RECOMMENDED PROCEDURE
FOR TREATED WATER FLUSHING OF
CONDENSATE, FEED WATER & DRIP LINES
PROJECT
RELIANCE, 7X90MW
PROCEDURE
PURPOSE
DOCUMENT
DOCUMENT
Issued by:
Issued to : CM,BHEL Site Office,Reliance ( Hazira & Dahej)
Sr Manager/TSX
00
Rev. No.
AGM/TX
V K Jhade
S.Mandal
Prepared by
Reviewed by
HEAD TSX
B.Swain
Approved by
30/04/2015
Date
Station: RUPPL
( 7X90MW)
Page 2 of 15
LIST OF CONTENTS
1. PLANT DETAILS
2. OBJECTIVE
3. PROPOSAL
4. SERVICES REQUIRED
5. SAFETY PERECAUTIONS
6. EMERGENCY PROCEDURE
7. STATE OF THE PLANT
8. METHOD
9. COMPLETION CRITERIA
10. LOG SHEET
Signatures
RUPPL
BHEL
Station: RUPPL
( 7X90MW)
Page 3 of 15
Condensate system One of the Two 100% duty condensate extraction pumps /unit
extracts condensate from condenser hotwell and pumps to Condensate Forwarding tank.
From Condensate Forwarding Tank the condensate water is again pumped to FST via
GSC, LPH 1,2 &3 and Deaerator by 2 of 3 Condensate Forwarding pump.
Feed water system- Any one of four 100% duty Boiler Feed Pump (BFP) will take
suction from FST and pumps the feed water to boiler feed water common header via HP
Heaters 1&2 From the common header, hot feed water can be fed to any one of the
running boiler.
Drip lines
Heater (LP & HP) drip lines All upper heaters drip lines are cascaded to downstream
heater to have maximum heat gain from the regenerative system.
2. OBJECTIVE:
The objective of this procedure is to remove scales, loose material, dirt etc, that might
have been pipeline, during manufacture, storage, erection at site. Failure to remove the
debris may result in damage pumps and contaminate feed water to boiler.
3. PROPOSAL:
Mechanical cleaning of Condenser, Condensate forwarding tank & CEP suction lines
from respective condenser before erection and DM water flushing up to suction nozzle of
the pump.
BHEL
Station: RUPPL
( 7X90MW)
Page 4 of 15
Mechanical cleaning of FST followed by treated water flushing of the BFP suction,
discharge upto boiler inlet bypassing the HP heaters. BFP recirculation lines will be
included in this circuit for treated water flushing.
Treated DM water flushing will be done for condensate, feed water & heater drip lines
bypassing the heater shell.
The effects of flushing are evaluated and concluded as per the completion criteria given
in section 9.0
4. SERVICES REQUIRED:
Condensate forwarding tank will be used as mixing tank and condensate forwarding
pump as circulating pump.
Availability of approximately of 1500 ton DM water per unit for the entire operation.
Actual quantity will be arrived at site after ensuring the location of CFT area
Availability of chemicals:
Signatures
RUPPL
BHEL
Station: RUPPL
( 7X90MW)
Page 5 of 15
Availability of DM water
5. SAFETY PRECAUTIONS:
Required quantities of safety gears such as helmets, Asbestos hand gloves, Ear Mufflers
etc are available.
Required stair cases or platform or approaches etc with hand rails to electrical operated
quick opening temporary valves are made available.
Required barricades to be made to prevent personal from coming into contact with treated
water
Required number of sign boards to be put into position at selected locations to indicate
the ongoing process of flushing.
6. EMERGENCY PROCEDURES:
The group consisting of Reliance and BHEL, which is carrying out flushing, should be
aware of procedures to be followed in case of accidents involving injury to personnel.
The group should be aware that if any abnormality is observed in the permanent and
temporary system during the process.
Signatures
RUPPL
BHEL
Station: RUPPL
( 7X90MW)
Page 6 of 15
The suction strainers of CFT pumps are to be kept in service during operation
All the regenerative equipment are installed in position and temporary pipe line
connections as per schemes are complete.
BFPs, their booster pumps and CEPs are bypassed suitably with temporary piping.
Suction and discharge ends of BFPs and CEPs are capped to prevent entry of flushing
fluid into the pump.
All the valves in the steam lines to and from Dearator are closed.
All the cutting and welding work on instrument tapping points is complete up to isolating
root valves.
All the orifices, flow nozzles, control valves and NRVs flap in reverse flow path are
removed and a check list is prepared. Spool pieces are provided wherever required.
All the instruments except those required during flushing are isolated.
Signatures
RUPPL
BHEL
Station: RUPPL
( 7X90MW)
Page 7 of 15
FLUSHING CIRCUIT
CONDENSATE CIRCUIT
CRCUIT 1- Condensate forwarding tank (CFT) - CFT Pump suction line pump
discharge- Drain cooler bypass-LP Heater1,2,3 bypass- Dearator -FST-FST DrainTemporary pipe to CFT.
CRCUIT 2 CFT Pump recirculation line common header (temporary) connect to CEP
Discharge near to CFT Tank-CEP Discharge & CEP r/c - temporary pipe to CFT Tank.
CRCUIT 3- Condensate forwarding tank (CFT) - CFT Pump suction line pump
discharge- Drain cooler bypass-LP Heater1,2,3 bypass- Dearator - Temporary pipe
connect to BFP Suction at dearator floor-BFP Suction Booster pump bypass- Main
pump suction- BFP discharge- BFP R/C lines FST- FST drain and over flow -CFT.
Signatures
RUPPL
BHEL
Station: RUPPL
( 7X90MW)
Page 8 of 15
The system is filled with DM water by running Condensate Forwarding pump circulation
pumps and circulation is established.
Open circuit flushing with cold DM water is carried out for each circuit till the effluent
becomes visibly clear.
Closed circuit flushing with cold DM water is started and continued for one hour through
each circuit. The system is then drained using substitution method till the effluent
becomes visibly clear and till turbidity in the sample collected from return line is less
than 10-15 NTU.
System is again filled with Hydrazine Hydrate 100-150 ppm and Ammonia to maintain
pH 9 to 9.5.
The solution is circulated in each circuit for duration of two to three hours depending
upon circuit length.
9. COMPLETION CRITERIA:
Rinsing after cold flushing is declared complete when turbidity in the sample collected
from return line is less than 10-15 NTU.
8
Signatures
RUPPL
BHEL
Station: RUPPL
( 7X90MW)
Page 9 of 15
DM Treated water flushing is considered completed after three hour circulation of each
circuit and system inlet and return sample of Hydrazine hydrate or carbohydrazide and
pH value stabilized.
10.0
Date
LOG SHEET
Sample
no
Turbidity
( NTU)
Inlet
outlet
pH
Inlet
Outlet
Crbohydrazide
Inlet
Remarks
Outlet
Signatures
RUPPL
BHEL
10
TO CFT
11
Booster Pump
Suction
CEP disch
after GSC
12
TO BOILER
13
14
FROM CONDENSATE
FORWARDING PUMP
DISCH TO D/A INLET
15