Вы находитесь на странице: 1из 8

Customer

Schlumberger Well Services


P.O.Box 2847,Al Khobar 31592
Tel.:00966-3/3316380/3316312
Fax: 00966-3/8827699
Mobile: 00966-5-50502671
Email:ngrey@slb.com

Est. Ref

4553

Estimated By

Abdul

Estimated Date

04/03/2011

Scope

As Per attached Inspection Report

Sl/No.

Item

Qty

Unit

Units Price

Total

IPE 300 X36kgX6M

nos

1,700.00

5,100.00

SHS 80X5mm

nos

300.00

1,500.00

UPN140 X16 Kg X 6M

nos

400.00

800.00

sch 40 PI 8"

nos

1,200.00

1,200.00

Total Sub Contract Cost

8,600.00

Consumable/MISC -Matl@15%

Material Handling Arrangement

Tronsportation & Cranage & MISC @20%

Manhour

300

Hours

25.00

7,500.00

10

Blasting & Painting

20

LTR

20.00

400.00

Total Matl Cost with Cons,Misc,Manhour

22,510.00

Markup 35%

7,878.50

Gross Estimated Value

30,388.50

Enclosed:sub contract original Quotation

Estimated By

04/03/2011

1,290.00
1

nos

3,000.00

3,000.00
1,720.00

Remarks

Customer

Nalco

Contact

Thomas

Job Title

Modification of Trailer

Date

31/03/2011

Scope

Scope of the work for Modification of Trailer.


1. Machined the all break drums.
2. Replace the linear 4 nos.
3. Replace the all wheel bots & Nuts with Greasing.
4. Greasing to all bearing wheels and replace the Bearings 1 set.
5. Repair the leaf spring at all crack areas and done minor welding work to repairs areas.
Notes:
1. .The above scope all job have been done by our sub contactor Al Jubail baby son workshop.
2. Materials are supplied by client.
3. we supply man hours 50 only.
4. Sub contactor quotes the above job to 4700/-SR.(Quotation as per attached)

Sl/No.

Item

Qty

Unit

Sub contract Charge for Scope of above

Lump Sum

Units
Price

Total

4,700.00

4,700.00

Total Sub Contract Cost

4,700.00

Consumable/MISC -Matl@15%

705.00

Tronsportation & MISC @10%

470.00

Manhour ( as per attched Time sheet) for


Scope No#5

Enclosed:sub contract original Quotation

Estimated By
3/4/2011

51

Hours

30.00

1,530.00

Total Matl Cost with Cons,Misc,Manhour

7,405.00

Markup 35%

2,591.75

Gross Estimated Value

9,996.75

Remarks

Customer

Halliburton

Contact

Mazer Malik

Job Title

Supply of Man Power and materials.

Date

31/03/2011

Sl/No.

Item

Qty

Unit

Units
Price

Total

Pipe sch 40X 4"X6M

nos

418.00

418.00

MS Plate 4'X8'X15mm

nos

1,395.00

697.50

12mm RB

nos

28.00

28.00

Clamp 4"

nos

15.00

60.00

Bolt

nos

10.00

20.00

Total Material Cost

1,223.50

Consumable/MISC -Matl@15%

183.53

Tronsportation & MISC @10%

122.35

Manhour ( as per attched Time sheet)

51

40.00

2,040.00

Total Matl Cost with Cons,Misc,Manhour

4,792.88

Markup 35%

1,677.51

Gross Estimated Value

6,470.38

Enclosed:Time sheet & Work done report Submiited by Sundar Rajan.

Estimated By

Hours

Remarks

Customer:Halliburton
Job Title:8"X4" 7/8"Crossover Rack
Item

Qty

Unit

Units
Price

Total

SHS 80X5mm

nos

298.00

1,788.00

MS Plate 4'X8'X12mm

nos

1,048.00

1,048.00

22mm RB

10

nos

119.00

1,190.00

MS Plate 4'X8'X10mm

nos

871.00

871.00

MS Plate 4'X8'X6mm

nos

525.00

262.50

Paint & thinner(Each 10 litre)

20

LTR

20.00

400.00

Total Material Cost

5,559.50

Consumable -Matl@20%

833.93

Tronsportation & MISC @10%

555.95

Manhour

200

Hours

20.00

4,000.00

Total Matl Cost with Cons,Misc,Manhour

16,508.88

Markup 25%

4,127.22

Gross Estimated Value

20,636.09

Remarks

1062Kg

Sl/No.

Customer:Halliburton
Job Title: 8'X3/"X4'-1/2"Vertical Mandrel Pin Rack
Item

Qty

Unit

Units
Price

Total

SHS 80X5mm

nos

298.00

1,788.00

MS Plate 4'X8'X12mm

nos

1,048.00

1,048.00

1-1/2"Sch80 PI X30.97

nos

198.00

792.00

MS Plate 4'X8'X10mm

nos

871.00

871.00

MS Plate 4'X8'X6mm

nos

525.00

262.50

Paint & thinner(Each 15 litre)

30

LTR

20.00

600.00

Total Material Cost

5,361.50

Consumable -Matl@20%

804.23

Tronsportation & MISC @10%

536.15

Manhour

200

Hours

20.00

4,000.00

Total Matl Cost with Cons,Misc,Manhour

16,063.38

Markup 25%

4,015.84

Gross Estimated Value

20,079.22

Remarks

1131Kg

Sl/No.

Customer:Halliburton
Job Title: 6'X4' Horozontal Mandrel Pallet
Item

Qty

Unit

Units
Price

Total

SHS 80X5mm

nos

298.00

894.00

MS Plate 4'X8'X12mm

nos

1,048.00

1,048.00

MS Plate 4'X8'X8mm

nos

658.00

658.00

MS Plate 4'X8'X10mm

nos

871.00

871.00

Paint & thinner(Each 10 litre)

20

LTR

20.00

400.00

Total Material Cost

3,871.00

Consumable -Matl@20%

580.65

Tronsportation & MISC @10%

387.10

Manhour

120

Hours

20.00

2,400.00

Total Matl Cost with Cons,Misc,Manhour

11,109.75

Markup 25%

2,777.44

Gross Estimated Value

13,887.19

Remarks

559.13Kg

Sl/No.

Customer:Halliburton
Job Title: 10'X4' Pipe Vice
Item

Qty

Unit

Units
Price

Total

SHS 80X5mm

nos

298.00

894.00

MS Plate 4'X8'X12mm

nos

1,048.00

2,096.00

MS Plate 4'X8'X8mm

nos

658.00

658.00

MS Plate 4'X8'X20mm(Half)

0.5

nos

1,750.00

875.00

5"Sch80 PI X30.97

Mtr

200.00

200.00

Paint & thinner(Each 10 litre)

20

LTR

20.00

400.00

Total Material Cost

5,123.00

Consumable -Matl@20%

768.45

Tronsportation & MISC @10%

512.30

Manhour

120

Hours

20.00

2,400.00

Total Matl Cost with Cons,Misc,Manhour

13,926.75

Markup 25%

3,481.69

Gross Estimated Value

17,408.44

Remarks

581.64