NO.
I
URAIAN
SATUAN
VOLUME
HARGA
SATUAN (Rp.)
TOTAL
(Rp.)
PEKERJAAN PERSIAPAN
1
ls
1.00
182,044,320
182,044,320
Pengukuran
ls
1.00
39,580,000
39,580,000
ls
1.00
66,000,000
66,000,000
ls
1.00
56,750,000
56,750,000
344,375,000
II
m'
81,993.60
4,868,561
m'
81,993.60
42,093
399,190,843,210
3,451,356,605
m'
81,993.60
373,457
30,621,083,875
titik
1,971.00
1,050,938
2,071,398,798
m2
16,612.73
1,678,930
27,891,609,220
PEKERJAAN BETON
1
m3
1,700.49
5,106,980
8,684,356,375
m3
11,187.91
4,995,054
55,884,234,948
Beton Balok
m3
8,913.60
6,555,711
58,434,985,570
m3
10,428.78
6,101,584
63,632,101,594
649,861,971,000
III
m'
42,307.20
4,868,561
m'
42,307.20
42,093
205,975,183,939
1,780,836,970
m'
42,307.20
373,457
15,799,919,990
titik
1,017.00
1,050,938
1,068,803,946
m2
8,571.86
1,678,930
14,391,560,922
PEKERJAAN BETON
1
m3
877.42
5,106,980
4,480,969,271
m3
5,772.76
4,995,054
28,835,244,517
Beton Balok
m3
4,588.80
6,555,711
30,082,846,637
m3
5,347.57
6,101,584
32,628,635,348
335,044,002,000
IV
m'
120,931.20
4,868,561
588,760,924,003
m'
120,931.20
42,093
5,090,357,002
m'
120,931.20
373,457
45,162,603,158
titik
2,907.00
1,050,938
3,055,076,766
m2
24,501.88
1,678,930
41,136,939,626
PEKERJAAN BETON
1
m3
2,508.03
5,106,980
12,808,434,288
m3
16,500.90
4,995,054
82,422,867,069
Beton Balok
m3
13,694.40
6,555,711
89,776,528,718
m3
17,385.33
6,101,584
106,078,039,160
974,291,770,000
Halaman 2-1
NO.
V
URAIAN
SATUAN
VOLUME
HARGA
SATUAN (Rp.)
TOTAL
(Rp.)
PEKERJAAN DOLPHIN
m'
2,038.40
4,868,561
m'
2,038.40
42,093
9,924,074,742
85,802,371
m'
2,038.40
373,457
761,254,749
titik
49.00
1,050,938
51,495,962
m2
413.00
1,678,930
693,398,707
PEKERJAAN BETON
1
m3
42.27
5,106,980
215,897,241
m3
278.14
4,995,054
1,389,308,733
Beton Balok
m3
201.60
6,555,711
1,321,631,338
m3
195.70
6,101,584
1,194,055,582
15,636,920,000
m'
1,331.20
4,868,561
m'
1,331.20
42,093
6,481,028,403
56,034,202
Preboring
m'
448.00
969,760
434,452,480
m'
1,331.20
373,457
497,145,958
titik
32.00
1,050,938
33,630,016
m2
269.71
1,678,930
452,831,809
PEKERJAAN BETON
1
m3
27.61
5,106,980
140,994,117
m3
171.42
4,012,555
687,817,778
8,783,935,000
m'
1,497.60
2,925,578
4,381,345,613
m'
1,497.60
42,093
63,038,477
m'
1,497.60
373,457
559,289,203
titik
36.00
1,050,938
37,833,768
m2
284.39
1,678,930
477,478,558
69,847,481
PEKERJAAN BETON
1
m3
27.12
2,575,373
m3
145.07
4,373,272
634,451,575
6,223,285,000
m'
3,328.00
4,868,561
m'
3,328.00
42,093
16,202,571,008
140,085,504
m'
3,328.00
373,457
1,242,864,896
titik
80.00
1,050,938
84,075,040
m2
674.29
1,678,930
1,132,079,522
PEKERJAAN BETON
1
m3
69.02
5,106,980
352,485,292
m3
2,227.54
4,763,068
10,609,929,389
29,764,091,000
Halaman 2-2
NO.
5
URAIAN
SATUAN
VOLUME
HARGA
SATUAN (Rp.)
TOTAL
(Rp.)
PEKERJAAN TRESTLE
PEKERJAAN TIANG PANCANG
1
m'
3,993.60
835,380
3,336,173,568
m'
3,993.60
76,799
306,704,486
m'
3,993.60
497,942
1,988,581,171
titik
96.00
2,105,625
202,140,000
PEKERJAAN BETON
1
m3
82.82
11,104,232
919,700,909
m3
544.92
5,095,980
2,776,907,707
Beton Balok
m3
376.80
6,558,714
2,471,323,435
m3
365.83
6,587,374
2,409,872,205
m'
9.00
1,610,000
14,490,000
AKSESORIS
3
14,425,894,000
6
m'
1,040.00
1,127,233
m'
1,040.00
42,093
1,172,322,320
43,776,720
m'
1,040.00
373,457
388,395,280
titik
25.00
1,050,938
26,273,450
m2
118.45
1,678,930
198,862,370
14,631.49
29,362
429,609,727
IWF 250X125X6X9
kg
IWF 200X100X5,5X8
kg
1,252.44
29,362
36,774,143
Besi L 100x100x10
kg
34,301.60
29,362
1,007,163,644
Besi L 75x75x9
kg
5,287.56
29,362
155,253,478
kg
5,579.13
29,362
163,814,287
Grating
m2
278.04
550,000
152,922,000
bh
40.00
5,000
200,000
Base Plate t = 12 mm
kg
471.00
29,362
13,829,502
Baut dia 14 mm
bh
8,068.00
7,500
60,510,000
Kg
61,523.22
902
10
55,493,944
3,905,201,000
Halaman 2-3