Академический Документы
Профессиональный Документы
Культура Документы
Glossary of Terms
GE
Oil & Gas
Compliance Categories
O
R
C
A
1
2
3
4
5
6
7
8
Optional
Routine
Campaign
Alert
Compliance Level
F
F/D
D
Field
Field or Depot
Depot
Timing Code
The information contained in this Service Bulletin is confidential and proprietary. This Bulletin and the information contained in it
are protected by copyright and/or other intellectual property rights. This Bulletin and information are provided for authorized use
only, and may not be used by or disclosed to others without the prior express written consent of Nuovo Pignone S.p.A.
2. Serviceable Units
All Gas Turbines with Mark VI Control Panel
3. Description
The manufacturer of the processor chip has
announced the end-of-life of this component,
and as a result, the manufacturer of the
IS215UCVFH# (UCVF), IS215UCVEH# (UCVE),
IS215UCVDH# (UCVD), and IS215UCVBH#
(UCVB) controller cards has announced the
end-of-life of these controllers. There is no
opportunity for a last time buy.
Page 1/6
SERVICE BULLETIN
NIC 08.21 Rev. 01
August 13, 2008
5. Modification
In the event of a controller failure, the
customer will be required to substitute with
IS215UCVGH1A (UCVG) cards in all controllers
in the system.
Under normal conditions, failure of a controller
requires the replacement of a single controller
card in the affected rack and takes about one
(1) hour. However, in the event of a failure
involving one of these end-of-life cards, all the
controllers in the system must be replaced as
a set since the UCVG controller is not
compatible with the older UCVF, UCVE, UCVD,
or UCVB controllers. A TMR system contains
three controller cards, while a simplex system
has one.
Page 2/6
SERVICE BULLETIN
NIC 08.21 Rev. 01
August 13, 2008
6. Recommendations
Customers should prepare to upgrade for
UCVG controllers at their earliest convenience.
This preparation must be done while the
turbine is off line. It requires about two (2)
hours and will avoid additional delays in a
future controller card replacement. The
preparation activities include changing the
M6B configuration file (as per GE drawing
336A7119BM). Please contact us as paragraph
9 to obtain the procedure.
7. Planning Information
a) Compliance
Compliance Category: (R)
Compliance level: (F)
Timing Code: (6)
b) Manpower
Only controller card substitution: 1 System Engineer for 1 hour
Please note that the Mark VI control will need
to be shut down to implement this change
and that the anticipated time for software
upgrade alone is approximately 2 hours per
unit.
c) Materials
The obsolete and replacement controller cards
are listed in Table 1.
Old GE Part
Number
IS215UCVEH2A
IS215UCVDH2AA
IS215UCVB
IS215UCVFH2A
Old NP Part
Number
RQO1400025
RQO1400134
N.A.
RQO1400174
New GE Part
Number
New NP Part
Number
IS215UCVGH1A
IRQ140000233
Page 3/6
SERVICE BULLETIN
NIC 08.21 Rev. 01
August 13, 2008
e) References
Not Applicable
f)
Modification Experience
8. Implementation Instructions
Not Applicable
9. Contacts
For units under warranty or covered under a
Contractual Service Agreement (CSA) please
refer to your GE Oil & Gas Project Manager.
For technical questions or application and
commercial requests please contact:
GE Oil & Gas
Customer Service Center
Via Felice Matteucci, 2
50127 Florence, Italy
e-Mail: customer.service.center@ge.com
Web: www.geoilandgas.com/online_tools/og_csc.htm
Phone: +39 055 427 2500
Fax: +39 055 423 2800
Please specify the Unit Serial Number and
Service Bulletin associated with the request
and whether the request is technical or
commercial.
To directly access and download GE Oil & Gas
Service Bulletins published on your fleet or to
subscribe to Service Bulletins e-mail
Page 4/6
SERVICE BULLETIN
NIC 08.21 Rev. 01
August 13, 2008
Page 5/6
SERVICE BULLETIN
NIC 08.21 Rev. 01
August 13, 2008
Compliance Level
The compliance level column indicates the GE
Oil
&
Gas
recommendation
for
implementation of the Service Bulletin. The
compliance levels are as follows:
F FIELD - Service Bulletins must be
implemented by trained on-site maintenance
personnel or a GE Oil & Gas Service
Representative. (These Service Bulletins may
also be implemented in a service shop.)
F/D FIELD/DEPOT - This combination of codes
indicates that action may be required both in
the field (F) and in a service shop (D). An
example would be an external modification to
an accessory that can only be performed
during an overhaul. The accessory may be
replaced with a modified component by onsite maintenance personnel. The removed
component would then be shipped to the
service shop for modification.
D DEPOT - Work must be performed by a
qualified service shop.
Timing Codes
The timing code column indicates the GE Oil &
Gas recommendation for when to implement
the Service Bulletin. The timing codes are
listed below:
1 Prior to start-up/engine operation
2 At the first opportunity (the next periodic
inspection or shutdown at the latest)
3 At the first opportunity (prior to the
component life limit)
4 At the first exposure of the module
5 At component part exposure
6 At component part repair or replacement
7 Optional
8 At the next depot visit
Revisions
This symbol shows where the
document has been revised (n
n
indicates the revision index history).
Page 6/6