TANAP LOGO

Activity
No.

INSPECTION AND TEST PLAN FOR OVERHEAD LINE CONSTRUCTION

Activity Description

Inspection/Test Requirements

Reference Document

SURVEY
1

Equipment Identification

Survey Equipment is calibrated

Manufacturers specification

Visual and Dimensional Check

Centrer locations at initial survey are located and staked

Anchoring Bolt positioning check

Verify survey markers are easily identified and placed securely

Supplier Drawings

Visual Inspection Procedure


Dimensional Inspection procedure &
drawing

Excavation

verify all Earth work baselines are set outside of the excavated areas to

WPS
Visual Inspection Procedure
NDE Procedures
Applicable Codes

Bolt tightening

avoid destruction

As per drawing spec.

galvanized coating check

Verify that galvanized coating applied properly.

Company Specifications

Material Identification

Verify material certificates exist and conform to project list

Supplier Drawings/ Packing List

Visual and Dimensional Check

Verify that dimensions are correct.


Verify that material is free from defects and inacceptable condition

Visual Inspection Procedure


Dimensional Inspection procedure &
drawing

Welding ( if required )

Verify proper WPS used


Verify welder cards
Verify proper fitup realized.
Visual check of weld seams.
NDT examination performed. (If required)

WPS
Visual Inspection Procedure
NDE Procedures
Applicable Codes

10

Bolt tightening

* Verify that all the bolts are secure and tightened according to project
drawings and specifications.

As per drawing spec.

11

Painting / coating check (if required)

Verify that final coating applied properly.

Company Specifications

HANDRAILS AND LADDERS


7
8

DINAMIK / SYA
LOGO

DINAMIK

TANAP LOGO

Activity
No.

INSPECTION AND TEST PLAN FOR OVERHEAD LINE CONSTRUCTION

Activity Description

Inspection/Test Requirements

Reference Document

WALKWAYS
12
13

Material Identification

Verify material certificates exist and conform to project list

Supplier Drawings/ Packing List

Visual and Dimensional Check

Verify that dimensions are correct.


Verify that material is free from defects and inacceptable condition

Visual Inspection Procedure


Dimensional Inspection procedure &
drawing
WPS
Visual Inspection Procedure
NDE Procedures
Applicable Codes

14

Welding ( if required )

Verify proper WPS used


Verify welder cards
Verify proper fitup realized.
Visual check of weld seams.
NDT examination performed. (If required)

15

Bolt tightening

* Verify that all the bolts are secure and tightened according to project
drawings and specifications.

As per drawing spec.

16

Painting / coating check (if required)

Verify that final coating applied properly.

Company Specifications

RADIATORS (TUBE BUNDLES AND FAN DRIVES)


17

Material Identification

Verify material certificates exist and conform to project list


Verify spool markings as per erection marking plans and Tag verification

Supplier Drawings/ Packing List

18

Visual and Dimensional Check

Verify that dimensions are correct.


Verify that material is free from defects and in acceptable condition

Visual Inspection Procedure


Dimension inspection procedure &
isometric

19

Positioning Check

* Verify that the position is correct after installation.

Supplier Drawings

20

Bolt tightening

* Verify that all the bolts are secure and tightened according to project
drawings and specifications.

As per drawing spec.

21

Document review

Review erection documentation

Quality Dossier

22

Painting / coating check (if required)

Verify that final coating applied properly.

Company Specifications

DINAMIK / SYA
LOGO

DINAMIK

TANAP LOGO

Activity
No.

Activity Description

INSPECTION AND TEST PLAN FOR OVERHEAD LINE CONSTRUCTION

Inspection/Test Requirements

Reference Document

DINAMIK / SYA
LOGO

DINAMIK

INLET PIPING
23

Material Identification

Verify material certificates exist and conform to project list


Verify markings as per erection marking plans and Tag verification

24

Visual and Dimensional Check

Verify that dimensions are correct.


Verify that material is free from defects and in acceptable condition

Visual Inspection Procedure


Dimensional Inspection procedure &
drawing

25

Orientation contol

Verify that Spools are placed in correct orientation on the equipment.

Approved fabrication drawings


Approved Plot plan.

26

Bolt tightening

* Verify that all the bolts are secure and tightened according to project
drawings and specifications.

Supplier Drawings and documents

27

Document review

Review erection documentation

Quality Dossier

28

Painting / coating check (if required)

Verify that final coating applied properly.

Company Specifications

Verify material certificates exist and conform to project list


Verify markings as per erection marking plans and Tag verification

Supplier Drawings/ Packing List

Visual Inspection Procedure


Dimensional Inspection procedure &
drawing

Supplier Drawings/ Packing List

OUTLET PIPING
29

Material Identification

30

Visual and Dimensional Check

Verify that dimensions are correct.


Verify that material is free from defects and in acceptable condition

31

Orientation contol

Verify that Spools are placed in correct orientation on the equipment.

Approved fabrication drawings


Approved Plot plan.

32

Bolt tightening

* Verify that all the bolts are secure and tightened according to project
drawings and specifications.

Supplier Drawings and documents

33

Document review

Review erection documentation

Quality Dossier

34

Painting / coating check (if required)

Verify that final coating applied properly.

Company Specifications

TANAP LOGO

Activity
No.

Activity Description

INSPECTION AND TEST PLAN FOR OVERHEAD LINE CONSTRUCTION

Inspection/Test Requirements

Reference Document

DINAMIK / SYA
LOGO

DINAMIK

VIBRATION SWITCHES
35

Material Identification

36

Visual and Dimensional Check

37

Orientation contol before erection

Verify material certificates exist and conform to project list


Verify markings as per erection marking plans and Tag verification
* Compliance to type

Supplier Drawings/ Packing List

Verify that dimensions are correct.


Verify that material is free from defects and in acceptable condition

Visual Inspection Procedure


Dimensional Inspection Procedure &
Drawings

Verify that all the attachments are placed in correct orientation on the
equipment

Approved fabrication drawings


Approved Plot plan.

JUNCTION BOXES
38

Material Identification

39

Visual and Dimensional Check

40

Orientation contol before erection

Verify material certificates exist and conform to project list


Verify markings as per erection marking plans and Tag verification
* Compliance to type

Supplier Drawings/ Packing List

Verify that dimensions are correct.


Verify that material is free from defects and in acceptable condition

Visual Inspection Procedure


Dimensional Inspection Procedure &
Drawings

Verify that all the attachments are placed in correct orientation on the
equipment.

Approved fabrication drawings


Approved Plot plan.

INSPECTION POINT
H

Is a HOLD POINT, which no work may proceed beyond this operation until acceptance by the inspector

Is a WITNESS POINT, which no work may proceed beyond this operation until the Inspector has accepted it

Is a REVIEW POINT, which cover the review of documents & does not require acceptance of the Inspector before proceeding with next operation, but must be seen prior to stamping of the

AI

Authorized Inspector

WHC

Ware House Chief

PREPARED BY
NAME:
DATE:
SIGN:

SYA

Page:
Date :
Rev. No:
Doc.No. :
Inspection
SYA

EPCM/TANAP

Page:
Date :
Rev. No:
Doc.No. :
Inspection
SYA

EPCM/TANAP

Page:
Date :
Rev. No:
Doc.No. :
Inspection
SYA

EPCM/TANAP

W/R

W/R

W/R

W/R

W/R

W/R

W/R

W/R

W/R

Page:
Date :
Rev. No:
Doc.No. :
Inspection
SYA

EPCM/TANAP

or

pted it

ector before proceeding with next operation, but must be seen prior to stamping of the item

EPCM/TANAP