Вы находитесь на странице: 1из 4

1

Material Estimation for rennovation of Pati


Brick Works

S.No
1
2
3
4

Particulars
Danchi Appa (Bricks) 2x4x8.5
Kun Appa (Bricks)
Normal Brick 2x4x9
Jhingati roof tiles
TOTAL

Total Quantity

Wastage Quantity

4000
140
820
6000

60%
70%
80%
50%

Required Quantity

Rate / Qtt

Cement,Sand and Mud Works


S.No
1
2
3

Particulars
Cement For Laying Bricks (Bags)
Sand For laying bricks (Cuft)
Mud For laying Jhingati Roof Tiles (Cuft)
TOTAL

18
58
56

Wood Works
S.No
1

Particulars
Wooden Beam
TOTAL

Length (in Feet)

Breadth (in Feet)

8.5

0.33

2
S.No

Labour Rate Estimation for rennovation of Pati


Particulars

1
2
3
4

Brick Works ( 4" Inner Brick Wall in cement Mortar)


Brick Works (Brick face Works with Danchi Appa)
Wooden Works
Jhingati Works
TOTAL

Total Rate Estimation for rennovation of Pati

S.No
1
2

Particulars
Material Cost Estimation for rennovation of Pati
Labour Cost Estimation for rennovation of Pati
TOTAL

Unit

Total Quantity

Sqft
Sqft
Carpentors cost
Sqft

153
466
Carpentors cost
350

Required Quantity

Rate / Pcs

Total Amount

2400
98
656
3000

18
24
15
20

43200
2352
9840
60000
115392

volume of mortar = no of bricks x ((.33*.75*.04)+(.16*.75*.04))


Total Amount
= 72.91
cement : sand = 1;4
vol of cement = 14.58
vol of sand = 58.33

1 bag cement = (35.3/29) Cuft


Height (in Feet)

Nos

0.5

Volume (in Cuft) Rate / Volume Total Amount


5.61

Rate/quantity

Total Amount

Total Amount