Pondasi Pagar
GALIAN
Galian Pondasi
Pjg Pondasi Pgr Biasa =
Luas Galian Pond. Pgr =
Volume Gal. Pondasi =
Galian Pondasi
Vol. Galian 1 Pondasi =
50
50
30
30
30
40
30
30
20
50
GALIAN
50
30
9.861 M3
Pgr
Pjt Total Pgr - (Lbr Pondasi Klm x Jml
Lebar X Tgg
Pjg X Luas Galian
Pgr
Lbr X Tgg X Pjg X Jml
### M3
= 88.00
= 0.35
= 74.20
X
X
(0.30
0.30
0.11
###
= 74.20 M
= 0.11 M2
= 7.79 M3
(0.30
0.30)
0.50
46.00 =
### M3
2.07 M3
(1.00
0.20)
=
=
X
X
= 89.04 M2
###
M2
5.00 M3
11.73 M2
0.30
0.26
M3
0.22
89.04 M2
= 74.20
###
15.95 M3
15
=
=
=
88.00 M
46.00 Bh
0.15 X 0.15
50
35
30
Batu Alam
Batu Alam
30
30
50
50
10
50
30
Pd Topi
Volume Beton =
0.639 M3
### M3
Pjg X Lbr X Tgg X Jml Klm =0.15 X
0.52 M3
0.12 M3
### M3
0.21 X
Pembesian Kolom
Tulangan Utama
Pjg 1 Besi Tul Utama Kolom = Tgg Klm + Pjg Masuk Pondasi
jg Besi Tul Utama 1 Kolom = Pjg 1 Besi X Jml
Pjg Besi Tul. Utama 46 Klm = Pjg 1 Klm X Jml Klm
Besi Yg dipakai Diameter =
10 mm
Berat Besi = Pjg Besi X Berat Besi D10
Tulangan Sengkang
Bjg Besi 1 Sengkang = (Lbr Klm - 0.04) X 4
Jml Sengkang 1 Klm =
(1.00 / 0.15)
Jml Sengkang 46 Kolom =
(7.00 X ###
Total Pjg Besi Sengkang =
322 X 0.44
Besi Yg dipakai Diameter =
6 mm
Berat Besi = Pjg Besi X Berat Besi D10
###
Kg
###
M2
###
M2
###
M2
###
M2
### Kg
= 0.50 + 0.50 = 1.00
= 1.00 X 4 Bh = 4.00
= 4.00 X ### = ###
M
M
M
0.44 M
Bakesting Kolom
Luas Bakesting 1 Klm =
Luas Bakesting 46 Klm =
Plasteran Kolom
Luas Plasteran 1 Klm =
Luas Plasteran 46 Klm =
Pengecatan Kolom
Luas Pengecatan 1 Klm =
Luas Pengecatan Klm =
Lbr X Tgg
Luas 1 Klm X Jml Klm
=
=
=
88.00 M
46.00 Bh
0.15 X
0.15
200
185
###
Pjg Pgr - (Lbr Klm X Jml) = 88.00 -
(0.15 X ###
= 81.10 M
X Dia
Kllng 2 Pipa X Pjg Pgr Besi
### M2
= 3.14 X 0.03 = 0.08 M
= 0.08 X 2 Bh = 0.16 M
= 0.16 X ### = 12.94 M2
Semen
Pasir
5.187
1.2
0.544
2.72
6.22
2.82
14.11
4.096
6.52
0.542857143
0.762222222
26.71
2.22
3.12
80.88
8.39
2.10
0.104
0.026
19.54
1,367.80
3.78
0.88
70.000
0.194
0.045
10.97
9.73
52.98
3.12
1,367.80
70,000
90,000.0
1500
80,000.0
200
Jml
Overhead
767,676.00
876,124.34
79,474.71
249,764.98
273,560.00
2,246,600.03
224,660.00
Total
2,471,260.03
/M3
/M3
/M3
/Zak
/Bh
2.00 M
10.00 M
LS
LS
LS
2.2
11
1
1
1
Harga Sat
20,833.33
15,750.00
150,000.00
15,000.00
10,000.00
Jml
Overhead
Total
Jml Harga
45,833.33
173,250.00
150,000.00
15,000.00
10,000.00
394,083.33
39,408.33
433,491.67