Вы находитесь на странице: 1из 33

Teamnet Engineering

1. Company profile
2. Reference projects, SCADA Projects and
Industrial Automations
3. Research & Development and
Innovation projects

4. Certifications
5. Customers and Collaborators

Table of
Contents

Company profile

Teamnet Engineering - A company of the Teamnet Group


Teamnet Group founded in 2001
In TOP 3 IT&C integrators in Romania
93 mil. EUR turnover in 2014
20+ R&D European projects
800 employees

1.500 + certifications of the team


members

Teamnet Engineering - Skills


Design

Implementation
Technological
environmental solutions
and other industrial
processes
Water and sewage works,
as well as water
treatment stations,
pumping,
collection, water network
systems
Waste management
systems, automatic waste
sorting stations, waste
incinerators
Industrial automation and
SCADA systems

We provide the
entire
development
cycle of a
complex project

Technological processes
Modelling of industrial
processes
Intelligent automatic
driving systems
Electrical systems,
industrial automation
and SCADA systems
Application specific
software

Entrepreneurship
General contracting for
complex works
Consulting

Industrial water
treatment systems

Water and sewage


systems
Waste management
systems

Automation and
electrical
engineering
SCADA (Supervisory
Control and Data
Acquisition)

Teamnet Engineering
SCADA products and activities

Products
Technological
installations
Design, industrial
automation, software
Industrial
communications for
automation systems

Activities
Provider of solutions for environmental
technologies
Commissioning of technological installations
Design, Research & Development,
Industrial Automation
Specific software for industrial applications

Reference projects, SCADA Projects


and Industrial Automation

Upgrading of wastewater treatment stations in


Bistria - Nsud County - Bistria, Salva, Nsud,
Sngeorz Bi

Addressable population in the modernization project of wastewater


treatment stations in Bistria County

Sngeorz-

Salva

Beclean

Bistria

Name

Number of equivalent
inhabitants

Bistria

131.000

Beclean

20.000

Salva

20.000

Sngeorz-B i

12.000

Total
beneficiaries

183.000

fully functional purge system for


both sewage and sludge from the
wastewater treatment process
from Salva, Beclean, Sngeorz a new water and sewage
infrastructure by using the
optimized collection and
wastewater treatment plants
systems
supplement of the water
treatment capacity through the
rehabilitation of the activated
sludge basins, as well as primary
and secondary decanters

the works were carried out within


the POS MEDIU 1 program

Beclean
new purification station
transfer wastewater collector
Bata Beclean

the works were carried out


within the POS MEDIU 1
program

Sngeorz new purification station


/Salva;

wastewater transfer collector


from the existing wastewater
treatment plant
to the
new waste water treatment
plant Salva;
transformation of the existing
wastewater treatment station
in a transfer pumping
station.
the works were carried out
within the POS MEDIU 1 program

expansion of the new


wastewater treatment plant
Sangeorz Bai built under another
contract with funding from CNI
funds;
collector main transfer pumping
station to the treatment plant
Rodna transfer Sngeorz
;
transforming the existing
wastewater treatment plant in
Rodna in a transfer pump

the works were carried out


within the POS MEDIU 1
program

Upgrading wastewater treatment stations in Bistria

Coagulant dosing if needed


Rough
water
Thin
grate

nitrogen recirculation

Secondary
decanters

effluent

Line 2
recirculated mud

Fine
grate

Sand and fat


separation
Primary
decanters

Excess sludge
Coagulant dosing if needed
nitrogen recirculation
Secondary
decanters

Line 1
recirculated mud

Coagulant if needed
nitrogen recirculation
Primary
sludge

Excess sludge
Secondary
decanters

effluent

Line 3
recirculated mud

Upgrading wastewater treatment stations in Sngeorz Bi

Upgrading wastewater treatment stations in Salva

Upgrading wastewater treatment stations in Beclean

Sistemul de managemet integrat al deeurilor din


judeul Bihor - Beiu, Marghita, Salonta, Scuieni,
Stei

Addressable population in the SMID Bihor project (Integrated waste


management system)
Marghita

Salonta

Beiu

Stei

Name

Number of equivalent
inhabitants

Salonta

17.735

Marghita

15.770

Beiu

10.667

S cuieni

11.526

Stei

6.529

Total beneficiaries

62.227

SMID Bihor (Integrated waste management system)


This project solves operational and environmental problems
caused by waste generation and management, such as an
integrated waste management system is elaborated.

Sorting stations are designed for the following capabilities:


BEIU : 7000 tonnes/year, operable 260 days a year with 1 eighthour shift, thus 26.7 tonnes/day or about 3.3 tons/hour.
MARGHITA: 4,500 tonnes/year, operable 260 days a year with 1
six-hour shift, thus 17.3 tonnes/day or about 2.9 tonnes/hour.
SALONTA: 4,500 tonnes/year, operable 260 days a year with 1
six-hour shift, thus 17.3 tonnes/day or about 2.9 tonnes/hour

Transfer stations are designed for the following


capabilities:
BEIU : 16.100 tonnes/year , operable 312 days a year

with 1 eight-hour shift


MARGHITA: 10.600 tonnes/year, operable 312 days a
year with 1 eight-hour shift

SALONTA: 9.900 tone/year, operable 312 days a year


with 1 eight-hour shift

S CUIENI: 13.000 tone/year, operable 312 days a year


with 1 eight-hour shift

STEI: 3.500 tone/year, operable 312 days a year with 1


eight-hour shift

Automation and SCADA system for wastewater


treatment plant expansion - Galai

Projected capacity: 370,000 equivalent inhabitants :


Max. dry weather daily flow rate: 66,00 m3/day
Rainy weather max. flow: 9,200 m3/hour
The water line has been extended with :
Four lines for biological treatment with nutrient
removing, 70,000 m3

Four final clarification pools 23,600 m3

Four final clarification pools, 8,000 Nm3/h. 250 kW

Chemical dosing plant for phosphorus removal

Recirculated and surplus mud pumping station

Buffer pool for surplus thicken sludge. Anaerobic


digestor, 6,000 m3

Motor/generator combined equipment with biogas


130 m3/h / 260 kW

Galai WWTP2 automation system - SCADA operating interface

Galai WWTP2 automation system - SCADA operating interfaces

Extension and rehabilitation of wastewater


treatment plants in Arges County

Integrated solid waste management


system in Vaslui County
Development of the monitoring system
of Vidraru dam
Technical support for the Ministry of
Environment and Climate Change of Romania

Tranforming finishing demineralized water


for Termoelectrica Midia
within Technical Project; Details of execution
Modernization of existing water chemical
treatment of the SC Electrocentrale Oradea
S.A. - approval documentation for
intervention works; Technical project;
Details of execution

Automation and SCADA system for


WWTP wastewater treatment plants Pechea and Lie
Modernization of the wagons loading
system to the CF Ramp (SCADA),
integration and connection with the
OpenTAS ROMINSERV SRL Bucharest
computer system

Other projects

Research, Development
and Innovation Projects

We offer an innovative solution for automatic monitoring and


conditional maintenance systems, which can optimize costs
through the early detection of defective industrial equipment
operation.

VIBROCHANGE

Experimental model for the detection

Experimental
Model

and diagnosis of the changes in the


Detection / Diagnosis / Communication
Ultrasonic
waves

Decisions

vibration processes of industrial


equipment, using advanced
techniques of measurement and

Vibrational
Process

Acoustic
Waves

predictive analysis, in order to prevent


Sensors &
Transducers

Modeling / Identification / Fusion

abnormal operation and to avoid

economic or environmental disaster.


Mechanic
Waves

Signal Processing

BIOCON

Advanced control system of a BIORAFINERY-type


installation

Biorafinery-type installation: anaerobic digestor + fotobioreactor

BIOCON

Advanced control system of a BIORAFINERY-type


installation
Modeling of processes of anaerobic digestion
and photosynthetic growth of microalgae and
the identification of the second process, based
on of the experiments carried out on the pilot
plant.
Study of the process of obtaining methane
through anaerobic wastewater treatment based
on the mathematical model, through numeric
simulation

Study on the use of biomass residues remaining


following the extraction of biodiesel as a
substrate for biogas production in anaerobic
step;
Synthesis of control algorithms for both
processes (complex processes and powerfully
non-linear) treated individually and coupled to
the HILS structure adopted within the project

Certifications

Certifications
Indusoft

MOLDSWA

ARA

ANRE

ISWA

Quality management system according to ISO 9001


Environmental management system according to ISO 1400
Occupational health and safety management system according to OHSAS
18001
Information security management system according to ISO 27001
Social responsibility management systems according to SRM 8000
ANRE type B certification for design and execution of Electrical installations
ANRE authorized electricians gr. IIIA/IIIB, IIA/IIB
Integrating System and Software Provider Indusoft Web Studio (Schneider)
Integrating System and Software Provider Siemens Germany
Integrating System and Software Provider (RASI) Rockwell Software

Customers and
collaborators

Customers at Local and Regional level


Bihor County Council

UEFISCDI Bucharest

GE Power Franta (part of General


Electric SUA Group)

SC Aquabis SA

Galai City Hall

SC Farming Matering SRL

Passavant GmbH Germania

Electrocentrale Oradea SA

Ap Canal SA Galai

Arcelor Mittal Galai

Biogest International GmbH Germany

UZINA TERMOELECTRICA MIDIA SA

Dunrea de Jos University of Galai

Tehnopol SRL Galai

Vega93 SRL Galai

Arcelor Mittal Tubular Products


Galati

Rominserv SRL Bucureti

Rompetrol SA - Nvodari

Tancrad SRL Brila

Indas SRL Bucureti

Collaborators

Dunarea de
Jos
University of
Galati

Thank you!

www.teamnet.ro