PROCUREMENT PLANNING
PREPARATION OF DOCUMENTS
Project Procurement
Management Plan (PPMP)
CONDUCT OF PREPROCUREMENT
Pre-Bidding Activity
Pre-Procurement Conference
Activity
Responsible
Performer
Respective Sections
Implementing Unit
Implementing Unit
Implementing Unit
DE
BAC Secretariat/
Records Unit
BAC Secretariat/
Records Unit
INDICATI
ANNUA
INDICATIVE
ANNUAL
T PLAN
Rules
DO 161 s. 2016
Deadline, August 1
July 1
August 1
Deadline, September 15
August 31
Deadline, September 30
Activity
Responsible
Performer
Respective Sections
Implementing Unit
Implementing Unit
Implementing Unit
DE
BAC Secretariat/
Records Unit
BAC Secretariat/
Records Unit
REVISE
ANNUA
REVISED
ANNUAL
T PLAN
Rules
DO 161 s. 2016
Deadline, December 1
December 31
Deadline, January 15
January 1
Deadline, January 15
Activity
Responsible
Performer
Respective Sections
Implementing Unit
Implementing Unit
Implementing Unit
DE
BAC Secretariat/
Records Unit
BAC Secretariat/
Records Unit
UPDATE
ANNUA
UPDATED
ANNUAL
T PLAN
Rules
ACTIVITES IN THE PREPARATION OF ANNUAL PROCUREMENT PLAN FOR COMMON SUPPLIES &
EQUIPMENT
Activity
Responsible
Performer
Respective Sections
Implementing Unit
Implementing Unit
Approve APP
Submit to DBM
Supply Officer
DE
Supply Officer/
Records Unit
Rules
Deadline, September 30
Deadline, October 15
Activity
Responsible
Performer
Respective Sections
Implementing Unit
Implementing Unit
Approve APP
Submit to DBM
Supply Officer
DE
Supply Officer/
Records Unit
Rules
Deadline, September 30
Deadline, October 15
Procedure
Activity Flow Chart
Start
Is it for Public
Bidding?
Alternative Mode of
Procurement
No
Yes
Prepare Bidding Documents
End
4.0
5.0
References
IRR of RA 9184
Department Order
Office Order
Latest GPPB Issuance
Request for Quotation
Records
BAC Resolutions
Brochures of Specifications of goods and equipment
Record Book
Prepared By:
LALENE G. FERNANDE
Head, BAC Secretariat
###
Issue Date:
Doc. Code:
Revision No.:
Page No.:
Interfaces
Remarks
3/1/2015
PU-GPB-PF
0
1 of 3
Issue Date:
Doc. Code:
Revision No.:
Procurement Unit
Procurement of Goods (AMP)
3.0
Page No.:
Procedure
Activity Flow Chart
Interfaces
Start
Check PPMP/APP
IU
IU
1
2
BAC Sec
4
5
6
BAC Sec
BAC Sec
1
2
3
Advertise
BAC Sec
Is it a an
Open or Closed
Quotation?
Open Canvass
No
Yes
BAC Sec
1
2
3
Evaluate Bid
BAC TWG
BAC TWG
Post Qualify
Is the supplier
post-qualified?
No
Yes
Transmit to COA
End
BAC Sec
1. Must be rec
BAC Sec
SU
IU
1. Must be sub
1
2
End
Issue Date:
Doc. Code:
Revision No.:
3/1/2015
PU-GAMP-PF
0
Page No.:
1 of 3
Remarks
Reminders
Shopping - below 50k,
CSE not in PS
NP SVP - 50k to 500
Direct Contracting Sole Distributorship
7 days
Declare LCRB
Approved PP
1. Must be received by the
Supplier
Issue Date:
Doc. Code:
Revision No.:
Procurement Unit
Procurement of Goods (Alternative Method of Procurement)
3.0
Page No.:
Procedure
Activity Flow Chart
Interfaces
Start
IU
Check PPMP/APP
IU
BAC Sec
BAC Sec
Prepare another PR
for Shopping*
IU
BAC Sec
BAC Sec
Transmit to COA
End
BAC Sec
SU
IU
1
2
Issue Date:
Doc. Code:
Revision No.:
3/1/2015
PU-GAMP-PF
0
Page No.:
1 of 3
Remarks
Refer to AMP
not available in PS
Must be submitted to
COA
Issue Date:
Doc. Code:
Revision No.:
Procurement Unit
Reimbursement effective April 2016
3.0
Page No.:
Procedure
Activity Flow Chart
Interfaces
Start
B
B
End User
Check APP
BAC Goods
End User
1
2
3
4
Purchase
BAC Goods
End User
1
2
Assign PR Number
End
BAC Sec
BAC Sec
BAC Sec
End
End User
1
2
Issue Date:
Doc. Code:
Revision No.:
3/1/2015
PU-GRe-PF
0
Page No.:
1 of 1
Remarks
Issue Form
Submit Form to DE for approval
Check if goods are included
in the PPMP
Prepare RFQ for P1,000
above goods
Refer to in-charge for
specialized equipment
2.0
3.0
Purpose
To ensure transparency and complying timelines in the procurement process.
Definition of Terms
ABC
Approved Budget Cost
BAC
Bids and Awards Committee
BAC SecBAC Secretariat that serves as an administrative support unit of the BAC
DBM
Department of Budget & Management
DE
District Engineer
GPPB-TSGovernmentProcurement Policy Board Technical Support Services
IRR
Implementing Rules and Regulations
IU
Implementing Unit
MOA
Memorandum of Understanding
MOU
Memorandum of Agreement
PDS
Planning & Design Section
PPMP Project Procurement Management Plan
Procure refers to the acquisition of Goods, Consulting Services, and the contracting for
infrastructure projects by the Procuring Entity
PrS
Procurement Service of DPWH
RA 9184known as "Government Procurement Reform Act"
TWG
Technical Working Group
Procedure
Activity Flow Chart
Interfaces
Start
Prepare PPMP
Respective
Sections
Respective
Sections
Submit to BAC
Submit to DE
BAC Sec
BAC
DE
Submit to DE
DE
End
4.0
References
IRR of RA 9184
Department Order
Office Order
Latest GPPB Issuance
5.0
Records
BAC Resolutions
Record Book
Prepared By:
LALENE G. FE
Head, BAC Secretariat
###
VIRGINIA G. BATOCAIL
District Engineer
March 01, 2016
Issue Date:
Doc. Code:
Revision No.:
3/1/2015
PU-APP-PF
0
Page No.:
1 of 1
Remarks
DO 161 s. 2016
DO 161 s. 2016
for evaluation & ensure consistency with the budget
DO 161 s. 2016
for consolidation
DO 161 s. 2016
for recommendation of procurement modality
DO 161 s. 2016
for approval
DO 161 s. 2016
for approval
INIA G. BATOCAIL
ct Engineer
h 01, 2016
Issue Date:
Doc. Code:
Revision No.:
Page No.:
Annual Procurement Plan (APP -Indicative)
3.0
Procedure
Activity Flow Chart
Interfaces
Start
Consolidate PPMPs
Submit to BAC
Submit to DE
File
End
PDS
PDS
BAC Sec
BAC Sec
BAC
DE
BAC Sec
BAC Sec
Issue Date:
Doc. Code:
Revision No.:
3/1/2015
PU-APP-PF
0
Page No.:
1 of 1
Remarks
DO 161 s. 2016
DO 161 s. 2016
for evaluation & ensure consistency with the budget
DO 161 s. 2016
DO 161 s. 2016
Deadline every 1st of August
Prepare every 6 months or as often as needed
DO 161 s. 2016
for recommendation of procurement modality
DO 161 s. 2016
for approval
DO 161 s. 2016
Deadline every 30th of September
Forward to PrS (DPWH)
3.0
Procedure
Activity Flow Chart
Interfaces
Start
Submit to BAC
Submit to DE
End
4.0
References
IRR of RA 9184
Department Order
Office Order
Latest GPPB Issuance
5.0
Records
Construction
BAC Sec
BAC Sec
BAC
DE
BAC Sec
BAC Sec
BAC Resolutions
Record Book
Prepared By:
LALENE G. FE
Head, BAC Secretariat
###
VIRGINIA G. BATOCAIL
District Engineer
March 01, 2016
Issue Date:
Doc. Code:
Revision No.:
3/1/2015
PU-APP-PF
0
Page No.:
1 of 1
Remarks
AO 46 of 2015
DO 161 s. 2016
for finalization of procurement modality
DO 161 s. 2016
for approval
DO 161 s. 2016
Deadline every 30th of September
AO 17 of 2012
DBM Circular Letter 2013-14
GPPB Circular 7 of 2015
INIA G. BATOCAIL
ct Engineer
h 01, 2016
how often?
how often?
...prepared
by IU
furnish copy
IU
refers to
BAC for
Contract ID
No.
Issue Date:
Doc. Code:
Revision No.:
Page No.:
CONTRACT REVIEW
3.0
Procedure
Activity Flow Chart
Interfaces
Start
Records
Are
there any
findings?
No
Yes
File
End
BAC
BAC Sec
BAC Sec
Issue Date:
Doc. Code:
Revision No.:
3/1/2015
PU-APP-PF
0
Page No.:
1 of 1
Remarks
FUNCT
BA
Lalene
PUBLIC BIDDING
1 Advertise
Preparation of Bid Docs
Posting in Web, Lalene
2 Post Bid Bulletin
Posting in Web, Lalene
3 Process Eligibility in CWR
4 Consolidate Contract Documents
5 Post Awards in CWR
Julie
PUBLIC BIDDING
1 Prepare APP (Infra & Goods)
2 Advertise
Posting in PhilGEPS*
Posting in Newspaper
3 Post Bid Bulletin
Posting in PhilGEPS
4 Prepare Eligibility Notice
5 Prepare Contract Documents **
Notice of Post Qualification
Notice of Award
Notice of Bidding Results
Contract
Notice to Proceed
6 Follow-up for Signatures (Infra)
7 Photocopy
8 Scan for E-copy
9 Post Awards in PhilGEPS*
10 Segregate with tabbing
11 Prepare COA Transmittal
PU
1
2
3
4
**
Lalene
Alternative Mode of Procurement
6 Receive PR/APR & RFQ
7 Assign PR#
8 Schedule Bidding
9 Assign dates of PO
Julie
Alternative Mode of Procurement
11 Advertise
Posting in Web
Posting in PhilGEPS
12 Post Awards in PhilGEPS
Alternativ
5
6
7
FUNCT
BAC
Kareen
PUBLIC BIDDING
1 Prepare Project Profile
2 Prepare Abstract As Read
3 Evaluate Bid as to Amount
4 Prepare Abstract As Calculated
5 Prepare Bid Evaluation Report
6 Prepare Post Qualification Report
7 Verifiy from other Offices of the f
Track Record
Personnel
Equipment
8 Check the f
Construction Safety & Health
Construction Schedule
Construction Method
Man Power Schedule
Equipment Utilzation
Pert CPM
9 Prepare Awarded Contract Report
10 Consolidate
Must follow-up until COA transmittal
Cathy
PUBLIC BIDDING
1 Prepare Abstract As Read
2 Evaluate Bid as to Amount
3 Prepare Abstract As Calculated
4 Prepare Bid Evaluation Report
5 Prepare Post Qualification Report
6 Verifiy from other Offices of the f
Track Record
Personnel
Equipment
7 Check the f
Construction Safety & Health
Construction Schedule
Construction Method
Man Power Schedule
Equipment Utilzation
Pert CPM
8 Prepare Awarded Contract Report
PU
1
2
3
4
5
6
Kareen
AMP
Cathy
AMP
1 Evaluate Bid as to Amount
1 Consolidate
Must follow-up until COA transmittal
FUNCT
Camilo
Adelina
PUBLIC BIDDING
AMP
PUBLIC BIDDING
AMP
PU
FUNCTIONAL CHART
BAC Secretariat
Sarah
PUBLIC BIDDING
Prepare Notices for Pre-procurement
Conference & Minutes
Prepare Notices for Pre-Bid & Opening
& Minutes
Prepare Resolution for Bid Bulletin
Prepare Notices for Postponement
Doreen
PUBLIC BIDDING
1 Prepare Notices for Bid Evaluation &
Post Qua-Evaluation & Minutes
2 Prepare Resolution for Award
3 Prepare Reports
Bidding Results
Violations
4 Respond to Verification of Track
Record, Personnel & Equipment
Requirement from other Districts
Ju
PUBLI
1
2
3
4
5
6
PUBLI
1
2
Sarah
Alternative Mode of Procurement
Make Resolution for AMP
Prepare Notices for Opening & Minutes
Prepare Notices for Postponement
Danilo
Ju
Ann
AMP
1 Check presenceof items in PPMP/APP
2 PreparE of Contract Documents
for Fuel & Reimbursements
3 Scan for E-copy
4 Follow-up for Signatures
5 Photocopy
Alternative Mo
7
8
9
10
11
FUNCTIONAL CHART
BAC TWG & SAC
Raul
PUBLIC BIDDING
Prepare Abstract As Read
Evaluate Bid as to Amount
Prepare Abstract As Calculated
Prepare Bid Evaluation Report
Prepare Post Qualification Report
Verifiy from other Offices of the f
Track Record
Personnel
Equipment
Check the f
Construction Safety & Health
Construction Schedule
Construction Method
Man Power Schedule
Equipment Utilzation
Pert CPM
Prepare Awarded Contract Report
Meryll
PUBLIC BIDDING
1 Prepare Abstract As Read
2 Evaluate Bid as to Amount
3 Prepare Abstract As Calculated
4 Prepare Bid Evaluation Report
5 Prepare Post Qualification Report
6 Verifiy from other Offices of the f
Track Record
Personnel
Equipment
7 Check the f
Construction Safety & Health
Construction Schedule
Construction Method
Man Power Schedule
Equipment Utilzation
Pert CPM
8 Prepare Awarded Contract Report
PUBLI
Raul
AMP
Evaluate Bid as to Amount
Meryll
AMP
1 Evaluate Bid as to Amount
FUNCTIONAL CHART
BAC
Linda
Ramon
PUBLIC BIDDING
AMP
PUBLIC BIDDING
AMP
PUBLI
Judylyn
PUBLIC BIDDING
Prepare Order of Payment
Follow-up for Signatures (Goods)
Photocopy
Scan for E-copy
Segregate with tabbing
Prepare COA Transmittal
Danilo
PUBLIC BIDDING
Preparation of Bidding Area
Prepare LCD & Screen
Judylyn
Alternative Mode of Procurement
Prepare Order of Payment
Prepare Contract Documents
for Small Value Procurement
(50k above to 500k)
Scan for E-copy
Follow-up for Signatures
Photocopy
LM
PUBLIC BIDDING
Check Performance Security,
CARI, with IC's as to:
Amount
Efectivity
LM
AMP
Jerry
PUBLIC BIDDING
AMP
Review all Construction documents
prior affixing signature