SN

o.

Girder
No.

Location

58-59 LS

Daroghawala
Interchange to Weighing
Station

57-58 RS

43-44 RS

53-54 RS

52-53 LS

58-57 RS

56-57 LS

55-56 LS

54-55 LS

10

59-60 LS

11

52-53 RS

12

51-52 RS

Remarks
7 Supports and 3 of them are settled.
Structure resting on footpath
2 major cracks on facing
6 Supports and 2 of them are settled
Surface cracks were found
Poor use of plaster of Paris to fill cracks and repairing
Cracked support
Major Settlement in 4 Supports out of total 6 supports
Support cracked
New Supports Installed after major Settlement in Existing Support
11 Supports and poorly placed
Various Surface Cracks
Poor Finishing
Inclined Placement of Girder
6 Supports and 4 are settled
Poor Finishing
Minor Cracks
Total 6 Supports
2 Supports Settled
6 Supports
No Major Settlement
Fungus Found
6 Supports
No Major Settlement
Facing Damaged
6 Support and 2 of them are settled
Inclined Placement of girder may cause damage to structure
6 Supports and 1 is settled
One major cracks found on facing
5 Supports
3 Supports Settled
Side walk damaged due to settlement
6 Supports

13

51-52 LS

14

62-63 RS

15
16

39-40 LS
50-51 RS

17
18
19

40-41 RS
41-42 RS
61-62 RS

20

60-61 RS

21

64-65 LS

22

59-60 RS

23

57-58 LS

24

41-42 LS

25

39-40 RS

Weighing Station to
Underpass 02

1 support Dislocated after loading


Side of girder is damaged during placement
6 Supports and 2 of them are settled
Couple of Surface crack found
6 Supports and 2 of them are settled
1 Support Damaged
1 Support is placed inclined which may cause settlement/Cracks in
future
Relatively good finishing
6 Supports and 2 of them are settled
6 Supports and 2 of them are settled
Minor cracks on facing
Footpath is damaged as it is taking load
4 Supports and 2 of them are settled
5 Supports and 2 Supports are settled
5 Supports
4 are settled
1 Support is cracked
5 Supports and 2 are settled
Cracked Supports
Girder resting on footpath
Severely Settled Supports
Inclined Placement of Girder
Wooden planks used for support instead on blocks
8 supports and 2 of them are settled
1 support cracked
Girder resting on footpath
7 Supports and 3 of them are settled
1 supports cracked and placed inclined
1 major crack on facing
6 Supports and 2 of them are settled
2 supports are placed on the inclined portion of ring road (Side Slope)
1 Support is cracked
7 Supports and all of them are poorly placed
Girder is placed on the side slope of road
One support damaged

26

42-43 LS

27

43-44 LS

28

47-48 LS

29

62-63 LS

30

40-41 LS

31

47-48 RS

32

48-49 LS

33

49-50 LS

34

49-50 RS

Underpass 02 to
Underpass 01

Underpass 01 to Testing
Lab

5 support settled
Supports effected by termite
6 Supports and 2 of them are severely settled
One support cracked
Support effected by termite
8 Supports and 3 of them are severely settled
Poor placement of Supports
Termite action
6 Supports and 1 supports is damaged
Supports effected by termite
6 Supports and all are Settled
2 are severely settled
Supports are effected by termite and may collapse soon
6 Supports
One support Cracked
Concreting is done to overcome settlement
6 Supports
Concreting is done in order to overcome settlement
Side damaged
Termite effect
6 Support and 2 are settled
1 crack on facing
6 Supports and 2 of them are settled
Inclined placement of supports
6 Supports and 1 is settled
1 Support is cracked