(1) CPM used to :

A.
B.
C.
D.

xxxx.
Calculate longest duration.
xxxx
xxxx
(2)WBS OBS relationship?
The OBS displays organizational relationships and then uses them for assigning work to
resources in a project.
Like its originator, the OBS allows complex projects to be broken down, providing a more
organized representation of the work to be completed. While the WBS is used to define
the project during early stages of its cycle, the OBS provides an organizational structure
for the project as it moves to completion. The hierarchical nature of the Organizational
Breakdown Structure allows for the appropriate resources and responsibilities to be
assigned.
(3)If a project has CPI value of 0.91 and SPI value of 1.01, what does it
mean?
It means that project is ahead on schedule (time wise), but is losing (Cost wise)

(4)ABET is:
A. Engineering
Programming
B. Engineering
Exam C.
Engineering
Firm
D. xxxxx

(5)If a contractor failed in delivering the project, what will be the


Consequences? Liquidating of the performance bond.
(6)In pert analysis, Activity is represented by:
A. Arrow
B. Line
C. Node

D. Xxxx

(7) Concrete durability depends on ( related to) ______ and ______:


A. Pozzolan and ______
B. ________ and eggs
C. _____ , ______ and _______
D. _________ , ________ , _________ and __________