OVERALL PROCESS FOR PROCUREMENT OF GOODS & SERVICES

PROCUREMENT PLANNING

PREPARATION OF DOCUMENTS

Project Procurement
Management Plan (PPMP)

Invitation to Bid (IB)

Annual Procurement Plan (APP)

Instruction to Bidders (ITB)

Approved Budget for the


Contract (ABC)

Bid Data Sheet (BDS)


General Conditions of Contract
(GCC)
Special Conditions of Contract
(SCC)
Schedule of Requirements
Technical Specifications
Bill of Quantities (BOQ)
Bidding Forms (BF)

GOODS & SERVICES

CONDUCT OF PREPROCUREMENT

Pre-Bidding Activity
Pre-Procurement Conference

ACTIVITES IN THE PREPARATION OF


PROJECT PROCUREMENT MANAGEMENT PLAN AND
PROCUREMENT PLAN

Activity

Responsible
Performer

Prepare Indicative Itemized List of


Goods & Summarize

Respective Sections

Prepare Indicative PPMP

Implementing Unit

Submit Indicative PPMP to Budget


Officer

Implementing Unit

Submit to District Engineer for


Approval

Implementing Unit

Consolidate Indicative PPMP into


APP

Approve Indicative APP

BAC with BAC


Secretariat

DE

Submit to Regional Office for


Regional Consolidation

BAC Secretariat/
Records Unit

Submit to Procurement Service and


GPPB

BAC Secretariat/
Records Unit

INDICATI
ANNUA

INDICATIVE
ANNUAL

T PLAN

Rules

DO 161 s. 2016

Deadline, August 1

July 1

For evaluation & ensure consistency with


the budget

For recommendation of procurement


modality

August 1

Deadline, September 15

August 31

Deadline, September 30

ACTIVITES IN THE PREPARATION OF


PROJECT PROCUREMENT MANAGEMENT PLAN AND
PROCUREMENT PLAN

Activity

Responsible
Performer

Prepare Revised Itemized List of


Goods & Summarize

Respective Sections

Prepare Revised PPMP

Implementing Unit

Submit Revised PPMP to Budget


Officer

Implementing Unit

Submit to District Engineer for


Approval

Implementing Unit

Consolidate Indicative PPMP into


APP

Approve Indicative APP

BAC with BAC


Secretariat

DE

Submit to Regional Office for


Regional Consolidation

BAC Secretariat/
Records Unit

Submit to Procurement Service and


GPPB

BAC Secretariat/
Records Unit

REVISE
ANNUA

REVISED
ANNUAL

T PLAN

Rules

DO 161 s. 2016

Deadline, December 1

For evaluation & ensure consistency with


the budget

For recommendation of procurement


modality

December 31

Deadline, January 15

January 1

Deadline, January 15

ACTIVITES IN THE PREPARATION OF


PROJECT PROCUREMENT MANAGEMENT PLAN AND
PROCUREMENT PLAN

Activity

Responsible
Performer

Prepare Updated Itemized List of


Goods & Summarize

Respective Sections

Prepare Updated PPMP

Implementing Unit

Submit Updated PPMP to Budget


Officer

Implementing Unit

Submit to District Engineer for


Approval

Implementing Unit

Consolidate Updated PPMP into APP

Approve Updated APP

BAC with BAC


Secretariat

DE

Submit to Regional Office for


Regional Consolidation

BAC Secretariat/
Records Unit

Submit to Procurement Service and


GPPB

BAC Secretariat/
Records Unit

UPDATE
ANNUA

UPDATED
ANNUAL

T PLAN

Rules

Submit every 5th of March, June &


September

For evaluation & ensure consistency with


the budget

For recommendation of procurement


modality

Submit every 5th of March, June &


September
Submit every 5th of March, June &
September

ACTIVITES IN THE PREPARATION OF ANNUAL PROCUREMENT PLAN FOR COMMON SUPPLIES &
EQUIPMENT

Activity

Responsible
Performer

Acquire the APP Form from PS

Respective Sections

Extract from Indicative PPMP items


that can be procured from PS

Implementing Unit

Submit APP Form to Supply Officer

Implementing Unit

Consolidate APP of all Sections

Approve APP

Submit to DBM

Supply Officer

DE

Supply Officer/
Records Unit

CUREMENT PLAN FOR COMMON SUPPLIES &


NT

Rules

Deadline, September 30

Deadline, October 15

ACTIVITES IN THE PROCUREMENT OF COMMON SUPPLIES & EQUIPMENT @PS-DBM

Activity

Responsible
Performer

Acquire the APP Form from PS

Respective Sections

Extract from Indicative PPMP items


that can be procured from PS

Implementing Unit

Submit APP Form to Supply Officer

Implementing Unit

Consolidate APP of all Sections

Approve APP

Submit to DBM

Supply Officer

DE

Supply Officer/
Records Unit

ON SUPPLIES & EQUIPMENT @PS-DBM

Rules

Deadline, September 30

Deadline, October 15

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS & HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Bukidnon 1st District Engineering Office
Malaybalay City
Procurement Unit
Procurement of Goods - Non-Infra Supplies & Equipment
Public Bidding
3.0

Procedure
Activity Flow Chart

Start

Is it for Public
Bidding?

Alternative Mode of
Procurement
No

Yes
Prepare Bidding Documents

Advertise in DPWH Web,


PhilGEPS & Bulletin

End
4.0

5.0

References
IRR of RA 9184
Department Order
Office Order
Latest GPPB Issuance
Request for Quotation
Records
BAC Resolutions
Brochures of Specifications of goods and equipment
Record Book

Prepared By:

LALENE G. FERNANDE
Head, BAC Secretariat
###

OCTAVIUS CESAR E. AZURA


Assistant District Engineer
March 01, 2016

Issue Date:
Doc. Code:
Revision No.:

Page No.:

Interfaces

Remarks

3/1/2015
PU-GPB-PF
0

1 of 3

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS & HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Bukidnon 1st District Engineering Office
Malaybalay City

Issue Date:
Doc. Code:
Revision No.:

Procurement Unit
Procurement of Goods (AMP)

3.0

Page No.:

Procedure
Activity Flow Chart

Interfaces

Start

Check PPMP/APP

Receive PR & RFQ with PPMP

IU

IU

1
2

BAC Sec

4
5
6

Certify Inclusion in PPMP

Identify Type of AMP

BAC Sec

BAC Sec
1
2
3

Assign APR & RFQ Number

Advertise

BAC Sec

Is it a an
Open or Closed
Quotation?

Open Canvass
No

Yes

BAC Sec

Drop & Open Bid Proposals

1
2
3

Evaluate Bid

BAC TWG

BAC TWG

Post Qualify

Is the supplier
post-qualified?

Evaluate the next


ranking supplier

No
Yes

Prepare Resolution to Award

Issue Award Notice

Prepare & Approve Purchase


Order

Transmit to COA

Furnish copies to IU & SU

End

BAC Sec

1. Must be rec

BAC Sec

SU
IU

1. Must be sub

1
2

End

Issue Date:
Doc. Code:
Revision No.:

3/1/2015
PU-GAMP-PF
0

Page No.:

1 of 3

Remarks

Purchase Request (PR),


with ABC amount must be
accompanied with
Approved request from
Central Office for IT
Pre-Inspection Report &
History of Repair for
Spare Parts
Stock Position Sheet for
items above Php1000
APR asessed by PS-DBM
Check & certify items
requested in the PPMP
Certify
Check & certify items
requested in the PPMP

Reminders
Shopping - below 50k,
CSE not in PS
NP SVP - 50k to 500
Direct Contracting Sole Distributorship

7 days

For Php50,000 & below,


open canvass (Shopping)

Late bids will not be


accepted
Record in Logbook
Record Minutes
Declare LCB

Declare LCRB

not practised, included


Abstract

not practised, included


Abstract

Approved PP
1. Must be received by the
Supplier

1. Must be submitted to COA

Photocopy for delivery


Original copy, for payment

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS & HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Bukidnon 1st District Engineering Office
Malaybalay City

Issue Date:
Doc. Code:
Revision No.:

Procurement Unit
Procurement of Goods (Alternative Method of Procurement)

3.0

Page No.:

Procedure
Activity Flow Chart

Interfaces

Start

IU

Check PPMP/APP

IU

Receive APR with PPMP

BAC Sec

Assign APR Number

BAC Sec

Submit APR to PS-DBM for


Assessment

Photocopy Assessed APR from


PS-DBM

Prepare another PR
for Shopping*

IU

Prepare New APR with PR for


PS & PR for Shopping*

Certify Inclusion in PPMP

Recheck APR Number

BAC Sec

BAC Sec

Prepare & Approve Purchase


Order

Transmit to COA

Furnish copies to IU & SU

End

BAC Sec

SU
IU

1
2

Issue Date:
Doc. Code:
Revision No.:

3/1/2015
PU-GAMP-PF
0

Page No.:

1 of 3

Remarks

to assure all CSE


passed thru the PS

Refer to AMP
not available in PS

Check & certify items


requested in the PPMP

Must be submitted to
COA

Photocopy for delivery


Original copy, for
payment with IAR
will be signed upon
delivery of items

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS & HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Bukidnon 1st District Engineering Office
Malaybalay City

Issue Date:
Doc. Code:
Revision No.:

Procurement Unit
Reimbursement effective April 2016

3.0

Page No.:

Procedure
Activity Flow Chart

Interfaces

Start
B
B
End User

Check APP

BAC Goods
End User

Issue Request to Procure


Charge to Reimbursement

1
2
3
4

Prepare RFQ if above P1,000


for canvass

Receive PR & RFQ (if


applicable) with Inspected
Official Receipt/Invoice

Purchase

BAC Goods
End User

1
2

Certify Inclusion in PPMP

Assign PR Number

Return Documents to End User

End

BAC Sec

BAC Sec

BAC Sec

End

End User

1
2

Issue Date:
Doc. Code:
Revision No.:

3/1/2015
PU-GRe-PF
0

Page No.:

1 of 1

Remarks

Issue Form
Submit Form to DE for approval
Check if goods are included
in the PPMP
Prepare RFQ for P1,000
above goods
Refer to in-charge for
specialized equipment

Receive PR & Invoice


Group Invoice for a
1 week purchase &
reflect the date on the
earliest purchase
Attach applicable documents
Related Memo or any
supporting document
For vehicles, related
documents (D0 123 S 2015)
Check & certify items
requested in the PPMP

Assign Number & record

Transmit & record

Prepare payment, with at


least P2,000/voucher
Claim reimbursement
within 3 months otherwise
claim is nullified
IAR for grouped invoice
must be dated on the
latest claim

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS & HIGHWAYS
BUKIDNON
1st District Engineering Office
Malaybalay City
PROJECT PROCUREMENT MANAGEMENT PLAN (PPMP)
1.0

2.0

3.0

Purpose
To ensure transparency and complying timelines in the procurement process.
Definition of Terms
ABC
Approved Budget Cost
BAC
Bids and Awards Committee
BAC SecBAC Secretariat that serves as an administrative support unit of the BAC
DBM
Department of Budget & Management
DE
District Engineer
GPPB-TSGovernmentProcurement Policy Board Technical Support Services
IRR
Implementing Rules and Regulations
IU
Implementing Unit
MOA
Memorandum of Understanding
MOU
Memorandum of Agreement
PDS
Planning & Design Section
PPMP Project Procurement Management Plan
Procure refers to the acquisition of Goods, Consulting Services, and the contracting for
infrastructure projects by the Procuring Entity
PrS
Procurement Service of DPWH
RA 9184known as "Government Procurement Reform Act"
TWG
Technical Working Group
Procedure
Activity Flow Chart

Interfaces

Start

Prepare PPMP

Respective
Sections

Submit to Budget Office

Respective
Sections

Submit to BAC Secretariat

Submit to BAC

Submit to DE

BAC Sec

BAC

DE

Submit to DE

DE

End

4.0

References
IRR of RA 9184
Department Order
Office Order
Latest GPPB Issuance

5.0

Records
BAC Resolutions
Record Book

Prepared By:

LALENE G. FE
Head, BAC Secretariat
###

OCTAVIUS CESAR E. AZURA


Assistant District Engineer
March 01, 2016

VIRGINIA G. BATOCAIL
District Engineer
March 01, 2016

Issue Date:
Doc. Code:
Revision No.:

3/1/2015
PU-APP-PF
0

Page No.:

1 of 1

Remarks

DO 161 s. 2016

DO 161 s. 2016
for evaluation & ensure consistency with the budget

DO 161 s. 2016
for consolidation

DO 161 s. 2016
for recommendation of procurement modality

DO 161 s. 2016
for approval

DO 161 s. 2016
for approval

2 Forward to PrS (DPWH)


3 Keep file

August 1 deadline, DO 161 s. 2016

INIA G. BATOCAIL
ct Engineer
h 01, 2016

GPPB Circular 7 of 2015

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS & HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Bukidnon 1st District Engineering Office
Malaybalay City

Issue Date:
Doc. Code:
Revision No.:

Page No.:
Annual Procurement Plan (APP -Indicative)

3.0

Procedure
Activity Flow Chart

Interfaces

Start

Receive Approved Indicative


PPMPs

Submit to Budget Office

Consolidate PPMPs

Prepare Indicative APP

Submit to BAC

Submit to DE

Transmit & Record

File

End

PDS

PDS

BAC Sec

BAC Sec

BAC

DE

BAC Sec

BAC Sec

Issue Date:
Doc. Code:
Revision No.:

3/1/2015
PU-APP-PF
0

Page No.:

1 of 1

Remarks

DO 161 s. 2016

DO 161 s. 2016
for evaluation & ensure consistency with the budget

DO 161 s. 2016

DO 161 s. 2016
Deadline every 1st of August
Prepare every 6 months or as often as needed
DO 161 s. 2016
for recommendation of procurement modality

DO 161 s. 2016
for approval

DO 161 s. 2016
Deadline every 30th of September
Forward to PrS (DPWH)

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS & HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Bukidnon 1st District Engineering Office
Malaybalay City
Annual Procurement Plan (APP-Revised)

3.0

Procedure
Activity Flow Chart

Interfaces

Start

Receive Approved Revised


PPMPs

Consolidate Revised PPMPs

Prepare Revised APP

Submit to BAC

Submit to DE

Transmit & Record

Transmit & Record

End

4.0

References
IRR of RA 9184
Department Order
Office Order
Latest GPPB Issuance

5.0

Records

Construction

BAC Sec

BAC Sec

BAC

DE

BAC Sec

BAC Sec

BAC Resolutions
Record Book
Prepared By:

LALENE G. FE
Head, BAC Secretariat
###

OCTAVIUS CESAR E. AZURA


Assistant District Engineer
March 01, 2016

VIRGINIA G. BATOCAIL
District Engineer
March 01, 2016

Issue Date:
Doc. Code:
Revision No.:

3/1/2015
PU-APP-PF
0

Page No.:

1 of 1

Remarks

1 Prepare as often as needed


Deadline every 15th of January
Prepare every 6 months or as often as needed

AO 46 of 2015

DO 161 s. 2016
for finalization of procurement modality

DO 161 s. 2016
for approval

DO 161 s. 2016
Deadline every 30th of September

1 Forward to GPPB-TSO e-copy


as often as needed
2 Forward to PrS (DPWH)
3 Keep file

AO 17 of 2012
DBM Circular Letter 2013-14
GPPB Circular 7 of 2015

INIA G. BATOCAIL
ct Engineer
h 01, 2016

1 Submit approved copy


2 Update as often as needed
3 Submit with the following
ABC
Plan
MOA or MOU if applicable
4 Transmit with details
needed for Advertisement
Name of Project
Location
Calendar Days
Profile
Equipment Requirement
Source of Fund
Quantities
Personnel Requirement
5 Refers with BAC for the

RA 9184 Section 7.3.2


RA 9184 Section 7.4
(unanimously decided)

GAA 2016 & MOA with DA?


make a form!
Furnish copy PPMP the IU

how often?

how often?

...prepared
by IU
furnish copy
IU
refers to
BAC for
Contract ID
No.

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS & HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Bukidnon 1st District Engineering Office
Malaybalay City

Issue Date:
Doc. Code:
Revision No.:

Page No.:
CONTRACT REVIEW
3.0

Procedure
Activity Flow Chart

Interfaces

Start

Receive Contract Review from


COA

Records

Are
there any
findings?
No
Yes

Act on the Findings

Transmit back to COA

File

End

BAC

BAC Sec

BAC Sec

Issue Date:
Doc. Code:
Revision No.:

3/1/2015
PU-APP-PF
0

Page No.:

1 of 1

Remarks

FUNCT

BA

Lalene
PUBLIC BIDDING
1 Advertise
Preparation of Bid Docs
Posting in Web, Lalene
2 Post Bid Bulletin
Posting in Web, Lalene
3 Process Eligibility in CWR
4 Consolidate Contract Documents
5 Post Awards in CWR

Julie
PUBLIC BIDDING
1 Prepare APP (Infra & Goods)
2 Advertise
Posting in PhilGEPS*
Posting in Newspaper
3 Post Bid Bulletin
Posting in PhilGEPS
4 Prepare Eligibility Notice
5 Prepare Contract Documents **
Notice of Post Qualification
Notice of Award
Notice of Bidding Results
Contract
Notice to Proceed
6 Follow-up for Signatures (Infra)
7 Photocopy
8 Scan for E-copy
9 Post Awards in PhilGEPS*
10 Segregate with tabbing
11 Prepare COA Transmittal

* for Goods, shall be transferred to


Danilo & Judylyn

PU
1
2
3
4

**

Lalene
Alternative Mode of Procurement
6 Receive PR/APR & RFQ
7 Assign PR#
8 Schedule Bidding
9 Assign dates of PO

Judylyn to learn (no computer)

Julie
Alternative Mode of Procurement
11 Advertise
Posting in Web
Posting in PhilGEPS
12 Post Awards in PhilGEPS

Alternativ
5
6
7

FUNCT

BAC

Kareen
PUBLIC BIDDING
1 Prepare Project Profile
2 Prepare Abstract As Read
3 Evaluate Bid as to Amount
4 Prepare Abstract As Calculated
5 Prepare Bid Evaluation Report
6 Prepare Post Qualification Report
7 Verifiy from other Offices of the f
Track Record
Personnel
Equipment
8 Check the f
Construction Safety & Health
Construction Schedule
Construction Method
Man Power Schedule
Equipment Utilzation
Pert CPM
9 Prepare Awarded Contract Report
10 Consolidate
Must follow-up until COA transmittal

Cathy
PUBLIC BIDDING
1 Prepare Abstract As Read
2 Evaluate Bid as to Amount
3 Prepare Abstract As Calculated
4 Prepare Bid Evaluation Report
5 Prepare Post Qualification Report
6 Verifiy from other Offices of the f
Track Record
Personnel
Equipment
7 Check the f
Construction Safety & Health
Construction Schedule
Construction Method
Man Power Schedule
Equipment Utilzation
Pert CPM
8 Prepare Awarded Contract Report

Must follow-up until COA transmittal

PU
1
2
3
4
5
6

Kareen
AMP

Cathy
AMP
1 Evaluate Bid as to Amount

1 Consolidate
Must follow-up until COA transmittal

Must follow-up until COA transmittal

FUNCT

Camilo

Adelina

PUBLIC BIDDING
AMP

PUBLIC BIDDING
AMP

1 Act as Presiding Officer during the


bidding
2 Coordinate with the BAC Secretariat
as to the completion of the
3 Bid Documents for issuance of NOA
4 Check & Sign Invitation to Bid &
5 Abstract of Bids before DE's approval

1 Act in the absence of the Chairman

PU

FUNCTIONAL CHART
BAC Secretariat

Sarah
PUBLIC BIDDING
Prepare Notices for Pre-procurement
Conference & Minutes
Prepare Notices for Pre-Bid & Opening
& Minutes
Prepare Resolution for Bid Bulletin
Prepare Notices for Postponement

Doreen
PUBLIC BIDDING
1 Prepare Notices for Bid Evaluation &
Post Qua-Evaluation & Minutes
2 Prepare Resolution for Award
3 Prepare Reports
Bidding Results
Violations
4 Respond to Verification of Track
Record, Personnel & Equipment
Requirement from other Districts

Ju

PUBLI
1
2
3
4
5
6

PUBLI
1
2

Sarah
Alternative Mode of Procurement
Make Resolution for AMP
Prepare Notices for Opening & Minutes
Prepare Notices for Postponement

Danilo

Ju

Alternative Mode of Procurement


1 Prepare APP (Goods) & Update
2 Canvass including PS
3 Facilitate Bidding
4 Prepare Contract Documents
for Shopping & PS (50k & below)
5 Scan E-copy
6 Follow-up for Signatures
7 Photocopy

Ann
AMP
1 Check presenceof items in PPMP/APP
2 PreparE of Contract Documents
for Fuel & Reimbursements
3 Scan for E-copy
4 Follow-up for Signatures
5 Photocopy

Alternative Mo
7
8

9
10
11

FUNCTIONAL CHART
BAC TWG & SAC

Raul
PUBLIC BIDDING
Prepare Abstract As Read
Evaluate Bid as to Amount
Prepare Abstract As Calculated
Prepare Bid Evaluation Report
Prepare Post Qualification Report
Verifiy from other Offices of the f
Track Record
Personnel
Equipment
Check the f
Construction Safety & Health
Construction Schedule
Construction Method
Man Power Schedule
Equipment Utilzation
Pert CPM
Prepare Awarded Contract Report

Must follow-up until COA transmittal

Meryll
PUBLIC BIDDING
1 Prepare Abstract As Read
2 Evaluate Bid as to Amount
3 Prepare Abstract As Calculated
4 Prepare Bid Evaluation Report
5 Prepare Post Qualification Report
6 Verifiy from other Offices of the f
Track Record
Personnel
Equipment
7 Check the f
Construction Safety & Health
Construction Schedule
Construction Method
Man Power Schedule
Equipment Utilzation
Pert CPM
8 Prepare Awarded Contract Report

Must follow-up until COA transmittal

PUBLI

Raul
AMP
Evaluate Bid as to Amount

Must follow-up until COA transmittal

Meryll
AMP
1 Evaluate Bid as to Amount

Must follow-up until COA transmittal

FUNCTIONAL CHART
BAC

Linda

Ramon

PUBLIC BIDDING
AMP

PUBLIC BIDDING
AMP

Review all documents prior affixing


signature

1 Review all documents prior affixing


signature

PUBLI

Judylyn
PUBLIC BIDDING
Prepare Order of Payment
Follow-up for Signatures (Goods)
Photocopy
Scan for E-copy
Segregate with tabbing
Prepare COA Transmittal

Danilo
PUBLIC BIDDING
Preparation of Bidding Area
Prepare LCD & Screen

Judylyn
Alternative Mode of Procurement
Prepare Order of Payment
Prepare Contract Documents
for Small Value Procurement
(50k above to 500k)
Scan for E-copy
Follow-up for Signatures
Photocopy

LM
PUBLIC BIDDING
Check Performance Security,
CARI, with IC's as to:
Amount
Efectivity

Must follow-up until COA transmittal

LM
AMP

Jerry
PUBLIC BIDDING
AMP
Review all Construction documents
prior affixing signature