1.
2.
3.
4.
5.
6.
7.
Purpose:
1
Scope of Works:
1
References
1
Definitions and Abbreviations
Responsibility
Installation Procedure
Testing and Commissioning of LV Switch Gears
5
8. Labour, Plant & Material Requirement
9. Health & Safety Requirements
10.Environmental Requirements
6
11.Quality Control Arrangements ( Testing, Inspections & Records):
6
12.Appendix & Attachments
6
1
2
4
5
5
1.
Purpose:
This Method statement provides the sequence and methodology that will be
used for
Installation, testing and commissioning of LV Switching gear
in order to achieve compliance with the contract specification and Drawings
2.
Scope of Work:
Installation, testing and commissioning of LV Switching gear detailed on
contract drawing and approved shop drawings.
3.
References
4.
5.
Responsibility:
In-Line with Project Organization chart and responsibilities explained in
our Quality plan, the following staff will be responsible to carry out the
installation process from start to
Completion
5.1 Project Manager
The Project Manager will have full authority and overall responsibility to
manage, supervise. He will Control the works and will have direct
responsibility for ensuring safe working
practices and compliance with
regulatory authoritys requirements. Co-ordinate with the engineers and
the Employer Representative for execution of the Contract Scope of
works. Implement the project quality systems to be the satisfaction of the
project requirements. Review changes and variations to evaluate impact
of those on time and schedule.
5.2 Construction Manager
Responsible to ensure that all works are carried-out as per the
specifications, approved shop drawings and Method Statement as per the
manufacturer instructions and
coordinated with other works.
installation
5.7
The project team of experienced Supervisors and Foremen shall ensure the
quality of the installation work carried out, and shall also ensure that it is as
per the latest approved construction shop drawing issued for installation and
according to instructions received from the Site Engineer.
To provide direct supervision to workers on site during the installation process
of LV Switch Gears.
To ensure that he has adequate resources of machinery, labour and materials
to carry out all the activities efficiently and to discuss with the Site Engineer.
To ensure safe and clean working environment.
6.
Installation Procedure:
6.1
6.2
6.3
6.3.1
6.3.2
6.3.3
6.3.4
6.3.5
6.3.6
6.3.7
6.3.8
6.3.9
6.3.10
6.3.11
6.3.12
6.3.13
6.3.14
6.3.15
6.3.16
6.3.17
6.3.18
7.0
Labour:
Materials:
8.1
9.
Forklift
Hydraulic Trolley
Megger
Safety induction and training to all involved site staff will be provided
by the main
contractor prior to commencing any activities
on site.
Tool box talk will be provided by safety office to highlight and hazards
or safety
regulations to be followed during the installation of
LV Switch Gears on site and
attendance singing sheet will be
kept.
All Personal on Site must Wear (PPE) equipments at all times
Ensure proper barricading to the work area with Standard safety
warning signs to be placed all around, visible to the public at any point
where work on site to be performed
The approved Risk Assessment Sheet must be implemented during the
work course on site to prevent or minimize any identified risks during
the execution of the job on site
10.
Environmental Requirements
In accordance with DGBR and BM Environmental requirements and
instructions related to waste collection & housekeeping on site, ----will
dedicated the required number of workers to perform the house
cleaning on site at all times and segregate and dispose any waste
materials in-order to maintained a healthy environment during the
installation of LV Switch Gear. Workers to Clear all the tools and
equipment after each work shift and ensure all surrounding areas are
free of debris and work area is left in safe condition
11.
Quality Control Arrangements (Testing, Inspections &
Records):
All Quality control measures and site inspections will be carried out in
accordance with the approved PQ plan
5
12.
Appendix & Attachments
Risk Assessment Sheet (RA)