Вы находитесь на странице: 1из 6
Exam 20-Jan-2014 Civil 4) Good Timer used for Construction the moisture content. Ans—10—» 12% 2) The Delay Time for a Series of activities that would not effec i occured the Project timing Caled + Total Slack + Total Slag + Creal Float + Float Pad + Critical Sieg ‘ans Total Siack 2) Whats the Maximum Value of PH 4 + Less Than 1 + More Than 4 + Zero Ans 4) ASHGAL Responsible fr. + Publ Werk + Public Housings + High Population area + Non of the above ‘Ans ~ Public Work Exam 20-Jan-2014 Civil 5) 1) Concrete Pouring 2) Shutter Stiplings 3) Shutter Erection 4) Curing Use the Correct Sequence Ans 31-42 '8) How many layers required for Slumb Test, + ALayers + 2layers + Slayers «A Layers Ans —8 Layers 1) The SPT-N Value of dense Sand + 020 + 2040 + Large of 50 + 100 ‘Ans = 20-40 Exam 20-Jan-2014 Civil 8) Slab Test for Concrete is carried out to determine. Strength Durability Workabity Water Content ‘Ans — Workabilty 8) For Isolated Foundation area of Foundation as per Calculation Required to be 2.2m? and the Colum Dimension is 0.25x0.8 what isthe best Foundation Size 41.Senxt.5m ‘mmx2.25 m 1.25m1.8m Non of the above ‘Ans = 1.28emx.m 10) Separation of water or water sand cement from freshly concrete is known, Bleeding Creeping Segregation Flooding ‘Ans - Bleeding Exam 20-Jan-2014 Civil 1). P aM Calculate the Deflection at Point A No Reply +12) What does QCS Mean? ‘Ans- Qatar Construction Specification +13)Management definition include all except a) Speed b) Progess ©) Qualty 4) Repeating ‘Ans = Repeating '4)Car Speed 60 mile thr and f=2 and Road Radius= Calculate the Super elevation from which equation Exam 20-Jan-2014 Civil 18)AS Built Drawing Submitted For. + Construction ‘+ Additional Work ' Record and Maintenance [Ans ~ Record and Maintexance 16)Maximum Backing Height at Champers and Pas per QCS. +300 mm + 00mm + 250mm + 150mm ‘Ans ~300 mm 17) Interdisciptinary nature of Engineering Projects 4) All Engineers Should be Experienced forall activities Regardless the Disciptine »b) All Engineer Should work and Cooperate Together and Solve allthe Engineering Issues, ° % Ans-B Exam 20-Jan-2014 Civil ‘t)To extract Good samp of Rock + Single tube Parallel + double tube Parale! ‘+ Teadtonal Spit space ‘Ans — Double Tube Parallel 4 The Summation of Internal Anges 6 side Polygon 4. 380 2, 840 3. 720 4. Non ofthe above ‘Ans ~1 Goose 720

Вам также может понравиться