ZAPATA COMBINADA RECTANGULAR

Columna Izquierda
Cm = 125.5 Tn
Cv =
69
Tn
t1 = 0.80 m
t2 = 0.60 m
f'c =
210
Kg/cm2

Columna Centro
Cm =
172
Tn
Cv =
84.5
Tn
t1 =
0.75
m
t2 =
0.60
m
f'c =
210
Kg/cm2

l1 =

5.50

l1

_1

Columna Derecha
Cm =
97
Tn
Cv =
60
Tn
t1 =
0.70
m
t2 =
0.55
m
f'c =
210
Kg/cm2

l2 =

4.30

l2

_2

_3

L
NTN

NPT

df

_(1(1))
1

_(1(2))

l1

Esfuerzo Neto del Terreno

n = 16.59 Tn/m2
2

Pt
Azap
Xo
Lz
lv
B
Azap
3

=
=
=
=
=
=
=

608
36.65
5.97
11.94
-0.10
3.07
37.045

Tn
cm2
m
m
m
m
cm2

Reaccin Neta del Terreno


Por Unidad de Longitud
P1u =
P2u =
P3u =

293
384.45
237.800

_(1(3))

_1

11.95 m

_2

3.10 m

_0
_=_/

_=(_1+_2
)/
Por Unidad de Area

Tn
Tn
Tn

lv

_=_____()
/

_=_
/_

Area de la Zapata

l2

W NU =
b =
Wnu =

76.59
3.1
24.71

Tn/m
m
Tn/m2

W NU =

76.5900

Tn/m

Dimensionamiento de la Altura hz de la Zapata


Para una Cuanta =
min =

0.0024
0.0024

= 0.9

_3

_2

_1

_0
_0(1)

_=_1+__=0

_=_1
/_
_((1))=(_1+
_2)/_

_((1))=_1 _2
+__=0
_=_(_^2)/2_1(_
_(1(1))/2)

Xo =
3.8256
m
Xo(1) = 8.845154329 m

_((1))=_(_((1))^2)/2_1
(_((1))_1/2)
_2(_((1))
( _1(1) + _1+_1(2) ))
_=^ ^2(10.59)

el mayor
w = 0.048478508
d =
1.27
m
hz =
1.35
cm

= (^ )/(^ )
5

Mu =

Verificacines
Por Cortante

= 0.85
218.238
218.65

30.635983264
Vd2

Y1
Vd1

Y4

Vd3

Y2
-166.212

Y3

Vd4
-19.15

-262.364

Y1
Y2
Y3
Y4

= 1.67 m
= 1.645 m
= 1.62 m
= 1.62 m

Vd1
Vd2
Vd3
Vd4

=
=
=
=

-134.459
92.247
94.577
104.928

=
=
=
=

_=0.53(^
)

Vu =
Vn =

_=/

134.46
158.19

_=0.53(^
)
Vc =

Tn
Tn

Vn < Vc .(Conforme)

Por Punzonamiento

= 0.85

_1

_2

_1

_3

2
2

_2

_1

_=
/

_2

2
2

_3

_ _

_1=_1_(1)(1)
__1=_1+/2
3=_3_,_1
(3=)(_2+
3)
_3= _2+

_2=_2_(2)(2)

_2= _1+ , _2= _2+

m1 = 1.435
n1 = 1.87

m2 =
n2 =

_3= _1+ ,

2.02
1.87

0.27(2+4/)(^
)_
_

0.27((_)/_ +2)(^
)_
1.06(^
)_

a) Columna Exterior (C1)


Vud = 226.7015086 Tn

Costado

Vc1 = 1.980 (^
)_
(
^
Vc2 = 2.7102532
_
^
Vc3 =
1.06 )(

)_

Vn = 266.70766
Vc =

1.06 (^

)_

Vc = 924.6930112 Tn

Vn < Vc .(Conforme)
b) Columna Interior (C2)
Vud = 291.1239007 Tn

Centro

Vc1 = 1.890 (^
)_
(
^
Vc2 = 2.302982
_
^
Vc3 =
1.06 )(

)_

Vn < Vc .(Conforme)
c) Columna Interior (C3)

Vn = 342.49871
Vc =

1.06 (^

)_

Vc = 1517.745069 Tn

Vud = 149.2175368 Tn

Vn = 175.55004

Vc1 = 1.915 (^
)_
(
^
Vc2 = 2.3494987

)
_
Vc3 =
1.06 (^

Centro

Vc =

1.06 (^

)_

Vc = 1478.728486 Tn

)_

Vn < Vc .(Conforme)
6

Diseo por Flexin

= 0.9

=(2(4^28/(0.85^
)))/2

_=_/(^
(/2))
Refuerzo Superior

Mu
As

min
As

=
=
=
=
=

443.246
95.030
0.0024
0.0024
95.430

Tn-m
cm

Dimetro de Varilla :
A =
3.88
# var = 24.60
Esp. S = 12.24

cm
Usar 25 7/8" @ 12 cm

Refuerzo Inferior

Dimetro de Varilla :
A =
1.98
# var = 16.07
Esp. S = 18.40
Usar 17 5/8" @ 18 cm

_=_( (
))/3
As = 31.80998084

Diseo en Direccin Transversal

_(1(1))

_(1(2))

_1
b1 =

_(1(3))

_3

_2
144

cm

b2 =

202

cm

b3 =

197

Zapata Exterior (C1)

_1

_=_1
/

293
3.10

Tn
m

t2 =

0.60

_2=(_2)/2

_2

_=(_(_2 )
^2)/2

_=_/(^
(/2))

P1u=
B=

As =

=(2(4^28/(0.85^
)))/2
15.5369

cm2

= _/( )

_=_/(^
(/2))
donde:

_=()
As =

44.329

Dimetro de Varilla :
A =
5.07
# var =
8.74
Esp. S = 15.93

cm2

Usar 9 1" @ 15 cm
Zapata Interior (C2)

_2

_=_2
/

P2u=
B=

_2=(_2)/2

_2

t2 =

384.45
3.10

Tn
m

0.60

_=(_(_2 )
^2)/2

_=_/(^
(/2))

=(2(4^28/(0.85^
)))/2

As =

20.3727

= _/( )

cm2

donde:

_=()
As =

62.183

Dimetro de Varilla :
A =
3.88
# var = 16.03
Esp. S = 11.61

cm2

Usar 17 7/8" @ 11 cm

Zapata Interior (C3)

_3

_=_3
/
_2=(_2)/2

_2

t2 =

237.800
3.10

Tn
m

0.55

_=(_(_2 )
^2)/2

_=_/(^
(/2))

P3u=
B=

As =

=(2(4^28/(0.85^
)))/2
13.0684

cm2

= _/( )
donde:

_=()
As =

60.644

cm2

Dimetro de Varilla :
A =
3.88
# var = 15.63

Esp. S =

12.05

Usar 16 7/8" @ 12 cm

Planos
Perfil
Acero Superior
Usar 25 7/8" @ 12 cm

Acero Inferior
Usar 17 5/8" @ 18 cm

l1 = 5.5 m

b1 = 1.44 m

l2 = 4.3 m

b2 = 2.02 m

lv = -0.0999999999

b3 = 1.97 m

L = 11.95 m
Usar 9 1" @ 15 cm

Usar 17 7/8" @ 11 cm

Usar 16 7/8" @ 12 cm

Planta

Acero Superior
Usar 25 7/8" @ 12 cm

Usar 17 7/8" @ 11 cm

Usar 9 1" @ 15 cm
Usar 16 7/8" @ 12 cm

L = 11.95 m
Acero Inferior
Usar 17 5/8" @ 18 cm
Secion Trasversal
Zapata Exterior C1 ( t2 = 0.6 m )

Zapata Interior C2 ( t2 = 0.6 m )

Zapata Exterior C3 ( t2 =

Lv = 1.25 m
Usar 9 1" @ 15 cm

Lv = 1.25 m

Lv = 1.25 m

Lv = 1.25 m

Usar 17 7/8" @ 11 cm

B = 3.1 m
Usar 17 5/8" @ 18 cm

B = 3.1 m
Usar 17 5/8" @ 18 cm

Lv = 1.275 m

Usar 16 7/8" @ 12 cm

R
hf
df
S/C
hc

Cimentacin
=
1.80
m
=
1.6
m
=
400
Kg/m2
=
0.20
m

s
ult
f'c
fy

=
=
=
=

df

hf

_3

_0

1.95
6.15
210
4200

Tn/m3
Kg/cm2
Kg/cm2
Kg/cm2

Mmx = -443.25 Tn-m


Mmx1 =
-312.67 Tn-m
443.24553 Tn-m

(^

hz =
d =

1.35
1.27

0.0

Abs.
134.46
92.25
94.58
104.93

Tn
Tn
Tn
Tn

m
m

(^
302.38 Tn

_3

m3 =
n3 =

1.97
1.82

Tn
el menor

Tn
el menor

Tn
el menor

a=
2.4679
a = 0.0721289

Varilla :
cm2

7/8"
25
12

Varillas
cm

17
18

Varillas
cm

@ 12 cm

Varilla :
cm2

5/8"

@ 18 cm

cm

qNU= 94.516129 Tn/m

Lv2 =

1.25

Mu = 73.840726 Tn-m

a = 2.514613
a=
0.025

= 0.0008496

min =

Varilla :
cm2

0.0024
1"
9
15

Varillas
cm

@ 15 cm

qNU= 124.01613 Tn/m

Lv2 =

1.25

Mu = 96.887601 Tn-m

a = 2.5162694
a=
0.0237

= 0.0007941
min =

Varilla :
cm2

0.0024
7/8"
17
11

Varillas
cm

@ 11 cm

Varilla :
cm2

qNU= 76.709677 Tn/m

Lv2 =

1.275

Mu = 62.350585 Tn-m

a = 2.5243913
a=
0.0156

= 0.0005223
min =

0.0024
7/8"
16.00

Varillas

12.00

cm

@ 12 cm

= -0.0999999999999979 m

hz = 1.35 m

97 m

6 7/8" @ 12 cm

a Exterior C3 ( t2 = 0.55 m )

B = 3.1 m

Lv = 1.275 m

Lv = 1.275 m

6 7/8" @ 12 cm

B = 3.1 m
Usar 17 5/8" @ 18 cm