Name of Work: Estimate for providing protection work to Bridge Approaches of RCC Bridge No: 34/1 & 84/1

of NH-37 under
Guwahati NH Division in the State of Assam under A.P. 2014-15.
ESTIMATE

Item No.

Ref. of
MoRT&H

Item of work

Unit

Quantity

Rate (Rs.)

For RCC Br. No. 34/1

cum

432.30

131.00

For RCC Br. No. 84/1

cum

432.30

131.00

For RCC Br. No. 34/1

cum

67.20

320.00

For RCC Br. No. 84/1

cum

67.20

303.00

1. EARTH WORK
1/3.3

2/3.18

301

305

Excavation in Soil with Dozer with lead upto 100 metres (Excavation for road way in soil by
mechanical means including cutting and pushing the earth to site of embankment upto a
distance of 100 metres (average lead50 metres), including trimming bottom and side slopes in
accordance with requirements of lines,grades and cross sections.

Construction of Subgrade and Earthen Shoulders (Construction of subgrade and earthen


shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to
site, spreading, grading to required slope and compacted to meet requirement of table (300-2) (
including compensation of earth.)(a), ( Including cost of testing of materials at site and
laboratory as directed by the deptt.)
From Private Land

2. SUB-BASE COURSES:
3/4.1/ A / (i)

401 Granular Sub-base with Close Graded Material (Table:- 400-1)

Item No.

Ref. of
MoRT&H

Item of work

Unit

Quantity

Rate (Rs.)

For RCC Br. No. 34/1

cum

108.42

2753.00

For RCC Br. No. 84/1

cum

106.34

2381.00

For RCC Br. No. 34/1

cum

117.00

2148.00

For RCC Br. No. 84/1

cum

114.75

2273.00

Plant Mix Method (Construction of granular sub-base by providing close graded Material, mixing
in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform
layers with motor grader on prepared surface and compacting with vibratory power roller to
achieve the desired density,complete as per cl. 401( with an initial lead of 5 Km.)( Including cost
of testing of materials at site and laboratory as directed by the deptt.)

for grading- I Material

4/4.12

406

Wet Mix Macadam (Providing, laying, spreading and compacting graded stone aggregate to wet
mix macadam specification including premixing the Material with water at OMC in mechanical
mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sbbase/base course on well prepared surface and compacting with vibratory roller to achieve the
desired density ( including carriage up to initial lead of 5.0 km from quarry and carriage of
mixed materials up to 10.0 Km initial lead from mixing plant )

3. BASE AND SURFACE COURSES:


5/5.3

504

Bituminous Macadam (Providing and laying bituminous macadam with 100-120 TPH hot mix
plant producing an average output of 75 tonnes per hour using crushed aggregates of specified
grading premixed with bituminous binder, transported to site, laid over a pr( including carriage
up to initial lead of 5.0 km from quarry and carriage of mixed materials up to 10.0 Km initial lead
from mixing plant ) ( Including cost of testing of materials at site and laboratory as directed by
the deptt.)
(b) With anti stripping agent as per IS:14982( Refer Appendix-5 of MoSRT&H specification)
(I)with 60/70 or VG-30 grade paved bitumen
for GradingII(19 mm nominal size)

Item No.

6/5.6

Ref. of
MoRT&H

507

Item of work

Unit

Quantity

Rate (Rs.)

For RCC Br. No. 34/1

cum

39.00

8037.00

For RCC Br. No. 84/1

cum

38.25

8174.00

cum
cum

31.20
30.60

9974.00
10111.00

Dense Graded Bituminous Macadam (Providing and laying dense bituminous macadam with
100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using
crushed aggregates of specified grading, premixed with bituminous binder @ 4.0 to 4.5% by
weight of total mix and filler transporting the hot miox to work site,laying with a hydrostatic paver
finisher with sensor control to the reqd. grade, lavel and alignment,rolling with smooth
wheeled,vibratory and tandem rollers to achieve the desired compaction as per MoSRT&H cl.
no. 507. complete in all respect. ( including carriage up to initial lead of 5.0 km from quarry and
carriage of mixed materials up to 10.0 Km initial lead from mixing plant )( Including cost of
testing of materials at site and laboratory as directed by the deptt.)
(c) With hydrated lime / cement as filler ( refer table 500-9 of MoSRT&H specification) & anti
stripping agent as per IS:14982( Refer Appendix-5 of MoSRT&H specification)
(I)'with 60/70 or VG-30 grade bitumen
(ii) for GradingII(19 mm nominal size)

For RCC Br. No. 34/1


For RCC Br. No. 84/1

Item No.

Ref. of
MoRT&H

7/5.8

8/5.1

Item of work

Unit

Quantity

Rate (Rs.)

For RCC Br. No. 34/1

cum

20.80

11029.00

For RCC Br. No. 84/1


Prime coat
(A) Prime coat (Providing and applying primer coat with bitumen emulsion on prepared surface
of granular Base including clearing of road surface and spraying primer at the rate of 0.60
kg/sqm using mechanical means.)( Including cost of testing of materials at site and laboratory
as directed by the deptt.)
(i) With bitumen emulsion-CSS-1h

cum

20.40

11168.00

For RCC Br. No. 34/1

sqm

520.00

34.00

For RCC Br. No. 84/1

sqm

510.00

34.00

509 Bituminous Concrete (Providing and laying bituminous concrete with 100-120 TPH batch type
hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of
specified grading, premixed with bituminous binder @ 5.4 to 5.6 % of mix and filler transporting
the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the reqd.
grade, lavel and alignment,rolling with smooth wheeled,vibratory and tandem rollers to achieve
the desired compaction as per MoSRT&H cl. no.509. complete in all respect. ( including
carriage up to initial lead of 5.0 km from quarry and carriage of mixed materials up to 10.0 Km
initial lead from mixing plant )( Including cost of testing of materials at site and laboratory as
directed by the deptt.)
(c) With hydrated lime / cement as filler ( refer table 500-9 of MoSRT&H specification) & anti
stripping agent as per IS:14982( Refer Appendix-5 of MoSRT&H specification)
(I) with 60/70 or VG-30 grade bitumen
ii) for Grading-II(13 mm nominal size)

502

Item No.

Ref. of
MoRT&H

9/5.2

503

Item of work

Unit

Quantity

Rate (Rs.)

For RCC Br. No. 34/1

sqm

1560.00

12.00

For RCC Br. No. 84/1

sqm

1530.00

12.00

For RCC Br. No. 34/1

cum

3790.86

108.00

For RCC Br. No. 84/1


Boulder apron laid in wire crates (Providing and laying of boulder apron laid in wire crates made
with 4mm dia GI wire conforming to IS: 280 & IS:4826 in 100mm x 100mm mesh (weaved
diagonally) including 10% extra for laps and joints laid with stone boulders weighting not less
than 40Kg each.)

cum

2562.54

108.00

For RCC Br. No. 34/1

cum

3626.49

2916.00

For RCC Br. No. 84/1

cum

2397.45

2916.00

For RCC Br. No. 34/1

cum

2324.40

1463.00

For RCC Br. No. 84/1

cum

1210.38

1463.00

Tack coat
Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at
the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with
mechanical broom.( Including cost of testing of materials at site and laboratory as directed by
the deptt.)
(I)With Bitumen emulsion CSS-1h
(a) Normal bituminous surface

4. PROTECTION WORKS FOR BRIDGE APPROACHES:


10/3.1

10/15.2

11/15.4

12/15.5

301

2503

2504

2504

Excavation in Soil by Manual Means.


(a)(Excavation for roadway in soil using manual means including loading in truck for carrying of
cut earth to embankment site with all lifts and lead upto1000 metres.)

Providing and laying Pitching on slopes laid over prepared filter media including boulder apron
laid dry in front of toe of embankment complete as per drawing and Technical specifications
A.Stone/Boulder

Providing and laying Filter material underneath pitching in slopes complete as per drawing and
Technical specification

12/15.5
Item
No.

13/13.9

15/14.10

16/14.11

Ref. of
MoRT&H
2504

2607

2700

1500

Item of work

Unit

Quantity

Rate (Rs.)

For RCC Br. No. 34/1

cum

697.32

1862.00

For RCC Br. No. 84/1

cum

453.89

1862.00

For RCC Br. No. 34/1

cum

754.38

1,524.00

For RCC Br. No. 84/1

cum

569.16

1,524.00

For RCC Br. No. 34/1

cum

24.48

5498.00

For RCC Br. No. 84/1

cum

18.00

5498.00

For RCC Br. No. 34/1

cum

24.48

12025.00

For RCC Br. No. 84/1

cum

18.00

12025.00

4. APPROACH SLAB, BACK-FILLING BEHIND ABUTMENT & WEARING COURSES FOR


BRIDGE PROPER:
Back Filling behind abutment, wing wall and retirn wall complete as per drawing and clause no
2607 of MoSRT&H Specification
(A) Granular Material

PCC M-15 Grade leveling course below approch slab complete including all accessories as
per drawing and technical specifications as per MORT & H section 2700

RCC approch slab including reinforcement and formwork complete as per drawing and
technical specifications clauses 1500, 1600, 1700 & 2704 of MORTH specification of Roads
and Bridge Works for superstructure works.
a) With TATA make TMT CRS (Fe-500) grade rebar

Item No.

Ref. of
MoRT&H

17/14.5

515

Item of work

Unit

Quantity

Rate (Rs.)

For RCC Br. No. 34/1

sqm

735.00

688.00

For RCC Br. No. 84/1

sqm

607.50

688.00

For RCC Br. No. 34/1

Each

30.00

1538.00

For RCC Br. No. 84/1

Each

30.00

1538.00

sqm

1.69

10000.00

Mastic Asphalt
(B) Providing and laying Bituminous wearing course comprising of tack coat with bitumen
emulsion CSS-1h as per APWD SOR item no 5.2 & MOSRT&H Specification Nos 503, 6mm
thick mastic asphalt as per APWD SOR item no 14.5 & MOSRT&H Specification Nos 515 &
2702 and 2 layers of 25 mm thick Asphalt concrete including of close Graded Premix
Surfacing(CGPS) materials with Type -a aggregate as per APWD SOR tem no 5.11 &
MOSRT&H Specification Nos 512 including all lead and lift as directed.

5. SAFETY WORKS, TRAFFIC SIGNS AND ROAD APPURTENANCES


18/17.54

RCC Hollow Circular Guard Post


Providing of hume pipe delineator, 250 mm in diameter, 1250 mm high, having 25mm skin
thickness filled with earth for stability up to 5 cm from top and remaining filled with 1:3:6 c.c.in
spherical segment to prevent percolation of water and emeded in c.c. (1:3:6) below ground level
up to a depth of 500mm, 75mm thick cc surrounding the pipe, painted white as per approved
drawing.

19/8.5

801

Direction and place identification sign upto 0.9sqm size board.


Providing and erecting direction and place identification retro-Reflectrorised sign as per IRC:67
made of encapsulated lens type reflective sheeting vide clause 801.3 fixed over aluminium
sheeting, 2mm thick with area exceeding 0.9sqm fixed on an angle iron of 25x25x4mm
supported on a mild steel angle iron post 75mm x 75mm x 6mm, 2 nos. firmly fixed to the
ground by means of properly design foundation with M-15 grade Cement concrete 45cm x
45cm x 60cm, 60cm below ground level as per approved drawing and sign. . ( All the Steel work
must be Tata/Sail/or any other approved brand)

For RCC Br. No. 34/1

Item No.

Ref. of
MoRT&H

Item of work

Unit

Quantity

Rate (Rs.)

sqm

1.69

10000.00

For RCC Br. No. 34/1

sqm

4.32

11000.00

For RCC Br. No. 84/1

sqm

4.32

11000.00

For RCC Br. No. 34/1

Each

4.00

3500.00

For RCC Br. No. 84/1

Each

4.00

3500.00

Each

80.00

298.00

For RCC Br. No. 84/1


19/8.6

801

Direction and place identification sign more than 0.9sqm size board.
Providing and erecting direction and place identification retro-Reflectrorised sign as per IRC:67
made of encapsulated lens type reflective sheeting vide clause 801.3 fixed over aluminium
sheeting, 2mm thick with area exceeding 0.9sqm fixed on an angle iron of 25x25x4mm
supported on a mild steel angle iron post 75mm x 75mm x 6mm, 2 nos. firmly fixed to the
ground by means of properly design foundation with M-15 grade Cement concrete 45cm x
45cm x 60cm, 60cm below ground level as per approved drawing and sign. . ( All the Steel work
must be Tata/Sail/or any other approved brand)

20/8.47

21/8.51

Providing Sparkle Solar Road Studs, manufactured by Tata B.P. Solar India Ltd. Of size
(125mmx125mm), 90mm height (from bottom of shank to the top of stud) with detachable
battery, m6LEDs-three on each side for Bi-directional studs/3 LEDs on one side for
unidirectional studs, ultra bright LED in amber and red colour, weight per stud 700+25 gms,
flash rate of 50-65 times per minute completely water resistant and weather proof with
replacement warranty and free maintenance fro one year from the date of installation of stud on
road-(installation should be made using adhesives and procedures recommended by
manufacturer under the supervision of their competent technician).
a) Bi-directional Stud

Providing reflective pavement marker with Micro prismatic lens in both direction having
thermoplastic body adhering to the specification and guidelines of MoSRT&Hs fixed to the
road surface using the adhesives and the procedures recommended by the manufacturers with
three months replacement warranty and free maintenance.
For RCC Br. No. 34/1

21/8.51

Item No.

Ref. of
MoRT&H

Item of work

Unit

Quantity

Rate (Rs.)

Each

80.00

298.00

For RCC Br. No. 34/1

Each

15.00

700.00

For RCC Br. No. 84/1

Each

15.00

700.00

For RCC Br. No. 34/1

Rm

40.00

45.00

For RCC Br. No. 84/1

Rm

40.00

45.00

For RCC Br. No. 34/1

Each

10.00

617.00

For RCC Br. No. 84/1

Each

10.00

617.00

For RCC Br. No. 34/1

Each

1.00

3316.00

For RCC Br. No. 84/1

Each

1.00

3316.00

For RCC Br. No. 84/1


22/8.52

23/ 8.53

24/17.55

Traffic cones: With rubber base and reflective of 7 inch sleeve, height= 750mm, bottom square:
385mm and weight 4.00 kg

Providing Inter linking chain link for traffic cones.

Drum Delineator
Providing of metal drum/empty bitumen drum delineator, 600 mm in diameter, 800 mm high,
filled with earth for stability up to 5 cm from top and remaining filled with 1:3:6 c.c. to prevent
percolation of water, painted in circumferential strips of alternate black and white 120 mm wide
all as per IRC:SP:55-2001and drawing.

25/8.43

Portable Barricade in Construction Zone (Installation of a steel portable barricade with


horizontal rail 300 mm wide, 2.5 m in length fitted on a 'A' frame made with 45 x 45 x 5 mm
angle iron section, 1.5 m in height, horizontal rail painted (2 coats) with yellow and white
stripes , 150mmin width at an angle of 450, 'A' frame painted with 2 coats of yellow paint,
complete as per IRC:SP:55-2001.

Total Cost for RCC Br. No. 34/1

Rs.

Total Cost for RCC Br. No. 84/1

Rs.

Grand Total Cost

Rs.

Item No.

Ref. of
MoRT&H

Item of work

Unit

Quantity

Rate (Rs.)

nder

Remarks
Amount (Rs.)

qty.=2*30*(12+14.2)/2*0.55
=432.30
Rate as SOR 13-14

56631.30

56631.30
56631.30

56631.30

Rate as per Analysis-01


enclosed.
Qty. on both side of shoulder
qty.=2*2*30*(1+1.8)/2* 0.4
=67.2

21504.00

0.00

21504.00
20361.60

20361.60

0.00
0.00

Remarks
Amount (Rs.)

Rate as per Analysis-02/ Qty.


as per Statement 02
enclosed.
0.00

0.00
298480.26

298480.26

253183.64

253183.64
Rate as per Analysis-02/ Qty. as
per Statement 02 enclosed.

0.00

251316.00

251316.00

260826.75

260826.75

0.00
Rate as per Analysis-02/ Qty. as
per Statement 02 enclosed.

0.00

Remarks
Amount (Rs.)

313443.00

313443.00

312655.50

312655.50
Rate as per Analysis-02/ Qty. as
per Statement 02 enclosed.

0.00

311188.80
309396.60

311188.80
309396.60

Remarks
Amount (Rs.)
Rate as per Analysis-02/ Qty. as
per Statement 02 enclosed.

0.00

229403.20

229403.20

227827.20

227827.20
Rate as per SOR 13-14/ Qty. as
per Statement-02

0.00

17680.00
17340.00

17680.00
17340.00

Remarks
Amount (Rs.)
Rate as per SOR 13-14/ Qty. as
per Statement-02

0.00

18720.00

18720.00

18360.00

18360.00

0.00
Rate as per SOR 13-14/ Qty. as
per Statement-01

409412.47

(Afzal Karim)
Executive
Engineer,PWD
Rate as per SOR 13-14/ Qty. as
Guwahati
NH
Division,Guwahati
per Statement-01

0.00
409412.47
276754.02

276754.02

0.00

10574855.01

10574855.01

6990975.86

6990975.86
Rate as per SOR 13-14/ Qty. as
per Statement-01

0.00
3400598.23

3400598.23

1770788.92

1770788.92
Rate as per SOR 13-14/ Qty. as
per Statement-01

0.00

Remarks
Amount (Rs.)

Rate as per SOR 13-14/ Qty. as


per Statement-01

1298410.24

1298410.24

845149.26

845149.26

0.00
Qty.
for br. No. 34/1
= 02 (10.8 x 1/2 x 6.35 x 11.00 )
=754.38
for br. No. 84/1
= 02 (8.5 x 1/2 x 6.20 x 10.80 )
=569.16

0.00

1149675.12

1149675.12

867399.84

867399.84
Qty.
for br. No. 34/1
= 02*(10.2 x 4.0 x 0.3) =24.48
for br. No. 84/1
= 02*(7.5 x 4 x 0.3 ) =18

0.00
134591.04

134591.04

98964.00

98964.00
Qty. as per above calculation.

0.00

294372.00
216450.00

294372.00
216450.00

Remarks
Amount (Rs.)
Qty.
for br. No. 34/1
= (7.5 x 98) = 735.00
for br. No. 84/1
= (7.5 x 81 ) = 607.5

0.00

505680.00

505680.00

417960.00

417960.00

0.00

0.00

46140.00

46140.00

46140.00

46140.00
Qty=02*1.3*0.65=1.69

0.00

16900.00

16900.00

Remarks
Amount (Rs.)

16900.00

16900.00
qty.=02*1.2*1.8=4.32

0.00

47520.00

47520.00

47520.00

47520.00
qty. @04 nos each at bridge site

0.00

14000.00

14000.00

14000.00

14000.00
qty. @ 02 x 40 nos. each at
bridge site

0.00

23840.00

23840.00

qty. @ 02 x 40 nos. each at


bridge site

Remarks
Amount (Rs.)

23840.00

23840.00

0.00
10500.00

10500.00
10500.00

10500.00

0.00
1800.00

1800.00
1800.00

1800.00

0.00

6170.00

6170.00
6170.00

6170.00

0.00

3316.00

3316.00
3316.00

3316.00
19456147.00
13228117.16
32684264.16

32587357.17 19456146.6689424

0 13131210.4963444

Remarks
Amount (Rs.)

STATEMENT NO: 01

Item & location

Breadth

Sl.
No.

Length

COMPUTATION OF QUANTITIES FOR PROTECTION WORK OF BRIDGE APPROACHES OF R.C.C. BRIDGE NO: 34/1 & 68/1 ON NH-37

Height h1
along
span

across
span

mean

Height
h2

34/1

15.27

7.00

11.13

84/1

13.33

6.20

9.77

Br. No.

Radius at base 'R'

Radius at top 'r'

along
span

across
span

mean

along
span

across
span

mean

3.00

22.90

14.00

18.45

4.50

6.00

5.25

3.00

20.00

12.40

16.20

4.50

6.00

5.25

01 Stone Pitching
A. Forward Slope
a) Coned portion
b) front of Abutment
B. Embank. Slope

34/1

10.80

15.27

3.00

22.90

6.10

84/1

8.50

13.33

3.00

20.00

5.90

34/1

25.20

3.20

6.40

84/1

15.00

2.60

5.20

34/1

11.80

22.90

14.00

18.45

84/1

13.00

20.00

12.40

16.20

34/1

11.80

10.80

84/1

13.00

8.50

34/1

11.80

25.20

84/1

13.00

15.00

Total for Br. No. 34/1=


Total for Br. No. 84/1=
G.Total=
02 Stone Apron
A. Forward Slope
a) Circular portion
b) Straight portion
B. Embank. Slope
Total for Br. No. 34/1=
Total for Br. No. 84/1=

Br. No.

Breadth

Item & location

Length

Sl.
No.

Height h1
along
span

across
span

mean

Height
h2

Radius at base 'R'


along
span

across
span

mean

Radius at top 'r'


along
span

across
span

mean

G.Total=
03 Stone Apron Key
A. Forward Slope
a) Circular portion
b) Straight portion
B. Embank. Slope

34/1

119.006

18.95

84/1

104.876

16.70

34/1

10.80

84/1

8.50

34/1

25.32

84/1

15.00

Total for Br. No. 34/1=


Total for Br. No. 84/1=
G.Total=
04 Filter Media

34/1
84/1

G.Total=
05 E/Work in cutting
For Apron

34/1
84/1

G.Total=

(B. P.Borah)
Asstt.Executive Engineer,PWD
Goalpara NH Sub-division

(K.K. Sarma)
Asstt.Executive Engineer,PWD
Boko NH Sub-division

(Afzal
Executive E
Guwahati NH D

(B. P.Borah)
Item & location
Br. No.
Asstt.Executive Engineer,PWD
Goalpara NH Sub-division

Breadth

Length

Sl.
No.

Height h1
along
span

Radius at base 'R'


Height
(K.K. Sarma)along
across
across
h2
mean
mean
Asstt.Executive
Engineer,PWD
span
span
span

Boko NH Sub-division

Radius at top 'r'


along
span

across
span

(Afzal
Executive E
Guwahati NH D

mean

Slant
height 's'

& 68/1 ON NH-37

Area
'A'

thick.
't'

Nos.

Qty.
'q'

15.50

1153.82

1.00

01

1153.82

12.87

866.97

0.80

01

693.58

20.80

224.66

1.00

02

449.32

17.48

148.59

0.80

02

237.74

7.16

180.32

1.00

04

721.27

5.81

87.21

0.80

04

279.06
2324.40
1210.38
3534.78

451.11

1.88

01

845.83

463.31

1.60

01

741.29

127.44

1.88

02

477.90

110.50

1.60

02

353.60

297.36

1.88

04

2230.20

195.00

1.60

04

1248.00
3553.93
2342.89

Slant
height 's'

Area
'A'

thick.
't'

Nos.

Qty.
'q'
5896.82

0.30

01

35.70

0.30

01

31.46

0.30

02

6.48

0.30

02

5.10

0.30

04

30.38

0.30

04

18.00
72.57
54.56
127.13

2324.40

0.30

01

697.32

1512.98

0.30

01

453.89
1151.21

1895.4281

2.00

01

3790.86

1464.31

1.75

01

2562.54

(Afzal Karim)
Executive Engineer,PWD
Guwahati NH Division,Guwahati

6353.39

Slant
height 's'

Area
thick.
Nos.
(Afzal Karim)
'A'
't'
Executive Engineer,PWD
Guwahati NH Division,Guwahati

Qty.
'q'

STATEMENT NO-02
QUANTITY FOR PAVEMENT WORKS

Chainage
(m)

GSB (150mm)
Bridge Location

Dist. (m)

WMM
(100 + 125) mm

BM (75mm)

DBM (60mm)

BC (40mm)

Area
(m2)

Volume
(m3)

Area
(m2)

Volume
(m3)

Area
(m2)

Volume
(m3)

Area
(m2)

Volume
(m3)

Area
(m2)

0.00
26.00

2.09
2.09

0.00
54.21

2.25
2.25

0.00
58.50

0.75
0.75

0.00
19.50

0.60
0.60

0.00
15.60

0.40
0.40

0.00
26.00

2.09
2.09

0.00
54.21
108.42

2.25
2.25

0.00
58.50
117.00

0.75
0.75

0.00
19.50
39.00

0.60
0.60

0.00
15.60
31.20

0.40
0.40

0.00
25.50

2.09
2.09

0.00
53.17

2.25
2.25

0.00
57.38

0.75
0.75

0.00
19.13

0.60
0.60

0.00
15.30

0.40
0.40

0.00
25.50

2.09
2.09

0.00
53.17
106.34
214.76

2.25
2.25

0.00
57.38
114.75
231.75

0.75
0.75

0.00
19.13
38.25
77.25

0.60
0.60

0.00
15.30
30.60
61.80

0.40
0.40

Br. No-34/1
33127.55
33153.55
33158.20
33254.90
33259.55
33285.55

Goalpara Side App.


Road
Br.Gap
Guwahati Side App.
Road

Tottal=
Br. No-84/1
83125.00
83150.50
83155.00
83235.00
83239.50
83265.00

Goalpara Side App.


Road
Br.Gap . Slab =
96.69m
Guwahati Side App.
Road

Tottal=
G.T.=

(B.P.Borah)
Asstt.Executive Engineer,PWD
Goalpara NH Sub-division

(K.K. Sarma)
Asstt.Executive Engineer,PWD
Boko NH Sub-division

(Afzal Karim)
Executive Engineer,PW
Guwahati NH Division,Guw

1000

12000
10000

1000

Eart

BC=40 mm
DBM=60 mm
BM=75 mm
WMM=(100 +

COMPOSITION OF HARD CRUST

(B.P.Borah)
Asstt.Executive Engineer,PWD
Goalpara NH Sub-division

(K.K. Sarma)
Asstt.Executive Engineer,PWD
Boko NH Sub-division

GSB=150 mm

(Afzal Karim)
Executive Engineer,PW
Guwahati NH Division,Guw

STATEMENT NO-02
TY FOR PAVEMENT WORKS
BC (40mm)

Prime Coat Tack Coat

Volume
(m3)

Area
(m2)

Area
(m2)

0.00
10.40

0.00
260.00

0.00
780.00

0.00
10.40
20.80

0.00
260.00
520.00

0.00
780.00
1560.00

0.00
10.20

0.00
255.00

0.00
765.00

0.00
10.20
20.40
41.20

0.00
255.00
510.00
1030.00

0.00
765.00
1530.00
3090.00

(Afzal Karim)
Executive Engineer,PWD
Guwahati NH Division,Guwahati

12000
10000

ON OF HARD CRUST

1000
Earthen shoulder

BC=40 mm
DBM=60 mm
BM=75 mm
WMM=(100 + 125) mm
GSB=150 mm

(Afzal Karim)
Executive Engineer,PWD
Guwahati NH Division,Guwahati

ANALYSIS NO. : 01
Rate Analysis for Earthwork in Subgrade & Shoulder

Extra lead
Total Lead beyond initial
lead of 03 kM

Base cost as
per It. 3.18(a)
of SOR 201314

Name & Location


Borrow Area

Location of
Work

Chainage
(Km)

Paharkata Borrow
Area
01 km away from
22nd. K.M. of NH37.

Bridge No:
34/1

34.00

13.00

10.00

235.00

Bundapara Earth
Quarry.
06 km away from
79th km of NH-37.

Bridge No:
84/1

84.00

11.00

8.00

235.00

(B.P.Borah)
Asstt.Executive Engineer,PWD
Goalpara NH Sub-division

(K.K. Sarma)
Asstt.Executive Engineer,PWD
Boko NH Sub-division

(Afzal Karim)
Executive Engineer,PWD
Guwahati NH Division,Guwa

oulder

Cost for extra


Total
lead @ Rs.
(Col.4+Col.5)
8.46 per Cum
5

84.6

320.00

67.68

303.00

(Afzal Karim)
Executive Engineer,PWD
Guwahati NH Division,Guwahati

ANALYSIS NO. : 02
Analysis of rate for providing and laying of GSB, WMM, Bituminous Works based on SOR for the year 2013-2014
Sl.
No.

Item of work

GSB (Closed Gaded)


01 Plant Mix Method.
Grade-I material

02 WMM

Unit

Cum.

Name and location of


Quarry

Location of

Total lead

Lead beyond Lead beyond loose volume of stone Cost of carriage for addl.
initial 5 Km
initial lead
chips after voids
Lead
from quarry to from Plant to
deduction
plant.
work site if
Plant to Work
Quarry to
Plant to work
any applicable
Site
plant beyond site beyond
(10 Km for
initial 5 Km
initial lead if
WMM &
@ Rs.
any
Bituminous
6.37/cu.m /km
@ Rs.
works)
6.37/cu.m /km
(in Rs.)
(in Rs.)

Plant Site

Work Site

Quarry to
Plant Site

22nd. KM of
NH-37

34.00

85.00

12.00

80.00

10

12.00

Hahim River Quarry


(16 km away from
KM-91 of NH-37)

11

619.67

92.95

(1.28 - 5%)
= 1.216
71st. KM of
NH-37

84.00

36.00

13.00

31.00

13.00

240.12

100.70

Boulder Ajagarh Hill


Quarry
22nd. KM of
(12 KM away from
NH-37
KM 25th of NH-37)

34.00

15.00

12.00

10.00

2.00

77.71

15.54

194.29

23.31

(1.32 - 7.5%)
= 1.22

Cum.
Dudhkhury Stone
Quarry (02 km
away from KM-99
of NH-37)

71st. KM of
NH-37

84.00

30.00

13.00

25.00

3.00

Sl.
No.

Item of work

BM
With anti stripping
agent with 60/70
03
grade paved bitumen
Gr.II (19mm Nominal
Size)

DBM
With anti stripping
agent with 60/70 or
03
VG-30 grade bitumen
Gr.II (19mm nominal
Size)

Unit

Name and location of


Quarry

Location of

Total lead

Lead beyond Lead beyond loose volume of stone Cost of carriage for addl.
initial 5 Km
initial lead
chips after voids
Lead
from quarry to from Plant to
deduction
plant.
work site if
Plant to Work
Quarry to
Plant to work
any applicable
Site
plant beyond site beyond
(10 Km for
initial 5 Km
initial lead if
WMM &
@ Rs.
any
Bituminous
6.37/cu.m /km
@ Rs.
works)
6.37/cu.m /km
(in Rs.)
(in Rs.)

Plant Site

Work Site

Quarry to
Plant Site

34.00

15.00

12.00

10.00

Boulder Ajagarh Hill


Quarry
22nd. KM of
(12 KM away from
NH-37
KM 25th of NH-37)

10

2.00

11

85.61

17.12

(1.415 - 5%) =
1.344

Cum.
Dudhkhury Stone
Quarry (02 km
away from KM-99
of NH-37)

71st. KM of
NH-37

84.00

30.00

13.00

25.00

3.00

214.03

25.68

Boulder Ajagarh Hill


Quarry
22nd. KM of
(12 KM away from
NH-37
KM 25th of NH-37)

34.00

15.00

12.00

10.00

2.00

85.61

17.12

Dudhkhury Stone
Quarry (02 km
away from KM-99
of NH-37)

84.00

214.03

25.68

(1.415 - 5%) =
1.344

Cum.
71st. KM of
NH-37

30.00

13.00

25.00

3.00

Sl.
No.

Item of work

BC
with anti stripping
agent
04 with 60/70 or VG-30
grade bitumen
Gr.II (13 mm nominal
size)

Unit

Name and location of


Quarry

Location of

Total lead

Lead beyond Lead beyond loose volume of stone Cost of carriage for addl.
initial 5 Km
initial lead
chips after voids
Lead
from quarry to from Plant to
deduction
plant.
work site if
Plant to Work
Quarry to
Plant to work
any applicable
Site
plant beyond site beyond
(10 Km for
initial 5 Km
initial lead if
WMM &
@ Rs.
any
Bituminous
6.37/cu.m /km
@ Rs.
works)
6.37/cu.m /km
(in Rs.)
(in Rs.)

Plant Site

Work Site

Quarry to
Plant Site

34.00

15.00

12.00

10.00

Boulder Ajagarh Hill


Quarry
22nd. KM of
(12 KM away from
NH-37
KM 25th of NH-37)

10

2.00

Cum.

11

86.70

17.34

216.74

26.01

(1.432-5%) = 1.361

Dudhkhury Stone
Quarry (02 km
away from KM-99
of NH-37)

(B.P.Borah)
Asstt.Executive Engineer,PWD
Goalpara NH Sub-division

71st. KM of
NH-37

84.00

30.00

13.00

25.00

(K.K. Sarma)
Asstt.Executive Engineer,PWD
Boko NH Sub-division

3.00

(Afzal Karim)
Executive Engineer
Guwahati NH Division,

3-2014
Cost of providing
& laying as per
SOR 2013-14
(in Rs.)

Total cost
including
carriage for all
lead
(in Rs.)

Remarks.

13

14

16

2040.00

2753.00
Item as per
Sl.No.4.1 A (i)
of SOR-2013-14

2040.00

2381.00

2055.00

2148.00
Item as per
Sl.No.4.12 of
SOR-2013-14

2055.00

2273.00

Cost of providing
& laying as per
SOR 2013-14
(in Rs.)

Total cost
including
carriage for all
lead
(in Rs.)

Remarks.

13

14

16

7934.00

8037.00
Item as per
Sl.No.5.3 b (I)
(ii) of SOR
2013-14

7934.00

8174.00

9871.00

9974.00
Item as per
Sl.No.5.6 (c).I. ii
of SOR-2013-14

9871.00

10111.00

Cost of providing
& laying as per
SOR 2013-14
(in Rs.)

Total cost
including
carriage for all
lead
(in Rs.)

Remarks.

13

14

16

10925.00

11029.00
Item as per
Sl.No.5.8 (c)
(I).ii of SOR2013-14

10925.00

11168.00

(Afzal Karim)
ecutive Engineer,PWD
ati NH Division,Guwahati

COMPUTATION OF CROSS-SECTIONAL AREA AND WETTED PERIMETER OF RIVER CROSS-SECTION FOR R.C.C. BR. NO. 84/1

Distance

RL of Stream Bed

Depth of Bed
from H.F.L.

83135.35
83150.35
83155
83160
83165
83170
83175
83180
83185
83190
83195
83200
83205
83210
83215
83220
83225
83230
83235
83254.65

95.50
93.80
93.00
90.30
89.30
88.65
88.20
87.80
87.60
87.30
87.30
86.50
86.80
86.60
87.00
89.00
91.40
93.80
95.00
95.50

0.00
1.70
2.50
5.20
6.20
6.85
7.30
7.70
7.90
8.20
8.20
9.00
8.70
8.90
8.50
6.50
4.10
1.70
0.50
0.00

(B.P.Borah)
Asstt.Executive Engineer,PWD
Goalpara NH Sub-division

Mean Depth

0.85
2.10
3.85
5.70
6.53
7.08
7.50
7.80
8.05
8.20
8.60
8.85
8.80
8.70
7.50
5.30
2.90
1.10
0.25

Distance between
two adj. point

Area

15.00
4.65
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
19.65
119.300

12.75
9.76
19.25
28.50
32.63
35.38
37.50
39.00
40.25
41.00
43.00
44.25
44.00
43.50
37.50
26.50
14.50
5.50
4.91
559.68

(K.K. Sarma)
Asstt.Executive Engineer,PWD
Boko NH Sub-division

Difference of level
between two adj.
point

X2

1.70
0.80
2.70
1.00
0.65
0.45
0.40
0.20
0.30
0.00
0.80
-0.30
0.20
-0.40
-2.00
-2.40
-2.40
-1.20
-0.50

225.00
21.62
25.00
25.00
25.00
25.00
25.00
25.00
25.00
25.00
25.00
25.00
25.00
25.00
25.00
25.00
25.00
25.00
386.12

(Afzal Karim)
Executive Engineer,P
Guwahati NH Division,Gu

Distance

RL of Stream Bed

Depth of Bed
from H.F.L.

(K.K.
Sarma)
Distance
between
Area
MeanAsstt.Executive
Depth
two adj.Engineer,PWD
point
Boko NH Sub-division

Difference of level
between two adj.
point

X2

R.C.C. BR. NO. 84/1

Y2

2.89
0.64
7.29
1.00
0.42
0.20
0.16
0.04
0.09
0.00
0.64
0.09
0.04
0.16
4.00
5.76
5.76
1.44
0.25
Total P =

Wetted Perimeter
P

15.096
4.718
5.682
5.099
5.042
5.020
5.016
5.004
5.009
5.000
5.064
5.009
5.004
5.016
5.385
5.546
5.546
5.142
19.656
122.055

(Afzal Karim)
Executive Engineer,PWD
uwahati NH Division,Guwahati

H.F.L
95.50
95.50
95.50
95.50
95.50
95.50
95.50
95.50
95.50
95.50
95.50
95.50
95.50
95.50
95.50
95.50
95.50
95.50
95.50
95.50

L.W.L.

87.3
87.3
87.3
87.3
87.3

Y2

Wetted Perimeter
P

H.F.L

L.W.L.

COMPUTATION OF CROSS-SECTIONAL AREA AND WETTED PERIMETER OF RIVER CROSS-SECTION FOR BR. NO. 34/1 on NH-37

Distance in m

RL of Stream Bed

Depth of Bed
from H.F.L.

33127.55
33132.55
33137.55
33142.55
33147.55
33152.55
33158.20
33163.20
33168.20
33173.20
33178.20
33183.20
33188.20
33193.20
33198.20
33203.20
33208.20
33213.20
33218.20
33223.20
33228.20
33233.20
33238.20
33243.20
33248.20
33253.20
33254.90
33260.55

96.40
95.00
94.50
94.00
93.50
93.50
92.50
88.56
87.16
86.96
85.81
85.46
84.81
85.06
85.86
85.06
85.81
85.91
86.06
86.26
86.56
87.31
88.26
88.36
89.40
91.40
92.50
93.00

0.00
1.40
1.90
2.40
2.90
2.90
3.90
7.84
9.24
9.44
10.59
10.94
11.59
11.34
10.54
11.34
10.59
10.49
10.34
10.14
9.84
9.09
8.14
8.04
7.00
5.00
3.90
3.40

Mean Depth

Distance between
two adj. point

Area
A

Difference of level
between two adj.
point

X2

0.70
1.65
2.15
2.65
2.90
3.40
5.87
8.54
9.34
10.02
10.77
11.27
11.47
10.94
10.94
10.97
10.54
10.42
10.24
9.99
9.47
8.62
8.09
7.52
6.00
4.45
3.65

5.00
5.00
5.00
5.00
5.00
5.65
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
1.70
5.65

3.50
8.25
10.75
13.25
14.50
19.21
29.35
42.70
46.70
50.08
53.83
56.33
57.33
54.70
54.70
54.83
52.70
52.08
51.20
49.95
47.33
43.08
40.45
37.60
30.00
7.57
20.62

1.40
0.50
0.50
0.50
0.00
1.00
3.94
1.40
0.20
1.15
0.35
0.65
-0.25
-0.80
0.80
-0.75
-0.10
-0.15
-0.20
-0.30
-0.75
-0.95
-0.10
-1.04
-2.00
-1.10
-0.50

25.00
25.00
25.00
25.00
25.00
31.92
25.00
25.00
25.00
25.00
25.00
25.00
25.00
25.00
25.00
25.00
25.00
25.00
25.00
25.00
25.00
25.00
25.00
25.00
25.00
2.89
31.92

Distance in m

RL of Stream Bed

Depth of Bed
from H.F.L.

Mean Depth

33265.55
33270.55
33275.55
33280.55
33285.55
Total=

93.50
94.00
94.50
95.00
96.40

2.90
2.40
1.90
1.40
0.00

3.15
2.65
2.15
1.65
0.70

Distance between
two adj. point

Area
A

5.00
5.00
5.00
5.00
5.00
158.00

15.75
13.25
10.75
8.25
3.50
1054.05

Difference of level
between two adj.
point

X2

-0.50
-0.50
-0.50
-0.50
-1.40

25.00
25.00
25.00
25.00
25.00

-96.70

(B.P.Borah)
Asstt.Executive Engineer,PWD
Goalpara NH Sub-division

(K.K. Sarma)
Asstt.Executive Engineer,PWD
Boko NH Sub-division

(Afzal Karim)
Executive Engineer,P
Guwahati NH Division,Gu

R. NO. 34/1 on NH-37

Y2

Wetted Perimeter
P

1.96
0.25
0.25
0.25
0.00
1.00
15.52
1.96
0.04
1.32
0.12
0.42
0.06
0.64
0.64
0.56
0.01
0.02
0.04
0.09
0.56
0.90
0.01
1.08
4.00
1.21
0.25

5.192
5.025
5.025
5.025
5.000
5.738
6.366
5.192
5.004
5.131
5.012
5.042
5.006
5.064
5.064
5.056
5.001
5.002
5.004
5.009
5.056
5.089
5.001
5.107
5.385
2.025
5.672

H.F.L

96.40
96.40
96.40
96.40
96.40
96.40
96.40
96.40
96.40
96.40
96.40
96.40
96.40
96.40
96.40
96.40
96.40
96.40
96.40
96.40
96.40
96.40
96.40
96.40
96.40
96.40
96.40
96.40

L.W.L

86.96
86.96
86.96
86.96
86.96
86.96
86.96
86.96
86.96
86.96
86.96
86.96

Y2

0.25
0.25
0.25
0.25
1.96

Wetted Perimeter
P
5.025
5.025
5.025
5.025
5.192
161.585

(Afzal Karim)
Executive Engineer,PWD
uwahati NH Division,Guwahati

H.F.L

96.40
96.40
96.40
96.40
96.40

L.W.L

RIVER CROSS-SECTION OF RCC BR. No- 84/1


98.00
96.00
94.00
92.00
90.00

RL's88.00
in Meter
86.00
84.00
82.00

83135
83145
83155
83165
83175
83185
83195
83205
83215
83225
83235
83245
83255
83130
83140
83150
83160
83170
83180
83190
83200
83210
83220
83230
83240
83250
8

Chainage in K.M.
RL of Stream Bed

(B.P.Borah)
Asstt.Executive Engineer,PWD
Goalpara NH Sub-division

H.F.L

(K.K. Sarma)
Asstt.Executive Engineer,PWD
Boko NH Sub-division

L.W.L.

(Afzal Karim)
Executive Engineer,PWD
Guwahati NH Division,Guwahati

RIVER CROSS-SECTION OF RCC BR. No- 34/1


98.00
96.00
94.00
92.00

RL's in Meter
90.00
88.00
86.00
84.00
82.00
80.00
78.00

33131
33141
33151
33161
33171
33181
33191
33201
33211
33221
33231
33241
33251
33261
33271
33281
33126
33136
33146
33156
33166
33176
33186
33196
33206
33216
33226
33236
33246
33256
33266
33276
332

Chainage in K.M.
RL of Stream Bed

(B.P.Borah)
Asstt.Executive Engineer,PWD
Goalpara NH Sub-division

H.F.L

(K.K. Sarma)
Asstt.Executive Engineer,PWD
Boko NH Sub-division

L.W.L

(Afzal Karim)
Executive Engineer,PWD
Guwahati NH Division,Guwahati

35
83245
83255
83240
83250
83260

fzal Karim)
ve Engineer,PWD
H Division,Guwahati

33261
33271
33281
6
33266
33276
33286

fzal Karim)
ve Engineer,PWD
H Division,Guwahati

DESIGN OF PROTECTION WORK FOR BRIDGE- APPROACHES OF R.C.C. BR.No : 84/1

Particulars

Unit

Design Data:
1. Length of existing Bridge

2. Type of existing Bridge


3. Observe Scour depth

4. B.M.

5. Bed Slope S

6. H.F.L. at bridge site

7. L.W.L at bridge site

8. L.B.L at bridge site

10. Area of River Cross-section 'A'

m2

11. Wetted Perimeter 'P'

Determination of Velocity, Discharge & Scour Depth:


12. Hydraulic mean Depth at Bridge Site : R = A/P

13. Mannings Velocity = V = 1/n R S/100

m/sec

14. Observed Velocity

m/sec

15. Discharged by Mannings Velocity = A.V.

m3/sec

16. Discharged by observed Velocity = A V

m3/sec

17. Discharge adopted for waterway 'q'


(Higher of 11 & 12 adopted provided highest discharge does
not exceed the next highest by more than 50%)

m3/sec

18. Design discharge Q=1.33q

m3/sec

19. Laceys Regime width W = 4.8Q

20. Modified Khoslas width = 2.67Q

21. Bank to Bank distance

22. Linear water-way considered 'L'

23. Discharge per meter width Db=Q/L

m3/sec/m

2/3

24. Determination of Normal Scour Depth for the case L<W


[Normal Scour Depth, dsm = 1.34 (Db2/ksf)1/3
where, ksf=Silt factor =1.76dm, dm=grain size in mm ]
For Medium Sand bed material & grain size 0.233mm, k sf
Therefore, scour depth, dsm

Design of Pitching & Launching Apron:


25. Thickness of Pitching t= 0.06Q1/3
(As per Clause 5.3.5.2 of IRC:89-1997)

26. Max. anticipated scour depth below H.F.L., D max= 1.5 dsm
(As per Clause 5.3.7.4 of IRC:89-1997)

27. R.L. of Dmax below H.F.L.

28. Dmax below L.W.L.

29. Width of Apron as per clause Cl. 5.3.7.5 of IRC:89-1997

30. Thickness of Inner Edge of Apron=1.5t

Particulars
31. Thickness of Outer edge of Apron =2.25t

Unit
m

32. Size and weight of Stone for Pitching


Equivalent Diameter of Stone for Pitching d=kV 2
(As per clause 5.3.5.1 of IRC:89-1997)

Weight of Stone from Table 5.1 of IRC:89-1997

kg.

33. Size and weight of Stone for Launching Apron


Equivalent Diameter of Stone for Apron d=(V/4.893) 2
(As per clause 5.3.7.2 of IRC:89-1997)
Weight of Stone from Table 5.2 of IRC:89-1997
34. Thickness of Filter Media Considered

(B.P. Borah)
Asstt.Executive
Engineer,PWD
Goalpara NH Subdivision

(Kalyan.Kr. Sarma)
Asstt.Executive
Engineer,PWD
Boko NH Sub-division

m
kg.
m

(Afzal Karim)
Executive Engineer,PWD
Guwahati NH Division,Guwahati

C.C. BR.No : 84/1

Values

80.00
P.S.C. girder bridge.
9.00
100 at Bridge Deck
0.10
95.50
87.30
86.50
560.00
122.00
4.59
2.93
3.50
1639.00
1960.00
1960.00
2607.00
245.00
136.00
112.02
112.02
23.30

0.85
11.29

0.80
16.94
78.56
8.74
13.00
1.20

Values
2.00

0.35
59.0

0.51
184.0
0.30

Karim)
ngineer,PWD
ivision,Guwahati

(B. P. Borah)
Asstt.Executive
Engineer,PWD
Goalpara NH Subdivision

DESIGN OF PROTECTION WORK FOR BRIDGE- APPROACHES OF R.C.C. BR.No : 34/1

Particulars

Unit

Design Data:
1. Length of existing Bridge

2. Type of existing Bridge


3. Observe Scour depth

4. B.M.

5. Bed Slope S

6. H.F.L. at bridge site

7. L.W.L at bridge site

8. L.B.L at bridge site

10. Area of River Cross-section 'A'

m2

11. Wetted Perimeter 'P'

Determination of Velocity, Discharge & Scour Depth:


12. Hydraulic mean Depth at Bridge Site : R = A/P

13. Mannings Velocity = V = 1/n R S/100

m/sec

14. Observed Velocity

m/sec

15. Discharged by Mannings Velocity = A.V.

m3/sec

16. Discharged by observed Velocity = A V

m3/sec

17. Discharge adopted for waterway 'q'


(Higher of 11 & 12 adopted provided highest discharge does
not exceed the next highest by more than 50%)

m3/sec

18. Design discharge Q=1.33q

m3/sec

19. Laceys Regime width W = 4.8Q

20. Modified Khoslas width = 2.67Q

21. Bank to Bank distance

22. Linear water-way considered 'L'

23. Discharge per meter width Db=Q/L

m3/sec/m

2/3

24. Determination of Normal Scour Depth for the case L<W


[Normal Scour Depth, dsm = 1.34 (Db2/ksf)1/3
where, ksf=Silt factor =1.76dm, dm=grain size in mm ]
For Medium to coarse Sand material & grain size 0.65mm, k sf
Therefore, scour depth, dsm

Design of Pitching & Launching Apron:


25. Thickness of Pitching t= 0.06Q1/3
(As per Clause 5.3.5.2 of IRC:89-1997)

26. Max. anticipated scour depth below H.F.L., D max= 1.5 dsm
(As per Clause 5.3.7.4 of IRC:89-1997)

27. R.L. of Dmax below H.F.L.

28. Dmax below L.W.L.

29. Width of Apron as per clause Cl. 5.3.7.5 of IRC:89-1997

30. Thickness of Inner Edge of Apron=1.5t

Particulars
31. Thickness of Outer edge of Apron =2.25t

Unit
m

32. Size and weight of Stone for Pitching


Equivalent Diameter of Stone for Pitching d=kV 2
(As per clause 5.3.5.1 of IRC:89-1997)

Weight of Stone from Table 5.1 of IRC:89-1997

kg.

33. Size and weight of Stone for Launching Apron


Equivalent Diameter of Stone for Apron d=(V/4.893) 2
(As per clause 5.3.7.2 of IRC:89-1997)
Weight of Stone from Table 5.2 of IRC:89-1997
34. Thickness of Filter Media Considered

(B. P. Borah)
Asstt.Executive
Engineer,PWD
Goalpara NH Subdivision

(Kayan.Kr. Sarma)
Asstt.Executive
Engineer,PWD
Boko NH Sub-division

m
kg.
m

(Afzal Karim)
Executive Engineer,PWD
Guwahati NH Division,Guwahati

C.C. BR.No : 34/1

Values

03 x 33.23= 96.70
P.S.C. girder bridge.
11.59
100 at Bridge Deck
0.10
96.40
86.96
84.81
1054.00
161.59
6.52
3.70
4.00
3903.00
4216.00
4216.00
5607.28
359.00
200.00
158.00
158.00
35.50

1.42
12.59

1.00
18.89
77.51
9.45
14.00
1.50

Values
2.25

0.45
126.0

0.67
417.0
0.30

Karim)
Engineer,PWD
ivision,Guwahati

STATEMENT NO-02
QUANTITY FOR PAVEMENT WORKS

Chainage
(m)

Earth work in Shoulder


Bridge Location

Dist. (m)

Earthwork In Cutting

BM (75mm)

DBM (60mm)

BC (40mm)

Area
(m2)

Volume
(m3)

Area
(m2)

Volume
(m3)

Area
(m2)

Volume
(m3)

Area
(m2)

Volume
(m3)

Area
(m2)

0.00
26.00

2.09
2.09

0.00
54.21

2.25
2.25

0.00
58.50

0.75
0.75

0.00
19.50

0.60
0.60

0.00
15.60

0.40
0.40

0.00
26.00

2.09
2.09

0.00
54.21
108.42

2.25
2.25

0.00
58.50
117.00

0.75
0.75

0.00
19.50
39.00

0.60
0.60

0.00
15.60
31.20

0.40
0.40

0.00
25.50

2.09
2.09

0.00
53.17

2.25
2.25

0.00
57.38

0.75
0.75

0.00
19.13

0.60
0.60

0.00
15.30

0.40
0.40

0.00
25.50

2.09
2.09

0.00
53.17
106.34
214.76

2.25
2.25

0.00
57.38
114.75
231.75

0.75
0.75

0.00
19.13
38.25
77.25

0.60
0.60

0.00
15.30
30.60
61.80

0.40
0.40

Br. No-34/1
33127.55
33153.55
33158.20
33254.90
33259.55
33285.55

Goalpara Side App.


Road
Br.Gap
Guwahati Side App.
Road

Tottal=
Br. No-84/1
83125.00
83150.50
83155.00
83235.00
83239.50
83265.00

Goalpara Side App.


Road
Br.Gap . Slab =
96.69m
Guwahati Side App.
Road

Tottal=
G.T.=

(B.P.Borah)
Asstt.Executive Engineer,PWD
Goalpara NH Sub-division

(K.K. Sarma)
Asstt.Executive Engineer,PWD
Boko NH Sub-division

(Afzal Karim)
Executive Engineer,PWD
Guwahati NH Division,Guwah

BC (40mm)

Prime Coat Tack Coat

Volume
(m3)

Area
(m2)

Area
(m2)

0.00
10.40

0.00
260.00

0.00
780.00

0.00
10.40
20.80

0.00
260.00
520.00

0.00
780.00
1560.00

0.00
10.20

0.00
255.00

0.00
765.00

0.00
10.20
20.40
41.20

0.00
255.00
510.00
1030.00

0.00
765.00
1530.00
3090.00

zal Karim)
e Engineer,PWD
H Division,Guwahati

Sl. No.

Item Description
1. Stone Pitching
a) Forward Slope
i) Coned Portion

Br.No.

Chainage

length

F.R.L

H.F.L

10.80

100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00

96.40
96.40
96.40
96.40
96.40
96.40
96.40
96.40
96.40

34/1
33152.75
33152.75
33260.35

ii) in front of Abutment


b) Embankment Slope

34/1

33127.55
33152.75
33260.35
33285.55

25.20
25.20

F.B.L

L.B.L/G.L.

height
h

base
b

97.00
97.00
97.00
97.00
97.00
97.90
97.90
97.90
97.90

84.81
93.50
84.81
93.00
84.81
96.40
93.50
93.00
96.40

12.19
3.50
12.19
4.00
12.19
1.50
4.40
4.90
1.50

16.69
7.00
16.69
8.00
16.69
3.00
8.80
9.80
3.00

slant
Mean 's'
Length 's'

20.66
7.83
20.66
8.94
20.66
3.35
9.84
10.96
3.35

Area

thick.

14.52
20.66

223.17

1.00

6.60

166.23

1.00

7.16

180.32

1.00

nos.

qty.

2.00

446.33

2.00

332.46

2.00

360.63