SEGREGATED M5 CROSSING
Work Package 1: New Landmark Pedestrian / Cycle Bridge to reconnect Gypsy Hill Lane and Black Horse Lane over M5 Motorway
Estimate Base: Year 2008, Quarter 4
Series
100
200
400
500
600
1100
1700
1800
1900
2000
2100
2300
2400
3000
Description
Preliminaries
Site Clearance
Restraint Systems
Drainage
Earthworks
Kerbs / Footways
Structural Concrete
Steelwork for structures
Protection of Steelwork
Waterproofing
Bearings
Bridge expansion Joints
Special Structures
Landscaping
493,000
10,000
206,000
6,000
305,000
22,000
197,000
1,498,000
107,000
32,000
2,000
5,000
59,000
20,000
Total
2,962,000
L
L
H
H
H
L
H
H
H
L
L
L
H
L
Cost
Notes
2.5
2.5
15
15
15
2.5
15
15
15
2.5
2.5
2.5
15
2.5
12,325
250
30,900
900
45,750
550
29,550
224,700
16,050
800
50
125
8,850
500
371,300
CIF SCHEME NO 26
SEGREGATED M5 CROSSING
Work Package 2: Pedestrian and Cycle Improvements to Gypsy Hill Lane from Cumberland Ave / Hollow Lane Junction to the new Landmark Pedestrian / Cycle Bridge
Estimate Base: Year 2008, Quarter 4
Series
100
200
300
400
500
600
700
1100
1200
1300
1400-1500
1600-2500
2700
2700
2700
3000
Description
Preliminaries
Site Clearance
Fencing and Environmental Barriers
Road Restraint Systems (Vehicle & Pedestrian)
Drainage
Earthworks
Road Pavements
Kerbs, Footways, & Paved Areas
Traffic Signs and Road Markings
Road Lighting Columns and Brackets
Electrical Work and Communications
Structures
Statutory Undertakers Works
Noise Insulation Works
Accommodation Works
Landscape and Ecology
Other Costs; Testing
Total
L
M
L
2.5
5
2.5
H
H
M
L
L
L
H
H
H
15
15
5
5
2.5
2.5
15
15
15
H
L
15
2.5
Cost
Notes
1,500 Risks associated with ecological surveys and environmental mitigation measures
188 Estimate is based on measure and value therefore risk is considered to be low
27,638
CIF SCHEME NO 26
SEGREGATED M5 CROSSING
Description
Preliminaries
Site Clearance
Restraint Systems
Drainage
Earthworks
Kerbs / Footways
Structural Concrete
Steelwork for structures
Protection of Steelwork
Waterproofing
Bearings
Bridge expansion Joints
Special Structures
Statutory Undertakers Works
Landscaping
10,000
2,000
0
3,000
2,000
5,000
0
0
0
0
0
27,200
0
0
0
Total
49,200
Cost
Notes
L
L
2.5
2.5
L
L
L
2.5
2.5
2.5
15
6,910
CIF SCHEME NO 26
SEGREGATED M5 CROSSING
Works Package 4: Exeter Science Park Bus Link Road and Tithebarn Lane Carriageway Widening Works
Estimate Base: Year 2008, Quarter 4
Series
100
200
300
400
500
600
700
1100
1200
1300
1400-1500
1600-2500
2700
2700
2700
300
Description
Preliminaries
Site Clearance
Fencing and Environmental Barriers
Road Restraint Systems (Vehicle & Pedestrian)
Drainage
Earthworks
Road Pavements
Kerbs, Footways, & Paved Areas
Traffic Signs and Road Markings
Road Lighting Columns and Brackets
Electrical Work and Communications
Structures
Statutory Undertakers Works
Noise Insulation Works
Accommodation Works
Landscape and Ecology
Other Costs; Testing
76,000
6,000
20,000
0
93,000
151,000
159,000
23,000
5,000
3,000
8,000
0
25,000
0
0
0
12,000
Total
581,000
L
L
L
2.5
2.5
2.5
H
H
M
L
L
L
H
15
15
5
2.5
2.5
2.5
15
15
2.5
Cost
Notes
1,900 Allowance for preliminary costs considered adequate
150 Estimate is based on measure and value therefore risk is considered to be low
500 Estimate is based on measure and value therefore risk is considered to be low
13,950
22,650
7,950
575
125
75
1,200
3,750 Risks associated with Statutory Undertakers costs and unidentified services
300 Estimate is based on measure and value therefore risk is considered to be low
53,125