
319 Cft.
Cft
56
x
Per
0.83
92.96 Cft
Cft
56
@ Rs.3,053.25
x
Per
0.67
75.04 Cft
Cft
P/L TST using 79 Lbs bitumen & 9.75 Cft Bajri Per % Sft
1
60
@ Rs.1,096.10
6
4
4
@ Rs.2,188.85
x
x
2
2
@ Rs.2,508.80
3
x
x
x
Per
180 Sft
Sft
576 Cft
7772
7772
Rs.7,772
Rs.233
Rs.972
Rs.8,977
(+)
(+)
Total:-
80
Rs.2.00
/
3.28 =
P. Metr P.Year
For
=
10 Years
24 Meters
Rs.49
=
G. Total:Say
Rs.488
Rs.9,465
Rs.9,500
=
=
100 Cft.
212 Km.
=
Rs.1,690.65
0.00
to
50
50
to
100
5.70
P.Km.
200
to
5.20
P.Km.
212
to
4.80
P.Km.
50
3
@ Rs.
Km.
Km.
@ Rs.
Km.
@ Rs.
Rs.500.00
Rs.285.00
Rs.520.00
Rs.57.60
Rs.3,053.25
100
200
Total:-
Sub Engineer
Executive Engineer
Provincial Highway Division
Lahore
=
=
100 Cft.
175 Km.
=
Rs.1,013.85
Rs.500.00
Rs.285.00
Rs.390.00
Rs.0.00
Rs.2,188.85
0.00
to
50
50
to
100
5.70
P.Km.
100
to
5.20
P.Km.
to
4.90
P.Km.
50
3
@ Rs.
Km.
Km.
@ Rs.
Km.
@ Rs.
175
Total:-
Sub Engineer
Executive Engineer
Provincial Highway Division
Lahore
ANALYSIS RATE FOR T.S.T USING 79 LBS. BITUMEN & 9.75 CFT. BAJRI.
Unit
Lead
=
=
100 Cft.
212 Km.
Rs.963.25
0.00
to
50
50
to
100
5.70
P.Km.
200
to
5.20
P.Km.
212
to
4.80
P.Km.
50
3
@ Rs.
Km.
Km.
@ Rs.
Km.
@ Rs.
Sub Engineer
9.75
Rs.500.00
Rs.285.00
Rs.520.00
Rs.57.60
Rs.1,362.60
100
200
Total:Rs.1,362.60
100
Rs.132.85
Total:-
###
Executive Engineer
Provincial Highway Division
Lahore
PROVINCE
PUNJAB
STATION
LAHORE
DIVISION
PROVINCIAL
LAHORE.
NAME OF WORK
MAJOR HEAD
---
AMOUNT
RS. 9500
HIGHWAY
DIVISION,