M.C.C.D.S.R.2006-07 Rate Analysis for Road Works Item


.Item No.1 (A)
Cutting down trees including trunks and branches and stacking the materials neatly with a lead of SOm as
. . directed (with griths above 30 em to 60 em.)

I'

I:

Spec. No. : Rd.1,

Page NO.179

DESCRIPTION

CUANTITY RATE IN Rs.

UNIT

AMOUNT IN Rs.
116.00

1) Labour
Mazdoor, unskilled heavyl male
Mazdo~r. unskilled light! female

0.800

DADO

145.00
145.00

Day
Day

Mazdoor. unskilled heavyl male

1.600

145.00

Day

2) Material
3)

1
;c'.

Machinery :
Equip. for cutting trees

58.00
232.00

Total Labour in Rs.

406.00

0.000

0.00
Total Material in Rs.

0.00
0.00

0.280

60.00

Day

Total Machinary in Rs.

Total of No.1 to 3 in Rs.

4) Scaffolding

16.80
16.80
422.80
0.00

Total

422.80

Total

4.23
427.03
_._-0.00

5) Sundries (1 %)

--_.- --------6) Water charges

Total

..... _ - -

7) Laboratory Testing

Total
----_.
8) Formwork etc.

Total
9) Overhead charges (10%)

427.03
0.00
427.03
... _ - 0.00
427.03
------42.70

- - -469.73
--0.00
469.73
---- . _ - - _Total
._-------_._
--Total

10) Total Lead

)
~

.,i, .:.

Say Completed Item Rate in Rs.Per No

406.00

11) Labour Component


Say Labour Component in Rs. Per No.

Camp. Rate Labour Rate


Rate proposed for M.C.C. D.S.R. 2006-2007

470.00

380.00

365.00

Unit
Per No.

406.00

M.C.C.D.S.R.2006,07 Rate Analysis for Road Works Item


Item No.1 (B)
Cutting down trees including trunks and branches and stacking the materials neatly with a lead of 50m as
.directed (with griths above 60 em to 90 em.)
Spec. No. : Rd.1, Page NO.179
../

.:

DESCRIPTION
1) Labour
Mazdoor, unskilled heavyl male
Mazdoor, unskilled Iightl female
Mazdoor, unskilled heavyl male

QUANTITY RATE IN Rs.


0.880
0.440
1.760

2) Material
3)

.,

Machinery :
Equip. for cutting trees

145.00
145.00
145.00

UNIT

AMOUNT IN Rs.

Day
Day
Day

127.60
63.80
255.20

0.000

Total Labour in Rs.


0.00
Total Material in Rs.

0.308

60.00

Day

Total Machinary in Rs.


Total of No.1 to 3 in Rs.

4)

Scaffolding

5)

Sundries (1%)

446.60
0.00
0.00
18.48
18.48
465.08

Total
6) <Water charges

Total
7) Laboratory Testing

Total
8) Formwork etc.

Total
9)

Overhead charges (10%)

Total
10) Total Lead

Total
Say Completed Item Rate in Rs.Per No
11) Labour Component
Say Labour Component in Rs.per No.
Compo Rate Labour Rate
Rate proposed for M.C.C. D.S.R. 2006-2007

'~""

.. :.

468.00

450.00

Unit
Per No.

0.00
469.73
0.00
469.73
0.00
469.73
46.97
516.70
0.00
516.70
517.00
446.00
450.00

M.C.C.D.S.R.2006-07 Rate Analysis for Road Works Item


Item No.1 (C)
Cutting down trees including trunks and branches and stacking the materials neatly with a lead of 50m as
directed (with griths above 90 em to 180 em.)
Spec. No. : Rd.1, Page No.179
DESCRIPTION
1) Jabour
Mazdoor, unskilled heavy! male
Mazdoor, unskilled light! female
Mazdoor, unskilled heavy! male

"I,

QUANTITY RATE IN Rs.


0.980
0.480
1.940

145.00
145.00
145.00

UNIT

AMOUNT IN Rs.

Day
Day
Day

142.10
69.60
281.30

2) Material

0.000

Total Labour in Rs.


0.00
Total Material in Rs.

3) Machinery :
Equip. for cutting trees

0.340

60.00

Day

Total Machinary in Rs.


Total of No.1 to 3 in Rs.
4) Scaffolding

Total
5) Sundries (1%)

Total
6) Water charges

Total

493.00
0.00
0.00
20.40
20.40
513.40
0.00
513.40
5.13
518.53
0.00
518.53

7) Laboratory Testing
...t.

8) Formwork etc.

Total
9) Overhead charges (10%)

Total

51.85
570.39
0.00

Total

570.39

10) Total Lead

Say Completed Item Rate in Rs.Per No

570.00
493.00

11) Labour Component


Say Labour Component in Rs. Per No.

, )
~.

Compo Rate Labour Rate


Rate proposed for M.C.C. D.S.R. 2006-2007

570.00

550.00

Unit
Per No.

550.00

"il

M.C.C.D.S.R.2006-07 Rate Analysis for Road Works Item


Itel)1 No.1 (0)
Cutting down trees including trunks and branches and stacking the materials neatly with a lead of 50m as
directed (with griths above 180 em to 270 em.)
Spec. No. : Rd.1 , Page No.179

DESCRIPTION
1) Labour
Mazdoor, unskilled heavy! male
Mazdoor, unskilled lightl female
J.
lvlazdoor, unskilled heavy! male

QUANTITY RATE IN Rs.


1.080
0.530
2.130

145.00
145.00
145.00

UNIT

AMOUNT IN Rs.

. Day
Day
Day

156.60
76.85
308.85

2)

Material

0.000

Total Labour in Rs.


0.00
Total Material in Rs.

3)

Machinery :
Equip. for cutting trees

0.374

60.00

Day

Total Machinary in Rs.


Total of No.1 to 3 in Rs.
4) Scaffolding

Total
5) Sundries (1 %)

'Total
6) Water charges

Total
7) Laboratory Testing

Total
8) Formwork etc.

Total

,'.

9) Overhead charges (10%)

Total
10) Total Lead

Total
Say Completed Item Rate in Rs.Per No
Say Labour Component in Rs. Per No.
Compo Rate Labour Rate
Rate proposed for M.C.C. D.S.R. 2006-2007

~.

22.44
22.44
564.74
0.00
564.74
5.65
570.39
0.00
570.39
0.00
570.39
0.00
570.39
57.04
627.43
0.00

627.43
627.00
542.00

. 11) Labour Component

542.30
0.00
0.00

627.00

595.00

Unit

Per No.

595.00

M.C.C.D.S.R.2006-07 Rate Analysis for Road Works Item


Item No.1 (E)
Cutting down trees including trunks and branches and stacking the materials neatly with a lead of SOm as
directed (with Rriths above 270 em to 450 em.)
Spec. No. : Rd.1, Page No.179
DESCRIPTION
1) Labour
Mazdoor, unskilled heavyl male
Mazdoor, unskilled Ii ghU female
Mazdoor, unskilled heavyl male

AMOUNT IN Rs.

Day
Day
. Day

172.55
84.10
339.30

1.190
0.580
2.340

145.00
145.00
145.00

2) Material

0.000

Total Labour in Rs.


0.00
Total Material in Rs.

3) Machinery :
Equip. for culling trees

0.411

60.00

;/.

.J

QUANTITY . RATE IN Rs. UNIT

.~.

Day

Total Machinary in Rs.


Total of No.1 to 3 in Rs
4) Scaffolding

Total
5) Sundries (1%)

Total
6) Water charges

Total
. 7)

Laboratory Testing

Total
8)

Formwork etc.

Total
9) Overhead charges (10%)

Total
1Dr Total Lead

Total
Say Completed Item Rate in Rs.Per No
Say Labour Component in Rs.Per No.
Compo Rate Labour Rate
Rate proposed for M.C.C. D.S.R. 2006-2007

,~.

24.66
24.66
620.61
0.00
620.61
6.21
626.82
0.00
626.82
0.00
626.82
0.00
626.82
62.68
689.50
0.00

689.50
689.00
595.00

. 11) Labour Component

,,".

595.95
0.00
0.00

690.00

655.00

Unit
Per No.

655.00

M.C.C.D.S.R.2006-07 Rate Analysis for Road Works Item


Item No.1 (F)
Cutting down trees including lrunks and branches and stacking the materials neatly with a lead of 50m as
directed (with griths above 450 em .J
Spec. No. : Rd.1, Page No.179
DESCRIPTION
1) Labour
Mazdoor, unskilled heavyl male
Mazdoor, unskilled Iightl female
Mazdoor, unskilled heavy! male

2)

QUANTITY RATE IN Rs.


1.810
0.640
2.570

Material

0.000

3)

_J

Machinery :
Equip. for cutting trees

0.434

145.00
145.00
145.00

UNIT

AMOUNT IN Rs.

Day
Day
Day

262.45
92.80
372.65

Total Labollr in Rs.


0.00
Total Material in Rs.
60.00

Day

Total Machinary in Rs.


Total of No.1 to 3 in Rs.
4) Scaffolding

Tolal
5) Sundries (1 %)

Tolal
6) Water charges

Total
7) Laboratory Testing
~otal

8) Formwork etc.

Total
9) Overhead charges (10%)

Total
10) Total Lead

Total
Say Completed Item Rate in Rs.Per No
, 11) Labour Component
Say Labour Component in Rs. Per No.
Compo Rate Labour Rate

)
Rate proposed for M.C.C. D.S.R. 2006-2007

....

~.

784.00

745.00

Unit
PerNo.

727.90
0.00
0.00
26.04
26.04
753.94
0.00
753.94
7.54
761.48
0.00
761.48
0.00
761.48
0.00
761.48
76.15
837.63
0.00
837.63
838.00
727.00
745.00

M.C.C.D.S.R.2006-07 Rate Analysis for Road Works Item


Item No.2
Excavation for Roadway in earth soil of all sorts sand, gravel or soft murum including dressing section
to the required grade, camber and side slopes and conveying the excavated materials with ail lifts upto a
iead of 50m. & spreading for imbackment stacking as directed.
Spec. No. : MORT & H : 301,

Page No.49 to 57

DESCRIPTION

QUANTITY RATE IN Rs.

1) Labour
Mazdoor, unskilled heavyl male

2)

_J

Quantity for 1.00 Cum


UNIT
AMOUNT IN Rs.

145.00

Day

145.00

Day

Mazdoor, unskilled IighU female

0.353
0.265

Totai Labour in Rs.

89.61

Material

0.000

0.00
Total Materiai in Rs.

0.00
0.00

0.000

0.00

0.00

3) Machinery :
Equip. for cUlling trees

Day

Totai Machinary in Rs.


Total of No.1 to 3 in Rs.
4) Scaffolding

Total
5) Sundries (1 %)

Total
6) Water charges
7)

9)

0.00
89.61
0.90
90.51
0.00
90.51
0.00

Total

90.51

Total

0.00
90.51

Total

9.05
99.56

Overhead charges (10%)

10) Total Lead

0.00
89.61

Total
Laboratory Testing

8) Formwork etc.

--.,

51.19
38.43

0.00

Total
Say Completed Item Rate in Rs Per Cum
11) Labour Component

99.56
70.00
89.60

Say Labour Component in Rs.Per Cum.


Compo Rate Labour Rate
Rate proposed for M.C.C. D.S.R. 2006-2007

70.00

70.00

Unit
Cum.

70.00

M.C.C.D.S.R.2006-07 Rate Analysis for Road Works Item


Item No.3
Excavation ior Roadway in' hard murum including dressing section to the required grade, camber and
side slopes and conveying the excavated materials with alf lifts upto a lead of 50m. & spreading for
imbackment stacking as directed.
Spec. No. : MORT & H : 301,

Page NoA9 to 57
QUANTITY RATE IN Rs.

DESCRIPTION
1) Labour
Mazdoor:unskilled heavyl male
Mazdoor, unskilled light! female

2)

0.500
0.265

Material

145.00
145.00

Quantity for 1.00 Cum


UNIT
AMOUNT IN Rs.
Day
Day

0.000

Total Labour in Rs.


0.00
Total Material in Rs.

0.000

0.00

72.50
38.43

110.93
0.00
0.00

3) Machinery :

Day

Total Machinary in Rs.


Total of No.1 to 3 in Rs.
4) Scaffolding

Total
5)

Sundries (1 %)

Total
6) Water charges

Total
7)

Laboratory Testing

8)

Formwork etc.

Total
Total
g) Overhead charges (10%)

Total
10) Total Lead

Total
Say Completed Item Rate in Rs Per Cum
11) Labour Component

0.00
0.00
110.93
0.00
110.93
1.11
112.03
0.00
112.03
0.00
112.03
0.00
112.03
11.20
123.24
0.00

123.24
80.00
110.93

Say Labour Component in Rs. Per Cum.


Compo Rate Labour Rate
Rate proposed for M.e.C. D.S.R. 2006-2007

80.00

80.00

Unit
Cum.

80.00

M.C.C.D.S.R.2006-07 Rate Analysis for Road Works Item


Item No.4
Excavation for Roadway in hard murum & boulders including dressing section 10 Ihe required grade,
camber and side slopes and conveying the excavated materiais with ali lifts upto a lead of 50m. & spreading
for imbackmenl stacking as directed.
Spec. No. : MORT & H : 301,

Page No.49 to 57

DESCRIPTION
1) Labour
Mazdoor, unskilled heavy! male
Mazdoor, unskilled IighU female

QUANTITY RATE IN Rs.


0.700
0.265

2) Material

145.00
145.00

Quantity for 1.00 Cum


UNIT
AMOUNT IN Rs.
Day
Day

0.000

Total Labour in Rs.


0.00
Total Material in Rs.

0.000

0.00

101.50
38.43

139.93
0.00
0.00

3) Machinery:
Day

Total Machinary in Rs.


Tota! of No.1 to 3 in Rs.

)
4) Scaffolding

Total

5) Sundries (1%)
Total

6) Water charges

====

0.00
139.93
0.00
139.93
1.40
141.32
0.00

-'-To"'t=al'----_ _~ _--,-14'-;.1.32
0.00
Total
141.32
---...- - - - - - - - -.---- 0.00-

7) Laboratory Testing
-~Formwork

0.00

etc.

Total

9) Overhead charges (10%)

141.32
14.13

....,"'=::oo=,10) Total Lead

--'1<.o-o"ta...
I
Total
Say Completed Item Rate in Rs Per Cum

11) Labour Component

..'1""55.46
0.00
155.46

90.00
139.93

Say Labour Component in Rs. Per Cum.


Compo Rate Labour Rate
Rate proposed for M.C.C. D.S.R. 2006-2007

90.00

90.00

Unit
Cum.

90.00

M.C.C.D.S.R.2006-07 Rate Analysis for Road Works Item


Item No.5
Excavation for Roadway in soft rock, including dressing section to the required grade, camber and side
slopes and conveying the excavated materials with all tifts upto a lead of 50m. & spreading or stacking as
directed.
Spec. No. : MORT & H : 302, Page No.47 to 63
Quantity for 1.00 Cum
DESCRIPTION
QUANTITY RATE IN Rs.
UNIT
AMOUNT IN Rs.
1) Labour
Blacksmith with tolls (2nd Class)
6.60
0.040
165.00
Day
Mazdoor, unskilled heavy! male
169.65
1.170
145.00
Day
Mazdoor, unskilled IighU female
38.43
0.265
145.00
Day
5.80
0.040
145.00
Day
Blow boy
220.48
Total Labour in Rs.
2) Material
0.00
0.000
0.00
Total Materiat in Rs.
0.00
3) Machinery:
0.00
0.000
0.00
Day
Totat Machinary in Rs.
Tota! of No, 1 to 3 in Rs.

4) Scaffolding
Tota!

5) Sundries (1 %)
Total

6) Water charges
_c---=-~

7)

Laboratory Testing

8)

Formwork etc.

9)

Overhead charges (10%)

Ti:.::o:.::ta:::.!.
Total

Totat

0.00
220.48
0.00
220.48
2.20
222.68
0.00
---, 222.68
0.00
222.68

--~

10) Total Lead


Totat
Say Completed Item Rate in Rs Per Cum

11) Labour Component

200.00
220.48

Say Labour Component in Rs. Per Cum


Compo Rate Labour Rate
Rate proposed for M.C.C. D.S.R. 2006-2007

200.00

200.00

Unit
Cum.

200.00

M.C.C.D.S.R.2006-07 Rate Analysis for Road Works Item

Item NO.6
E.xcavation for Roadway in hard rock by blasting including dressing section to the required grade,
camber and side slopes and conveying the excavated materials with all Iiffs upto a lead of 50m. & spreading
or stacking as directed.
Spec. No. : MORT & H : 302, Page No.47 to 63
Quantity for 1.00 Cum
DESCRIPTION
QUANTITY RATE IN Rs.
UNIT
AMOUNT IN Rs.
1) Labour
Blacksmith with tolls 2nd Class (8)
8.25
165.00
Day
0.050
150.00
Day
0.180
27.00
Quarry man, semi skilled (66)
145.00
Day
0.180
26.10
Helper unskilled
145.00
Day
145.00
Mazdoor, unskilled heavy! male
1.000
145.00
Day
145.00
Mazdoor, unskilled Iightl female
1.000
145.00
Day
0.050
7.25
Blow boy
358.60
Total Labour in Rs.
2) Material
0.00
70.00
Day
Noble dynamite (38)
11.90
0.170
10.00
Day
Detonater (346)
14.00
1.400
14.00
10.00
Day
Nipple for fastening detonater (43) .
1.400
24.00
Day
15.60
0.650
Red tape safly fuse (40)
55.50
Total Material in Rs.
3) Machinery:
Air Compressor P.No.15
0.050
457.00
Hour
22.85
Wagon Drill
0.050
1664.00
Day
83.20
106.05
Total Machtnal}' tn Rs.
520.15
Tota! of No.1 to 3 in Rs.
4) Scaffolding
0.00
520.15
Total
5.20
5)Sundries (1%)
525.35
Total
5.20
6) Water charges (1%)
530.55
Total
2.60
7) Laboratory Testing (0.50%)
533.15
Total
0.00
8) Formwork etc.
533.15
Total
53.32
9) Overhead charges (10%)
586.47
Total------~,,;
0.00
10) Total Lead
586.47
Total
Say Completed Item Rate in Rs Per Cum
315.00
11) Labour Component
358.60
Say Labour Component in Rs.Per Cum
265.00
Camp. Rate Labour Rate
Rate proposed for M.C.C. D.S.R. 2006-2007

315.00

265.00

Unit
Cum.

([~

M.C.C.D.S.R.2006-07 Rate Analysis for Road Works Item


Item No.7
Excavation for Roadway in hard rock by wedging chiselfeing or line drilling including dressing section
to the required grade, camber and side slopes and conveying the excavated materials with all lifts upto a
lead of 50m. & spreading or stacking as directed.
Spec. No. : MORT & H : 302, Page No.47 to 63
Quantity for 1.00 Cum
DESCRIPTION
QUANTITY RATE IN Rs.
UNIT
AMOUNT IN Rs.
1) Labour
Blak smith with tolls (2nd Class)
0.050
165.00
Day
8.25
Labour for Exc.in hard rock
2.500
145.00
Day
362.50
Mazdoor, unskilled lighU female
0.500
145.00
Day
72.50
Blow boy
0.050
145.00
Day
7.25
Total Labour In Rs.
450.50
2) Material
0.000
0.00
0.00
Total Material in Rs.
0.00
3) Machinery :
Air Compressor P.No.15
0.160
457.00
Hour
73.12
Wagon Drill
Day
266.24
0.160
1664.00
Total Machinary in Rs.
339.36
789.86
Total of No.1 to 3 in Rs.
4) Scaffolding
0.00
Total
789.86
5) Sundries (1 %)
7.90
Total
797.76
6) Water charges (1%)
7.90
Total
805.66
7) Laboratory Testing (0.50%)
3.99
Total
809.65
8) Formwork etc.
0.00
Total
809.65
-----------_._80.96
9) Overhead charges (10%)
Total
890.61
10) Total Lead
0.00
890.61
Total
Say Completed Item Rate in Rs Per Cum
410.00
11 ) Labour Component
450.50
Say Labour Component in Rs.Per Cum.
340.00

----~----

Compo Rate Labour Rate

)
Rate proposed for M.C.C. D.S.R. 2006;2007

410.00

340.00

Unit
Cum.

\)

M.C.C.D.S.R.2006-07 Rate Analysis for Road Works item


Item No.8
Watering & compating of embankment by vibratory roller, formed of material obtained from the road
cutting, within a lead of Sam. laying them in layers of unform thickness not exceeding 20 em. including
breaking clods, dressing to the required line etc. to 100% of standard proctor dencity.
Spec. No. : MORT & H : 305, Page NO.67 to 83
Quantity for 1.00 Cum
DESCRIPTION
QUANTiTY RATE IN Rs.
UNIT
AMOUNT IN Rs.
1) Labour
Mazdoor, unskiiled heavylmale
0.050
145.00
Day
7.25
Bhishi (mixing I curing), semi skilled
0.060
145.00
Day
8.70

15.95
0.00
0.00
12.16
64.77
76.93
92.88
0.00
92.88
0.93
93.81
0.94
94.74

42.00
15.95
14.00
Camp. Rate Labour Rate
Rate proposed for M.C.C. D.S.R. 2006-2007

40.00

14.00

Unit
Cum.

I~

M.C.C.D.S.R.2006-07 Rate Analysis for Road Works Item


Item No.9
Watering & compating of embankment by vibratory roller ,formed of material obtained from the road
cutting, within a lead of 50m. laying them in layers of unform Ihickness not exceeding 20 em. including
breaking clods, dressing to the required line etc. to 95% of standard proctor dencity.
Spec. No. : MORT & H : 305, Page No.67 to 83
Quantity for 1.00 Cum
DESCRIPTION
QUANTITY RATE IN Rs.
UNIT
AMOUNT IN Rs.
1) Labour
Mazdoor, unskilled heavylmale
0.050
145.00
Day
7.25
Shishi (mixing I curing), semi skilled
0.063
145.00
Day
9.14

2) Material

0.000

3) Machinery:
Water tank (7.5 T.) 11.5/11
Vibratory roller (8 to 10 M.T.) 8.2/10

0.004
0.007

Total Labour in Rs.


0.00
Total Material in Rs.

16.39
0.00
0.00

3040.00
Hour
8096.00
Day
Total Machinary in Rs.
Total of No.1 to 3 in Rs.

4) Scaffolding
Total
5) Sundries (1%)
Total
6) Water charges (1%)
Total

7)

12.16
56.67
68.83
85.22
0.00
85.22
0.85
86.07
0.86
86.93

----0.43

Laboratory Testing (0.50%)


Total

8) Formwork etc.
Total
9) Overhead charges (10%)
Total
10) Total Lead
Total
Say Completed Item Rate in Rs.Per Cum
11) Labour Component
Say Labour Component in Rs.Per Cum.
Compo Rate Labour Rate
Rate proposed for M.C.C. D.S.R. 2006-2007

38.00

14.00

Unit
Cum.

87.36
0.00
87.36
8.74
96.10
0.00
96.10
38.45
16.39
14.00

M.C.CD.S.R.2006-07 Rate Analysis for Road Works Item


Item No.10
Providing earth work in embankment with approved materials obtained from departmental land or other
sourse upto lead of 50 m. including aI/ iifts, laying in layers of unform thikness not exceeding 20 em.
breaking clods, dressing to the required line, curve grade and section, watering and compaction with
vibrotary rol/erto 95%of standard proctor dencity complete.

Camp. Rate Labour Rate


Rate proposed for M.C.C. D.S.R. 2006-2007

110.00

80.00

Unit
Cum.

M.C.C.D.S.R.2006-07 Rate Analysis for Road Works Item


Item No. 11
Providing earth work in embankment with approved materials obtained from private fand or other
sourse upto lead of 50 m. including all lifts, laying in layers of unform thikness not exceeding 20 em.
breaking clods, dressing to the required line, curve grade and section, watering and compaction with
vibrotary roller to 95%of standard proctor dencity complete.
Spec. No, : MORT & H : 305, Page NO.67 to 83
Quantity for 1.00 Cum
DESCRIPTION
QUANTITY RATE IN Rs.
UNIT
AMOUNT IN Rs.
1) Labour
0.050
7.25
Mazdoor, unskilled heavyl male
145.00
Day
0.063
Shishi (mlxing/curing) semi skilled
9.14
145.00
Day
75.11
0.518
Mazdoor, unskilled heavyl male
145.00
Day
Mazdoor, unskilled IighV female
38.43
145.00
Day
0.265
129.92
Total Labour in Rs.
2) Material
25.00
25.00
1.000
Total Material in Rs.
25.00
3) Machinery :
0.004
3040.00
Hour
Water tank (7.5 T.) 11 .5/11
12.16
Vibratory roller (8 to 10 M.T.) 8.2/10
0.007
8096.00
Day
56.67
Total Machinary in Rs.
68.83
Total of No.1 to 3 in Rs.
223.75
0.00
4) Scaffolding
Total
223.75
5) Sundries (1 %)
2.24
225.99
6) Water charges (1 %)
2.26
Total
228.25
7) Laboratory Testing
Total
8) Formwork etc.
Total
9) Overhead charges (10%)
22.82
251.07
Total
0.00
10) Total Lead
Total
251.07
Say Completed Item Rate in Rs.Per Cum
125.50
129.92
11) Labour Component
Say Labour Component in Rs.Per Cum
80.00
Compo Rate Labour Rate
Rate proposed for M.C.C. D.S.R. 2006-2007

115.00

80.00

Unit
Cum.

M.C.C.D.S.R.2006-07 Rate Analysis for Road Works Item


Item No.12
Providing earth work in embankment with approved materials obtained from departmental land or other
sourse upto lead of 50 m. including all lifts, laying in layers of unform thikness not exceeding 20 em.
breaking clods, dressing to the required line, curve grade and section, watering and compaction with
vibrotary roller to 100%ofstandard proctor dencity complete.
Spec. No. : MORT & H : 305,

Page No.67 to 83

DESCRIPTION
1) Labour
Mazdoor, unskilled heavyl male
Mazdoor, unskilled lighU female
Mazdoor, unskilled heavyl male

QUANTITY RATE IN Rs.


0.050
0.265
0.518

2) Material
3)
)

0.000

Machinery :
Water tank (7.5 T.) 11.5/11
Vibratory roller (8 to 10 M.T.) 8.2/10

0.004
0.008

145.00
145.00
145.00

Quantity for 1.00 Cum


UNIT
AMOUNT IN Rs.
Day
Day
Day

Total Labour in Rs.


0.00
Total Material in Rs.
3040.00
Hour
8096.00
Day
Total Machinary in Rs.
Total of No.1 to 3 in Rs.

4) Scaffolding

Total
5) Sundries (1 %)

Total
6) Water charges (1 %)

Total
7)

Laboratory Testing

8)

Formwork etc.

Total
Total
9) Overhead charges (10%)

Total
10) Total Lead

Total
Say Completed Item Rate in Rs.Per Cum
11 ) Labour Component
Say Labour Component in Rs.Per Cum
Compo Rate Labour Rate
Rate proposed for M.C.C. D.S.R. 2006-2007

117.00

80.00

Unit
Cum.

7.25
38.43
75.11
120.79
0.00
0.00
12.16
64.77
76.93
197.71
0.00
197.71
1.98
199.69
2.00
201.69
0.00
201.69
0.00
201.69
20.17
221.86
0.00
221.86
117.00
120.79
80.00

M.C.C.D.S.R.2006-07 Rate Analysis for Road Works Item


Item No. 13
Providing earth work in embankment with approved materiats obtained from private land or other
sourse upto lead of 50 m. including al/ lifts, laying in layers of unform thikness not exceeding 20 em.
breaking clods, dressing to the required tine, curve grade and section, watering and compaction with
vibrotary rol/er to 100%ofstandard proctor dencity complete.
Spec. No. :MORT & H : 305,

Page No.67 to 83

DESCRIPTION
1) Labour
Mazdoor:unskilled heavy/ male
Bhishi (mixing/curing) semi skilled
Mazdoor, unskilled heavy/ male
Mazdoor, unskilled IighU female

.,

QUANTITY RATE IN Rs.


0.050
0.063
0.518
0.265

2)

Material

1.000

3)

Machinery:
Water tank (7.5 T.) 11.5/11
Vibratory roller (8 to 10 M.T.) 8.2/10

0.004
0.008

4)

Scaffolding

5)

Sundries (1 %)

Quantity for 1.00 Cum


UNIT
AMOUNT IN Rs.

145.00
Day
145.00
Day
145.00
Day
145.00
Day
Tota/ Labour in Rs.
25.00
Total Material in Rs.
3040.00
Hour
8096.00
Day
Total Machinary in Rs.
Total of No.1 to 3 in Rs.

7.25
9.14
75.11
38.43
129.92
25.00
25.00
12.16
64.77
76.93
231.85

Total
6) Water charges(1 %)

Total
7)

Laboratory Testing (0.50%)

8)

Formwork etc.

9)

Overhead charges (10%)

Total
Total
Total
10) Total Lead

Tota/
Say Completed Item Rate in Rs.Per Cum
11) Labour Component
I

--,",

Say Labour Component in Rs.Per Cum.


,

Compo Rate Labour Rate


Rate proposed for M.C.C. D.S.R. 2006-2007

123.00

84.00

Unit
Cum.

2.34
236.51
1.18
237.69
0.00
237.69
23.77
261.46
0.00
261.46
123.00
129.92
84.00

M.C.C.D.S.R.2006-07 Rate Analysis for Road Works Item


Item No.14
Providing earth work in embankment with approved materiats obtained from departmental land or other
sourse upto tead of 50 m. including att tifts, laying in layers of unform thikness not exceeding 20 em.
breaking clods, dressing to the required tine, curve grade and section, with normal watering and
compaction by vibratory rotter comptete.
Spec. No. : MORT & H : 305,

Page NO.67 to 83

DESCRIPTION
1) Labour
Mazdoor, unskilled heavy/ male
Mazdoor:unskilled light! female
Mazdoor, unskilled heavy/ male

..

QUANTITY RATE IN Rs.


0.050
0.265
0.518

2)

Material

0.000

3)

Machinery :
Water tank (7.5 T.) 11.5/11
Vibratory roller (8 to 10 M.T.) 8.2/10

0.004
0.004

145.00
145.00
145.00

Quantity for 1.00 Cum


UNIT
AMOUNT IN Rs.
Day
Day
Day

Totat Labour in Rs.


0.00
Totat Materiat in Rs.

120.79
0.00
0.00

3040.00
Hour
8096.00
Day
Total Machinary in Rs.
Total of No.1 to 3 in Rs.

12.16
32.38
44.54
165.33
0.00
165.33
0.83
166.16
0.83
166.99
0.00
166.99
0.00
166.99
16.70
183.69
0.00
183.69
90.00
120.79
70.00

4) Scaffolding

Total
5) Sundries (0.50%)

Total
6) Water charges (0.50%)

Total
7)

Laboratory Testing

8)

Formwork etc.

9)

Overhead charges (10%)

Total
Total
Total
10) Total Lead

Total
Say Completed Item Rate in Rs.Per Cum
11) Labour Component
Say Labour Component in Rs.Per Cum
Compo Rate Labour Rate
Rate proposed for M.C.C. D.S.R. 2006-2007

90.00

7.25
38.43
75.11

70.00

Unit
Cum.

M.C.C.D.S.R.2006-07 Rate Analysis for Road Works Item

,
)

Item No.15
Providing earth work in embankment with approved materials obtained from private land or other
sourse upto lead of 50 m. including all lifts, laying in layers of unform thikness not exceeding 20 em.
breaking clods, dressing to the required line, curve grade and section, with normal watering and
compaction by vibratory roller complete.
Spec. No. : MORT & H : 305, Page NO.67 to 83
Quantity for 1.00 Cum
DESCRIPTION
UNIT
AMOUNT IN Rs.
QUANTITY RATE IN Rs.
1) Labour
145.00
Day
Mazdoor, unskilled heavyl male
0.050
7.25
75.11
145.00
Day
Mazdoor, unskilled heavyl male
0.518
38.43
145.00
Day
Mazdoor, unskilled lightl female
0.265
Total Labour in Rs.
120.79
2) Material
1.000
25.00
25.00
Total Material in Rs.
25.00
3) Machinery :
0.004
12.16
Water tank (7.5 T.) 11.5111
3040.00
Hour
Vibratory roller (8 to 10 M.T.) 8.2/10
0.008
64.77
8096.00
Day
Total Machinary in Rs.
76.93
Total of No.1 to 3 in Rs.
222.71
4) Scaffolding
0.00
Total
222.71
5) Sundries (0.5%)
1.11
Total
223.83
--~~ -------"--T12
6) Water charges(0.5%)
Total
224.95
0.00
7) Laboratory Testing
Total
224.95
0.00
8) Formwork etc.
Total
224.95
- - - - - 22.49
9) Overhead charges (10%)
Total
247.44
0.00
10) Total Lead
247.44
Total
Say Completed Item Rate in Rs.Per Cum
100.00
120.79
11) Labour Component
Say Labour Component in Rs.Per Cum.
80.00
Camp. Rate Labour Rate
Rate proposed for M.C.C. D.S.R. 2006-2007

100.00

80.00

Unit
Cum.

M.C.CD.S.R.2006-07 Rate Analysis for Road Works Item


Item No.16 (a)
Preparing embankment with approval malerials obtained from the cutting within a lead of 50m. including
laying in layers of unform thikness not exceeding 20 em, breaking clods, dressing to the required lines
curves, grade and section with normal watering and compaction by vibratory roller etc completed.
Spec. No. : MORT & H : 305,

Page No.67 to 83

DESCRIPTION
1) Labour
Mazdoor, unskilled heavylmale
Mazdoor, unskilled heavylmale

QUANTITY RATE IN Rs.


0.050
0.050

2) Material

0.000

3) Machinery:
Water tank (7.5 T.) 11.5/11
Vibratory roller (8 to 10 M.T.) 8.2/10

0.004
0.003

145.00
145.00

Quantity for 1.00 Cum


UNIT
AMOUNT IN Rs.
Day
Day

Total Labour in Rs.


0.00
Total Material in Rs.

3040.00
Hour
8096.00
Day
Total Machinary in Rs.
Total of No.1 to 3 in Rs.

4) Scaffolding
Total

5) Sundries (0.5%)
---.c=c-::-c==~=,,

---,T<c::o.::ta,,-I

6) Water charges (0.5%)


Total

7) Laboratory Testing
Total

8) Formwork etc.
Total

9) Overhead charges (10%)


Total

10) Total Lead

7.25
7.25

14.50
0.00
0.00
12.16
24.29
36.45
50.95
0.00
50.95
0.25
51.20
0.26
51.46
0.00
51.46
0.00
51.46
5.15
56.60
0.00

Total
Say Completed Item Rate in Rs Per Cum

56.60
25.00

Say Labour Component in Rs.Per Cum.

12.00

11) Labour Component

14.50

Camp. Rate Labour Rate


Rate proposed for M.C.C. D.S.R. 2006-2007

25.00

12.00

Unit
Cum.

M.C.C.D.S.R.2006-07 Rate Analysis for Road Works Item


Item No.16 (b)
Preparing embankment with approval materials obtained from the cutting within a lead of 50m. inclUding
laying in layers of unform thikness not exceeding 20 cm, breaking clods, dressing to the required lines
curves, grade and section and compaction by vibratory roller with 95% proctor density etc completed.
Spec. No. : MORT & H : 305,

Page No.67 to 83
QUANTiTY RATE IN Rs.

DESCRIPTION
1) Labour
Mazdoor, unskilled heavylmale
Mazdoor, unskilled heavy/male

0.050
0.050

2) Material

0.000

3) Machinery:
Water tank (7.5 T.) 11.5/11
Vibratory roller (8 to 10M.T.) 8.2/10
Cart on hire with driver

0.004
0.007
0.150

145.00
145.00

Quantity for 1.00 Cum


UNIT
AMOUNT IN Rs.
Day
Day

Total Labour in Rs.


0.00
Total Material in Rs.
3040.00
Day
8096.00
Day
230.00
Day
Total Machinary in Rs.
Tota/ of No.1 to 3 in Rs.

4) Scaffolding

Total

7.25
7.25

14.50
0.00
0.00
12.16
56.67
34.50
103.33
117.83
0.00
117.83

5) Sundries (1%)

Total
6) Water charges (1 %)

Total
7) Laboratory Testing
8) Formwork etc.
9) Overhead charges (10%)

Total
10) Total Lead

Total
Say Completed Item Rate in Rs Per Cum
11) Labour Component
Say Labour Component in Rs.Per Cum.
Compo Rate Labour Rate
Rate proposed for M.C.C. D.S.R. 2006-2007

30.00

12.00

Unit
Cum.

0.00
132.22
30.00
14.50
12.00

M.C.CD.S.R.2006-07 Rate Analysis for Road Works Item


Item No.16 (e)
Preparing embankment with approvai materials obtained from the cutting within a lead of 50m. including
laying in layers of unform thikness not exceeding 20 cm, ;breaking clods, dressing to the required lines
curves, grade and section and compaction by vibratory rolter with 100% proctor density etc completed.
Spec. No. : MORT & H : 305,

Page No.67 to 83
QUANTITY RATE IN Rs.

DESCRIPTION
1) Labour
Mazdoor, unskilled heavylmale
Mazdoor, unskilled heavylmale

0.050
0.050

2) Material

0.000

3) Machinery:
Water tank (7.5 T.) 11.5/11
Vibratory roller (8 to 10 M.T.) 8.2/10
Cart on hire with driver

0.004
0.008
0.250

145.00
145.00

Quantity for 1.00 Cum


UNIT
AMOUNT IN Rs.
Day
Day

Total Labour in Rs.


0.00
Total Material in Rs.
3040.00
Day
8096.00
Day
230.00
Day
Total Machinary in Rs.
TotalofNo. 1 to 3 in Rs.

4) Scaffolding

Total
5) Sundries (1%)

Total
6) Water charges (1 %)

Total
7) Laboratory Testing (0.50%)

Total
8) Formwork etc.

Total
9)

Overhead charges (10%)

Total
10) Total Lead

Total
Say Completed Item Rate in Rs Per Cum
11) Labour Component

Say Labour Component in Rs.Per Cum.


Compo Rate . Labour Rate
Rate proposed for M.C.C. D.S.R. 2006-2007

40.00

14.00

Unit
Cum.

7.25
7.25

14.50
0.00
0.00
12.16
64.77
57.50
134.43
148.93
0.00
148.93
1.49
150.42
1.50
151.92
0.76
152.68
0.00
152.68
14.89
167.57
0.00
167.57
40.00
14.50
14.00

M.C.C.D.S.R.2006-07 Rate Analysis for Road Works Item


Item No. 17
Supplying hand broken over size metal grade I /quartzite gneiss stone rubble at the road side for soling
including conveying and stacking complete. (by blastying)
Spec. No. : MORT & H : 404,

Page NO.112 to 115

DESCRIPTION

QUANTITY RATE IN Rs.

1) Labour
Mazdoor, unskilled heavyl male

2)

,I

3)

0.800

Material
Hand broken over size metal grade I

1.100

145.00

Quantity for 1.00 Cum.


UNIT
AMOUNT IN Rs.
Day

116.00

Total Labour in Rs.

116.00

280.00
Cum
Total Material in Rs.

308.00
308.00

Machinery :
0.000

0.00

Day

Total Machinary in Rs.


Total of No.1 to 3 in Rs.
4) Scaffolding

Total
5) Sundries (0.50%)

Total
6) Water charges

Total
7)

Laboratory Testing

8)

Formwork etc.

0.500

Total
Total
9) Overhead charges (10%)

Total
10) Total Lead

0.500

Total
Say Completed Item Rate in Rs Per Cum
11) Labour Component

0.00
0.00
424.00
0.00
424.00
2.12
426.12
0.00
426.12
2.13
428.25
0.00
428.25
42.83
471.08
0.00
471.08
283.00
116.00

Say Labour Component in RS.Per Cum.


Camp. Rate Labour Rate
Rate proposed for M.C.C. D.S.R. 2006-2007

235.00

108.00

Unit
Cum.

116.00

M.C.CD.S.R.2006-07 Rate Analysis for Road Works Item


Item No. 18
Supplying hand broken over size metel grade- If trap/ granite I quartzite! gneiss stone over size metal at the road
side, including conveying and stacking complete. (by blasting)

Spec. No. : MORT & H : 404,

Page NO.112 to 115


QUANTITY RATE IN Rs.

DESCRIPTION
1) Labour
Mazdoor, unskilled heavyl male

1.200

2) Material
Hane borken over size metal grade-II

1.100

145.00

Quantity for 1.00Cum.


UNiT
AMOUNT IN Rs.
Day

174.00

Total Labour in Rs.

174.00

290.00
Cum
Total Material in Rs.

319.00
319.00

3) Machinery :
0.000

0.00

Day

Total Machinary in Rs.


Total of No.1 to 3 in Rs.

)
~

4) Scaffolding
Total

5) Sundries (0.50%)
Total

6) Water charges
Total

0.500

7) Laboratory Testing

Total

8) Formwork etc.
Total

9) Overhead charges (10%)


Total

0.500

10) Totai Lead

Total
Say Completed Item Rate in Rs Per Cum

11) Labour Component


Say Labour Component in Rs.Per Cum.
Camp. Rate Labour Rate
Rate proposed for M.C.C. D.S.R. 2006-2007

250.00

125.00

Unit
Cum.

0.00
0.00
493.00
0.00
493.00
2.47
495.47
0.00
495.47
2.48
497.94
0.00
497.94
49.79
547.74
0.00
547.74
329.00
174.00
150.00

M.C.C.D.S.R.2006-07 Rate Analysis for Road Works Item


Item No.19
Supplying hand broken over size metel grade- III trap/ granite / quartzite! gneiss stone over size metal at the road
side, including conveying and stacking complete. (by blasting)
Spec. No. : MORT & H.: 404, Page No.112 to 115

QUANTITY RATE IN Rs.

DESCRIPTION
1) Labour
Mazdoor, unskilled heavy! male

2)

3)

1.800

Material
Hane borken over size metal grade-ill

1.150

145.00

Quantity for 1.00 Cum.


UNIT
AMQUNT IN Rs.
Day

Total Labour in Rs.

261.00

300.00
Cum
Total Material in Rs.

345.00
345.00

Machinery :
0.000

0.00

Day

Total Machinary in Rs.


Tota! of No.1 to 3 in Rs.

~
4)

261.00

Scaffolding
Total

5) Sundries (0.50%)
Total
6) Water charges
Total
7)

Laboratory Testing

8)

Formwork etc.

9)

Overhead charges (10%)

0.500
Total
Total
Total

10) Total Lead

0.500
Total
Say Completed Item Rate in Rs Per Cum

11) Labour Component


Say Labour Component in Rs.Per Cum.
Compo Rate Labour Rate
Rate proposed for M.C.C. D.S.R. 2006-2007

260.00

130.00

Unit
Cum.

0.00
0.00
606.00
0.00
606.00
3.03
609.03
0.00
609.03
3.05
612.08
0.00
612.08
61.21
673.28
0.00
673.28
207.00
261.00
130.00

M.C.C.D.S.R.2006-07 Rate Analysis for Road Works Item


Item No. 20
Supplying 40 mm. Trap / granite / quartzite / gneiss stone metal, hand broken at the road side, including
conveying and .stacking complete (by blasting)
Spec. No. : MORT & H : 404,

Page No.112 to 115

DESCRIPTION
1) Labour
Mazdoor, unskilled heavyl male
2)

3)

QUANTITY RATE IN Rs.

Material
Rd-6 * 0.6 Tr Rubble

Quantity for 1.00 Cum.


AMOUNT IN Rs.
UNIT

2.200

137.10
Day
Total Labour in Rs.

301.62
301.62

1.200

166.00
Cum
Total Material in Rs.

199.20
199.20

0.000

0.00
Total Machinary in Rs.
Total of No.1 to 3 in Rs.

0.00
0.00
500.82
0.00
500.82
2.50
503.32
0.00
503.32
2.52
505.84
0.00
505.84
50.58
556.42
0.00
556.42
110.00
301.62
15.00

Machinery :

4) Scaffolding

.J

Total
5) Sundries (0.50%)

0.500

Total
6) Water charges

Total
7)

Laboratory Testing

8)

Formwork etc.

0.500

Total
Total
9) Overhead charges (10%)

Total
10) Total Lead

0.500

Total
Say Completed Item Rate in Rs Per Cum
11) Labour Component
Say Labour Component in Rs.Per Cum.
Compo Rate Labour Rate
Rate proposed for M.C.C. D.S.R. 2006-2007

270.00

140.00

Unit
Cum.

M.C.C.D.S.R.2006-07 Rate Analysis for Road Works Item


Item No. 21
Supplying hard muruml kankar at the road side, including conveying and stacking complete.
Spec. No. : MORT & H : 305,

Page No.67 to 71
QUANTITY RATE IN Rs.

DESCRIPTION
1) Labour
Mazdoor, unskiiled heavy! male
Mazdoor, unskilled IighUfemale

0.420'
0.225

145.00
145.00

Quantity for 1.00 Cum.


UNIT
AMOUNT IN Rs.
Day
Day

60.90
32.63

Tota! Labour in Rs.

93.53

75.00
Total Material in Rs.

90.00
90.00

2) Material
1.200
3) Machinery:
0.000

0.00

Day

Total Machinary in Rs.


Total of No.1 to 3 in Rs.

J
4) Scaffolding

Total

5) Sundries (0.50%)
Total

6) Water charges
Total

0.500;

7) Laboratory Testing

Total

8) Formwork etc.
Total

9) Overhead charges (10%)


Total

0.500

10) Total Lead

Total
Say Completed Item Rate in Rs Per Cum

11) Labour Component


Say Labour Component in Rs.Per Cum.
Compo Rate Labour Rate
Rate proposed for M.C.C. D.S.R. 2006-2007

80.00

15.00

Unit
Cum.

0.00
0.00
183.53
0.00
183.53
0.92
184.44
0.00
184.44
0.92
185.36
0.00
185.36
18.54
203.90
0.00
203.90
110.00
95.53
15.00

M.C.C.D.S.R.2006-07 Rate Analysis for Road Works Item


Item No. 22
Supplying soft murum at the road side, including conveying and stacking complete.
Spec. No. : MORT & H : 305,

Page No.67 to 71

DESCRIPTION
1) Labour
Mazdoor, unskilled heavy! male
Mazdoor, unskilled IighVfemale

QUANTITY RATE IN Rs.


0.300
0.225

145.00
145.00

Quantity for 1.00 Cum.


UNIT
AMOUNT IN Rs.
Day
Day

43.50
32.63

Total Labour in Rs.

76.13

65.00
Total Material in Rs.

78.00
78.00

2) Material
1.200
3) Machinery:
0.000

0.00

Day

Total Machinary in Rs.


Total of No.1 to 3 in Rs.
4) Scaffolding
Total
5) Sundries (0.50%)
Total
6) Water charges
Total
7)

Laboratory Testing

8)

Formwork etc.

0.500
Total
Total

9) Overhead charges (10%)


Total
10) Total Lead

0.500
Total
Say Completed Item Rate in Rs Per Cum

. 11) Labour Component


Say Labour Component in Rs.Per Cum.
Compo Rate Labour Rate
Rate proposed for M.C.C. D.S.R. 2006-2007

70.00

15.00

Unit
Cum.

0.00
0.00
154.13
0.00
154.13
0.77
154.90
0.00
154.90
0.77
155.67
0.00
155.67
15.57
171.24
0.00
171.24
96.00
76.13
15.00

M.C.C.D.S.R.2006-07 Rate Analysis for Road Works Item


Item No. 23
Spreading oversize metal including sectioning complete.
Spec. No. : MORT & H : 404.33,

Page NO.117to 119

DESCRIPTION
1) Labour
Mazdoor, .unskilled heavy! male
Mazdoor, unskilled IIghUfemale

2)

3)

QUANTITY RATE IN Rs.


0.100
0.100

145.00
145.00

Quantity for 1.00 Cum.


UNIT
AMOUNT IN Rs.
Day
Day

14.50
14.50

Total Labour in Rs.

29.00

0.000

0.00
Total Matenal in Rs.

0.00
0.00

0.000

0.00

Material

Machinery :

Day

Total Machinary in Rs.


Tota! of No.1 to 3 in Rs.
4) Scaffolding
Tota!
5) Sundries
Total
6) Water charges
Total
7)

Laboratory Testing

8)

Formwork etc.

0.000
Tota!
Tota!

"9)Oiierhead charges (10%)


Total
0.000

10) Total Lead

Total
Say Completed Item Rate in Rs Per Cum
11) Labour Component
Say Labour Component in Rs.Per Cum.
Camp. Rate Labour Rate

)
Rate proposed for M.C.C. D.S.R. 2006-2007

20.00

20.00

Unit
Cum.

0.00
0.00
29.00
0.00
29.00
0.00
29.00
0.00
29.00
0.00
29.00
0.00
29.00
2.90
31.90
0.00
31.90
21.00
29.00
29.00

M.C.C.D.S.R.2006-07 Rate Analysis for Road Works Item


Item No. 24
Spreading gravel/sand / soft murum / hard murum over rubble soling / W.B.M. surface complete.
Spec. No. : MORT & H : 305.35,

Page No.73 to 74

DESCRIPTION
1) Labour
Mazdoor, unskilled heavy! male
Mazdoor, unskilled light/female

QUANTITY RATE IN Rs.


0.070
0.070

145.00
145.00

Quantity for 1.00 Cum.


UNIT
AMOUNT IN Rs.
Day
Day

10.15
10.15

Total Labour in Rs.

20.30

0.00
Tota! Material in Rs.

0.00
0.00

2) Material
0.000
3) Machinery:

Tota! Machinary in Rs.


Tota! of No.1 to 3 in Rs.

)
4) Scaffolding

Total
5) Sundries

Tota!
6) Water charges

Total
0.000

7) Laboratory Testing

Total
8)

Formwork etc.

Total
9) Overhead charges (10%)

Total
0.000

10) Total Lead

Total
Say Completed Item Rate in Rs Per Cum
11) Labour Component
Say Labour Component in Rs.Per Cum.
Compo Rate Labour Rate
Rate proposed for M.C.C. D.S.R. 2006-2007

20.00

20.00

Unit
Cum.

0.00
20.30
0.00
20.30
0.00
20.30
0.00
20.30
0.00
20.30
0.00
20.30
2.03
22.33
0.00
22.33
22.00
20.30
20.00

M.C.C.D.S.R.2006-07 Rate Analysis for Road Works Item


Item No. 25
Compacting rubble salling / oversize metal layers 20 mm loose thick with vibratory roller including artificial
watering complete.

Camp. Rate Labour Rate


Rate proposed for M.C.C. D.S.R. 2006-2007

800.00

130.00

Unit
Sq.m

M.C.C.D.S.R.2006-07 Rate Analysis for Road Works. Item


Item No. 26
Compacting rubbte size metat tayers 20 mm loose thick with vibrotary roller including artificial watering
complete.
Spec. No. : MORT & H : 404.34,

Page No.117 to 120

DESCRIPTION
1) Labour
Mazdoor, unskilled lighUfemale
Bhisti (Mixing I Curing), Semi-Sk
Labour for traffic requlation

QUANTITY RATE IN Rs.


0.800
0.270
0.540

145.00
145.00
155.00

Quantity for 100 Sq.m..


UNIT
AMOUNT IN Rs.
Day
Day
Day

116.00
39.15
83.70

Total Labour in Rs.

238.85

0.00
Total Material in Rs.

0.00
0.00

2) Material
0.000
3) Machinery:
Vibratory Roller (8 to 10 MT)
Water tanker

4)

Scaffolding
,-c-

5) Sundries (0.50%)
-=-;-;c,--;_-;-_----.=c-

6) Water charges (1%)


7) Laboratory Testing
8) Formwork etc.
_-c---,--_--c=7c-

--e)Overhead charges (10%)


10) Total Lead

11) Labour Component

0.100
0.015

8096.00
Day
3040.00
Day
Total Machinary in Rs.
Total of No.1 to 3 in Rs.

809.60
45.60
855.20
1094.05
0.00
--.:Total
1094.05
5.47
1099.52
f,:.::otal
11.00
Total
1110.52
0.000
0.00
1110.52
Total
0.00
_~_ _1110.52
---"Total
111.05
1221.57
Total
0.00
0.000
1221.57
Total
Say Completed Item Rate in Rs Per 100 Sq.m
900.00
238.85
Say Labour Component in Rs.Per 100 Sq.m
125.00

Camp. Rate Labour Rate


Rate proposed for M.C.C. D.S.R. 2006-2007

850.00

119.00

Unit
100 Sq.m

M.C.C.D.S.R.2006-07 Rate Analysis for Road Works Item


Item No. 27
Picking the road surface including sectioning complete (WBM Surface)
Spec. No. : Rd.33, Page No.208.
DESCRIPTION
1) Labour
Mazdoor, unskilled heavylmaie
mazdoor, unskilled IighUfemale
Labour for traffic requlation
Blacksmith with toois, 2nd Ciass.

QUANTITY RATE IN Rs.

Quantity for 1.00 Sq.m..


UNIT
AMOUNT IN Rs.

0.010
0.010
0.010
0.002

145.00
Day
145.00
Day
155.00
Day
155.00
Day
Total Labour in Rs.

1.45
1.45
1.55
0.31
4.76

0.000

0.00
Total Material in Rs.

0.00
0.00

2) Material

3) Machinery:

Total Machinary in Rs.


Total of No.1 to 3 in Rs.

4) Scaffolding
Total

5) Sundries (0.1%)
Total

6) Water charges
Total

0.000

nLaboratory Testing

Total

8) Formwork etc.
Total

9) Overhead charges (10%)


Total

0.000

10) Totai Lead

Total
Say Completed Item Rate in Rs Per Sq.m

11) Labour Component


Say Labour Component in Rs.Per Sq.m

Camp. Rate Labour Rate


Rate proposed for M.C.C. D.S.R. 2006-2007

4.80

4.80

Unit
Sq.m

0.00
4.76
0.00
4.76
0.05
4.81
0.00
4.81
0.00
4.81
0.00
4.81
0.48
5.29
0.00
5.29
5.30
4.76
5.00

M.C.C.D.S.R.2006-07 Rate Analysis for Road Works Item


Item No. 28
Picking the road surface including sectioning complete (B. T. Surface)

Compo Rate Labour Rate


Rate proposed for M.C.C. D.S.R. 2006-2007

8.00

8.00

Unit
Sq.m

M.C.C.D.S.R.2006-07 Rate Analysis for Road Works Item


Item No. 29 (A)
Supplying crushed metal 25 mm. to 40 mm. of trap / qrantite / quartzite / gneis stone metal at the road
side including conveying and stacking for use in bituminous road surface.
Spec. No. :MORTH : 404 , Page No. 112 to 115
DESCRIPTION
1) Labour
Beldar, Skilled
Mazdoor, unskilled heavyi male
Mazdoor, unskilled IighUfemale
Watchman
2)

3)

QUANTITY RATE IN Rs.

Quantity for 1.00 Cum.


UNIT
AMOUNT IN Rs.

0.100
0.200
0.200
0.070

145.00
Day
145.00
Day
145.00
Day
145.00
Day
Total Labour in Rs.

14.50
29.00
29.00
10.15
82.65

Material
Rd-19, Rubble 15 to 23 CM (BL)
Kerosine I Solvent

1.200
0.033

230.00
Cum
18.00
LIT
Total Material in Rs.

276.00
0.59
276.59

Machinery :
Crusher

0.033

2888.00

Day

95.30

)
Total Machinary in Rs.
Total of No.1 to 3 in Rs.
4) Scaffolding

Total
5)

Sundries (1 %)

Total
6) Water charges

Total
7)

Laboratory Testing (0.50%)

8)

Formwork etc.

9)

Overhead charges (10%)

0.500

Total
Total
Total
10) Total Lead

0.500

Total
Say Completed Item Rate in Rs Per Cum
11) Labour Component
Say Labour Component in Rs.Per Cum.
Camp. Rate Labour Rate
Rate proposed for M.C.C. D.S.R. 2006-2007

400.00

93.00

Unit
Cum.

95.30
454.55
0.00
454.55
4.55
459.09
0.00
459.09
2.30
461.39
0.00
461.39
46.14
507.53
2.54
510.07
474.00
82.65
77.00

M.C.CD.S.R.2006-07 Rate Analysis for Road Works Item

Camp. Rate Labour Rate

)
Rate proposed for M.C.C. D.S.R. 2006-2007

405.00

93.00

Unit
Cum.

M.C.C.D.SR.2006-07 Rate Analysis for Road Works Item


Item No. 29 (C)
Supplying crushed metal 20 mm. of trap / qrantite / quartzite / gneis stone metal at the road side inctuding
conveying and stacking for use in bituminous road surface.
Spec. No. :MORTH : 404, Page No. 112 to 115
QUANTITY RATE IN Rs.

DESCRIPTION
1) Labour
Beldar, Skilled
Mazdoor, unskilled heavyl male
Mazdoor, unskilled light/female
Watchman
2)

Material
Rd-19, Rubble 15 to 23 CM (BL)
.Kerosine I Solvent

3) Machinery :
Crusher

Quantity for 1.00 Cum.


UNIT
AMOUNT IN Rs.

0.100
0.200
0.200
0.070

145.00
Day
145.00
Day
145.00
Day
Day
145.00
Total Labour in Rs.

14.50
29.00
29.00
10.15
82.65

1.200
0.033

230.00
Cum
18.00
LIT
Total Material in Rs.

276.00
0.59
276.59

0.033

2888.00

Day

Total Mach/nary in Rs.


Total of No.1 to 3 in Rs.
4) Scaffolding
Total
5) Sundries (1 %)
Total
6) Water charges
Total
0.500

7) Laboratory Testing (0.50%)

Total
8)

Formwork etc.

9)

Overhead charges (10%)

Total
Total
0.500

10) Total Lead

Total
Say Completed Item Rate in Rs Per Cum
11 ) Labour Component

Say Labour Component in Rs.Per Cum.


Compo Rate Labour Rate
Rate proposed for M.C.C. D.S.R. 2006-2007

405.00

93.00

Unit
Cum.

95.30
95.30
454.55
0.00
454.55
4.55
459.09
0.00
459.09
2.30
461.39
0.00
461.39
46.14
507.53
2.54
510.07
474.00
82.65
78.00

M.C.C.D.S.R.2006-07 Rate Analysis for Road Works Item


Item No. 29 (0)
Supplying (Crusher broken) 12 mm. (about 1 & 1/2 inch) trap / qrantite / quartzite / gneis stone metal at
Ihe road side including conveying and stacking for use in bituminous road surface.
Spec. No: :MORTH: 404, Page No. 112 to 115
DESCRIPTION
1) Labour
Beldar, Skilled
Mazdoor. unskilled heavy! male
Mazdoor, unskilled IighUfemale
Watchman
2)

3)

QUANTITY RATE IN Rs.

Quantny for 1.00 Cum.


UNIT
AMOUNT IN Rs.

0.100
0.200
0.200
0.070

145.00
Day
145.00
Day
145.00
Day
145.00
Day
Total Labour in Rs.

14.50
29.00
29.00
10.15
82.65

Material
Rd-19, Rubble 15 to 23 CM (BL)
Kerosine! Solvent

1.200
0.033

230.00
Cum
18.00
LIT
Total Material in Rs.

276.00
0.59
276.59

Machinery :
Crusher

0.033

2888.00

Day

Total Machinary in Rs.


Total of No.1 to 3 in Rs.
4) Scaffolding

Total
5) Sundries (1 %)

Total
6) Water charges

Total
7)

Laboratory Testing (0.50%)

8)

Formwork etc.

g)

Overhead charges (10%)

0.500

Total
Total
Total
0.000

10) Total Lead

Total
Say Completed Item Rate in Rs Per Cum
11) Labour Component
Say Labour Component in Rs.Per Cum.
Compo Rate Labour Rate
Rate proposed for M.C.C. D.S.R. 2006-2007

405.00

93.00

Unit
Cum.

95.30
95.30
454.55
0.00
454.55
4.55
459.09
0.00
459.09
2.30
461.39
0.00
461.39
46.14
507.53
0.00
507.53
474.00
82.65
78.00

M.C.C.D.S.R.2006-07 Rate Analysis for Road Works Item


Item No. 29 (E)
Supplying 10 mm. of Irap / qranlite / quartzite / gneis stone metat at the road side inctuding conveying and
stacking for use in bituminous road surface.
Spec. No. :MORTH :404, Page No. 112to 115
DESCRIPTION
1) Labour
Beldar, Skilled
Mazdoor, unskilled heavyl male
Mazdoor, unskilled lighVfemale
Watchman
2)

3)

QUANTITY RATE IN Rs.

Quantity for 1.00 Cum.


UNIT
AMOUNT IN Rs.

0.100;
0.200
0.200
0.070

145.00
Day
145.00
Day
145.00
Day
145.00
Day
Totat Labour in Rs.

14.50
29.00
29.00
10.15
82.65

Material
Rd-19, Rubble 15 to 23 CM (BL)
Kerosine I Solvent

1.200
0.033

230.00
Cum
18.00
LIT
Totat Maierial in Rs.

276.00
0.59
276.59

Machinery :
Crusher

0.033

2888.00

Day

Total Machinary in Rs.


Total of No.1 to 3 in Rs.
4)

Scaffolding

5)

Sundries (1 %)

Total
Total
6) Water charges
Totat
7)

Laboratory Testing (0.50%)

8)

Formwork etc.

9)

Overhead charges (10%)

0.500
Total
Total
Total

10) Total Lead

0.500
Total
Say Completed Item Rate in Rs Per Cum

11) Labour Component


Say Labour Component in Rs.Per Cum.

)
Compo Rate Labour Rate
Rate proposed for M.C.C. D.S.R. 2006-2007

400.00

93.00

Unit
Cum.

95.30
95.30
454.55
0.00
454.55
4.55
459.09
0.00
459.09
2.30
461.39
0.00
461.39
46.14
507.53
2.54
510.07
460.00
82.65
75.00

Lt\

M.C.C.D.S.R.2006-07 Rate Analysis for Road Works Item


Item No. 29 (F)
Supplying 6 mm. of trap / qrantite / quartzite / gneis stone metal at the road side including conveying and
stacking for use in bituminous road surface.
Spec. No. :MORTH : 404 , Page No. 112 to 115
DESCRIPTION
1) Labour
Beidar, Skilled
Mazdoor, unskilled heayyl male
Mazdoor, unskilled light/female
Watchman
2)

3)

QUANTITY RATE IN Rs.

Quantity for 1.00 Cum.


UNiT
AMOUNT IN Rs.

0.100
0.200;
0.200
0.070

145.00
Day
145.00
Day
145.00
Day
145.00
Day
Total Labour in Rs.

14.50
29.00
29.00
10.15
82.65

Materiai
Rd-19, Rubble 15 to 23 CM (BL)
Kerosine I Solvent

1.200
0.033

230.00
Cum
18.00
LIT
Total Material in Rs.

276.00
0.59
276.59

Machinery :
Crusher

0.033

2888.00

Day

Total Machinary in Rs.


Total of No.1 to 3 in Rs.
4) Scaffolding

Total
5) Sundries (1 %)

Total
6) Water charges

Total
7) Laboratory Testing (0.50%)

0.500

Total
8) Formwork etc.

Total
9) Overhead charges (10%)

Total
10) Total Lead

0.500

Total
Say Completed ttem Rate in Rs Per Cum
11) Labour Component
Say Labour Component in Rs.Per Cum.
Compo Rate Labour Rate
Rate proposed for M.C.C. D.S.R. 2006-2007

300.00

35.00

Unit
Cum.

95.30
95.30
454.55
0.00
454.55
4.55
459.09
0.00
459.09
2.30
461.39
0.00
461.39
46.14
507.53
2.54
510.07
380.00
82.65
62.00

M.C.C.D.S.R.2006-07 Rate Analysis for Road Works Item


Item No. 29 (G)
Supplying stone dust of trap / qrantite / quartzite / gneis stone metal at the road side including conveying
and stacking for use in bituminous road surface.
Spec. No. :MORTH: 404, Page No. 112 to 115
DESCRiPTION
1) Labour
Beidar, Skilled
Mazdoor, unskilied heavy! male
Mazdoor, unskiiled light/female
Watchman
2)

QUANTITY RATE iN Rs.

Materiai
Rubbie

Quantity for 1.00 Cum.


UNIT
AMOUNT IN Rs.

0.100
0.200
0.200
0.070'

145.00
Day
145.00
Day
145.00
Day
145.00
Day
Total Labour in Rs.

1.000

230.00

Cum

Total Material in Rs.


3)

Machinery :
Crusher

0.010

2888.00

Day

Total Machinary in Rs.


Total of No.1 to 3 in Rs.
4) Scaffolding

Total
5) Sundries (1%)

Total
6) Water charges

Total
7) Laboratory Testing

0.000

Total
8)

Formwork etc.

Total
9) Overhead charges (10%)

Total
10) Total Lead

0.500

Total
Say Completed Item Rate in Rs Per Cum
11) Labour Component

Say Labour Component in Rs.Per Cum.


Compo Rate Labour Rate
Rate proposed for M.C.C. D.S.R. 2006-2007

150.00

15.00

Unit
Cum.

14.50
29.00
29.00
10.15
82.65
230.00
230.00
28.88
28.88
341.53
0.00
341.53
-3.42
344.95
0.00
344.95
0.00
344.95
0.00
344.95
34.49
379.44
1.90
381.34
238.00
82.65
51.00

M.C.C.D.S.R.2006-07 Rate Analysis for Road Works Item


Item No. 30 (A)
Providing & laying bituminous tack coat including supplying all materials preparing the existing surface,
hitting bitumen and applying tack coat evenly on the surface etc. complete at 25 Kg. / 110 sqmt. on B. T.
Surface with GOaO grade bitumen.
Spec. No. :MORTH : 503 , Page No. 157 to 160
DESCRIPTION
1) Labour
Mazdoor, unskilled heavyl male
Mazdoor, 'unskilled lighUfemale

QUANTITY RATE IN Rs.


0.500
0.500

2) Material
Bitumen Bulk at Mumbal
Hitting I spray bitumen (Bouzer)
3)

0.025
0.025

Machinery :
Bitumen Pressure ISprayer

0.050

145.00
145.00

Quantity for 100 Sq.m ..


UNIT
AMOUNT IN Rs.
Day
Day

Total Labour in Rs.

'145.00

25125.00
M.T.
1800.00
M.T.
Total Material in Rs.

628.13
45.00
673.13

150.00

M.T.

Total Machinary in Rs.


Totat of No.1 to 3 in Rs.
4) Scaffolding

Total
5) Sundries (1.5%)

Total
6) Water charges

Total
7)

Laboratory Testing

8)

Formwork etc.

9)

Overhead charges (10%)

72.50
72.50

0.000

Total
Total
Total

7.50
7.50
825.63
0.00
825.63
12.38
838.01
0.00
838.01
0.00
838.01
0.00
838.01
83.80
921.81

10) Total Lead

Total lead
Total
Say Completed Item Rate in Rs Per 100 Sq.mt.

l __)

11) Labour Component


Say Labour Component in Rs.Per 100 Sq.m
Camp. Rate Labour Rate
Rate proposed for M.C.C. D.S.R. 2006-2007

925.00

250.00

Unit
100 Sq.m

0.00
921.81
922.00
145.00
145.00

M.C.C.D.S.R.2006-07 Rate Analysis for Road Works Item


Item No. 30 (8)
Providing & applying tack coat of bituminous 60nOgrade by seal propelled or toward bitumen pressue
sprayer at uniform spraying at unilorm tempreture at the rate 01 50 Kg/ 100 sq.m. on existing hlack top
surface including transportation of bitumen from lactory . store to plant site etc.
Spec. No. :MORTH : 503, Page No. 157 to 160
DESCRIPTION
1) Labour
Mazdoor, unskilled heavyl male
Mazdoor, unskilled IighUfemale

QUANTITY RATE IN Rs.


0.500
0.500

2) Material
Bitumen Bulk at Mumbai
Hilling I spray bitumen (Bouzer)

0.050
0.050

3) Machinery :
Bitumen Pressure ISprayer

0.050

145.00
145.00

Quantity for 100 Sq.m..


AMOUNT IN Rs.
UNIT
Day
Day

Total Labour in Rs.

145.00

26735.00
M.T.
M.T.
1800.00
Total Material in Rs.

1336.75
90.00
1426.75

150.00

M.T.

Total Machinary in Rs.


Total of NO.1 to 3 in Rs.
4) Scaffolding
Total
5) Sundries (1.5%)
Total
-6)Water charges
Total
7) Laboratory Testing

0.000
Total

8) Formwork etc.
Total
9) Overhead charges (10%)
Total
10) Total Lead

0.500
Total
Say Completed Item Rate in Rs Per 100 Sq.m.

11) Labour Component

Say Labour Component in Rs.Per 100 Sq.m


Camp. Rate Labour Rate
Rate proposed for M.C.C. D.S.R. 2006-2007

1700.00

72.50
72.50

300.00

Unit
100 Sq.m

7.50
7.50
1579.25
0.00
1579.25
23.69
1602.94
0.00
1602.94
0.00
1602.94
0.00
1602.94
160.29
1763.23
8.82
1772.05
1765.00
145.00
145.00

M.C.C.D.S.R.2006-07 Rate Analysis for Road Works Item


Item No. 31 (A)
Providing & laying bitumen tack coat including supplying all materials preparing Ihe existing surface, hitting
bitumen & appling tack coat evenly on the surface etc. complete at 50 Kg./100 Sqmt. on WB.M.Surface with
601l0.grade bitumen.
Spec. No. :MORTH : 503 , Page No. 157 to 160
Quantity for per 1.00 Sq.m..
DESCRIPTION
UNIT
AMOUNT IN Rs.
QUANTITY RATE IN Rs.
1) Labour
Mazdoor, unskilled heavyl male
0.500
145.00
Day
72.50
Mazdoor, unskilled lighUfemale
72.50
0.500
145.00
Day
Mazdoor, unskilled IIghUfemale
0.500
145.00
Day
72.50

2)

Material
Bitumen Bulk at Mumbai
Hitting I spray bitumen (Bouzer)

0.050
0.050;

3) Machinery:
Bitumen Pressure IS prayer

1.000

Total Labour in Rs.

217.50

M.T.
25125.00
1800.00
M.T.
Total Material in Rs.

1256.25
90.00
1346.25

150.00

M.T.

Total Machinary in Rs.


Total of No.1 to 3 in Rs.
Total
Total
Total

0.500
Total
Total
Total

0.050;
Tota/lead
Tota/
Say Completed Item Rate in Rs Per Sq.m

Say Labour Component in Rs.Per Sq.m


Camp. Rate Labour Rate
Rate proposed for M.C.C. D.S.R. 2006-2007

1550.00

300.00

Unit
Sq.m

150.00
150.00
1713.75
0.00
1713.75
25.71
1739.46
0.00
1739.46
8.70
1748.15
0.00
1748.15
174.82
1922.97
22.74
22.74
1945.71
1946.00
217.50
218.00

M.C.C.D.S.R.2006-07 Rate Analysis for Road Works Item


Item No. 31 (6)
Providing & laying bitumen tack coat including supplying all malerials preparing the existing surface,
hitting bitumen & appling tack coat evenly on the surface etc. complete at 100 Kg./100 Sqmt. on WB.M.
Surface with 30/40 grade bitumen.
Spec. No. :MORTH : 502 , Page No. 145 to 149
DESCRIPTION
1) Labour
Mazdoor, unskilled heavyl male
Mazdoor, unskilled lighUfemale
Mazdoor, unskilled IighUfemale

2)

)
.'

QUANTITY RATE IN Rs.


0.500
0.500
0.500

Materiai
Bitumen Bulk at Mumbai
Hitting I spray bitumen (Bouzer)

0.100
0.100

3) Machinery :
Bitumen Pressure ISprayer

1.000

145.00
145.00
145.00

Quantity for per 100 Sq.m..


UNIT
AMOUNT IN Rs.
Day
Day
Day

Total Labour in Rs.

217.50

26735.00
M.T.
1800.00
M.T.
Total Material in Rs.

2673.50
180.00
2853.50

150.00

M.T.

Total Machinary in Rs.


Total of NO.1 to 3 in Rs.
4) Scaffolding

Total
5)

Sundries (1.5%)

Total
6) Water charges

Total
7)

Laboratory Testing (0.50%)

8)

Formwork etc.

72.50
72.50
72.50

0.500

Total
Total
9) Overhead charges (10%)

Total

150.00
150.00
3221.00
0.00
3221.00
48.32
3269.32
0.00
3269.32
16.35
3285.66
0.00
3285.66
328.57
3614.23

10) Total Lead

Total
. Say Completed Item Rate in Rs Per 100 Sq.m
11 ) Labour Component

Say Labour Component in Rs.Per 100 Sq.m


Camp. Rate Labour Rate
Rate proposed for M.C.C. D.S.R. 2006-2007

3100.00

400.00

Unit
Sq.m

0.00
3614.00
217.50
218.00

M.C.C.D.S.R.2006-07 Rate Analysis for Road Works Item


Item No. 32 (A)
Providing 25mm (about 1'J thick premix bituminous carpet including supplying all materials, preparing and
cleaning the base, heating bitumen, mixing hot bitumen and aggregate in a bitumen mixer, laying the carpet
layers and compaction with vibratory roller complete by using bulk asphalt (the does not include cost of tack
coat and seal coat) with 60170 grade bitumen.

DESCRIPTION
1) Labour
Mazdoor, unskilled heavyl male
Mazdoor, unskilled lighUfemale
2)

3)

QUANTITY RATE IN Rs.


7.150
2.650

Material
Tr. Metal 20 mm
Tr. Metai 10 mm
Tr. Metai 6 mm.
Bitumen mixing
(205 Kg + 2% wastage = 205 + 4 = 209)
Kerosine I Solvent
Fire wood I Heating bitumen
Machinery :
Boiler for 100 sqmt.
Mixer for 100 Sqmt.
Vibratory Roiler (8 to 10 M.T.)

1.850
1.200
0.600;
0.209
9.000
33.440

0.200
0.200
0.100
0.000

Quantity for 100 Sq.mt.


UNIT
AMOUNT IN Rs.

145.00
Day
145.00
Day
Total Labour in Rs.
400.00
400.00
400.00
25125.00

Cum
Cum
Cum
M.T.

30.00
LIT
3.00
Kg.
Total Material in Rs.
2732.00
Day
1688.00
Day
Day
8096.00
0.00
Day
Total Machinary in Rs.
Total of No.1 to 3 in Rs.

4) Scaffolding
Total
5) Sundries (1 %)
Total
6) Water charges
Total
7)

Laboratory Testing

8)

Formwork etc.

0.500
Total
Total

I,

9) Overhead charges (10%)


Total
10) Total Lead
Metal (5Km.)

2.500

109.060

Total lead
Total
Say Completed Item Rate in Rs Per 100 Sq.m.
11) Labour Component
Say Labour Component in Rs. Per 100 Sq.m
Compo Rate Labour Rate
Rate proposed for M.C.C. D.S.R. 2006-2007

8790.00

1600.00

Unit
100 Sq.m

1036.75
384.25
1421.00
740.00
480.00
240.00
5251.13
270.00
100.32
7081.45
546.40
337.60
809.60
0.00
1693.60
10196.05
0.00
10196.05
101.96
10298.01
0.00
10298.01
51.49
10349.50
0.00
10349.50
1034.95
11384.45
272.65
272.65
11657.10
9400.00
1421.00
1421.00

M.C.C.D.S.R.2006-07 Rate Analysis for Road Works Item


Item No. 32 (B)
Providing 25mm (about t'? thick premix bituminous carpet including supplying all malerials, preparing and
cleaning the base, heating bitumen, mixing hot bitumen and aggregate in a bitumen mixer, laying the carpet
layers and compaction with vibratory roller complete by using bulk asphalt (the does not include cost of tack
coat and seal coat) with 30140 grade bitumen.
Quantity for 100 Sq.ml.
DESCRIPTION

QUANTITY RATE IN Rs.

1) Labour
Mazdoor, unskilled heavy! male
Mazdoor, unskilled light/female

7.150
2.650

2) Material
Tr. Metal 20 mm
Tr. Metal 10 mm
Tr. Metal 6 mm.
Bitumen mixing
(205 Kg + 2% wastage = 205 + 4 = 209)
Kerosine I Solvent
Fire wood I Heating bitumen
3)

Machinery:
Boiler for 100 sqml.
Mixer for 100 Sqml.
Vibratory Roller (8 to 10 M.T.)

1.850
1.200
0.600
0.209
9.000
33.440

0.220
0.270
0.150
0.000

UNIT

145.00
Day
145.00
Day
Total Labour in Rs.
400.00
400.00
400.00
26735.00

Cum
Cum
Cum
M.T.

30.00
LIT
3.00
Kg.
Total Material In Rs.
2732.00
Day
1688.00
Day
8096.00
Day
0.00
Day
Total Machinary in Rs.
Total of No.1 to 3 in Rs.

4) Scaffolding
Total
5) Sundries (1 %)
Total
6) Water charges
Total
7)

0.500

Laboratory Testing

Total
8) Formwork etc.
Total
9)

Overhead charges (10%)


Total

10) Total Lead


Metal (5Km.)

2.500

109.060

Total lead
Total
Say Completed Item Rate in Rs Per 100 Sq,m
11) Labour Component
Say Labour Component in Rs Per 100 Sq m
Compo Rate Labour Rate
Rate proposed for M.C.C. D.S.R. 2006-2007

9070.00

1600.00

Unit
100 Sq.m

AMOUNT IN Rs.
1036.75
384.25
1421.00
740.00
480.00
240.00
5587.62
270.00
100.32
7417.94
601.04
455.76
1214.40
0.00
2271.20
11110.14
0.00
11110.14
111.10
11221.24
0.00
11221.24
56.11
11277.34
0.00
11277.34
1127.73
12405.08
272.65
272.65
12677.73
10150.00
1421.00
1421 00

M.C.CD.S.R.2006-07 Rate Analysis for Road Works Item


Item No.33
Compacting 25mm thick premix bituminous carpet with vibratory roller, including labour, use of pliant etc.
complete.
Quantity for 100 Sq.mt.
QUANTITY RATE IN Rs.

DESCRiPTION
1) Labour
Mazdoor, unskilled heavy! male
Mazdoor, unskilled light/female

0.150
0.150

145.00
145.00

UNIT

AMOUNT IN Rs.

Day
Day

21.75
21.75

Total Labour in Rs.

43.50

0.00
0
Total Material in Rs.

0.00
0.00

2) Material
0.000
3) Machinery :
Vibratory Roller (8 to 10 M.T.)

0.030

8096.00
Day
Total Machinary in Rs.
Total of No.1 to 3 in Rs.

4) Scaffolding

Total
. 5) Sundries (0.10%)

Total
6) Water charges (1%)

Total
7) Laboratory Testing

0.000

Total
8)

Formwork etc.

Total
9) Overhead charges (10%)

Total
. 10) Total Lead

0.000

Total
Say Completed Item Rate in Rs Per 100 Sq.m.
11) Labour Component

r)

Say Labour Component in Rs.Per 100 Sq.m


Camp. Rate Labour Rate
Rate proposed for M.C.C. D.S.R. 2006-2007

300.00

35.00

Unit
100 Sq.m

242.88
242.88
286.38
0.00
286.38
0.29
286.67
2.87
289.53
0.00
289.53
0.00
289.53
28.95
318.49
0.00
318.49
318.00
43.50
44.00

M.C.C.D.S.R.2006-07 Rate Analysis for Road Works Item


Item No. 34(A)
Providing 20mm (about 2'? thick premix bituminous carpet,. inciuding suppiying ali materials preparing and
cleaning best hitting bitumen and mix hot bitumen and arrange in a bitumen mixer, laying the carpet layers
and compaction with vibrotory rolier complete by using bulk asphalt (Rate does not include cost.of tack coat
& seal coat) with 60nO grade bitumen
Spec. No. : MORT & H : 509,

Page No.177 to 184


Quantity for 1000 Sq.mt.

DESCRIPTION

QUANTITY RATE IN Rs.

1) Labour
Mazdoor, unskilled heavyl male
2)

3)

UNIT

20.000

145.00
Day
Total Labour in Rs.

2900.00
2900.00

Material
Aggregate 12mm
Crush aggregate 10 mm
Bitumen bulk at Mumbai
Kerosine I Solvent

18.000
9.000
2.460
90.000

400.00
Cum
400.00
Cum
25125.00
Cum
30.00
LIT
Total Material in Rs.

7200.00
3600.00
61807.50
2700.00
75307.50

Machinery :
Drum mix plant
Self propelled paver finisher

0.960.
0.960

DumperfTipper
Vibratory Roller (8 to 10 MT)

0.720
0.500

4)

Scaffolding

5)

Sundries (1 %)

2037.00
Hour.
742.00
Hour.
3040.00
Day
8096.00
Day
Total Machinary in Rs.
Total of No. 1 to 3 in Rs.
Total
Total

6) Water charges
Total

7)

Laboratory Testing

8)

Formwork etc.

0.500
Total
Total

-\

AMOUNT IN Rs.

9) Overhead charges (10%)


For 1000 Sq.mt.
10) Rate per 100 Sq.m.
10) Total Lead
Metal (5Km.)

Total

2.700

109.060

Total lead
Total
Say Completed Item Rate in Rs Per 100 Sq.m.
12) Labour Component for 1000 Sq.mt.
Say Labour Component in Rs. Per 100 Sq.m.
Camp. Rate Labour Rate
Rate proposed for M.C.C. D.S.R. 2006-2007

7356.00

1300.00

Unit
100 Sq.m.

1955.52
712.32
2188.80
4048.00
8904.64
87112.14
0.00
87112.14
871.12
87983.26
0.00
87983.26
439.92
88423.18
0.00
88423.18
8842.32
97265.50
9726.55
294.46
294.46
10021.01
10020.00
2900.00
290.00

S\

M.C.C.D.S.R.2006-07 Rate Analysis for Road Works Item


Item No. 34(8)
Providing 20mm (about 2'J thick premix bituminous carpet, including supplying all materials preparing and
cleaning the base heating bitumen and mixing hot bitumen and aggregate in a bitumen mixer, laying the
carpet layers and compaction with vibratory roller complete by using bulk asphalt (the rate does not include
cost of tack coat and seal coat) with 30140 grade bitumen.
Spec. No. : MORT & H : 509,

Page No.177 to 184


Quantity for 1000 Sq.mt.

DESCRIPTION

QUANTITY RATE IN Rs.

1) Labour
Mazdoor, unskilled heavyl male
2)

3)

UNIT

20.000

145.00
Day
Total Labour in Rs.

2900.00
2900.00

Material
Aggregage 12 mm
Course Aggregate 10 mm
Bitumen bulk at Mumbai
Kerosine I Solvent

18.000
9.000
2.460
90.000

400.00
Cum
400.00
Cum
26735.00
Cum
30.00
LIT
Total Material in Rs.

7200.00
3600.00
65768.10
2700.00
79268.10

Machine,\, :
Drum Mix Plant
Self propelled paver finisher
Dumper I Tipper
Vibratory Roller (8 to 10 M.T.)

0.960
0.960
0.720:
0.500

2037.00
Hour.
742.00
Hour.
4128.00
Day
8096.00
Day
Total Mach/nary in Rs.
Total of No.1 to 3 in Rs.

1955.52
712.32
2972.16
4048.00
9688.00
91856.10
0.00
91856.10
1377.84
93233.94
0.00
93233.94
466.17
93700.11
0.00
93700.11
9370.01
103070.12
10307.01

4) Scaffolding
Total
5) Sundries (1.50%)
Total
6) Water charges
Total
0.500

7) Laboratory Testing

Total
8)

Formwork etc.
Total

AMOUNT IN Rs.

9) Overhead charges (10%)


For 1000 Sq.mt.
10) Rate per 100 Sq.m.
10) Total Lead
Metal (5Km.)

Total

2.700

109.060

Total lead
Total
Say Completed Item Rate in Rs Per 100 Sq.m
11) Labour Component for 1000 Sq.mt.
Say Labour Component in Rs. Per 100 Sq.m.
Camp. Rate Labour Rate

IRate proposed for M.C.C. D.S.R. 2006-2007

7956.00

1300.00

Unit
100 Sq.m.

294.46
294.46
10601.47
10600.00
2900.00
290.00

M.C.CD.S.R.2006-07 Rate Analysis for Road Works Item


Item No. 35
Compacting 20 mm thick premix bituminous carpet with vibratory roller including hire charges of power roller
etc. complete. .

Compo Rate Labour Rate


Rate proposed for M.e.C. D.S.R. 2006-2007

300.00

35.00

Unit
100 Sq.m

M.C.CD.S.R.2006-07 Rate Analysis for Road Works Item


Item No. 36
Providing single coat bituminous surface dressing inciuding supplying all materials, cleaning the road
surface, heating and applying bitumen to the WB.M. road surface, spreading chips, use of tools, plant and
equipment and rolling complete. (if bulk asphalt) with 60170 grade bitumen.
Spec. No. : MORT & H : 510,

Page No.188 to 192


Quantity for 100 Sq.mt.

DESCRIPTION

QUANTITY RATE IN Rs.

1) Labour
Mazdoor, unskilled heavyl male
Mazdoor, unskilled light/female
Mazdoor, unskilled heavyl male
2)

)
3)

UNIT

AMOUNT IN Rs.

4.000
2.500
2.000

145.00
Day
145.00
Day
145.00
Day
Total Labour in Rs.

580.00
362.50
290.00
1232.50

Material
Tr. Metal crush
Bitumen bulk at Mumbai
Kerosine I Solvent
Fire wood I Heating bitumen

1.500
0.225
12.000
36.000

400.00
Cum
25125.00
M.T.
30.00
LIT
Kg
3.00
Total Material in Rs.

600.00
5653.13
360.00
108.00
6721.13

Machinery :
Boiler (asphalt)
Vibratory Roller (8 to 10 M.T.)

0.150
0.150

2732.00
Day
8096.00
Day
Total Machinary in Rs.
Total of No.1 to 3 in Rs.

409.80
1214.40
1624.20
9577.83

4) Scaffolding

Total
5) Sundries (1%)

0.010

Total
6) Water charges

Total
7)

Laboratory Testing

8)

Formwork etc.

9)

Overhead charges (10%)

0.005

Total
Total

Total
10) Total Lead
Metal (5Km.)

0.600

109.060

Total lead
Total
Say Completed Item Rate in Rs Per 100 Sq.m.
11) Labour Component
Say Labour Component in Rs.Per 100 Sq.m
Compo Rate Labour Rate
Rate proposed for M.C.C. D.S.R. 2006-2007

6000.00

700.00

Unit
100 Sq.m

0.00
9577.83
95.78
9673.60
0.00
9673.60
48.37
9721.97
0.00
9721.97
972.20
10694.17
65.44
65.44
10759.60
6600.00
1232.50
1233.00

S \.j

M.C.C.D.S.R.2006-07 Rate Analysis for Road Works Item


Item No. 37
Providing single coat bituminous surface dressing including supplying all materials, cleaning the road
surface, heating and applying bitumen to the road surface, spreading chips, use of tools, plant and
equipment and railing complete. (if bulk asphalt) with 60/70 grade bitumen.
Spec. No. : MORT & H : 510,

Page No.188 to 192


Quantity for 100 Sq.mt.

DESCRIPTION

QUANTITY RATE IN Rs.

1) Labour
Mazdoor, unskilled heavy! male
Mazdoor, unskilled light/female
Mazdoor, unskilled heavy! male

4.000
2.500
2.000

2) Material
Tr.Metal (Crushed)
Bitumen Bulk at Mumbai
Kerasin !Solvent
Hitting! spray bitumen (Bouzer)
3)

1.050
0.125
7.500
20.000

Machinery :
Boiler (asphalt)
Vibratory Roller (8 to 10 M.T.)

0.150
0.150

145.00
145.00
145.00

UNIT

AMOUNT IN Rs.

Day
Day
Day

580.00
362.50
290.00

Total Labour in Rs.

1232.50

400.00
Cum
25125.00
M.T.
30.00
LIT
3.00
M.T.
Total Material in Rs.

420.00
3140.63
225.00
60.00
3425.63

Day
2732.00
Day
8096.00
Total Machinary in Rs.
Total of No.1 to 3 in Rs.

4) Scaffolding

Total
5) Sundries (1%)

0.010

6) Water charges

0.000

Total
Total
7)

Laboratory Testing (0.50%)

0.005

8)

Formwork etc.

0.000

Total
Total
9) Overhead charges (10%)

0.100

Total
10) Totai Lead
Metal (5 Km.)

0.616

109.06

67.18

Total lead
Total
Say Completed Item Rate in Rs Per 100 Sq.m.
11) Labour Component
Say Labour Component in Rs. Per 100 Sq.m
Compo Rate Labour Rate
Rate proposed for M.C.C. D.S.R. 2006-2007

6100.00

400.00

409.80
1214.40
1624.20
6282.33
0.00
6282.33
62.82
6345.15
0.00
6345.15
31.73
6376.87
0.00
6376.87
637.69
7014.56

Unit
100 Sq.m

67.18
7100.00
6500.00
1232.50
1000.00

s .,

M.C.C.D.S.R.2006-07 Rate Analysis for Road Works Item


Item No. 38

Providing two coat bituminous surface dressing including supplying all materials including all leads,
cleaning roads surface, heating and applying bitumen to the road surface, spreading chip & rolling etc.
complete (with bulk asphalt) with 60170 grade bitumen.
Spec. No. : MORT & H : 510,

Page No.188 to 192


Quantity for 100 Sq.mt.

DESCRiPTiON

QUANTITY RATE IN Rs.

1) Labour
Mazdoor, unskilled heavyl maie
Mazdoor, unskilled IighVfemale
Watchmen

38.000
77.000
1.600

145.00
145.00
145.00

UNIT

AMOUNT IN Rs.

Day
Day
Day

5510.00
11165.00
232.00
16907.00

Total Labour in Rs.


2)

Material
Tr.Metal (20 mm Crushed)
Tr.Metal10 mm 112 (crushed)
Bitumen Bulk at Mumbai
Kerasin iSolvent
Hitting I spray bitumen (Bouzer)

15.000
10.000
2.900
15.000
2.900

400.00
400.00
25125.00
30.00
1800.00

Cum
Cum
M.T.
LIT
M.T.

Total Material in Rs.


3)

Machinery :
Boiler (asphalt)
Vibratory Roller (8 to 10 M.T.)

1.500
2.900

2732.00
3040.00

Day
Day

Total Machinary in Rs.


Total of No.1 to 3 in Rs.
4)

Scaffolding

Total
5)

Sundries (1 %)

0.010

6)

Water charges

0.000

7)

Laboratory Testing (0.50%)

0.005

8)

Formwork etc.

0.000

9)

Overhead charges (10%)

0.100

Total
Total
Total
Total
Total
11) Total Lead
Metal (5 Km.)

0.725

109.06

Total lead
Total

For 1000 Sq.mt

Say Completed Item Rate in Rs Per 100 Sq.m.


12) Labour Component for 1000 Sq.mt
Say Labour Component in Rs.Per 100 Sq.m
Camp. Rate Labour Rate
Rate proposed for M.C.C. D.S.R. 2006-2007

9550.00

600.00

Unit
100 Sq.m

6000.00
4000.00
72862.50
450.00
5220.00
78532.50
4098.00
8816.00
12914.00
108353.50
0.00
108353.50
1083.54
109437.04
0.00
109437.04
547.19
109984.22
0.00
109984.22
10998.42
120982.64
79.07
79.07
121061.71
12106.17
16907.00
1690.70

M.C.CD.S.R.2006-07 Rate Analysis for Road Works Item


Item No. 39
Providing bituminous liquid seal coat to black top surface, including supplying all materials with all
leads, preparing existing road surface heating and applying bitumen, spreading chips and rolling complete
(with bulk asphalt) with 60/70 grade bitumen.
Spec. No. : MORT & H : 513,

Page No.201 to 204


Quantity for 1000 Sq.mt.

DESCRIPTION

QUANTITY RATE IN Rs.

1) Labour
Mazdoor, unskilled heavyl male
Mazdoor, 'unskilled light/female
Watchmen

2)

)
3)

Material
Tr.Metal10 mm 112 (crushed)
Bitumen Bulk at Mumbai
Kerosin ISolvent
Hilling I spray bitumen (Bouzer)
Machinery :
Power Roller (8 to 10 M.T.)

13.000
30.000
0.625

145.00
145.00
145.00

UNIT

AMOUNT IN Rs.

Day
Day
Day

1885.00
4350.00
90.63

Total Labour in Rs.

6325.63

9.000
0.980
7.500
0.989

400.00
Cum
25125.00
M.T.
30.00
LIT
1800.00
M.T.
Total Material in Rs.

3600.00
24622.50
225.00
1780.20
26627.70

0.625

3040.00

Day

Total Machinary in Rs.


Total of No.1 to 3 in Rs.
4) Scaffolding

Total
5) Sundries (1%)

0.010

Total
6) Water charges

0.000

7) Laboratory Testing (0.50%)

0.005

8)

0.000

Total
Total

-,

Formwork etc.

Total
9)

Overhead charges (10%)


For 1000 Sq.mt.
10) Total Lead
Metal (5 Km.)

Rate for 1000 S9.mt.

0.100

Total
0.600

109.06

1900.00
1900.00
34853.33
0.00
34853.33
348.53
35201.86
0.00
35201.86
176.01
35377.87
0.00
35377.87
3537.79
38915.65
65.44

Totat lead
Totat
Say Completed Item Rate in Rs Per 100 Sq.m.

65.44
38981.09
3898.10

Say Labour Component in Rs. Per 100 Sq.m.

6325.63
632.60

12) Labour Component for 1000 Sq.mt.

Camp. Rate Labour Rate


Rate proposed for M.C.C. D.S.R. 2006-2007

2985.00

450.00

Unit
100Sq.m

M.C.C.D.S.R.2006-07 Rate Analysis for Road Works Item


Item No.40
Providing and laying bituminous bound macadam surface 75 mm thick, including supplying materials,
spreading 40 mm & 20 mm trap metal layer, heating and spraying bitumen at the rate of 250 Kg./100 sqmt.
and spreading 12 mm aggregates and compaction etc. complete with 60170 grade bitumen.
Quantity for 100 Sq.mt.
QUANTITY RATE IN Rs.

DESCRIPTION
1) Labour
Mazdoor, unskilled heavy! male
Mazdoor, unskilled IighUfemale
Watchmen
2)

3)

UNIT

1.400
8.000
0.200

145.00
Day
145.00
Day
145.00
Day
Total Labour in Rs.

203.00
1160.00
29.00
1392.00

Material
Bitumen Bulk at Mumbai
Tr.Metal 40 mm (crushed)
Tr.Metal 20 mm (crushed)
Tr.Metal12 mm (crushed)
Kerasin !Solvent

0.250.
9.000
1.500
1.800
7.500

25125.00
M.T.
400.00
Cum
400.00
Cum
400.00
Cum
30.00
LIT
Total Material in Rs.

6281.25
3600.00
600.00
720.00
225.00
11426.25

Machinery :
VibratoryRolier (8 to 10 M.T.)

0.200

8096.00
Day
Total Machinary in Rs.
Total of No.1 to 3 in Rs.

1619.20
1619.20
14437.45
0.00
14437.45
144.37
14581.82
0.00
14581.82
72.91
14654.73
0.00
14654.73
1465.47
16120.21

4) Scaffolding

Total
5) Sundries (1%)

0.010

6) Water charges

0.000

Total
Total
7) Laboratory Testing (0.50%)

0.005

8) Formwork etc.

0.000;

9) Overhead charges (10%)

0.100

Total
Total

AMOUNT IN Rs.

Total
10) Total Lead
40 mm Metal (5 Km.)
Crushed Metal (5 Km.)

9.000
3.300

128.31
109.06

Total lead
Total
Say Completed Item Rate in Rs Per 100 Sqm

1154.79
359.90
1514.69
17634.89
17635.00

Say Labour Component in Rs. Per 100 Sq.m

1392.00
1600.00

11) Labour Component

Compo Rate Labour Rate


Rate proposed for M.C.C. D.S.R. 2006-2007

14500.00

1600.00

Unit
100 Sq.m

M.C.C.D.S.R.20q6-07 Rate Analysis for Road Works Item


Item No. 41
Providing and fixing 1:2:4 R.C.C. Km. stones of standard size and shape including fixing and lettering as
per detailed drawing, including fixing in block at standard size of cement concrete 1:4:8 painting etc.
complete.
Spec. No.: Rd.69 Page No. 243I.R.C.-26-1967
Quantity for Per No.
QUANTITY RATE IN Rs.

DESCRIPTION
1) Labour
Painter lind Class, skilled
Mazdoor, unskilled heavyl male
Mukadam

0.500
1.250
0.500

2) Material
BDE 1A (C.C. 1:2:4)
BDE 1C (C.C. 1:4:8)
Synthetic Paint
Lime slaked (Fine Lime)
Mild Steel upto 10 mm dia
3)

Machinery :
Concrete mixer
Vibrator

150.00
145.00
175.00

UNIT

AMOUNT IN Rs.

Day
Day
Day

75.00
181.25
87.50

Total Labour in Rs.

343.75

0.103
0.183.
0.200
1.000
0.008

2290.00
Cum
1795.00
Cum
175.00
Liter
5.00
Kg.
29900.00
M.T.
Total Material in Rs.

235.87
328.49
35.00
5.00
239.20
843.56

0.100
0.100

168.00
Hour
85.00
Hour
Total Machinary in Rs.
Total of No.1 to 3 in Rs.

16.80
8.50
25.30
1212.61
0.00
1212.61
12.13
1224.73
12.25
1236.98
6.18
1243.16
62.16
1305.32
130.53
1435.85

4) Scaffolding

Total
5) Sundries (1 %)

0.010

6) Water charges

0.010

7) Laboratory Testing (0.50%)

0.005

8) Formwork etc.

0.050;

9) Overhead charges (10%)

0.100

Total
Total
Total
Total
Total
10) Total Lead

11)

Total lead
Total
Say Completed Item Rate in Rs Per No.

0.00
1435.85
1436.00

Say Labour Component in Rs. Per No.

343.75
344.00

12) Labour Component

Camp. Rate Labour Rate


Rate proposed for M.C.C. D.S.R. 2006-2007

1100.00

160.00

Unit
Per No.

M.C.C.D.S.R.2006-07 Rate Analysis for Road Works Item


Item No.42
Providing and fixing 1:2:4 R.C.C. 5th stones of standard size and shape including fixing and lettering as
per detaiied drawing, including fixing in block at standard size of cement concrete 1:4:8 painting etc.
complete.
Spec. No. : Rd.69 Page No. 243 I.R.C.-8-1980
Quantity for Per No.
DESCRIPTION

QUANTITY RATE IN Rs.

1) Labour
Painter lind Class, skilled
Mazdoor, unskilled heavyl male

2)

3)

0.500
0.750

Material
BDE 1A (C.C. 1:2:4)
BDE 1C (C.C. 1:4:8)
Synthetic Paint
Lime slaked (Fine Lime)
Mild Steei upto 10 mm dia

0.225
0.210
0.300
1.500
0.008

Machinery :
Concrete mixer
Vibrator

0.100
0.100

4)

Scaffoiding

5)

Sundries (1%)

0.010

6) Water charges

0.010

150.00
145.00

UNIT

AMOUNT IN Rs.

Day
Day

75.00
108.75

Total Labour in Rs.

183.75

2290.00
Cum
1795.00
Cum
175.00
Liter
Kg.
5.00
29900.00
M.T.
Total Material in Rs.

515.25
376.95
52.50
7.50
239.20
1191.40

168.00
Hour
85.00
Hour
Total Machinary in Rs.
Total of No.1 to 3 in Rs.

Total
Total
Total
7)

Laboratory Testing (0.50%)

0.005

8)

Formwork etc.

0.050

9)

Overhead charges (10%)

0.100

Total
Total
Total

16.80
8.50
25.30
1400.45
0.00
1400.45
14.00
1414.45
14.14
1428.60
7.14
1435.74
71.79
1507.53
150.75
1658.28

10) Total Lead

11 )

Total lead
Total
Say Completed Item Rate in Rs Per No.

0.00
1658.28
1658.00

Say Labour Component in Rs. Per No.

184.00
184.00

12) Labour Component

Camp. Rate Labour Rate


Rate proposed for M.C.C. D.S.R. 2006-2007

1600.00

175.00

Unit
Per No.

M.C.C.D.S.R.2006-07 Rate Analysis for Road Works Item


Item No. 43
Providing and fixing 1:2:4 R.C.C. 200 M stones of standard size of 75 cm x 20 cm x 20 cm and shape
including fixing in block of cement concrete 1:4:8 painting etc, comptete.

Spec. No. : Rd.69 Page No. 243 I.R.C.-26-1967


Quantity for Per. No.
QUANTITY RATE IN Rs.

DESCRIPTION
1) Labour
Painter lind Class, skilled
Mazdoor, unskilled heavyl male

2)

3)

Material
BDE 1A (C.C. 1:2:4)
BDE 1C (C.C. 1:4:8)
Synthetic Paint
Lime siaked (Fine Lime)
Mild Steel upto 10 mm dia
Machinery :
Concrete mixer
Vibrator

0.100
0.100

150.00
145.00

UNIT

AMOUNT IN Rs.

Day
Day

15.00
14.50

Total Labour in Rs.

29.50

0.030
0.090
0.010
0.500
0.003

2290.00
Cum
1795.00
Cum
175.00
Liter
5.00
Kg.
M.T.
29900.00
Totat Materiat in Rs.

68.70
161.55
1.75
2.50
89.70
324.20

0.050
0.050

168.00
Hour
85.00
Hour
Totat Machinary in Rs.
Total of No.1 to 3 in Rs.

8.40
4.25
12.65
366.35
0.00
366.35
3.66
370.01
3.70
373.71
1.87
375.58
18.78
394.36
39.44
433.80

4) Scaffolding

Totat
5) Sundries (1%)

0.010

Totat
6) Water charges

0.010

7)

Laboratory Testing (0.50%)

0.005

8)

Formwork etc.

0.050

Total
Total
Total
9)

Overhead charges (10%)

0.100

Total
10) Total Lead

Total lead
Total
Say Completed Item Rate in Rs Per No.

0.00
433.80
433.00

Say Labour Component in Rs. Per No.

29.50
30.00

11) Labour Component

Camp. Rate Labour Rate


Rate proposed for M.C.C. D.S.R. 2006-2007

430.00

100.00

Unit
Per No.

~\

M.C.C.D.S.R.2006-07 Rate Analysis for Road Works Item


Item No. 44
Providing and fixing 1:2:4 guard stones indicator stone of size 75 cm x 20 cm x 20 cn (about 2'-6" x 8" x
8'1 including fixing in ground and white in washin.G etc. complete.
Spec. No. : Rd.79 Page No. 244
Quantity for Per No.
QUANTITY RATE IN Rs.

DESCRIPTION
1) Labour
Painter (white washer) Semi skilled
Mazdoor, unskilled heavy! male

0.010
0.040

150.00
145.00

UNIT

AMOUNT IN Rs.

Day
Day

1.50
5.80

Total Labour in Rs.


2)

Material
BDE 1A (C.C. 1:2:4)
Guard Stone (Std. size)
Lime slaked (Fine Lime)

0.030
1.000
0.100

.J

2290.00
70.00
5.00

Cum
No
Kg.

Total Material in Rs.


3)

4)

Machinery :
Concrete mixer
Vibrator

0.050
0.050

168.00
Hour
85.00
Hour
Total Machinary in Rs.
Total of No.1 to 3 in Rs.

Scaffolding
Total

5)

Sundries (1%)

0.010

6) Water charges

0.010

7)

0.005

Total
Total
Laboratory Testing (0.50%)

Total
8)

Formwork etc.

0.050
Total

9) Overhead charges (10%)

0.100
Total

7.30
68.70
70.00
0.50

139.20
8.40
4.25
12.65
159.15
0.00
159.15
1.59
160.74
1.61
162.35
0.81
163.16
8.16
171.32
17.13
188.45

10) Total Lead

Total lead
Total
Say Completed Item Rate in Rs Per No.
11) Labour Component

7.00
Say Labour Component in Rs.
Camp. Rate Labour Rate

Rate proposed for M.C.C. D.S.R. 2006-2007

0.00

188.45
188.00

188.00

60.00

Unit
Per No.

7.00

M.C.C.D.S.R.2006-07 Rate Analysis for Road Works Item


Item No. 45
Providing and fixing R.C.C. 1:2:4 Boundary stones of size of 75 cm x 20 cm x 20 cm including fixing in
cemenl concrete 1:4:8 white washing, painting etc. complete.
Spec. No. : Rd.70 Page No. 2441.R.C.-25-1967
Quantity for Per No.
DESCRIPTION

QUANTITY RATE IN Rs.

1) Labour
Painter (White washer) Semi skilled
Mazdoor, unskilled heavy! male

2)

3)

0.100
0.100

Material
BDE 1A (C.C. 1:2:4)
BDE 1C (C.C. 1:4:8)
Lime slaked (Fine Lime)
Mild Steel

0.030
0.090
0.500
0.003

Machinery :
Concrete mixer
Vibrator

0.050
0.050

150.00
145.00

UNIT

AMOUNT IN Rs.

Day
Day

15.00
14.50

Total Labour in Rs.

29.50

2290.00
Cum
1795.00
Cum
5.00
Kg.
29900.00
M.T.
Total Material in Rs.

68.70
161.55
2.50
89.70
322.45

168.00
Hour
85.00
Hour
Total Machinary in Rs.
Total of No.1 to 3 in Rs.

4) Scaffolding

Total
5) Sundries (1%)

0.010

6) Water charges

0.010

Total
Total
7) Laboratory Testing (0.50%)

0.005

Total
8)

Formwork etc.

0.050

Total
9) Overhead charges (10%)

0.100

Total

8.40
4.25
12.65
364.60
0.00
364.60
3.65
368.25
3.68
371.93
1.86
373.79
18.69
392.48
39.25
431.73

10) Total Lead

11)

Total lead
Total
Say Completed Item Rate in Rs Per No.

0.00
431.73

Say Labour Component in Rs. Par No.

30.00

12) Labour Component

432.00
29.50

Compo Rate Labour Rate


Rate proposed for M.C.C. D.S.R. 2006-2007

350.00

50.00

Unit
Per No.

M.C.C.D.S.R.2006-07 Rate Analysis for Road Works Item


Item No. 46
Providing and fixing trap stone pin headers at the top of pitching as directed etc. complete.
Spec. No. : Rd.71 Page No. 245
Quantity for Per No.
QUANTITY RATE IN Rs.

DESCRIPTION
1) Labour
Masson lind class, skilled
Mazdoor, unskilled IighU female

0.200
0.200;

160.00
145.00

UNIT

AMOUNT IN Rs.

Day
Day

32.00
29.00

Total Labour in Rs.

61.00

2) Material
Pin header (Std. size)

6.000

20.00

No

120.00

)
Total Material in Rs.
3)

0.000

0.00

0.00

Total Machinary in Rs.


Total of No.1 to 3 in Rs.
4) Scaffolding

Total
5) Sundries (1 %)

0.010;

6) Water charges

0.010

Total
Total
7)

Laboratory Testing (0.50%)

0.005

8)

Formwork etc.

0.000

Total
Total

....,

120.00

Machinery:

0.100

9) Overhead charges (10%)

Total

0.00
181.00
0.00
181.00
1.81
182.81
1.83
184.64
0.92
185.56
0.00
185.56
18.56
204.12

10) Total Lead

Total lead
Total
Say Completed Item Rate in Rs Per No.

0.00
204.12
204.00

Say Labour Component in Rs. Per No.

61.00
61.00

11) Labour Component

Compo Rate Labour Rate


Rate proposed for M.C.C. D.S.R. 2006-2007

204.00

60.00

Unit
Per No.

M.C.CD.S.R.2006-07 Rate Analysis for Road Works Item

Camp. Rate Labour Rate


Rate proposed for M.C.C. D.S.R. 2006-2007

80.00

25.00

Unit
PerSq.m.

M.C.C.D.S.R.2006-07 Rate Analysis for Road Works Item


Item No. 48
Providing dry rubble stone masonry complete for head walls as directed etc. complete.
Quantity for Per Cum.
QUANTITY RATE IN Rs.

DESCRIPTION
1) Labour
Mason lind class, skilled
Mazdoor, unskilled heavy/male

1.000
1.000

160.00
145.00

UNIT

AMOUNT IN Rs.

Day
Day

160.00
145.00

Total Labour in Rs.


2)

Material
Tr. Ruble'15-23 Cm. @Quarry(MSNR
Tr. header

1.250
7.000

250.00
25.00

Cum
No

Total Material in Rs.

305.00
312.50
175.00

487.50

3) Machinery :
0.000

0.00

0.00

Total Machinary in Rs.


Total of No.1 to 3 fn Rs.
4) Scaffolding

Total
5) Sundries (1 %)

0.005

6) Water charges

0.010

7)

Laboratory Testing

0.005

8)

Formwork etc.

0.000

Total
Total
Total
Total
9) Overhead charges (10%)

0.100

Total
10) Total Lead
Tr. rubble

"!
11 )
12) Labour Component

1.250

71.01

56.81

Total lead
Total
Say Completed Item Rate in Rs Per Cum.
Say Labour Component in Rs.Per Cum.

Compo Rate Labour Rate


Rate proposed for M.C.C. D.S.R. 2006-2007

400.00

95.00

0.00
792.50
0.00
792.50
3.96
796.46
7.96
804.43
4.02
808.45
0.00
808.45
80.84
889.29

Unit
Per Cum

71.01
960.31
960.00
305.00
305.00

M.C.C.D.S.R.2906-07 Rate Analysis for Road Works Item


Item No. 49
Cutting the grass from the road side and dumping same as directed etc. complete. (For 100 Sq.mt.)

DESCRIPTION
1) Labour
Mazdoor, unskilled light/female

QUANTITY RATE IN Rs.

2.000

145.00

Quantity for 100 Sq.mt.


UNIT
AMOUNT IN Rs.

Day

Total Labour in Rs.

290.00
290.00

2) Material
0.000

0.00

Camp. Rate Labour Rate


Rate proposed for M.C.C. D.S.R. 2006-2007

110.00

110.00

0.00

Unit
100 Sq.m.

M.C.CD.S.R.2006-07 Rate Analysis for Road Works Item


Item No. 50

Excavation in wet soils or stush by physicat means Excavation in wet soils or stush by physical means
including use of centrifugal pump forremoval including use of centrifugal pump for removal of water or by
any other approved method disposing of water or by any other approved method disposing off stuff so
removed as directed in the form of off stuff so removed as directed in the form of berms to a lead of 50 m
and aI/lifts of berms to a lead of 50 m and aI/lifts.

Camp. Rate Labour RatE

Unit

I
Rate proposed for M.C.C. D.S.R. 2006-200

100.00

100.00

Per Cum.

M.C.CD.S.R.2006-07 Rate Analysis for Road Works Item


Item No. 51
Excavation in creek areas including providing bund including USf! of centrifugal pump for removal of water or
by any other approved method disposing off stuff so removed as directed in the form of berms to a lead of
50 m. and aI/lifts.
Spec. No. :MORTH : 301 to 303. Page No. 49 to 63
Quantity for Per Cum.
QUANTITY RATE IN Rs

DESCRIPTION
1)

2)

3)
)

Labour
Mazdoor, unskilled heavyl male
Mazdoor, unskilled light/female

UNIT

0.750
0.750
0.000

Day
145.00
145.00
Day
0.00
0
Total Labour in Rs.

108.75
108.75
0.00
217.50

0.000

0.00
0
Total Material in Rs.

0.00
0.00

MaterIal

Machinery: .
Water Pump

4)

Scaffolding

5)

SundrIes (1.0%)

0.063

Hours
1168.00
Total Machinary in Rs.
Total of No.1 to 3 in Rs.

Total
0.010

Total
6)

AMOUNT IN Rs.

Water charges

0.000

Total
7)

Laboratory Testing

0.000

8)

Formwork etc.

0.000

9)

Overhead charges (10%)

0.100

Total
Total
Total

73.58
73.58
291.08
0.00
. 291.08
2.91
293.99
0.00
293.99
0.00
293.99
0.00
293.99
29.40
323.39

10) Total Lead


0.000

0.00

0.00

Total lead
Total
Say Completed Item Rate in Rs Per Cum
11) Labour Component
Say Labour Component in Rs.Per Cum.

Compo Rate Labour Rat,

Unit

I
Rate proposed for M.C.C. D.S.R. 2006,200

150.00

150.00

Per Cum.

0.00
323.39
323.00
217.50
218.00

M.C.C.D.S.R.2006-07 Rate Analysis for Road Works Item


Item No. 52
Supplying grade I (90 mm to 40 mm) trap stone metal at the road side including conveying to 1/2 km. leads
and lifts and stacking etc., complete.
Spec. No. :MORTH : 404,_ Page No. 112 to 114
Quantity for Per Cum.
QUANTITY RATE IN Rs

DESCRIPTION
1)

2)

3)

UNIT

AMOUNTIN Rs.

Labour

Material
Aggregate 80 mm (by Blasting)
Tr. Metal Blasted 69 mm
Tr. Metal Blasted 40 mm
Tr. Metal Blasted 20 mm (Crushed)
Course Aggregate 10 mm

0.000

0.00
Total Labour in Rs.

0.00
0.00

0.250
0.320
0.340
0.060
0.030

Cu.m.
280.00
Cu.m.
280.00
280.00
Cu.m.
Cu.m.
400.00
CU.m.
400.00
Total Material in Rs.

70.00
89.60
95.20
24.00
12.00
290.80

Machinery :
0.000

4)

Scaffolding

5)

Sundries (1 %)

0.010

6)

Water charges

0.000

7)

Laboratory Testing (0.5%)

0.005

8)

Formwork etc.

0.000

9)

Overhead charges (10%)

0.100

0
0.00
Total Machinary in Rs.
Total of No.1 to 3 in Rs.
Total
Total
Total
Total
Total
Total

10) Total Lead


Metal (1/2 Km.)

1.000

0.00
0.00
290.80
0.00
290.80
2.91
293.71
0.00
293.71
1.47
295.18
0.00
295.18
29.52
324.69
69.12

69.12

)
Total lead
Total
Say Completed Item Rate in Rs Per Cum
11)

Labour Component
Say Labour Component in Rs. Per Cum.

Compo Rate Labour RatE

Rate proposed for M.C.C. D.S.R. 2006-200

260.00

Unit
Per Cum.

69.12
393.81
390.00
0.00
0.00

M.C.C.D.S.R.2006-07 Rate Analysis for Road Works Item


Item No. 53
Supplying grade /I (63 mm to 40 mm) trap stone metal at the road side including conveying to 1/2 km,. lead
etc., complete.
Spec. No. :MORTH : 404, Page No. 112 to 114
Quantity for Per Cum.
QUANTITY RATE IN Rs
UNIT
AMOUNT IN Rs.
0.000

0.00
Total Labour in Rs.

0.00
0.00

0.050
0.430
0.430
0.060
0.030

CU.m.
290.00
290.00
CU.m.
290.00
Cu.m.
CU.m.
400.00
400.00
CU.m.
Total Material in Rs.

14.50
124.70
124.70
24.00
12.00
299.90

0.000

4)

Scaffoldin9

5)

Sundries (1%)

0.010

6)

Water charges

0.000

7)

Laboratory Testing (0.5%)

0.005

8)

Formwork etc.

0.000

9)

Overhead charges (10%)

0.100

0.00
Total Machinary in Rs.
Total of No.1 to 3 in Rs.
Total
Total
Total
Total
Total
Total

10) Total Lead


Metal (1/2 Km.)

1.000

0.00
0.00
299.90
0.00
299.90
3.00
302.90
0.00
.302.90
1.51
304.41
0.00
304.41
30.44
334.85
69.12

69.12

)
Total lead
Total
Say Completed Item Rate in Rs Per Cum

11) Labour Component

0.00
0.00

Say Labour Component in Rs. Per Cum.

Camp. Rate Lacour Rate

Unit

R ate proposed for M.C.C. D.S.R. 2006-200

300.00

69.12
403.97
404.00

Per Cum.

M.C.CD.S.R.2006-07 Rate Analysis for Road Works Item


Item No. 54
Supplying grade 11/ (53 mm to 20 mm) trap stone metal at the road side including conveying to 1/2 km,. lead
etc., complete.

Camp. Rate Labour Rat,

Unit

I
Rate proposed for M.C.C. D.S.R. 2006:200

310.00

Per Cum

M.C.C.D.S.R.2006-07 Rate Analysis for Road Works Item

Item No. 55
Supplying sand at the road side including conveying and stacking complete.

Compo Rate Labour Rat

Unit

I
R ate proposed for M.C.C. D.S.R. 2006-200

410.00

30.00

Per Cum

M.C.C.D.S.R.2006-07 Rate Analysis for Road Works Item


Item No. 56
Supplying gravel at the road side including conveying and stacking complete.
Spec. No. :MORTH :1007, 1008, Page No. 367 to 368
Quantity for Per Cum.
DESCRIPTION
1)

2)

3)

QUANTITY RATE IN Rs

UNIT

AMOUNT IN Rs.

Labour
Mazdoor, unskilled heavyl male

0.250

145.00
Day
Total Labour in Rs.

36.25
36.25

Material
Gravel at Nalla Bed

1.000

200.00
Cu.m
Total Material in Rs.

200.00
200.00

.0.00

0.00
0.00
236.25
0.00
236.25
.2.36
238.61
0.00
238.61
1.19
239.81
0.00
239.81
23.98
263.79

Machinery :
0.000

'rotal Machinary in Rs.


Total of No.1 to 3 in Rs.
4)

Scaffolding

5)

Sundries (1.0%)

Total
0.010
Total
6)

Water charges

0.000

7)

Laboratory Testing (0.5%)

0.005

8)

Formwork etc.

0.000

9)

Overhead charges

0.100

Total
Total
Total
Total
10) Total Lead
Metal (1/2 Km.)

1.000

58.76

58.76

Total lead
Total
Say Completed Item Rate in Rs Per Cum

58.76
322.55
. 323.00

Say Labour Component in Rs.Per Cum

36.25
36.00

11) Labour Component

Rate proposed for M.C.C. D.S.R. 2006-200

Compo Rate Labour Rat


200.00

40.00

Unit
Per Cum

'I '\
M.C.C.D.S.R.2006-07 Rate Analysis for Road Works Item
Item No. 57
Supplying stone dust at the road side including conveying upto a lead of 1/2 km. and stacking etc.,
complete.
Spec. No. :MORTH : 1007, 1008, Page No. 367 to 368
Quantity for Per Cum.
DESCRIPTION
1)

2)

3)

QUANTITY RATE IN Rs

Labour
Blender, Skilled
Mazdoor Unskilled Heavy i Male.
Mazdoor Unskilled Heavy I Female.
Watchman

0.100
0.200
0.200
0.070

Material
Stone Dust

1.000

UNIT

145.000
Day
145.000
Day
145.000
Day
145.000
Day
Total Labour in Rs.
175.00
Total Material in Rs.

AMOUNT IN Rs.
14.50
29.00
29.00
10.15
82.65
175.00
175.00

Machinery :
0.000

4)

Scaffolding

5)

Sundries (1.0%)

0.00
Total Machinary in Rs.
Total of No.1 to 3 in Rs.

Total
0.010

Total

------6) Water charges

0.000

Total
7)

Laboratory Testing (0.5%)

0.005

8)

Formwork etc.

0.000

9)

Overhead charges (1 0%)

0.100

Total
Total
Total
10) Total Lead
Metal (1/2Km.)

)
11 )

1.000

0.00
0.00
257.65
0.00
257.65
2.58
260.23
0.00
260.23
1.30
261.53
0.00
261.53
26.15
287.68
58.76

58.76

Total lead
Total
Say Completed Item Rate in Rs Per Cum

58.76
346.44
346.00

Say Labour Component in Rs.Per Cum

82.65
83.00

12) Labour Component

Compo Rate Labour Rat,

Rate proposed for M.C.C. D.S.R. 2006-200

150.00

30.00

Unit
Per Cum

M.C.C.D.S.R.2006-07 Rate Analysis for Road Works Item


Item No. 58
Compacting the hard murum/kankar with vibratory rolter inctuding arlificial watering coomplete (completed
average 150 mm thick.)
Spec. No. :MORTH : 404.3 & 404.4, Page No. 117 to 118
Quantity for 100 Sq.m
QUANTITY RATE IN Rs

DESCRIPTION
1)

2)

3)

')

Labour
Mazdoor, unskilled heavyl male
Bhisti (Mixing ICuring) Semi -Sk
Labour for traffic regulation

AMOUNT IN Rs.

UNIT

0.063
0.166
0.330

145.00
Day
145.00
Day
145.00
Day
Total Labour in Rs.

9.14
24.07
47.85
81.06

0.000

0.00
Total Material in Rs.

0.00
0.00

Material

Machinery :
Vibratory roller (8 to 10 MI.)
Water Tanker (7.5 T.)

0.550
0.083

4)

Scaffolding

5)

Sundries (1.0%)

0.010

6)

Water charges

0.000

7)

Laboratory Testing

0.000

8096.00
Day
Day
3040.00
Total Machinary in Rs.
Total of NO.1 to 3 in Rs.

Total
Total
Total
Total
8)

Formwork etc.

0.000

9)

Overhead charges (10%)

0.100

Total
Total

4452.80
252.32
4705.12
4786.18
0.00
4786.18
47.86
4834.04
0.00
4834.04
0.00
4834.04
0.00
4834.04
483.40
5317.44

10) Total Lead

11)
12)

Total lead
Total
Say Completed Item Rate in Rs Per 100 Sq.m.
Labour Component
Say Labour Component in Rs.Per 100 Sq.m.

Camp. Rate Labour RatE

I
R ate proposed for M.C.C. D.S.R. 2006-200

450.00

50.00

Unit
100 Sq.ml.

0.00
5317.44
531.00
81.06
81.00

M.C.C.D.S.R.2006-07 Rate Analysis for Road Works Item


Item No. 59
Providing and laying water bound macadam 75 mm consolidated thickness including conveying al/ material,
with lead upto 5 km. & al/ lifts spreading selecting compacting and spreading blindage including Brtificial
watering etc., complete by using GRADE-II metal.
Spec. No. :MORTH : 404, Page No. 112 to 120
Quantity for Per Cum.
QUANTITY RATE IN Rs

DESCRIPTION
1)

2)

3)

4)

UNIT

AMOUNT IN Rs.

Labour
Mazdoor, unskilled heavyi male
Mazdoor, unskilled lighUfemale

1.330
0.330

145.00
Day
145.00
Day
Total Labour in Rs.

192.85
47.85
240.70

Material
Stone Screenings
Metal Grade-II, 63 mm to 40 mm

0.240
1.330

CU.m.
300.00
290.00
CU.m.
Total Material in Rs.

72.00
385.70
457.70

Machinery :
Vibratory roller (8 to 10 MI.)
Water Tanker(7.5.T.)

0.005
0.001

8096.00
Day
3040.00
Day
Total Machinary in Rs.
Total of No.1 to 3 in Rs.

40.48
3.04
43.52
. 741.92

Scaffolding

Total
5)

Sundries (1.0%)

0.010

6)

Water charges

0.000

7)

Laboratory Testing (0.5%)

0.005

8)

Formwork etc.

0.000

g)

Overhead charges (10%)

0.100

Total
Total
Total
Total
Total
10) Total Lead'
Metal (5 Km.)

0.240
1.330

)
11 )
12) Labour Component

58.76
;69.60

Total lead
Total
Say Completed Item Rate in Rs Per Cum
Say Labour Component in Rs.Per Cum

Compo Rate Labour Rate

Unit

I
Rate proposed for M.C.C. D.S.R. 2006-200

800.00

210.00

Per Cum.

0.00
741.92
7.42
749.34
0.00
749.34
3.75
753.09
0.00
753.09
75.31
828.39
14.10
92.57
106.67
. 935.06
935.00
240.70
241.00

M.C.CD.S.R.2006-07 Rate Analysis for Road Works Item


Item No. 63
Providing and laying 75mm thick built up spray grout including supplying all materials, preparing and
cleaning the base, laying the required thickness of metal in. 2 layers, heating and spraying bitumen,
spreading chips, compacting both layers with vibratory roller etc. complete. (without tack coat) with 60170
grade bitumen
Spec. No. :MORTH : Clause No.506, Page NO.167 to 170
Quantity for 100 Sq.m.
DESCRIPTION
1)

2)

3)

QUANTITY RATE IN Rs

UNIT

Labour
Mazdoor, unskilled heavyl male
Mazdoor, unskilled light/female

20.000
170.000

145.00
Day
Day
145.00
Total Labour in Rs.

2900.00
24650.00
27550.00

Material
Aggregate
50mm
25mm
20mm
10mm
Bituminous for spraying

0.000
10.000
40.000
50.000
13.000
3.000

0.00
CU.m.
400.00
400.00
Cu.m.
CU.m.
400.00
400.00
Cu.m.
M.T.
25125.00
Totai Material in Rs.

0.00
4000.00
16000.00
20000.00
5200.00
75375.00
100575.00

0.600
0.250

Day
8096.00
Day
1320.00
. Total Machinary in Rs.
Total of No.1 to 3 in Rs.

4857.60
330.00
5187.60
133312.60
0.00
133312.60
1333.13
134645.73
0.00
134645.73
673.23
135318.95
0.00
135318.95
13531.90
148850.85
14885.08

Machinery :
Vibratory roller (8 to 10 MI.)
Heating Charges

4)

Scaffolding

5)

Sundries (1.0%)

0.010

6)

Water charges

0.000

7)

Laboratory Testing (0.50%)

0.005

8)

Formwork etc.

0.000

9)

Overhead charges (10%)

0.100

Total
Total
Total
Total
Total

AMOUNT IN Rs.

Total
10) Rate per 100 Sq.m.
11) Total Lead
Metal (5 Km.)

7.500

109.06

Total lead
Total
Say Completed Item Rate in Rs Per 100 Sq.m.
12) Labour Component
Say Labour Component in Rs. Per 100 Sq.m

Compo Rate Labour RatE

Unit

I
Rate proposed for M.C.C. D.S.R. 2006-200 15700.00

4000.00

100 Sq.mt

817.95
817.95
15703.03
15703.00
4000.00
4000.00

Item No. 64 (a)(i)


Providing and applying primer coat over prepared surface of granular base with bitumen heated in bitumen
boiler filled with spray set (excluding cleaning of road surface.) with 60170 bitumen.
Spec. No. :MORTH : 502, Page No. 155 to 157
Quantity for 100 Sq.m
DESCRIPTION
1)

2)

3)

)
_,.J

QUANTITY RATE IN Rs

UNIT

AMOUNT IN Rs.

Labour
Mazdoor, unskilled heavyl male
Mazdoor, unskilled light/female

1.000
1.500

Day
145.00
145.00
Day
Total Labour in Rs.

145.00
217.50
362.50

Material
Bitumen Bulk at Mumbai
Heating I spray bitumen (Bouzer)

0.050
0.050

M.T.
21125.00
M.T.
1800.00
Total Material in Rs.

1056.25
90.00
1146.25

Machinery :
Bitumen pressure sprayer

0.150

1920.00
M.T.
Total Machinary in Rs.
Total of No.1 to 3 in Rs.

288.00
288.00
1796.75
0.00
1796.75
26.95
1823.70
0.00
1823.70
9.12
1832.82
0.00
1832.82
183.28
2016.10

4)

Scaffolding

5)

Sundries (1.5%)

0.015

6)

Water charges

0.000

7)

Laboratory Testing (0.50%)

0.005

8)

Formwork etc.

0.000

9)

Overhead charges (10%)

0.100

Total
Total
Total
Total
Total
Total
10) Total Lead
Total lead
Total
Say Compteted Item Rate in Rs Per 100 Sq.m.

11 )
12)

Labour Component
Say Labour Component in Rs.
I

IComp. Rate Labour RatE

I L

Rate proposed for M.C.C. D.S.R. 20062007

Unit

0.00
2016.10
2016.00
360.00
360.00

M.C.CD.S.R.2006-07 Rate Analysis for Road Works Item


Item No. 60(a)
Providing & laying hot mix hot laid bituminous macadam with 3% bitumen content by weight of total mix for
levelling course to remove irregularities, Including diversion of traffic supply of all materials, heating bitumen and
chips in hot mix plant laying bituminous macadam by sensor paver finisher to the required line, level and camber
including compactlnging with power roller and vibratory roller to achieve desired density etc. complete.(excludlng
tack coat) with 60no grade bitumen
Spec. No. :MORTH :Clause No.504, Page No.160 to 163
Quantity for Per 50 Cum.
DESCRIPTION
QUANTITY RATE IN Rs
UNIT
. AMOUNT IN Rs.
1)

2)

3)

Labour
Mazdoor, unskilled heavy! male
Mazdoor, unskilled light/female

30.000
16.000

145.00
Day
145.00
Day
Total Labour in Rs.

4350.00
2320.00
6670.00

Material
Bitumen Bulk at Mumbai(Density 2.0 MT!Cum)
Course aggregate 10 mm
Tr. Metal 40 mm blasted
Tr. Metal 25 mm (Curshed)
Aggergate 12 mm

3.000
7.000
22.000
21.000
17.500

25125.00
M.T.
400.00
Cu.m.
400.00
CU.m.
400.00
CU.m.
400.00
CU.m.
Total Material In Rs.

75375.00
2800.00
8800.00
8400.00
7000.00
102375.00

Machinery :
Dumper I Tipper
Power roller (8 to 10 MT.)
Boiler (Asphalt)
Hotmix plant (30 to 40 T)
Paver Finisher

2.200
0.550
:0.550
3.360
4.000

4128.00
Day
3040.00
Day
2732.00
Day
2037.00
Hour
742.00
Hour
Total Machlnary In Rs.
Total of No.1 to 3 In Rs.

9081.60
1672.00
1502.60
6844.32
2968.00
22068.52
131113.52
0.00
131113.52
1311.14
132424.66
0.00
132424.66
662.12
133086.78
0.00
133086.78
13308.68
146395.46

4)

Scaffolding

5)

Sundries (1.0%)

Total
0.010

Total
6)

Water charges

0.000

7)

Laboratory Testing (0.50%)

0.005

8)

Formwork etc.

0.000

9)

Overhead charges (10%)

0.100

10)

Total Lead
Metal (5 Km.)

Total
Total
Total
Total

Total (for 50 Cu.mt.)


11 )

1.350

109.06

Total lead
Total
Say Completed Item Rate in Rs Per 50 Cum

Labour Component for 50 Cum.


Say Labour Component in Rs.Per Cum.
Camp. RatE Labour RatE
Rate proposed for M.C.C. D.S.R. 2006-2007

2815.00

280.00

Unit
Per Cum.

147.23
147.23
146542.69
2930.85
6670.00
133.40

M.C.C.D.S.R.2006-07 Rate Analysis for Road Works Item


Item No. 60(b)
Providing & laying hot mix hot laid bituminous macadam with 3% bitumen content by weight of total mix for
levelling course to remove irregularities, including diversion of traffic supply of all materials, heating bitumen and
chips in hot mix plant laying bituminous macadam by sensor paver finisher to the required line, level and camber
including compactinging with power roller and vibratory roller to achieve desired density etc. complete.(excluding
lack coat) with 30140 grade bitumen
Spec. No. :MORTH : Clause No. 504, Page No.160 to 163
Quantity for Per 50 Cum.
QUANTITY RATE IN Rs

DESCRIPTION
1)

2)

3)

UNIT

30.000
16.000

145.00
Day
145.00
Day
Total Labour in Rs.

4350.00
2320.00
6670.00

Material
Bitumen Bulk at Mumbai
Course Aggegate 10 mm
Tr. Metal 40 mm blasted
Tr. Metal 25 mm (Crushed)
Aggregate 12 mm

3.000
7.000
22.000
21.000
17.500

26735.00
M.T.
400.00
Cu.m
400.00
Cu.m
400.00
Cu.m.
400.00
Cu.m
Total Material in Rs.

80205.00
2800.00
8800.00
8400.0C
7000.00
107205.00

2.200
0.550
0.550
3.300
4.000

4120.00
Day
3040.00
Day
2732.00
Day
2037.00
Hours
752.00
Hours
Total Machinary in Rs..
Total of No.1 to 3 in Rs.

9064.00
1672.00
1502.60
6722.10
3008.00
21968.70
135843.70
0.00
135843.70
1358.44
137202.14
0.00
137202.14
686.01
137888.15
0.00
137888.15
13788.81
151676.96

Machinery :
Dumper! Tipper
Power roller (8 to 10 MI.)
Boiler (Asphalt)
Hotmix Plant (30 to 40 T)
Paver finisher

4)

Scaffolding

5)

Sundries (1.0%)

0.010

6)

Water charges

0.000

7)

Laboratory Testing (0.50%)

0.005

8)

Formwork etc.

0.000

9)

Overhead charges (10%)

0.100

10)

Total Lead
Metal (5 Km.)

Total
Total
Total
Total
Total
Total

Total (for 50 Cu.ml.)


11 )

AMOUNT IN Rs.

Labour
Mazdoor, unskilled heavy! male
Mazdoor, unskilled light/female

1.350

109.06

Totai lead
Total
Say Completed Item Rate in Rs Per Cum

Labour Component for 50 Cum.


Say Labour Component in Rs. Per Cum.
Camp. Rate Labour Rat
Rate proposed for M.C.C. D.S.R. 2006-2007

2835.00

280.00

Unit
Per Cum

147.23
147.23
151824.19
3036.48
6670.00
133.40

M.C.C.D.S.R.2006-07 Rate Analysis for Road Works Item


Item No. 61 (a)
Providing & laying hot mix hot laid bituminous macadam with 3.5% bitumen content by weight of total mix
including diversion of traffic supply of all materials, heating bitumen and chips, mixing bitumen and chips in hot
mix plant, laying bituminous macadam by sensor paver finisher to the required line, level and camber including
compacting with power roller and vibratory roller to achieve desired density etc. complete.(excluding tack coat)
with 60170 grade bitumen
Spec. No. :MORTH : Clause No.504, Page No. 160 to 163
Quantity for Per 50 Cum.
QUANTiTY RATE IN Rs

DESCRIPTION
1)

2)

Labour
Mazdoor, unskilled heavyl male
Mazdoor, unskilled light/female

30.000
16.000

3)

145.00
Day
145.00
Day
Total Labour in Rs.

CU.m
400.00
400.00
CU.m
CU.m.
400.00
400.00
CU.m
Total Material in Rs.

8800.00
8400.00
6800.00
2800.00
114737.50

Machinery :
Hotmix plant (30 to 40 T)
Self propelled Paver finisher
Boiler (Asphalt)
Dumper 1 Tipper
Vibratory Roller (8 to 10 M.T)
Power Roller (8 to 10 M.T.)

3.360
4.000
0.550
2.200
0.550
;0.550

2037.00
Hour
747.00
Hour
2732.00
Day
4127.00
Day
8096.00
Day
2040.00
Day
Total Machinary in Rs.
Total of No.1 to 3 in Rs;

6844.32
2988.00
1502.60
9079.40
4452.80
1122.00
25989.12
147396.62
0.00
147396.62
1473.97
148870.59
0.00
148870.59
744.35
149614.94
0.00
149614.94
14961.49
164576.43

4)

Scaffolding

5)

Sundries (1.0%)

0.010

6)

Water charges

0.000

7)

Laboratory Testing (0.50%)

0.005

8)

Formwork etc.

0.000

25125.00

M.T.

Total
Total
Total

Total
9)

Overhead charges (10%)

10)

Total Lead
Metal (5 Km.)

0.100

Total

Total (for 50 Cu.mt.)


11 )

4350.00
2320.00
6670.00

22.000
21.000
17.000
7.000

3.500

Total

)"

AMOUNT IN Rs.

Material
Bitumen Bulk at Mumbai
(Density
2.00 MT/Cum)
Tr.Metal40 mm (Crushed)
Tr. Metal 25 mm (Crushed)
Tr. Metal 10 mm (Crushed)
Tr. Metal 10 mm 112 mm (Crushed)

UNIT

1.350

109.06

Total lead
Total
Say Completed Item Rate in Rs Per Cum

Labour Component for 50 Cum.


Say Labour Component in Rs.Per Cum.
Compo RatE Labour RatE
Rate proposed for M.C.C. D.S.R. 2006-2007

2988.00

280.00

Unit
Per Cum

87937.50

147.23
147.23
164723.66
3294.00
6670.00
133.00

<2\

M.C.CD.S.R.2006-07 Rate Analysis for Road Works Item


Item No. 61(b)
Providing & laying hot mix hot laid bituminous macadam with 3.5% bitumen content by weight of total mix
including diversion of traffic supply of all materials, heating bitumen and chips, mixing bitumen and chips in hot
mix plant, laying bituminous macadam by sensor paver finisher to the required line, level and camber including
compacting with power roller and vibratory roller to achieve desired density etc. complete.(excluding tack coat)
with 30140 grade bitumen

Spec. No. :MORTH : Clause No.504, Page NO.160 to 163


Quantity for Per 50 Cum.
DESCRIPTION
1)

2)

QUANTITY RATE IN Rs

Labour
Mazdoor, unskilled heavy/ male
Mazdoor, unskilled IighUfemale

30.000
16.000

Material
Bitumen Bulk at Mumbai (Density 2.00

3.500

UNIT

145.00
Day
145.00
Day
Total Labour in Rs..
26735.000

M.T.

AMOUNT IN Rs.
4350.00
2320.00
6670.00
93572.500

MT/Cum)
Tr.Material 40 mm (Crushed)
Tr.Material 25 mm (Crushed)
Tr, Metel 1Omm /12 mm (Crushed)
Tr, Metel 1Omm /12 mm (Crushed)

22.000
21.000
17.000
7.000

400.00
Cu.m.
400.00
Cu.m.
400.00
Cu.m.
400.00
Cu.m.
Total Material in Rs.

8800.00
8400.00
6800.00
2800.00
120372.50

Machinery :
Hot mix plant (30 to 40 Tonne)
Self propelled Paver finisher
Boiler (Ashpalt)
Dumper I Tipper
Vibratory roller (8 to 10 MT.)
Power Roller (8 to 10 MT.)

3.360
4.000
0.550
2.200
0.550
.0.550

2039.00
Hour
742.00
Hour
2732.00
Day
4128.00
Day
8096.00
Day
3040.00
Day
Total Machinary in Rs.
Total of No.1 to 3 in Rs,

6851.04
2968.00
1502.60
9081.60
4452.80
1672.00
26528.04
153570.54
0.00
153570.54
1535.71
155106.25
0.00
155106.25
775.53
155881.78
0.00
155881.78
15588.18
171469.95

)
3)

Total
0.010

Total
0.000

Total
0.005

Total
0.000

Total
0.100

Total
1.350

109.06

147.23

Total lead
Total
0.000
Say Completed Item Rate in Rs Per Cum
Say Labour Component in Rs Per Cum
Camp. Rate Labour Rate
Rate proposed for M.C.C. D.S.R. 2006-2007

3100.00

280.00

Unit
Per Cum.

147.23
171617.19
3432.34
3432.00
6670.00
13300

M.C.CD.S.R.2006-07 Rate Analysis for Road Works Item

Camp. Rate Labour Rate


Rate proposed for M.C.C. D.S.R. 2006-2007

3950.00

300.00

Unit
Per Cum

M.C.C.D.S.R.2006-07 Rate Analysis for Road Works Item


Item No. 62(b)

Providing and laying hot mix hot laid dense bituminous macadam with 4.5% bitumen by weight of total mix
including diversion of traffic supply of all materials heating bitumen and chips mixing bitumen and chips in hot mix
laying bitumenous macadam by paver finisherr including compacting with power roller and vibratory roller etc.,
complete. (excluding tack coat) with 30140 grade bitumen.
Spec. No. :MORTH: 507, Page No.170 to 178
Quantity for Per 50 Cum.
DESCRIPTION

1)

QUANTITY RATE IN Rs

Labour
Mazdoor, unskilled heavyl male
Mazdoor, unskilled light/female

30.000
16.000

145.00
145.00

UNIT

AMOUNT IN Rs.

Day
Day

4350.00
2320.00
6670.00

Total Labour in Rs.


2)

Material
Bitumen Bulk at Mumbai 4.5% ( density 2.25
M.T. I Cu.m.)
Tr. Metal 40 mm (Crushed)
Tr. Metal 25 mm (Crushed)
Metal 1Omm 112 mm (Crushed)
Metal 1Omm 112 mm (Crushed)

'5.062

26735.00

M.T.

24.500
21.000
17.500
7.000

400.00
400.00
400.00
400.00

Cu.m.
Cu.m.
Cu.m.
Cu.m.

Total Material in Rs.


3)

Machinery :
Hot mix plant (30 to 40 M.T.)
Self propelled Paver finisher
Boiler (Asphalt)
Dumper I Tipper
Vibratory Roller (8 to 10m)
Power Roller (8 to 10)

3.300
4.000
0.550
2.200
0.550
0.550

2037.00
742.00
2732.00
4128.00
8096.00
3040.00

Hour
Hour
Day
Day
Day
Day

Total Machinary in Rs.


Total of No.1 to 3 In Rs.
4)

Scaffolding

5)

Sundries (1.0%)

0.010

6)

Water charges

0.000

7)

Laboratory Testing (0.50%)

0.005

Total
Total
Total
Total
8)

Formwork etc.

0.000

9)

Overhead charges (10%)

0.100

10)

Total Lead
Metal (5 Km.)

Total
Total
1.400

Total lead
Total
Say Completed Item Rate in Rs Per Cum

12)

Labour Component for 50 Cum


Say Labour Component in Rs.Per Cum.
Compo Rate Labour Rat
Rate proposed for M.C.C. D.S.R. 2006-2007

4000.00

300.00

9800.00
8400.00
7000.00
2800.00
163332.57
6722.10
2968.00
1502.60
9081.60
4452.80
1672.00
26399.10
196401.67
0.00
196401.67
1964.02
198365.69
0.00
198365.69
991.83
199357.52
0.00
199357.52
19935.75
219293.27
152.68

109.06

Tota.1 (for 50 Cu.mt.)

135332.57

Unit
Per Cum

152.68
219445.95
4388.92
6670.00
133.40

M.C.C.D.S.R.2006-07 Rate Analysis for Road Works Item


Item No.64(a)
Providing and laying 20 mm thick mix seai surfacing "A" TYPE including supplying all matenals, cleaning the base
heating bitumoen and aggregates in hot mix plant laying the mix seal surfacing by paver finisher coompacting by
power roller etc., complete. (excluding tack coat) (a) With bitumen 60170 grade.

Camp. RatE Labour Rat


Raie proposed for M.C.C. D.S.R. 2006-2007

9200.00

2200.00

Unit
100 Sq.m.

M.C.CD.S.R.2006-07 Rate Analysis for Road Works Item


Item No.64 (b)
Providing and laying 20 mm thick mix seal surfacing ')<\" TYPE including supplying all materials, cleaning the base
heating bitumen and aggregates in hot mix plant laying the mix seal surfacing by paver finisher compacting by
power roller etc., complete. (excluding tack coat) (b)with bitumen 30140 grade.
Spec. No. :MORT & H: 510 Page No. 186 to 192
Quantity for Per 1000 Sq.m.
DESCRIPTION
1)

QUANTITY RATE IN Rs

Labour
Mazdoor, unskilled heavyl male
Mazdoor, unskilled IighUfemale
Watchman

12.000
37.000
1.000

Material
Bitumen Bulk at Mumbai(Density 2.40

2.200

2)

UNIT

145.00
Day
145.00
Day
145.00
Day
Total Labour in Rs.
26735.00

M.T.

AMOUNT IN Rs.
1740.00
5365.00
145.00
7250.00
58817.00

MT/Cum)

Aggregate 10 mm and below

27.000

CU.m.
400.00
Total Material in Rs.

10800.00
69617.00

Machinery :
Drum mix plant
Self propelled Paver finisher
Dumper I Tipper
Power roller (8 to 10 MI.)

0.960
0.960
0.720
0.500

2039.00
Hour
742.00
Hour
Day
4128.00
3040.00
Day
Total Machinary in Rs.
Total of No.1 to 3 in Rs.

1957.44
712.32
2972.16
1520.00
7161.92
84028.92

3)

4)

Scaffolding

5)

Sundries (1.0%)

0.010

6)

Water charges

0.000

7)

Laboratory Testing (0.50%)

0.005

8)

Formwork etc.
Total for 1000 Sq.m.
Overhead charges (10%)

0.000

Total
Total
Totai
Total

9)

Total
;0.100

Total
10)
11 )

Rate per 100 Sq.m.


Total Lead
Metal (5 Km.)

294.46

109.06

Total lead
Total
Say Completed Item Rate in Rs Per 100 sq.m.

-----

12)

2.700

Labour Component for 1000 Cum.


Say Labour Component in Rs.Per 100 Sq.m
Compo RatE Labour Rat
Rate proposed for M.C.C. D.S.R. 2006-2007

9632.00

2200.00

0.00
84869.21
424.35
85293.56
0.00
85293.56
8529.36
93822.91
9382.29

Unit
100 Sq.m

294.46
9676.75
9150.00
7250.00
725.00

M.C.C.D.S.R.2006-07 Rate Analysis for Road Works Item

Item No.55 (a)


Providing and laying 20 mm thick mix seal surfacing "B" TYPIF inciuding supplying all materials, cleaning the base
heating bitumen and aggregates in hot mix plant laying the mix seal surfacing by paver finisher compacting by
power roller etc., complete. (excluding tack coat) (b) with bitumen 60nO grade.

Compo RatE Labour RatE


Rate proposed for M.C.C. D.S.R. 2006-2007

8425.00

2150.00

Unit
100 Sq.m

'tll
M.C.C.D.S.R.2006-07 Rate Analysis for Road Works Item
Item No.65 (b)
Providing and laying 20 mm thick mix seal surfacing "B" TYPE including supplying all materials, cleaning the base
heating bitumen and aggregates in hot mix plant laying the mil' seal surfacing by paver finisher compacting by
power roller etc., complete. (excluding tack coat) (b) with bitumen 30140 grade.
Spec. No. :MORT & H : 512, Page No. 199 to 201
Quantity for Per 1000 Sq.m.
DESCRIPTION
1)

2)

3)

QUANTITY RATE IN Rs

Labour
Mazdoor, unskilled heavyl male
Mazdoor, unskilled light/female
Watchman

12.000
37.000
0.120

Material
Bitumen Bulk at Mumbai(Density 2.40
MT/Cum)
Aggregate 10 mm and below

27.000

Machinery :
Drum mix plant
Self propelled Paver finisher
Dumper I Tipper .
Power roller (8 to 10 MI.)

0.960
0.960
'0.720
0.500

1.900

4)

Scaffolding

5)

Sundries (1.0%)

0.010

6)

Water charges

0.000

7)

Laboratory Testing (0.50%)

0.005

8)

Formwork etc.

0.000

9)

Overhead charges (10%)


Total for 1000 Sq.m.
Rate for 100 Sq.m.
Total Lead
Metal (5 Km.)

0.100

UNIT

145.00
Day
145.00
Day
145.00
Day
Total Labour in Rs.
26735.00

M.T.

400.00
Cu.m.
Total Material in Rs.
2037.00
Hour
742.00
Hour
4128.00
Day
3040.00
Day
Total Machinary in Rs.
Total of No.1 to 3 in Rs.

Total
Total
Total
Total
Total

10)
11 )
\

12)
13)

Total

2.700

109.06

Labour Component for 1000 Sq.m


Say Labour Component in Rs.Per 100 Sq.m

Rate proposed for M.e.C. D.S.R. 2006-2007

8730.00

2150.00

1740.00
5365.00
17.40
7122.40
50796.50
10800.00
61596.50
1955.52
712.32
2972.16
1520.00
7160.00
75878.90
0.00
75878.90
758.79
76637.69
0.00
76637.69
383.19
77020.88
0.00
77020.88
7702.09
84722.97
8472.29
294.46

Total lead
Total
Say Completed Item Rate in Rs Per 100 Sq.m

Camp. Rate Labour Rate

AMOUNT IN Rs.

Unit
100 Sq.m

294.46
8766.75
8400.00
7122.40
712.24

M.C.C.D.S.R.2006-07 Rate Analysis for Road Works Item


Item No.66 (a)

Providing & laying hoi mix hot laid bituminous concrete of required thickness with 5.8% bitumen content by weight
of total mix including supply of all materials, heating bitumen and chips, mixing bitumen and chips in hot mix
plant, laying bituminous concrete by sensor paver finisher to the required line, level end camber and compacting
with power roller and vibratory roller to achieve desired density including diversion of trafifc etc.
complete. (excluding tack coat) with 60170 grade bitumen
Spec. No. :MORT & H : Ciause No.509, Page No. 183 to 188
Quantity for" Per 40 Cum.
DESCRIPTION
1)

QUANTITY RATE IN Rs

Labour
Mazdoor, unskilled heavyl male
Mazdoor, unskilled IighUfemale
Watchman

25.000
75.000
0.840

145.00
145.00
145.00

UNIT

AMOUNT IN Rs.

Day
Day
Day

3625.00
10875.00
121.80
14621.80

Total Labour in Rs.


2)

Material
Bitumen Bulk at Mumbai(Density 2.40
MT/Cum)
Aggregate 10 mm and beiow (Crushed)
Lime soaked (Fine Lime)

5.560

25125.00

M.T.

139695.00

56.000
40.000

400.00
5.00

Cu.m.
Kg.

22400.00
200.00
162295.00

Total Material in Rs.


3)

Machinery :
Drum mix plant
Seif propelied Paver finisher
Power rolier (8 to 10 MI.)
Dumper I Tipper

3.360
;3.360
0.600
2.520

2037.00
742.00
3040.00
4128.00

Hour
Hour
Day
Day

Total Machinary in Rs.


Total of No.1 to 3 in Rs.
4)

Scaffolding

---,---,-,..-~------'Total

.-=_--=,---:-:-,--c-=c=
5)

Sundries (1.5%)

0.015

6)

Water charges

0.000

7)

Laboratory Testing (0.50%)

0.005

8)

Formwork etc.

0.000

9)

Overhead charges (10%)


for 40 Cum
Rate per Cum
Total Lead
Metal (5 Km.)

0.100

Total
Total
Total
Total

10)
11 )

Total

1.400

109.06

152.68

Total lead
Total
12)
13)

Say Completed Item Rate in Rs Per Cum


Labour Component for 40 Cum.
Say Labour Component in Rs.Per Cum.
Compo Rate Labour Rate
Rate proposed for M.C.C. D.S.R. 2006-2007

5380.00

1050.00

6844.32
2493.12
1824.00
10402.56
21564.00
198480.80
0.00
198480.80
2977.21
201458.01
0.00
201458.01
1007.29
202465.30
0.00
202465.30
20246.53
222711.83
5567.80

Unit
Per Cum

152.68
5720.48
5380.00
14621.80
365.55

M.C.C.D.S.R.2006-07 Rate Analysis for Road Works Item


Item No.66 (b)
Providing & laying hot mix hot laid bituminous concrete of required thickness with 5.8% bitumen content by weight
of total mix including supply of all materials, heating bitumen and chips, mixing bitumen and chips in hot mix
plant, laying bituminous concrete by sensor paver finisher to the required line, level and camber and compacting
with power roller and vibratory roller to achieve desired density including diversion of trafifc etc.
complete.(excluding tack coat) with CRMB 55 grade bitumen
Spec. No. :MORT & H : Clause No.509, Page No, 183 to 188
Quantity for Per 40 Cum.
DESCRIPTION
1)

2)

3)

QUANTITY RATE IN Rs

Labour
Mazdoor. unskilled heavyl male
Mazdoor. unskilled IighUfemale
Watchman

25.000
75.000
0.840

UNIT

145.00
Day
145.00
Day
145.00
Day
Total Labour in Rs.

56.000
40.000

400.00
Cu.m.
Kg.
5.00
Total Material in Rs.

22400.00
200.00
162873.24

Machinery :
Drum mix plant
Self propelled Paver finisher
Vibratory roller (8 to 10 MI.)
Power roller (8 to 10 MI.)
Dumper I Tipper

3.360
3.360
.0.200
0.600
2.520

3037.00
Hour
742.00
Hour
8096.00
Day
3040.00
Day
4128.00
Day
Total Machinary in Rs.
Total of No.1 to 3 in Rs.

10204.32
2493.12
1619.20
1824.00
10402.56
26543.20
204038.24
0.00
204038.24
2040.38
206078.62

Scaffolding

5)

Sundries (1.0%)

5.560

25229.00

M.T.

Total
0.010

Total
Water charges

7)

Laboratory Testing (0.50%)

0.005

8)

Formwork etc.

0.000

9)

Overhead charges (10%)


for 40 Cum
Rate per Cum.
Total Lead
Metal (5 Km.)

0.100

Total
Total

12)
13)

Total

1.400

Labour Component for 40 Cum.


Say Labour Component in Rs.
Compo Rate Labour Rate
5400.00

1050.00

206078.62
1030.39
207109.02
0.00
207109.02
20710.90
227819.92
5695.50
152.68

109.06

Total lead
Total
Say Completed Item Rate in Rs Per Cum

Rate proposed for M.C.C. D.S.R. 2006-2007

140273.24

O.OC

0.000

Total

10)
11 )

3625.00
10875.00
121.80
14621.80

Material
Bitumen Bulk at Mumbai(Density 2.40
MT/Cum)
Aggregate 10 mm and below (Crushed)
Lime soaked (Fine Lime)

4)

6)

AMOUNT IN Rs.

Unit
Per Cum.

152.68
5848.18
5450.00
14621.00
365.55

vI
M.C.C.D.S.R.2006-07 Rate Analysis for Road Works Item
Item No.66 (e)
Providing & laying hot mix hot laid bituminous concrete of required thickness with 5.8% bitumen content by weight
of total mix including supply of all materials, heating bitumen and chips, mixing bitumen and chips in hot mix
plant, laying bituminous concrete by sensor paver finisher to the required line, level and camber and compacting
with power roller and vibratory roller to achieve desired density including diversion of trafifc etc.
complete. (excluding tack coat) with 30140 grade bitumen
Spec. No. :MORT & H : Clause No. 509, Page No.183 to 188
Quantity for Per 40 Cum.
QUANTITY RATE IN Rs

DESCRIPTION
1)

2)

3)
\

UNIT

Labour
Mazdoor, unskilled heavyl male
Mazdoor, unskilled light/female
Watchman

25.000
75.000
0.840

145.00
Day
145.00
Day
145.00
Day
Total Labour in Rs.

3625.00
10875.00
121.80
14621.80

Material
Bitumen Bulk at Mumbai(Density 2.40 MTICun
Aggregate 10 mm and below (Crushed)
Lime soaked (Fine Lime)

5.560
56.000
40.000

26735.00
M.T.
400.00
Cu.m.
Kg.
5.00
Total Material in Rs.

148646.60
22400.00
200.00
171246.60

3.360
3.360
0.500
0.600
2.520
0.550

2039.00
Hour
742.00
Hour
8096.00
Day
3040.00
Day
4128.00
Day
2732.00
Day
Total Machinary in Rs.
Total of No.1 to 3 in Rs.

6851.04
2493.12
4048.00
1824.00
10402.56
1502.60
27121.32
212989.72
0.00
212989.72
3194.85
216184.57
0.00
216184.57
1080.92
217265.49
0.00
217265.49
21726.55
238992.04
5974.80

Machinery :
Drum mix plant
Self propelled Paver finisher
Vibratory roller (8 to 10 MI.)
Power roller (8 to 10 MI.)
Dumper I Tipper
Boiler

4)

Scaffolding

5)

Sundries (1.5%)

0.015

6)

Water charges

0.000

7)

Laboratory Testing (0.50%)

0.005

Total
Total
Total
Total
8)

Formwork etc.

0.000

9)

Overhead charges (10%)


for 40 Cum.
Rate per Cum
Total Lead
Metal (5 Km.)

0.100

Total

10)
11 )

12)
13)

AMOUNT IN Rs.

Total

.1.400

152.68

109.06

Total lead
Total
Say Completed Item Rate in Rs Per Cum
Labour Component for 40 Cum.

Say Labour Component in Rs.


Compo Rate Labour Rate
Rate proposed for M.C.C. D.S.R. 2006-2007

5600.00

1050.00

Unit
Per Cum.

152.68
6127.48
5600.00
14621.80
365.55

9'1.,.,
M.C.CD.S.R.2006-07 Rate Analysis for Road Works Item
Item No.67
Providing and laying hard murum for side shoulder in layers of 20 cm to 30 cm thickness, including conveying with
all leads and lifts spreading sectioning and watering compacting to required grade with vibratory roller etc.,
complete.

DESCRIPTION
1)

2)

3)

QUANTITY RATE IN Rs

Labour
Mazdoor, unskllled lighUfemale
Labour for traffic regulation
Bhisti (Mixing I Curing) Semi skllled

0.083
0.330
0.166

Material
Hard Murum

1.160

Machinery :
Water Tanker (7.5 Tonne)
Vibratory roller (8 to 10 MI.)

0.008
0.001

4)

Scaffolding

5)

Sundries (1.0%)

6)

Water charges (1 %)

0.010

7)

Laboratory Testing

0.000

8)

Formwork etc.

;0.000

UNIT

145.00
Day
145.00
Day
145.00
Day
Total Labour in Rs.

12.04
47.85
24.07
83.96

CU.m.
75.00
Total Material in Rs.

87.00
87.00

3040.00
Day
8096.00
Day
Total Machinary in Rs.
Total of No.1 to 3 in Rs.

Total
0.010

Total
Total
Total
Total
9)

Overhead charges (10%)

10)

Total Lead
Murum (1/2 Km.)

0.100

Total

12)
13)

1.160

AMOUNT IN Rs.

24.32
8.10
32.42
203.37
0.00
203.37
2.03
205.40
2.05
207.46
0.00
207.46
0.00
207.48
20.75
228.20
56.79

48.96

Total lead
Total
Say Completed Item Rate in Rs Per Cum

56.79
285.00
285.00

Say Labour Component in Rs.Per Cum

83.96
84.00

Labour Component

Compo Rate Labour Rat


Rate proposed for M.C.C. D.S.R. 2006-2007

165.00

50.00

Unit
Cum

M.C.C.D.S.R.2006-07 Rate Analysis for Road Works Item


Item No. 68
Providing traffic lane line strips 10 em in width with approved road marking paint in two coat as per detailed
specifications etc., complete.
Spec. No.:
Quantity for 5 Rmt.
QUANTITY RATE IN Rs.

DESCRIPTION
1) Labour
Painter 2nd Class, Skilled
Mazdoor, unskilled heavy/male
2)

Material
Paint concidering the 50 m. for 1 liter in 2
coat.

UNIT

AMOUNT IN Rs.

0.375
0.375

150.00
Day
145.00
Day
Total Labour in Rs.

56.25
54.38
110.63

1.000

170.00

170.00

Liter

Total Material in Rs.

170.00

3) Machinery :
0.000

,
)

4) Scaffolding (1%)

0.010

5) Sundries (1.5%)

0.015

0.00
Total Machinary in Rs.
Total of No.1 to 3 in Rs.

Total
Total
6) Water charges (1%)

0.010

7)

Laboratory Testing (0.50%)

0.005

8)

Formwork etc.

0.010

Total
Total
Total
9) Overhead charges (10%)

0.100

Total

0.00
0.00
280.63
2.81
283.43
4.25
287.68
2.88
290.56
1.45
292.01
2.92
294.93
29.49
324.43

10) Total Lead

Total lead
Total

Total (for 50 Rmt.)


Rate per Rmt.

Say Completed Item Rate in Rs Per Rmt


12) Labour Component
Say Labour Component in Rs.
Camp. Rate Labour Rate
Rate proposed for M.C.C. D.S.R. 2006-2007

65.00

20.00

Unit
PerSq.m

0.00
324.43
6.49
6.50
110.00
110.00

M.C.C.D.S.R.2006-07 Rate Analysis for Road Works Item


Item No. 69
Providing and applying 2.5 mm thick hot applied thermoplastic pavement marking paint with resin and 10%
approved glass beads etc., @ 250 gm per sqmt area. The finished surface to be level, uniform and free from
stroaks and holes etc., complete with 3 year guarantee
Spec. No. :MORT & H : Clause No. 803, Page NO.320 to 326
DESCRIPTION

QUANTITY RATE IN Rs.

A) White paint
Rate as per D.S.R. for
Add 10%

650.00
65.00

Rate Proposed Per Sq.m.


Labour Component per Sq.m.
Camp. Rate Labour Rate
Rate proposed for M.C.C. D.S.R. 2006-2007

715.00

45.00

UNIT
Sq.mt

AMOUNT IN Rs.

Total Rs.

650.00
65.00
715.00

Say Rs.
Rs.
Rs.

700.00
700.00
50.00

Unit
PerSq.m

Item No. 70
Providing and applying 2.5 mm thick hot applied thermoplastic pavement marking paint with resin and 10%
approved glass beads etc., @ 250 gm per sqmt area. The finished surface to be level, uniform and free from
stroaks and holes etc., complete with 3 year guarantee
Spec. No. :MORT & H : Clause No. 803, Page NO.320 to 326
B)

Yellow paint
Rate as per D.S.R. for
Add 10%

680.00
68.00

Sq.mt
Total Rs.
Say Rs.
Rs.
Rs.

Rate Proposed per Sq.m.


Labour Component per Sq.m.

Camp. Rate Labour Rate


Rate proposed for M.C.C. D.S.R. 2006-2007

745.00

45.00

Unit
PerSq.m

680.00
68.00
748.00
725.00
725.00
50.00

M.C.C.D.S.R.2006-07 Rate Analysis for Road Works Item


Item No.71
Providing and painting zebra painting of pedestrian crossing on the carriageway with approved road marking
paint in two coats.

DESCRIPTION

QUANTITY RATE IN Rs.

UNIT

AMOUNT IN Rs.

1) Labour
Painter 2nd Class, Skilled
Mazdoor, unskilled light I female

0.500
0.500

150.00
Day
145.00
Day
Total Labour in Rs.

75.00
72.50
147.50

2) Material
Road marking paint

1.000

170.00

Liter
Total Material in Rs.

170.00

0.00
Total Machinary in Rs.
Total of No.1 to 3 in Rs.

0.00
0.00
317.50
0.00
317.50
4.76
322.26
3.22
325.49
1.63
327.11
0.00
327.11
32.71
359.82

170.00

3) Machinery :
0.000

")
4) Scaffolding

0.000

5) Sundries (1.5%)

0.015

Total
Total
6) Water charges (1 %)

0.010

7) Laboratory Testing (0.50%)

0.005

8) Form work etc.

0.000

Total
Total
Total
9) Overhead charges (10%)

0.100;

Total
10) Total Lead
Metal (5 Km.)

0.000

0.00

Say Completed Item Rate in Rs Per Sq.m.


12) Labour Component
Say Labour Component in Rs.
Compo Rate Labour Rate
Rate proposed for M.C.C. D.S.R. 2006-2007

50.00

20.00

I.

0.00

Total lead
Total

Total (for 5.00 Sq.m. )


Rate per Sq.m.

Unit
PerSq.m

0.00
359.82
71.96
50.00
20.00
20.00

M.C.C.D.S.R.2006-07 Rate Analysis for Road Works Item


Item No. 72 (a)
Providing and laying hot mix hot laid premix seal coat 6 mm thick hot mix comprising of thin application of stone
aggregate premix with bituminous binder including supplying of all materials, heating bitumen, mixing chipsand
bitumen, laying the premix sea

DESCRIPTION

QUANTITY RATE IN Rs.

1) Labour
Mazdoor, unskilled heavyl male
Mazdoor, unskilled lighVfemale

0.150
0.150

2) Material
Bitumen Bulk at Mumbai(Density 2.40
MT/Cum)
Aggregate 6 mm and below (Crushed)

0.900

3) Machinery :
Drum mix plant
Dumper I Tipper
Vibratory roller (8 to 10 MI.)

0.150
0.150
0.150

0.098;

UNIT

145.00
Day
145.00
Day
Total Labour in Rs.
251125.00

M.T.

400.00
CU.m.
Total Material in Rs.
2037.00
Hour
Day
4128.00
Day
8096.00
Total Machinary in Rs.
Total of No. 1 to 3 in Rs.

4) Scaffolding

Total
5)

Sundries (1.0%)

0.010

Total
6) Water charges

0.000

7) Laboratory Testing (0.50%)

0.005

8) Formwork etc.

0.000'

9) Overhead charges (10%)

0.100

Total
Total
Total
Total
'.

10) Rate per 100 Sq.m.


10) Total Lead
Metal (5 Km.)
Total (for 40 Cu.ml.)

0.900

109.06

Total lead
Total
Say Completed Item Rate in Rs Per 100 Sq.m.

12) Labour Component


Say Labour Component in Rs.
Compo Rate Labour Rate
Rate proposed for M.C.C. D.S.R. 2006-2007

3000.00

500.00

Unit
100 Sq.m

AMOUNT IN Rs.
21.75
21.75
43.50
24610.25
360.00
24970.25
305.55
619.20
1214.40
2139.15
27152.90
0.00
27152.90
271.53
27424.43
0.00
27424.43
137.12
27561.55
0.00
27561.55
2756.16
30317.71
3031.77
98.15
98.15
3129.92
2375.00
510.00
510.00

M.C.C.D.S.R.2006-07 Rate Analysis for Road Works Item


Item No. 72 (b)
Providing and laying hot mix hot laid premix seal coat 6 mm thick hot mix comprising of thin application of stone
aggregate premix with bituminous binder including supplying of ail materials, heating bitumen, mixing chipsand
bitumen, laying the premix sea

DESCRIPTION
1)

2)

QUANTITY RATE IN Rs.

Labour
Mazdoor, unskilled heavyl male
Mazdoor, unskilled light/female

0.150
0.150

Material.
Bitumen Bulk at Mumbai(Density 2.40

0.098

UNIT

145.00
Day
145.00
Day
Total Labour in Rs.
26735.00

M.T.

AMOUNT IN Rs.
21.75
21.75
43.50
2620.03

MT/Cum)

3)

Aggregate 6 mm and below (Crushed)

0.900'

Machinery :
Drum mix plant
Dumper I Tipper
Vibratory roller (8 to 10 MI.)

0.150
0.150
0.150

4)

Scaffolding

5)

Sundries (1.0%)

400.00
CU.m.
Total Material in Rs.
Hour
2037.00
4128.00
Day
8096.00
Day
Total Machinary in Rs.
Total of No.1 to 3 in Rs.

Total
0.010

Total
6) Water charges

0.000

7)

0.005

Total
Laboratory Testing (0.50%)

Total
8)

Formwork etc.

0.000

9)

Overhead charges (10%)

0.100

Total
Total
10) Total Lead
Metal (5 Km.)

0.900

109.06

Total lead
Total
Say Completed Item Rate in Rs Per Cum
12) Labour Component
Say Labour Component in Rs.
Compo Rate Labour Rate
Rate proposed for M.C.C. D.S.R. 2006-2007

3150.00

500.00

Unit
100 Sq.m.

360.00
2980.03
305.55
619.20
1214.40
2139.15
5162.68
0.00
5162.68
51.63
5214.31
0.00
5214.31
26.07
5240.38
0.00
5240.38
524.04
5764.42
98.15
98.15
5862.57
2750.00
510.00
510.00

M.C.C.D.S.R.2006-07 Rate Analysis for Road Works Item

Item No.73 (a)


Providing and laying hot mix hot laid premix seal coat 10 mm thick hot mix comprising of thin application of
stone aggregate premix with bituminous binder including supplying of all materials, heating bitumen, mixing
chipsand bitumen, laying the premix se

Camp. Rate Labour Rate


Rate proposed for M.C.C. D.S.R. 2006-2007

5000.00

800.00

Unit
PerSq.m

M.C.C.D.S.R.2006-07 Rate Analysis for Road Works Item


Item No.73 (b)
Providing and laying hot mix hot laid premix seal coat 10 mm thick hot mix comprising of thin application of
stone aggregate premix wiih bituminous binder including supplying of all materials, heating bitumen, mixing
chipsand bitumen, laying the premix se

DESCRIPTION

QUANTITY RATE IN Rs.

1) Labour
Mazdoor, unskilled heavyl male

0.400

2) Material
Bitumen Bulk at Mumbai(Density 2.40
MT/Cum)
Aggregate 6 mm and below (Crushed)
3)

Machinery :
Drum mix plant
Dumper I Tipper
Vibratory rolier (8 to 10 MI.)

0.146
1.500

0.200
0.200
0.200;

UNIT

145.00
Day
Total Labour in Rs.
26735.00

M.T.

400.00
Cu.m.
Total Material in Rs.
2037.00
Hour
4128.00
Day
8096.00
Day
Total Machinary in Rs.
Total of No.1 to 3 in Rs.

4) Scaffolding

Total
5) Sundries (1.0%)

0.010

6) Water charges

0.000

7)

Laboratory Testing (0.50%)

0.005

8)

Formwork etc.

0.000

Total
Total
Total
Total
9) Overhead charges (10%)

0.100

Total
~

10) Total Lead


Metal (5 Km.)

1.500

109.06

12) Labour Component


Say Labour Component in Rs.

Rate proposed for M.C.C. D.S.R. 2006-2007

5250.00

800.00

58.00
58.00
3903.31
600.00
4503.31
407.40
825.60
1619.20
2852.20
7413.51
0.00
7413.51
74.14
7487.65
0.00
7487.65
37.44
7525.08
0.00
7525.08
752.51
8277.59
163.59

Total lead
Total
Say Completed Item Rate in Rs Per 100 Sq.m.

Compo Rate Labour Rate

AMOUNT IN Rs.

Unit
100 Sq.m

163.59
8441.18
3550.00
800.00
800.00

M.C.C.D.S.R.2006-07 Rate Analysis for Road Works Item

Item No.
Providing oil painting to the plain surface of cement plaster wooden planks, steel sheets etc., in two coats with
super grade oil paint.

Spec. No.:
DESCRIPTION

QUANTITY RATE IN Rs.

UNIT

AMOUNT IN Rs.

[tern No.74
Labour
Painting rate as per 2005-2006
P.51/1t. 3 of PDSR
Add 10% for labour rate

40.00

Rs.
Rs.
Rs.

Total Labour
Say

Camp. Rate Labour Rate


Rate proposed for M.C.C. D.S.R. 2006-2007

4.00
44.00

44.00
44.00

Unit

5.00

44.00

Item NO.75
Machlnary
For lettering 5 em. height rate for 2005-06

2.20

Add 10% for labour rate


Total Labour

Rs.
Rs.

Say

0.22
2.42

2.40

Rs. ====.;;;2;;.4~0
Compo Rate Labour Rate
Rate proposed for M.C.C. D.S.R. 2006-2007

2.20

Unit

2.00

Item NO.76

)
For lettering 7.5 em. height rate for 2005-06

3.00

Add 10% for labour rate


Total Labour

Rs.
Rs.

Say

0.30
3.30

3.30

Rs. =~==~3';,30~
Camp. Rate Labour Rate
Rate proposed for M.e.e. D.S.R. 2006-2007

0-9\

3.30

30.00

Unit

Item NO.77
For lettering 10 em. height rate for 2005-06

4.00

Add 10% for labour rate


Total Labour
Say

Rs.
Rs.

Rate proposed

Rs.
Compo Rate Labour Rate

Rate proposed for M.C.C. D.S.R. 2006-2007

4.40

0.40
4.40

4.40
4.40

Unit

4.00

Item No.78
For lettering 12.5 em. height rate for 2005-06

4.25

\
'.

--'

0.43

Add 10% for labour rate


Total Labour

Rs.
Rs.

Say

.)

4.68

4.60

Rs. ====.,;4;,;;.6,;;,,0
Camp. Rate Labour Rate
Rate proposed for M.C.C. D.S.R. 2006-2007

4.60

Unit

4.10

item NO.79
For lettering 15 em. height rate for 2005-06

6.00

Add 10% for labour rate


Total Labour

Rs.
Rs.

Say

0.60
6.60

6.60

Rs. =====6.=60=
Camp. Rate Labour Rate
Rate proposed for M.C.C. D.S.R. 2006-2007

6.60

6.00

Unit

M.C.C.D.S.R.200607 Rate Analysis for Road Works Item

Item No. 80
Refixing the disturbed guard in position and line with necessary excavation and back filling ramming etc.,
complete.
Spec. No.
Quantity for 30 Rmt.
QUANTITY RATE IN Rs.

DESCRIPTION
1) Labour
Mazdoor, unskilled heavy! male
Mazdoor, unskilled light/female
2)

3)

UNIT

1.000
1.000

145.00
Day
145.00
Day
Total Labour in Rs.

145.00
145.00
290.00

0.000

0.00
Total Material in Rs.

0.00
0.00

Material

Machinery:
0.000

0.00
Total Machinary in Rs.
Totat of No.1 to 3 in Rs.

4) Scaffoiding

Total
5) Sundries (5.0%) for quarry spouls! c.c.

0.050

6) Water charges (1%)

0.010

7)

0.010.

Total
Total
Laboratory Testing (1.50%)

Total
8)

AMOUNT IN Rs.

0.000

Formwork etc.

Total
9) Overhead charges (10%)

0.100

Total
10) Total Lead
Metal (5 Km.)

0.000

0.00

0.00

Total lead
Total Rate per 30 Rmt
Rate perRmt
Say Completed Item Rate in Rs Per Rmt
12) Labour Component for 30 Rmt.
Say Labour Component in Rs. Per Rmt
Compo Rate Labour Rate
Rate proposed for M.C.C. D.S.R. 2006-2007

6.00'

6.00

0.00
0.00
290.00
0.00
290.00
14.50
304.50
3.05
307.55
3.08
310.62
0.00
310.62
31.06
341.68

Unit
Rmt

0.00
341.68
11.39
10.00
290.00
9.66

,0 : .
M.C.C.D.S.R.2006~07

Rate Analysis for Road Works Item

Item No. 81
Removing and refixing existing kerb stone etc., complete.
Spec. No.
Quantity for 10 Rmt.
DESCRIPTION

QUANTITY RATE IN Rs.

1) Labour
Mazdoor, unskilled heavyl male
Mazdoor, unskilled lighVfemale

UNIT

AMOUNT IN Rs.

1.000
1.000

145.00
Day
145.00
Day
Total Labour in Rs.

145.00
145.00
290.00

0.000

0.00
Total Material in Rs.

0.00

2) Material
0.00

3) Machinery:
0.000

0.00
Total Machinary in Rs.
Total of No.1 to 3 in Rs.

4) Scaffolding
Total

5) Sundries (1%)

0.010

6) Water charges (1%)

0.010

7) Laboratory Testing

0.000

8) Formwork etc.

0.000

9) Overhead charges (10%)

0.100

Total
Totai
Total
Total
Total

10) Total Lead


Metal (5 Km.)

0.000

0.00

0.00

Total lead
Rate for 10 Rmt.
Rate per Rmt.
Say Completed Item Rate in Rs Per Rmt

)
12) Labour Component for 10 Rmt.

Say Labour Component in Rs.Per Rmt


Compo Rate Labour Rate
Rate proposed for M.C.C. D.S.R. 2006-2007

20.00

17.00

0.00
0.00
290.00
0.00
290.00
2.90
292.90
2.93
295.83
0.00
295.83
0.00
295.83
29.58
325.41

Unit
Rmt

0.00
325.41
32.54
28.00
290.00
29.00

M.C.C.D.S.R.2006-07 Rate Analysis for Road Works Item

Item No. 82
Providing white washing to the parapate of bridges, culverts and parapet in two coats of approved colour
washing etc., complete.
Spec. No.
Quantity for 33.33 Sq.m.
DESCRIPTION

QUANTITY RATE IN Rs.

1) Labour
Painter 2nd Class
Mazdoor; unskilled lighUfemale
2)

3)

Material
Lime
Brushes

UNIT

AMOUNT IN Rs.

0.250
1.000

150.00
Day
145.00
Day
Total Labour in Rs.

37.50
145.00
182.50

10.000
2.000

5.00
Kg
35.00
No
Total Material In Rs.

50.00
70.00
120.00

Machinery:
0.000

4) Scaffolding (10%)

0.100

5) Sundries (1%)

0.010

6) Water charges (1%)

0.010

7)

Laboratory Testing

0.000

8)

Formwork etc.

0.000

0.00
Total Machinary in Rs.
Total of No.1 to 3 in Rs.

Total

0.00
0.00
302.50
30.25
332.75

Total
Total
Total
0.00
339.44
33.94
373.38

Total
0.100;

9) Overhead charges (10%) 33.33 Sq.m.

Total
10) Total Lead
Metal (5 Km.)

0.000

0.00

0.00

-=--=-:::-=C:'To""tallead
Rate for 33.33 Sq.m.
Rate per Sq.mt.
Say Completed Item Rate in Rs Per Cum
12) Labour Component for 33.33 Sq.mt.
Say Labour Component in Rs.Per Cum
Camp. Rate Labour Rate
Rate proposed for M.C.C. D.S.R. 2006-2007

7.50

4.00

Unit
Cum

-===O'-:.O~O
373.38
11.20
9.00
182.50
5.47

M.C.C.D.S.R.2006-07 Rate Analysis for Road Works Item

Compo Rate Labour Rate


Rate proposed for M.C.C. D.S.R. 2006-2007

2.50

1.30

Unit
Per No.

\ u 'Q

M.C.C.D.S.R.2006-07 Rate Analysis for Road Works lIem


Item No. 84
Breaking and removing the existing C.C. pavement to full width depth including lean concrete cutting dowel
bars breaking the removed C.C. slab pieces in to 2" to 3" size spreading the layer watering and consolidation
with power roller etc., complete (2nd layer notto be more than 3') complete.
Spec. No.:
DESCRIPTION

QUANTITY RATE IN Rs.

Rate as per D.S.R. for 2005-2006


Add 10%

290.00

UNIT
Cum
Rs.
Say Rs.
Rs.

Compo Rate Labour Rate


Rate proposed for M.C.C. D.S.R. 2006-2007

290.00

AMOUNT IN Rs.
290.00
29.00
319.00
319.00
290.00

Unit
Cum

Item No. 85
Breaking and removing the existing asphalt pavement to full width depth including lean concrete cutting dowel
bars breaking the removed C. C. slab pieces in to 2" to 3" size spreading the layer watering and consolidation
with power roller etc., complete (2nd layer not to be more than 3') complete.

Spec. No.:
DESCRIPTION

QUANTITY RATE IN Rs.

Rate as per D.S.R. for 2005-2006


Add 10%

235.00

UNIT
Cum
Rs.

)
Compo Rate Labour Rate
Rate proposed for M.C.C. D.S.R. 2006-2007

258.00

Say Rs.
Rs
Unit
Cum

AMOUNT IN Rs.
235.00
23.50
258.50
258.50
258.50

M.C.C.D.S.R.2006-07 Rate Analysis for Road Works Item


Item No. 86
Providing rain cuts over side shoulder and making arrangement for surface drainage.
Spec. No.:
DESCRIPTION

QUANTITY RATE IN Rs.


2.200

Rate as per D.S.R. for 2005-2006


Add 10%

UNIT

AMOUNT IN Rs.

Rmt.

Rs.

Camp. Rate Labour Rate


Rate proposed for M.C.C. D.S.R. 2006-2007

2.40

2.40

Say Rs.
Rs
Unit
Rmt

M.C.C.D.S.R.2006-07 Rate Anaiysis for Road Works Item


Item No. 87 (A)

2.20
0.22
2.42
2.40
2.40

Providing and laying 12 mm thick mastic asphalt wearing course with 10/20 paving grade bitumoen meeting
the requirements of table 500.29 of MORT & H specification including cleaning the road surface by mechanical
broom as compound air laying the mastic asphalt layer of required profile camber including providing antikid
surface with bitumen precoated lead stone chippings of 7.5 inm nominal size at the rate of 0.005 cum/10 sqm at
an approximate spacing of 10 em centre to center in both direction into surface when the temprature of surface
is not less than 100 c, protruding 1 mm to 4mm over mastic surface including transportion of all materials with
all levels and lifts etc., complete.
(Spec. No. MORT & H CI. No. 515).
Quantity for 100 Sq.m.
DESCRIPTION
1) Labour
Mason 2nd Class
Machine operator
Unskilled heavy labour for loading,
conveying, cleaning etc.

QUANTITY RATE iN Rs.


9.000
15.000
16.000

UNIT

160.00
175.00
145.00

day
day
day

Total Labour in Rs.


2)
)

Material
Stone dust
Lime stone powder
Bitument Bulk at Mumbai
Disele

3) Machinery :

0.800
1113.00
0.417.
360.06
0.000

175.00
CU.m
5.00
Kg
30375.00
M.T.
36.11
Liter
Total Material in Rs.
0.00
Total Machinary in Rs.
Total of No.1 to 3 in Rs.

4) Scaffolding
Total
5) Sundries (1 %)

0.010

6) Quality Control

0.000

Total
Total
7)

Laboratory Testing (.0.50%)

0.005
Total

8)

Formwork etc.

0.000
Total

9) Overhead charges (10%) for 100 m.


Rate for 100 Sq.m.
Rate per Sq.mt.
10) Total Lead
Metal (5 Km.)

0.100
Total

0.008

109.06

Total lead
Total
Say Completed Item Rate in Rs Per Sq.mt
12) Labour Component for 100 Sq.m
Say Labour Component in Rs Per Sq mt
Compo Rate Labour Rate

AMOUNT IN Rs.
1440.00
2625.00
2320.00
6385.00
140.00
5565.00
12666.38
12999.60
31370.98
0.00
0.00
37755.98
0.00
37755.98
377.56
38133.53
0.00
38133.53
190.67
38324.20
0.00
38324.20
3832.42
42156.62
421.56
0.87
0.87
422.43
310.00
6385.00
6385

Unit

290.00
30.00
Sq.mt
Rate proposed for M.C.C. D.S.R. 2006-2007
M.C.C.D.S.R.2006-07 Rate AnalysIs for Road Works Item
Item No. 87 (B)

,c\ c)
(

Providing and laying 25 mm thick mastic asphalt wearing course with 10/20 paving grade bitumoen meeting
the requirements of table 500.29 of MORT & H specification including cleaning the road surface by mechanicat
broom as compound air laying the mastic asphalt layer of required profile camber including providing antikid
surface with bitumen precoated lead stone chippings of 7.5 mm nominal size at the rate of 0.005 cum/10 sqm at
an approximate spacing of 10 em centre to center in both direction into surface when the temprature of surface
is not less than 100 c, protruding 1 mm to 4mm over mastic surface tncludtng transportion of aI/ materials with
aI/levels and lifts etc., complete.
.
(Spec.No. MORT & H CI. No. 515).
Quantity for 100 Sq.m
DESCRIPTION
1) Labour
Mason 2nd Class
Machine operator
Unskilled heavy labour for loading,
conveying, cleaning etc.
2) Material
Stone dust
Lime stone powder
Bitument Bulk at Mumbai (2.5MT/Cum.)
Disele .

QUANTITY RATE IN Rs.


9.000
15.000
16.000

1.666
2318.740
0.875
748.800

UNIT

160.00
175.00
145.00

day
day
day

AMOUNT IN Rs.
1440.00
2625.00
2320.00

Total Labour in Rs.

6385.00

175.00
CU.m
5.00
Kg
30337.00
M.T.
36.11
Liter
Total Material in Rs.

291.55
11593.70
26544.88
27039.17
65469.29

3) Machinery:
0.000

0.00
Total Machinary in Rs.
Total of No.1 to 3 in Rs.

4) Scaffolding
Total
5) Sundries (1%)

0.010

6) Quality Control (.0.50%)

0.005

7) Laboratory Testing

0.000

8) Formwork etc.

0.000

Total
Total
Total
Total

,
I

9) Overhead charges (10%) for 100 m.


Rate for 100 Sq.m.
Rate per Sq.mt.
10) Total Lead
Metal (5 Km.)

0.100
Total

0.017;

109.06

Total lead
Total
Say Completed Item Rate in Rs Per Sq.mt
12) Labour Component for 100 Sq.m.

Item No. 87 (C)

0.00
0.00
71854.29
0.00
71854.29
718.54
72572.84
362.86
72935.70
0.00
72935.70
0.00
72935.70
7293.57
80229.27
799.58
1.82
1.82
801.40
590.00
6385.00
63.85

Providing and laying 40 mm thick mastic asphalt wearing course with 10/20 paving grade bitumoen meeting
the requirements of table 500.29 of MORT & H specification including cleaning the road surface by mechanical
broom as compound air laying the mastic asphalt layer of required profile camber including providing antikid
surface with bitumen precoated lead stone chippings of 7.5 mm nominal size at the rate of 0.005 cum/10 sqm at
an approximate spacing of 10 em centre to center in both direction into surface when the temprature of surface
is not less than 100 c, protruding 1 mm to 4mm over mastic surface including transportion of aI/ materials with
aI/levels and lifts etc., complete.

(Spec.No. Rd.5268
DESCRIPTION
1) Labour
Mason 2nd Class
Machine operator
Unskilled heavy labour for loading,
conveying, cleaning etc.
2) Material
Stone dust
Lime stone powder
Bitument Bulk at Mumbai
Dlsele

Quantity for 100 Sq.m.


QUANTITY RATE IN Rs.

g.ooo
15.000
16.000

2.660
3717.420
1.392
1202.400

UNIT

160.00
175.00
145.00

day
day
day

AMOUNT IN Rs.
1440.00
2625.00
2320.00

Total Labour in Rs.

6385.00

175.00
Cu.m
Kg
5.00
30337.00
M.T.
36.11
Liter
Total Material in Rs.

465.50
18587.10
42229.10
43418.66
104700.37

3) Machinery:
0.000

0.00
Total Machinary in Rs.
Total of No.1 to 3 in Rs.

4) Scaffolding
Total

5) Sundries (1 %)

0.010

6) Quality Control (.0.50%)

0.005

7) Laboratory Testing

0.000

8) Formwork etc.

0.000

9) Overhead charges (10%) for 100 m.


For 100 Sq.m.
Rate per Sq.mt.
10) Total Lead
Metal (5 Km.)

0.100

Total
Total
Total
Total

,
)

Total (for 40 Cu.mt.)

Total

0.027

0.00
0.00
111085.37
0.00
111085.37
1110.85
112196.22
560.98
112757.20
0.00
112757.20
0.00
112757.20
11275.72
124032.92
1240.32

109.06

2.90

Total lead
Total
Say Completed Item Rate in Rs Per Sq.mt

12) Labour Component for 100 Sq.m.


Say Labour Component in Rs Per Sq mt
Camp. Rate Labour Rate

2.90
1243.22
890.00
6385.00
6385

Unit

Rate proposed for M.C.C. D.S.R. 2006-2007


80.00
Sq.mt
890.00
M.C.C.D.S.R.2006-07 Rate AnalysIs for Road Works Item
Item No. 88

\\ \

Dressing of side sholder including excavation, cutting shtuts and busher spreading the excavated stuff and
section to the required line level and slop etc. complete.
(Spec. No.
Quantity for 10 Sq.m.
DESCRIPTION

QUANTITY RATE IN Rs.

1) Labour
Mazdoor unskilled, heavy

UNIT

AMOUNT IN Rs.

0.300

145.00
day
Total Labour in Rs.

43.50
43.50

0.000

0.00
Total Material in Rs.

0.00
0.00

2) Material

3) Machinery:
0.000

0.00
Total Machinary in Rs.
Total of No.1 to 3 in Rs.

4) Scaffolding
Total
5) Sundries (1%)

0.010

6) Labour Aminities (0.5%)

0.005

Total
Total
7) Water Charges (1%)

0.010

8) Laboutory testing

0.000

9) Overhead charges (10.%)


For 10 Sq.m.
10) Total Lead
Metal (5 Km.)

0.100;

Total
Total
Total
0.000

0.00

0.00
Total lead
Total

For 10 Sq.m.
Rate per Sq.mt.

Say Completed ttem Rate in Rs Per Sq.mt


12) Labour Component for 10 Sq.m
Say Labour Component in Rs.Per Sq.mt.
"-

Compo Rate Labour Rate


Rate proposed for M.C.C. D.S.R. 2006-2007

4.00

4.00

Unit
Sq.mt

M.C.C.D.S.R.2006-07 Rate Analysis for Road Works Item


Item No. 89

0.00
0.00
43.50
0.00
43.50
0.44
43.94
0.22
44.15
0.44
44.60
0.00
44.60
4.46
49.06

0.00
49.06
4.91
43.50
43.50
4.35

\ \ NJ

Compo Rate Labour Rate


Rate proposed for M.C.C. D.S.R. 2006-2007

60.00

5.00

Unit
Sq.mt

M.C.C.D.S.R.2006-07 Rate Analysis for Road Works Item


Item No. 90 (A)

I \ J

Providing & appiying tack coat on the surface using bitumen emulsion required heating if any and spraying the
same with spray set including cleaing the surface (on granualr sub base / WB.M. (25 Kg.l100 Sq.mt.)
(Spec.No. MOST CI. 503, Pg.148
Quantity for 100 Sq.m
QUANTITY RATE IN Rs,

DESCRIPTION

UNIT

AMOUNT IN Rs.

1) Labour
Mazdoor unskilled, heavy/male
Mazdoor unskilled,light/female

0.800
1.200

145.00
day
145.00
day
Total Labour in Rs.

116.00
174.00
290.00

2) Material
Bitumen bulk at Mumbai emulsion
Heating / spray bitume'n (Bouzer)

0.025
0.025'

22238.00
M.T.
1800.00
M.T.
Total Material in Rs,

555.95
45.00

150.00
M.T.
Total Machinary in Rs.
Total of No.1 to 3 in Rs.

7.50
7.50
898.45
0.00
898.45
13.48
911.93
0.00
911.93
4.56
916.49
0.00
916.49
91.65
1008.14

3)

Machinery :
Bitumen Pressure Sprayer

0.050

4) Scaffolding
Total

)
5) Sundries (1.5%)

0.015

6) Water Charges

0.000

7) Laboutory testing (0.50%)

0.005

8) Formwork etc.

0.000

9) Overhead charges (10%) for 100 Sq.mt.


For 100 Sq.m.
10) Total Lead

0.100

Total
Total
Total
Total
Total
Total lead
Total
11) Complete Item Rate
Say Completed Item Rate in Rs Per 100 Sq.mt.
12) Labour Component
Say Labour Component in Rs.Per 100 Sq.mt

600.95

0.00
1008.14
1008.00
1008.00
290.00
290.00

)
Compo Rate Labour Rate
Rate proposed for M.C.C. D.S.R. 2006-2007

1000.00

235.00

Unit
100 Sq.mt

M.C.C.D.S.R.2006-07 Rate Analysis for Road Works Item


Item No. 90 (B)

f\

Providing & applying tack coat on the surface using bitumen emulsion required heating if any and spraying the
same with spray set including cleaing the surface (on granualr sub base / WB.M. (40 Kg.l100 Sq.mt.)
(Spec. No. MOST CI. 503, Pg.148
Quantity for 100 Sq.m.
QUANTITY RATE IN Rs.

DESCRIPTION
1) Labour
Mazdoor unskilled, heavy/male
Mazdoor unskilled,light/female
2)

0.800
1.200

Material
Bitumen bulk at Mumbai emulsion
Heating / spray bitumen (Bouzer)

0.040
0.040

3) Machinery :
Bitumen Pressure Sprayer

0.050

UNIT

145.00
day
145.00
day
Total Labour in Rs.
22238.00
1800.00

M.T.
M.T.
Total Material in Rs.

150.00
M.T.
Total Machinary in Rs.
Total of No.1 to 3 in Rs.

4) Scaffolding

Total
5) Sundries (1.5%)

0.015
Total

6) Water Charges

0.000

7) Laboutory testing (0.50%)

0.005

8) Formwork etc.

0.000

Total
Total
Total
9) Overhead charges (10%) for 100 Sq.mt.
For 100 Sq.m.
10) Total Lead
Metal (5 Km.)

0.100
Total
0.000

Say Completed Item Rate in Rs Per 100 Sq.mt.


12) Labour Component
Say Labour Component in Rs.Per 100Sq.mt.
Camp. Rate Labour Rate
1450.00

889.52
72.00
961.52
7.50
7.50
1259.02
0.00
1259.02
18.89
1277.91
0.00
1277.91
6.39
1284.29
0.00
1284.29
128.43
1412.72
0.00

11) Complete Item Rate

Rate proposed for M.C.C. D.S.R. 2006-2007

116.00
174.00
290.00

0.00
Total lead
Total

")

AMOUNT IN Rs.

260.00

0.00
1412.72
1413.00
1413.00
290.00
290.00

Unit
100 Sq.mt

M.C.C.D.S.R.2006-07 Rate Analysis for Road Works Item


Item No. 91

'1

l \ .)

Removing and fixing of 80 mm thick paver blocks.


(Spec.No.
QUANTITY RATE IN Rs.

DESCRIPTION
Rate as per D.S.R. for 2005-2006
Add 10%

191.00

Compo Rate Labour Rate


Rate proposed for M.C.C. D.S.R. 2006-2007

210.00

200.00

UNIT

AMOUNT IN Rs.

Sq.mt
Rs.

191.00
19.10
210.10

Say Rs.
Rs.

210.00
210.00

Unit
Sq.mt

Item No. 92
Removing and fixing of 60 mm thick paver blocks.
(Spec. No.
DESCRIPTION

QUANTITY RATE IN Rs.

Rate as per D.S.R. for 2005-2006


Add 10%

189.00

Compo
Rate proposed for M.C.C. D.S.R. 2006-2007

R~te

200.00

UNIT

AMOUNT IN Rs.

Sq.mt
Rs.

189.00
18.90
207.90

Say Rs.
Rs.

208.00
208.00

Labour Rate

Unit

190.00

Sq.mt

M.C.C.D.S.R.2006-07 Rate Analysis for Road Works Item

Item No. 93

Providing & fixing inter locking concrete paver unishape (monolithic single layer paver coat concrat blocks) of
spray cement colour 60 mm thick having arrange crusting strength of 40 N/sq.m.placed on average thickness of
40 mm uniformati graded eiver sand caushining with properly completed with mechnical compactor with
required level lead and camber etc. complete as directed.

QUANTITY RATE IN Rs.

Quantity for Per 100 Sq.mt


UNIT
AMOUNT IN Rs.

2.000
8.000
8.000

160.00
day
145.00
day
145.00
day
Total Labour in Rs.

320.00
1160.00
1160.00
2640.00

103.000
4.500

425.00
Sq.mt
560.00
Cum.
Total Material in Rs.

43775.00
2520.00
46295.00

4.000

85.00
Hour
Total Machinary in Rs.
Total of No.1 to 3 in Rs.
Total

0.010
Total

0.000
Total

0.005
Total

0.000
Total

0.100
Total

0.000

0.00

0.00

Total lead
Total
Say Completed Item Rate in Rs Per Sq.mt.

)
12) Labour Component for 100 Sq.m.

Say Labour Component in Rs.Per Sq.mt.


Camp. Rate Labour Rate
Rate proposed for M.C.C. D.S.R. 2006-2007

509.00

340.00
340.00
49275.00
0.00
49275.00
492.75
49767.75
0.00
49767.75
248.84
50016.59
0.00
50016.59
5001.66
55018.25

30.00

0.00
55018.25
550.18
2640.00
26.40

Unit
Sq.mt

M.C.C.D.S.R.2006-07 Rate Analysis for Road Works Item


Item No. 94

Providing & fixing enter locking concrete paver unishape (rilOnolithic single layer paver coat concret blocks) of
spray cement colour 80 mm thick having arrange crusting strength of 40 N/sq.m.placed on average thickness of
40 mm uniformati graded eiver sand caushining with properly completed with mechnical compactor with
required level lead and camber etc. complete as directed.

Quantity for 100 Sq.mt.


DESCRIPTION

QUANTITY RATE IN Rs.

1) Labour
Mazdoor 2nd Class skilled
Mazdoor unskilled heavy Imale
Mazdoor unskilled light Ifemale

2.000
8.000
8.000

2) Material
Paver
Sand

103.000
4.500

UNIT

160.00
day
145.00
day
145.00
day
Total Labour in Rs.
550.00
560.00

Sq.mt
Cum.

Total Material in Rs.


3)

Machinery :
Equip. for compation vibrator

4.000'

85.00
Hour
Total Machinary in Rs.
Total of No.1 to 3 in Rs.

6) Water Charges

0.000

7) Laboutory testing (0.50%)

0.005

490.77
1404.20
1894.97
71288.86

Total
Total
8)

0.000

Total
9) Overhead charges (10%) for 100 Sq.mt.
for 100 Sq.m.
10) Total Lead
Sand (5 Km.)

0.100

4.500
5.150;

109.06
272.66

Say Completed Item Rate in Rs Per Sq.mt


11) Labour Componentfor 100 Sq.m.
Say Labour Component in Rs.Per Sq.mt.
Compo Rate Labour Rate
Rate proposed for M.C.C. D.S.R. 2006-2007

712.00

30.00

59170.00

Cum.
1000 Nos.
Total lead
Total

Total

Formwork etc.

56650.00
2520.00

Total

Total
0.010

320.00
1160.00
1160.00
2640.00

340.00
340.00
62150.00
0.00
62150.00
621.50
62771.50
0.00
62771.50
313.86
63085.36
0.00
63085.36
6308.54
69393.89

4) Scaffolding
5) Sundries (1.%)

AMOUNT IN Rs.

712.89
2640.00
26.40

Unit
Sq.mt

M.C.C.D.S.R.2006-07 Rate Analysis for Road Works Item


Item No. 95 .

Providing & fixing enter locking concrete paver unishape (monolithic single layer paver coat concret blocks) of
spray cement colour 100 mm thick having arrange crusting strength of 40 N/sq.m.placed on average thickness
of 40 mm uniformati graded eiver sand caushining with properly completed with mechnical compactor with
required level lead and camber etc. complete as directed.

Quantity for 100 Sq.mt.


DESCRIPTION

QUANTITY RATE IN Rs.

1) Labour
Mazdoor 2nd Class skilled
Mazdoor unskilled heavy Imale
Mazdoor unskilled light Ifemale

2.000
8.000
8.000

2) MaterIal
Paver
Sand

103.000
4.500

3) Machinery :
Equip. for compation vibrator

4.000

UNIT

160.00
day
145.00
day
145.00
day
Total Labour in Rs.
700.00
560.00

Sq.mt
Cum.
Total Material in Rs.

85.00
Hour
Total Machinary in Rs.
Total of No.1 to 3 in Rs.

6) Water Charges

0.000

7)

0.005

490.77
1404.20
1894.97
88539.64

Total
Total
8) Formwork etc.

0.000

9)

0.100

Total
Overhead charges (10%) for 100 Sq.mt.
for 100 Sq.m.
10) Total Lead
Sand (5 Km.)

4.500
5.150

109.06
272.66

'\

74620.00

Cum.
1000 Nos.
Total lead
Total

Total

Laboutory testing (0.50%)

72100.00
2520.00

Total

Total
0.010

320.00
1160.00
1160.00
2640.00

340.00
340.00
77600.00
0.00
77600.00
776.00
78376.00
0.00
78376.00
391.88
78767.88
0.00
78767.88
7876.79
86644.67

4) Scaffolding
5) Sundries (1.%)

AMOUNT IN Rs.

Say Completed Item Rate in Rs Per Sq.mt.


12) Labour Component for 100 Sq.m.
Say Labour Component in Rs.Per Sq.mt
Compo Rate Labour Rate
Rate proposed for M.C.C. D.S.R. 2006-2007

885.00

30.00

Unit
Sq.mt

M.C.C.D.S.R.2006-07 Rate Analysis for Road Works Item


Item No. 96

885.40
2640.00
30.00

Providing & fixing cautionary /warning sign board in shape of equilateral triangle of90 em. sides made out of 12
guage (3 mm) thick aluminium sheet bounded with white ratro reffective sheeting of high intensity grade having
pressure sensitive / heat activated adhesive retro reffective or screen printed transparant red coloured border,
black coloured cut out symbol of non reffefctive sheeting having pressure sensitive adhesive or screen pringed
symbols in black opaque colour with non pealable crystal clear transparent protective coat including 1 m.s. coat
of epoxy permer and two coats of epoxy finish paint having black and white bands of 25 em. width including G.I.
fixture etc. and fixing the boards in 1:4:8 concrete block of size 60 em. x 60 em x 75 including transportation etc.
complete.

I.R.C. -67 of 1977


Spec. No. MORT & H Circular No. 33023131/83, dated 11/5194.
DESCRIPTION

QUANTITY RATE IN Rs.

Rate as per D.S.R. for 2005-2006


Add 10%

5500.00

Quantity for Per No.


UNIT
Per No.
Rs.

5500.00
550.00
6050.00

Say Rs.
Rs.

6050.00
6050.00

432.00

Labour
Add 10%

Compo Rate Labour Rate


Rate proposed for M.C.C. D.S.R. 2006-2007

6050.00

490.00

AMOUNT IN Rs.

Rs.

432.00
43.20
475.20

Say Rs.
Rs.

475.00
475.00

Unit
Per No.

M.C.C.D.S.R.2006-07 Rate Analysis for Road Works Item


Item No. 97

Providing & fixing retro reflective board in square or rectangular shape of any size made out of 12 guage
(3 mm) thick aluminium sheet bounded with white ratro reflective sheeting of high intensity grade / engineering
grade having pressure sensitive / heat activated adhesive or screen printed transperant colour over white retro
reflective sheeting having border and masseges in white background with non pealable crystal clear transperant
protective coat including m.s. angle iron frame of size 35 mm x 35 mm x 3 mm and 2 m.s. angle iron post of
size 65 mm x 65 mm x 6 mm 3.60 metre long properly cross base with angle iron of size 50 mm x 50 mm x 5
mm duly painted with one coat of epoxy primer and two coats of epoxy finish paint having alternate black and
white bands of 25 mm width including G.I. fixture etc. and fixing the boards in 1:4:8 concrete block of size 60
cm. x 60 cm. x 75 cm. including transporation etc. complete.

I.R.C. -67 of 1977


Spec. No. MORT & H Circular No. 33023131183, dated 11/5194.
Quantity for Per No.
DESCRIPTION
QUANTITY RATE IN Rs.
UNIT
AMOUNT IN Rs.
Rate as per D.S.R. for 2005-2006
Add 10%

5500.00

Per No.
Rs.

5500.00
550.00
6050.00

Say Rs.
Rs.

6050.00
6050.00

)
432.00

Labour
Add 10%

Compo Rate Labour Rate


Rate proposed for M.C.C. D.S.R. 2006-2007

6050.00

490.00

Rs.

432.00
43.20
475.20

Say Rs.
Rs.

475.00
475.00

Unit
Per No.

M.C.C.D.S.R.2006-07 Rate Analysis for Road Works Item


Item No. 98

Providing & fixing informative sign board in rectangular shape of any size 1.30 x 1.20 made out of 16 guage
(1.6 mm) thick mild steel sheet printed with one coat of zinc chromate storing primer and two coat green stone
enamel paint on front side and gray store enamle paint on back side and border / messages / symobles with cut
out of oil paint into tow coat including one m.s.angle of size 65 mm x 65 mm x 6 mm 3.65 metre long properly
cross base with angle iron of size 50 mm x 50 mm x 6 mm duly painted with alternate black and white bands of
25 em width including G.I. fixture etc. and fixing the boards in 1:4:8 concrete block of size 60 em. x 60 em. x 75
em. including transporation etc. complete.

I.R.C. -67 of 1977


Spec. No. MORT & H Circular No. "33023/31/83, dated11/5/94.
DESCRIPTION

QUANTITY RATE IN Rs.

Rate as per D.S.R. for 2005-2006


Add 10%

5150.00

UNIT

AMOUNT IN Rs.

Sq.mt

Rs.
Say Rs.
Rs.

Labour
Add 10%

432.00
Rs.
Say Rs.
Rs.
Camp. Rate Labour Rate

Rate proposed for M.C.C. D.S.R. 2006-2007

5665.00

490.00

Unit
Sq.mt

M.C.C.D.S.R.2006-07 Rate Analysis for Road Works Item


Item No.99

5150.00
515.00
5665.00
5665.00
5665.00
432.00
43.20
475.20
475.00
475.00

)l

Providing and faying Pavement Quality Concrete of M 40 grade, coarse and fine aggregates of specified gradation using
minimum cement content 350 kg/cum of concrete with OPC approved admixture, mixing with mechanised batch mix plant of
appropriate capacity as per the design mix to the specified workability, transporting the mix with dumpers or transit mixers
and laying with self propelled slip from paving train of required capacity having electronic sensor device where possible, or
othel1Nise curing with approved curing method and covering with moist hessian or ponding and sprinkling of water including
and finishing to the desired surface texture by mechanical means including all material, labour, machinery with alf leads and
lifts etc. complete (Ready mix concrete only)
Spec.MORT & H : Clause No. 602, Page No. 262 to 289

Quantity Per Cum.


DESCRIPTION
1)

UNIT

0.100
0.200
0.050
1.000
1.000

160.00
145.00
175.00
145.00
145.00

day
day
day
day
day

AMOUNT IN Rs.

Total Labour in Rs.

16.00
29.00
8.75
145.00
145.00
343.75

Cum.
Cum.
Cum.
Cum.
Total Material in Rs.

268.00
88.00
249.20
2024.00
2629.20

Hour
Hour

99.00
660.00
66.00
825.00
3797.95
0.00
3797.95
37.98
3835.93
38.36
3874.29
19.37
3893.66
38.94
3932.60
194.68
4127.28
412.73
4540.01

Material
TR. METAL 20 MM (CRUSHED)
TR. METAL 10 MM/12 MM (CRUSHED)
SAND (SCREENED)
CEMENT

3)

RATE IN Rs.

Labour
MASON lind CLASS, SKILLED
BHISTI.(MIXING/CURING). SEMI-SKI
MUKADAM, Semi skilled
MAZDOOR UNSKILLED HEAVY/MALE
MAZDOOR UNSKILLED LIGHT/FEMALE

2)

QUANTITY

0.67
0.22
0.445
9.200

400.00
400.00
560.00
220.00

0.033
0.440
0.033

3000.00
1500.00
2000.00

Machinery :
Batching plant (30 Cu.ml./Hr.)
Transit Mixer (3 Trips/day)
Paver finisher (30 Cu.ml./Hr.)

Day

Total Machinary in Rs.


Total of No. 1 to 3 in Rs.
4)

Scaffolding

5)

Sundries (1. %)

0.010

6)

Water Charges

0.010

7)

Laboutory testing (0.50%)

0.005

8)

Labour Amenities

0.010

9)

Formwork etc.

0.050

Total
Total
Total
Total
Total
Total
10) Overhead charges (10%) for 1.0 Cum)

0.100

Total
11 ) Conveying with loading, unloading & stacking

Cement
Metai
Sand

0.460
0.850
0.425

77.90
109.60
109.60

Cam.

Cum.
Cum.
Totat
Say Completed Item Rate in Rs Per Sq.mt

11) Labour Component


Say Labour Component in Rs.Per S9.mt.
Compo Rate Labour Rate
Rate proposed for M.C.C. D.S.R. 2006-2007

4718.00

344.00

35.83
93.16
46.58
175.57
4715.58
343.75
344.00

Unit
Sq.mt

M.C.C.D.S.R.2006-07 Rate Analysis for Road Works Item


Item NO.100

Providing and laying Dry lean concrete (Grade M-10) base including providing coarse and fine aggregates (blending of
Natural and Crushed Sand) to the specified gradation using minimum cement content 150 kglcum. of concrete with ope
approved admixture, mixing of concrete as per approved design mix using mechanised batch mix plant of appropriate
capacity, transporting and laying with self propelled paver with electronic sensor sensor device and compacting with
vibratory roller of minimum 80 - 100KN static weight / Mini vibratory roller as desired to give desired compacted density and
average compressive strength of 10 MPa at 7 days and curing with liquid curing compound and sprinkling water and
convering with moist hessain or ponding of water including providing construction joints, including all material, labour,
machinery with aI/leads and lifts etc. complete. (Ready mix concrete only)
Spec.MORT & H : Clause No. 601. Page No. 253 to 261
Quantity Per Cum.

DESCRIP lION
1) Labour
MASON lind CLASS, SKILLED
BHISTI.(MIXING/CURING). SEMI-SKI
MUKADAM, Semi skilled
MAZDOOR UNSKILLED HEAVYIMALE
MAZDOOR UNSKILLED L1GHTIFEMALE

QUANIIIY

RAIE IN Rs.

UNII

0.100
0.200
0.050
1.000
1.000

160.00
145.00
175.00
145.00
145.00

day
day
day
day
day

Total Labour in Rs.


2)

.,,
3)

Material
TR. METAL 40 MM (CRUSHED)
TR. METAL 20 MM (CRUSHED)
SAND (SCREENED)
CEMENT

AMOON I IN Rs.
16.00
29.00
8.75
145.00
145.00
343.75

0.700
0.240
0.470
4.400

400.00
400.00
560.00
220.00

280.00
96.00
263.20
968.00
1607.20

0.033
0.440
0.033

3000.00
1500.00
2000.00

99.00
660.00
66.00
825.00
2775.95
0.00
2775.95
27.76
2803.71
28.04
2831.75
14.16
2845.91
28.46
2874.36
142.30
3016.66
301.67
3318.33

Cum.
Cum.
Cum.
Cum.
Total Material in Rs.

Machinery :
Batchlng plant (30 Cu.mt./Hr.)
Transit Mixer (3 Trips/day)
Paver finisher (30 Cu.mt./Hr.)

4)

Scaffolding

5)

Sundries (1.%)

0.010:

6)

Water Charges

0.010

7)

Laboutory testing (0.50%)

0.005

8)

Labour Amenities

0.010

9)

Formwork etc.

0.050

Hour
Hour
Day
Total Machinary in Rs.
Total of NO.1 to 3/n Rs.
Total
Total
Total
Total
Total
Total

10) Overhead charges (10%) tor 1.0 Cum)

0.100

Total
11 ) Conveying with loading unloading & stacking
1

Cement
Metal
Sand

0.220
0.940
0.470

77.90
109.60
109.60

Cum.

Cum.
Cum.
Total
Say Completed Item Rate in Rs Per Sq.mt

11) Labour Component

Say Labour Component in Rs.Per 8q.mt.


Compo Rate Labour Rate
Rate proposed for M.C.C. D.S.R. 2006-2007

3490.00

344.00

17.14
103.02
51.51
171.67
3490.00
343.75
344.00

Unit
Sq.mt

M.C.C.D.S.R.2006-07 Rate Analysis for Road Works Item

Item No.101

Providing and constructing reinforced earth structure constructed of precast concrete facing, of M-35 grade
concrete cast on a flat surface using reinforcing steel of min. strength 415 N/mm2 conforming to 15:1786, using
40 mm (nominal) concrete cover & reinforcing adherence strips should be fully galvanised confirming to as
8006 1995 specification with ultimate tensile strength of 490 N/mm2 and back fill material with angle of internal
friction more than or equal to 340, coefficient of uniformity more than or equal to 2, maximum dry density =20
KN/ m3 , minimum dry density = 18 KN/ m3 with bolts and nuts of hexagonal cap high strength screw with
12mm dia & 30 mm in length hot dip galvanised confirmatory using vertical joint fillers between panel of
polyurethane foam strips and bearing pads for horizontal joints between panels of elastomer with vulcanised
EPDM, with geotexti/e filler cloth glued to the panel from inside both at vertical and horizontal joints and in
reasonably close conformity with the line, grade, design and dimension as shown on the approved drawing etc.
complete.
Camp. Rate Labour Rate
Rate proposed for M.C.C. D.S.R. 2006-2007

3555.00

Unit
Sq.mt

M.C.C.D.S.R.2006-07 Rate Analysis for Road Works Item


Item No. 79
Providing traffic lane line strips 10 em in width with approved road marking paint in two coat as per
detailed specifications etc., complete.
Spec. No. :MORTH : 500, 501, 504 Page No. 145 to 149
QUANTITY RATE IN Rs. UNIT

DESCRIPTION
1)

2)

Labour
Mazdoor, unskilled heavyl male
Mazdoor, unskilled light/female
Watchman

25.000
75.000
84.000

;145.00
Day
145.00
Day
145.00
Day
Total Labour in

3625.00
10875.00
12180.00
26680.00

Material
Bitumen Bulk at Mumbai(Density 2.40 MT/Cu
Aggregate 10 mm and below (Crushed)
Lime soaked (Fine Lime)

5.560
56.000
40.000

25229.00
M.T.
400.00
CU.m.
5.00
Kg.
Total Material in

140273.24
22400.00
200.00
162873.24

3.360
3.360
0.550
0.600
2.520
0.550

2039.00
Hour
742.00
Hour
8096.00
Day
3040.00
Day
4128.00
Day
2732.00
Day
;Total Machinary in
Total of No.1 to 3 iI

6851.04
2493.12
4452.80
1824.00
10402.56
1502.60
27526.12
217079.36
0.00
217079.36
2170.79
219250.15
0.00
219250.15
1096.25
220346.40
0.00
220346.40
22034.64
242381.04

.J

3)

4)

Machinery :
Drum mix plant
Seif propeiied Paver finisher
Vibratory roiier (8 to 10 MI.)
Power roiier (8 to 10 MI.)
Dumper I Tipper
Boiier

Scaffolding

Total
5)

Sundries (1.0%)

0.010

Total
6) Water charges

0.000

Total

7)

Laboratory Testing (0.50%)

0.005

Total
8)

AMOUNT IN Rs.

Formwork etc.

0.000

Total
9) Overhead charges (10%)

0.100

Total
10) Total Lead
Metal (5 Km.)

Total (for 40 Cu.ml.)


11) Multypiying Factor

1.350

147.23

109.06

Total Ie,
Total
0.025
Say Completed Item Rate in Rs Per Cum

147.23
242528.28
6063.21
6063.00

Say Labour Component in

667.00
667.00

12) Labour Component

M.C.C.D.S.R.2005-06 Rate Analysis for Road Works Item

Item No. 80
Providing and applying 2.5 mm thick hot applied thermoplastic pavement marking paint with resin and
10% approved glass beads etc., @ 250 gm per sqmt area. The finished surface to be level, uniform and
free from stroaks and holes etc., complete with 3 years guarantee.
Spec. No. :MORTH : 500, 501,504 Page No. 145 to 149
QUANTITY RATE IN Rs. UNIT

DESCRIPTION

')

25.000
75.000
84.000

145.00
Day
'145.00
Day
145.00
Day
Total Labour in

3625.00
10875.00
12180,00
26680.00

2) Material
Bitumen Bulk at Mumbai(Densily 2.40 MT!Cu
Aggregate 10 mm and below (Crushed)
Lime soaked (Fine Lime)

5.560
56.000
40.000

25229,00
M.T.
400.00
CU.m.
5.00
Kg.
Total Material in

140273,24
22400,00
200.00
162873.24

3.360
3.360
0.550
0.600
2.520
0,550

2039.00
Hour
742.00
Hour
8096.00
Day
3040,00
Day
4128.00
Day
2732,00
Day
Total Machinary in
Total of No.1 to 3 II

6851.04
2493,12
4452.80
1824.00
10402,56
1502.60
27526.12
217079.36
0.00
217079.36
2170.79
219250.15
0.00
219250.15
1096.25
220346.40
0.00
220346.40
22034.64
242381.04

3)

Machinery :
Drum mix plant
Self propelled Paver finisher
Vibratory roller (8 to 10 MI.)
Power roller (8 to 10 MI.)
Dumper I Tipper
Boiier

4) Scaffolding

Total
5) Sundries (1.0%)

0.010

Total

AMOUNT IN Rs.

1) Labour
Mazdoor, unskilled heavy! male
Mazdoor, unskilled light/female
Watchman

6) Water charges

0.000

7)

Laboratory Testing (0.50%)

0,005

8)

Formwork etc.

0.000

9)

Overhead charges (10%)

0.100

Total

Total
Total
Total
10) Total Lead
Metal (5 Km.)

Total (for 40 Cu.ml.)


11) Mullyplying Factor

1.350

109,06

147.23

Total Ie,
Total
0,025
Say Completed Item Rate in Rs Per Cum

12) Labour Component


Say Labour Component in

147.23
242528.28
6063.21
6063.00
667.00
667.00

M.C.C.D.S.R.2005-06 Rate Analysis for Road Works Item

M.C.C.D.S.R2005-06 Rate Analysis for Road Works Item

Item No. 82 (a)


Providing and laying hot mix hot laid premix seal coat 6 mm thick hot mix comprising of thin application of
stone aggregate premix with bituminous binder including supplying of all materials, heating bitumen,
mixing chipsand bitumen, laying the premix seal coat manually including compacting with power roller
etc., complete. with 60170 grade bitumen.
Spec. No. :MORTH : 500, 501,504 Page No. 145 to 149
DESCRIPTION

QUANTITY RATE IN Rs. UNIT

1) Labour
Mazdoor, unskilled heavyl male
Mazdoor, unskilled light/female
Watchman
2)

3)

25.000
75.000
84.000

145.00
Day
145.00
Day
145.00
Day
Total Labour in

3625.00
10875.00
12180.00
26680.00

Material
Bitumen Bulk at Mumbal(Density 2.40 MTICu
Aggregate 10 mm and below (Crushed)
Lime soaked (Fine Lime)

5.560
56.000
40.000

25229.00
M.T.
400.00
Cu.m.
5.00
Kg.
Total Material in

140273.24
22400.00
200.00
162873.24

Machinery :
Drum mix plant
Self propelled Paver finisher
Vibratory roller (8 to 10 Mt.)
Power roller (8 to 10 MI.)
Dumper I Tipper
Boller

3.360
3.360
0.550
0.600
2.520
0.550

2039.00
Hour
742.00
Hour
8096.00
Day
3040.00
Day
4128.00
Day
2732.00
Day
Total Machinary in
Total of No.1 to 3 II

6851.04
2493.12
4452.80
1824.00
10402.56
1502.60
27526.12
217079.36

4) Scaffolding

Total
5) Sundries (1.0%)

0.010

6) Water charges

0.000

7)

0.005

Total
Total
Laboratory Testing (0.50%)

Total
8)

AMOUNT IN Rs.

Formwork etc.

0.000

Total
9) Overhead charges (10%)

0.100

Total
10) Total Lead
Metal (5 Km.)

Total (for 40 Cu.mt.)


11) Multyplying Factor

1.350

109.06

0.00
217079.36
2170.79
219250.15
0.00
219250.15
1096.25
220346.40
0.00
220346.40
22034.64
242381.04
147.23

Total Ie,
Total
0.025
Say Completed Item Rate in Rs Per Cum

147.23
242528.28
6063.21
l!063.00

Say Labour Component in

667.00
667.00

12) Labour Component

M.C.C.D.S.R.2005-06 Rate Analysis for Road Works Item

Item No. 82 (b)


Providing and laying hot mix hot laid premix seal coat 6 mm thick hot mix comprising of thin application of
stone aggregate premix with bituminous binder including supplying of all materials, heating bitumen,
mixing chipsand bitumen, laying the premix seal coat manually including compacting with power roller
etc., complete. with 30140 grade bitumen.
Spec. No. :MORTH : 500, 501, 504 Page No. 145 to 149
DESCRIPTION

QUANTITY RATE IN Rs. UNIT

1) Labour
Mazdoor, unskilled heavyl male
Mazdoor, unskilled light/female
Watchman
2)

!
3)

AMOUNT IN Rs.

25.000
75.000
84.000

145.00
Day
145.00
Day
145.00
Day
Total Labour in

3625.00
10875.00
12180.00
26680.00

Material
Bitumen Bulk at Mumbai(Density 2.40 MTICu
Aggregate 10 mm and below (Crushed)
Lime soaked (Fine Lime)

5.560
56.000
40.000

25229.00
M.T.
400.00
Cu.m.
5.00
Kg.
Total Material in

140273.24
22400.00
200.00
162873.24

Machinery :
Drum mix plant
Self propelled Paver finisher
Vibratory roller (8 to 10 MI.)
Power roller (8 to 10 MI.)
Dumper I Tipper
Boiler

3.360
3.360
0.550
0.600
2.520
0.550

2039.00
Hour
742.00
Hour
8096.00
Day
3040.00
Day
4128.00
Day
2732.00
Day
Total Machinary in
Total of No.1 to 3 iI

6851.04
2493.12
4452.80
1824.00
10402.56
1502.60
27526.12
217079.36

4) Scaffolding

Total
5) Sundries (1.0%)

0.010

6) Water charges

0.000

7)

Laboratory Testing (0.50%)

0.005

8)

Formwork etc.

0.000

9)

Overhead charges (10%)

0.100

Total
Total
Total
Total
Total
10) Total Lead
Metal (5 Km.)

Total (for 40 Cu.ml.)


11 ) Multyplying Factor

1.350

109.06

0.00
217079.36
2170.79
219250.15
0.00
219250.15
1096.25
220346.40
0.00
220346.40
22034.64
242381.04
147.23

Total Ie,
Total
0.025
Say Completed Item Rate in Rs Per Cum

12) Labour Component


Say Labour Component in

147.23
242528.28
6063.21
6063.00
667.00
'667.00

M.C.C.D.S.R.2005-06 Rate Analysis for Road Works Item

Item No. 83 (a)


Providing and laying hot mix hot laid premix seal coat 10 mm thick hot mix comprising of thin application
of stone aggregate premix with bituminous binder including supplying of all materials, heating bitumen,
mixing chipsand bitumen, laying the premix seal coat manually including compacting with power roller
etc., complete. with 60nO grade bitumen.
Spec. No. :MORTH : 500, 501, 504 Page No. 145 to 149
DESCRIPTION
1)

2)

3)

QUANTITY RATE IN Rs. UNIT

Labour
Mazdoor, unskilled heavyl male
Mazdoor, unskilled light/female
Watchman

25.000
75.000
84.000

145.00
Day
145.00
Day
145.00
Day
Total Labour in

3625.00
10875.00
12180.00
26680.00

Material
Bitumen Bulk at Mumbai(Density 2.40 MT/Cu
Aggregate 10 mm and below (Crushed)
Lime soaked (Fine Lime)

5.560
56.000
40.000

45229.00
M.T.
400.00
Cu.m.
Kg.
5.00
Total Material in

140273.24
22400.00
200.00
162873.24

3.360
3.360
0.550
0.600
2.520
0.550

2039.00
Hour
742.00
Hour
8096.00
Day
3040.00
Day
4128.00
Day
2732.00
Day
Total Machinary in
Total of No. 1 to 3 II

6851.04
2493.12
4452.80
1824.00
10402.56
1502.60
27526.12
217079.36
0.00
217079.36
2170.79
219250.15
0.00
219250.15
1096.25
220346.40
0.00
220346.40
22034.64
242381.04

Machinery :
Drum mix plant
Self propelled Paver finisher
Vibratory roller (8 to 10 MI.)
Power roller (8 to 10 Mt.)
Dumper I Tipper
Boiler

4) Scaffolding

Total
5) Sundries (1.0%)

0.010

6) Water charges

0.000

7) Laboratory Testing (0.50%)

0.005

Total

'\

Total
Total
8)

AMOUNT IN Rs.

Formwork etc.

0.000

Total
9) Overhead charges (10%)

0.100

Total
10) Totai Lead
Metal (5 Km.)

Total (for 40 Cu.mt.)


11 ) Multyplying Factor'

1.350

147.23

109.06

Total Ie,
Total

147.23
242528.28

0.025
Say Completed Item Rate in Rs Per Cum

6063.21
6063.00
667.00
667.00

12) Labour Component


Say Labour Component in

M.C.C.D.S.R.2005-06 Rate Analysis for Road Works Item

Item No. 83 (b)


Providing and laying hot mix hot laid premix seal coat 10 mm thick hot mix comprising of thin application
of stone aggregate premix with bituminous binder including supplying of all materials, heating bitumen,
mixing chipsand bitumen, laying the premix seal coat manually including compacting with power roller
etc., complete. with 30140 grade bitumen.
Spec. No. :MORTH : 500, 501,504 Page No. 145 to 149
DESCRIPTION

QUANTITY RATE IN Rs. UNIT

1) Labour
Mazdoor, unskilled heavyl male
Mazdoor, unskilled IighUfemale
Watchman

25.000
75.000
84.000

145.00
Day
145.00
Day
145.00
Day
Total Labour in

3625.00
10875.00
12180.00
26680.00

2) Material
Bitumen Bulk at Mumbai(Density 2.40 MT/Cu
Aggregate 10 mm and below (Crushed)
Lime soaked (Fine Lime)

5.560
56.000
40.000

25229.00
M.T.
400.00
Cu.m.
Kg.
5.00
Total Material in

140273.24
22400.00
200.00
162873.24

3.360
3.360
0.550
0.600
2.520
0.550

2039.00
Hour
742.00
Hour
8096.00
Day
Day
3040.00
4128.00
Day
2732.00
Day
Total Machinary in
Total of NO.1 to 3 il

6851.04
2493.12
4452.80
1824.00
10402.56
1502.60
27526.12
217079.36
0.00
217079.36
2170.79
219250.15
0.00
219250.15
1096.25
220346.40
0.00
220346.40
22034.64
242381.04

3)

Machinery :
Drum mix plant
Self propelled Paver finisher
Vibratory roller (8 to 10 Mt.)
Power roller (8 to 10 Mt.)
Dumper I Tipper
Boiler

4) Scaffolding

Total
5) Sundries (1.0%)

0.010

Total
)

AMOUNT IN Rs.

6) Water charges

0.000

Total
7)

Laboratory Testing (0.50%)

0.005

Total
8)

Formwork etc.

0.000

Total
9) Overhead charges (10%)

0.100

Total
10) Total Lead
Metal (5 Km.)

Total (for 40 Cu.mt.)


11) Multyplying Factor

1.350

109.06

147.23

Total Ie,
Total
0.025
Say Completed Item Rate in Rs Per Cum

12) Labour Component


Say Labour Component in

147.23
242528.28
6063.21
6063.00
667.00
667.00

M.C.C.D.S.R.2005-06 Rate Analysis for Road Works Item

Item No. 84 (a)


Providing and laying hot mix hot laid premix seal coat 15 mm thick hot mix comprising of thin application
of stone aggregate premix with bituminous binder including supplying of all materials, heating bitumen,
miXing chipsand bitumen, laying the premix seal coat manually including compacting with power roller
etc., complete. with 60no grade bitumen.

Spec. No. :MORTH : 500, 501, 504 Page No. 145 to 149
DESCRIPTION

QUANTITY RATE IN Rs. UNIT

1) Labour
Mazdoor, unskilled heavyl male
Mazdoor, unskilled light/female
Watchman

25.000
75.000
84.000

145.00
Day
145.00
Day
145.00
Day
Total Labour in

3625.00
10875.00
12180.00
26680.00

2) Material
Bitumen Bulk at Mumbai(Density 2.40 MT/Cu
Aggregate 10 mm and below (Crushed)
Lime soaked (Fine Lime)

5.560
56.000
40.000

25229.00
M.T.
400.00
CU.m.
5.00
Kg.
Total Material in

140273.24
22400.00
200.00
162873.24

3.360
3.360
0.550
0.600
2.520
0.550

2039.00
Hour
742.00
Hour
8096.00
Day
3040.00
Day
4128.00
Day
2732.00
Day
Total Machinary in
Total of No.1 to 3 II

6851.04
2493.12
4452.80
1824.00
10402.56
1502.60
27526.12
217079.36
0.00
217079.36
2170.79
219250.15
0.00
219250.15
1096.25
220346.40
0.00
220346.40
22034.64
242381.04

3)

Machinery :
Drum mix plant
Self propelled Paver finisher
Vibratory roller (8 to 10 Mt.)
Power roller (8 to 10 MI.)
Dumper I Tipper
Boiler

4) Scaffolding

Total
5)

Sundries (1.0%)

0.010

Total

AMOUNT IN Rs.

6) Water charges

0.000

Total
7)

Laboratory Testing (0.50%)

0.005

Total
8)

Formwork etc.

0.000

Total
9)

Overhead charges (10%)

0.100

Total
10) Total Lead
Metal (5 Km.)

Total (for 40 Cu.mt.)


11) Multyplying Factor

1.350

109.06

147.23

Total Ie,
Total
0.025
Say Completed Item Rate in Rs Per Cum

12) Labour Component


Say Labour Component in

147.23
242528.28
6063.21
6063.00
667.00
667.00

M.C.C.D.S.R.200S-06 Rate Analysis for Road Works Item

Item No. 84 (b)


Providing and laying hot mix hot laid premix seal coat 15 mm thick hot mix comprising of thin application
of stone aggregate premix with bituminous binder including supplying of all materials, heating bitumen,
mixing chipsand bitumen, laying the premix seal coat manually including compacting with power roller
etc., complete. with 30140 grade bitumen.

Spec. No. :MORTH : 500, 501, 504 Page No. 145 to 149
DESCRIPTION

QUANTITY RATE IN Rs. UNIT

1) Labour
Mazdoor, unskilled heavy/ male
Mazdoor, unskilled light/female
Watchman
2)

Material
Bitumen Bulk at Mumbai(Density 2.40 MT/Cu
Aggregate 10 mm and below (Crushed)
Lime soaked (Fine Lime)

3) Machinery :
Drum mix plant
Self propelled Paver finisher
Vibratory roller (8 to 10 MI.)
Power roller (8 to 10 MI.)
Dumper / Tipper
Boiler

25.000
75.000
84.000

Day
145.00
Day
145.00
Day
145.00
Total Labour in

3625.00
10875.00
12180.00
26680.00

5.560
56.000
40.000

25229.00
M.T.
400.00
CU.m.
5.00
Kg.
Total Material in

140273.24
22400.00
200.00
162873.24

3.360
3.360
0.550
0.600
2.520
0.550

2039.00
Hour
742.00
Hour
8096.00
Day
3040.00
Day
Day
4128.00
2732.00
Day
Total Machinary in
Total of No.1 to 3 II

6851.04
2493.12
4452.80
1824.00
10402.56
1502.60
27526.12
217079.36
0.00
217079.36
2170.79
219250.15
0.00
219250.15
1096.25
220346.40
0.00
220346.40
22034.64
242381.04

4) Scaffolding

Total
5) Sundries (1.0%)

0.010

Total

')

6) Water charges

0.000

Total
7)

Laboratory Testing (0.50%)

0.005

Total
8)

Formwork etc.

0.000

Total
9) Overhead charges (10%)

0.100

Total
10) Total Lead
Metal (5 Km.)

Total (for 40 Cu.ml.)


11) Muityplying Factor

AMOUNT IN Rs.

1.350

109.06

147.23

Total Ie,
Total
0.025
Say Completed Item Rate in Rs Per Cum

12) Labour Component


Say Labour Component in

147.23
242528.28
6063.21
6063.00
667.00
667.00

M.C.C.D.S.R.2005-06 Rate Analysis for Road Works Item

Item No. 85 (a)


Supplying hot mix premix bituminous with aggregate as per I.R. C. standard grading"A" and bitumen
content with 3.5% asphalt by weight of aggregate as per specification including heating the aggregate and
bitumen and mixing aggregate and bitumen in mechanical mixer in fair season at site of work with 60170
grade bitumen.
Spec. No. :MORTH : 500, 501, .504 Page No. 145 to 149
DESCRIPTION
1)

2)

3)

QUANTITY RATE IN Rs. UNIT

Labour
Mazdoor, unskilled heavyl male
Mazdoor, unskilled IighUfemale
Watchman

25.000
75.000
84.000

145.00
Day
145.00
Day
Day
145.00
Total Labour in

3625.00
10875.00
12180.00
26680.00

Material
Bitumen Bulk at Mumbai(Density 2.40 MT/Cu
Aggregate 10 mm and below (Crushed)
Lime soaked (Fine Lime)

5.560
56.000
40.000

25229.00
M.T.
400.00
Cu.m.
5.00
Kg.
Total Material in

140273.24
22400.00
200.00
162873.24

3.360
3.360
0.550
0.600
2.520
0.550

2039.00
Hour
742.00
Hour
8096.00
Day
3040.00
Day
4128.00
Day
2732.00
Day
Total Machinary in
Total of No.1 to 3 II

6851.04
2493.12
4452.80
1824.00
10402.56
1502.60
27526.12
217079.36
0.00
217079.36
2170.79
219250.15
0.00
219250.15
1096.25
220346.40
0.00
220346.40
22034.64
242381.04

Machinery :
Drum mix plant
Self propelled Paver finisher
Vibratory roller (8 to 10 Mt.)
Power roller (8 to 10 Mt.)
Dumper I Tipper
BoHer

4) Scaffolding

Total
5) Sundries (1.0%)

0.010

Total

AMOUNT IN Rs.

6) Water charges

0.000

Total
7)

Laboratory Testing (0.50%)

0.005

8)

Formwork etc.

0.000

9)

Overhead charges (10%)

0.100

Total
Total
Total
10) Total Lead
Metal (5 Km.)

Total (for 40 Cu.mt.)


11) Multypiying Factor

1.350

109.06

147.23

Total Ie,
Total
0.025
Say Completed Item Rate in Rs Per Cum

12) Labour Component


Say Labour Component in

147.23
242528.28
6063.21
6063.00
667.00
667.00

M.C.C.D.S.R.2005-06 Rale Analysis for Road Works Item

Item No. 85 (b)


Supplying hot mix premix bituminous with aggregate as per I.R. C. standard grading"A" and bitumen
content with 3.5% asphalt by weight of aggregate as per specification including heating the aggregate and
bitumen and mixing aggregate and bitumen in mechanical mixer in fair season at site of work with 30140
grade bitumen.
Spec. No. :MORTH: 500, 501, 504 Page No. 145 to 149
DESCRIPTION

QUANTITY RATE IN Rs. UNIT

1) Labour
Mazdoor, unskilled heavy/ male
Mazdoor, unskilled light/female
Watchman

25.000
75.000
84.000

145.00
Day
145.00
Day
145.00
Day
Total Labour in

3625.00
10875.00
12180.00
26680.00

2) Material
Bitumen Bulk at Mumbai(Density 2.40 MT/Cu
Aggregate 10 mm and below (Crushed)
Lime soaked (Fine Lime)

5.560
56.000
40.000

25229.00
M.T.
400.00
CU.m.
Kg.
5.00
Total Material in

140273.24
22400.00
200.00
162873.24

3.360
3.360
0.550
0.600
2.520
0.550

2039.00
Hour
742.00
Hour
8096.00
Day
Day
;3040.00
4128.00
Day
2732.00
Day
Total Machinary in
Total of No.1 to 3 ;,

6851.04
2493.12
4452.80
1824.00
10402.56
1502.60
27526.12
217079.36

3)

Machinery :
Drum mix plant
Self propelled Paver finisher
Vibratory roller (8 to 10 MI.)
Power roller (8 to 10 MI.)
Dumper / Tipper
Boiler

4) Scaffolding

Total
5) Sundries (1.0%)

0.010

Total

AMOUNT IN Rs.

6)

Water charges

0.000

Total
7)

Laboratory Testing (0.50%)

0.005

Total
8)

Formwork etc.

0.000

Total
9)

Overhead charges (10%)

0.100

Total
10) Total Lead
Metal (5 Km.)

Total (for 40 Cu.ml.)


11 ) Multyplylng Factor

1.350

109.06

0.00
217079.36
2170.79
219250.15
0.00
219250.15
1096.25
220346.40
0.00
220346.40
22034.64
242381.04
'147.23

Total Ie,
Total
0.025
Say Completed Item Rate in Rs Per Cum

12) Labour Component


Say Labour Component in

147.23
242528.28
6063.21
6063.00
667.00
667.00

M.C.C.D.S.R.2005-06 Rate Analysis for Road Works Item

Item No. 86 (a)


Supplying hot mix premix bituminous with aggregate as per I.R. C. standard grading''A'' and bitumen
content with 3.5% asphalt by weight of aggregate as per specification including heating the aggregate and
bitumen and mixing aggregate and bitumen in mechanical mixer in fair season at site of work with 60170
grade bitumen.
Spec. No. :MORTH : 500, 501,504 Page No. 145 to 149
DESCRIPTION

QUANTITY RATE IN Rs. UNIT

AMOUNT IN Rs.

1) Labour
Mazdoor, unskilled heavyl male
Mazdoor, unskilled light/female
Watchman

25.000
75.000
84.000

145.00
145.00
145.00

3625.00
10875.00
12180.00
26680.00

5.560
56.000
40.000

25229.00
400.00
5.00

140273.24
22400.00
200.00
162873.24

3.360
3.360
0.550
0.600
2.520
0.550

2039.00
742.00
8096.00
3040.00
4128.00
2732.00

6851.04
2493.12
4452.80
1824.00
10402.56
1502.60
27526.12
217079.36
0.00
217079.36
2170.79
219250.15
0.00
219250.15
1096.25
220346.40
0.00
220346.40
22034.64
242381.04

Day
Day
Day
Total Labour in

2) Material

Bitumen Bulk at Mumbai(Density 2.40 MTICu


Aggregate 10 mm and below (Crushed)
Lime soaked (Fine Lime)

M.T.
CU.m.
Kg.
Total Material in

3) Machinery :
Drum mix plant
Self propelled Paver finisher
Vibratory roller (8 to 10 MI.)
Power roller (8 to 10 MI.)
Dumper I Tipper
Boiler

Hour
Hour
Day
Day
Day
Day
Total Machinary in
Total of No.1 to 3 iJ

4) Scaffolding
Total

5) Sundries (1.0%)

0.010

6) Water charges

0.000

7) Laboratory Testing (0.50%)

0.005

8) Formwork etc.

0.000

9) Overhead charges (10%)

0.100

Total

Total
Total
Total
Total

10) Total Lead


Metal (5 Km.)

Total (for 40 Cu.ml.)


11) Multyplying Factor

1.350

;109.06

147.23
Total Ie,
Total

0.025
Say Completed Item Rate in Rs Per Cum

12) Labour Component


Say Labour Component in

147.23
242528.28
6063.21
6063.00
667.00
667.00

M.C.C.D.S.R.2005-06 Rate Analysis for Road Works Item

Item No. 86 (b)


Supplying hot mix premix bituminous with aggregate as per I.R. C. standard grading"A" and bitumen
content with 3.5% asphalt by weight of aggregate as per specification including heating the aggregate and
bitumen and mixing aggregate and bitumen in mechanical mixer in fair season at site of work with 30140
grade bitumen.

Spec. No. :MORTH: 500, 501, 504 Page No. 145 to 149
QUANTITY RATE IN Rs. UNIT

DESCRIPTION
1) Labour
Mazdoor, unskilled heavyl male
Mazdoor, unskilled light/female'
Watchman
2)

3)

AMOUNT IN Rs.

25.000
75.000
84.000

145.00
Day
'145.00
Day
145.00
Day
Total Labour in

3625.00
10875.00
12180.00
26680.00

Material
Bitumen Bulk at Mumbai(Density 2.40 MTICu
Aggregate 10 mm and below (Crushed)
Lime soaked (Fine Lime)

5.560
56.000
40.000

25229.00
M.T.
400.00
CU.m.
5.00
Kg.
Total Material in

140273.24
22400.00
200.00
162873.24

Machinery :
Drum mix plant
Self propelled Paver finisher
Vibratory roller (8 to 10 Mt.)
Power roller (8 to 10 MI.)
Dumper I Tipper
Boiler

3.360
3.360
0.550
0.600
2.520
0.550

2039.00
Hour
742.00
Hour
8096.00
Day
3040.00
Day
4128.00
Day
2732.00
Day
.Total Machinary in
Total of NO.1 to 3 il

6851.04
2493.12
4452.80
1824.00
10402.56
1502.60
27526.12
217079.36
0.00
217079.36
2170.79
219250.15
0.00
219250.15
1096.25
220346.40
0.00
220346.40
22034.64
242381.04

4) Scaffolding

Total
5) Sundries (1.0%)

0.010

Total
6) Water charges

0.000

Total
7)

Laboratory Testing (0.50%)

0.005

8)

Formwork etc.

0.000

Total
Total
9) Overhead charges (10%)

0.100

Total
10) Total Lead
Metal (5 Km.)

Total (for 40 Cu.mt.)


11 ) Multyplying Factor

1.350

109.06

147.23

Total Ie,
Total
0.025
Say Completed Item Rate in Rs Per Cum

12) Labour Component

147.23
242528.28
6063.21

6063.00
667.00

Say Labour Component in

667.00

M.C.C.D.S.R.2005-06 Rate Analysis for Road Works Item

Item No. 87
Providing oil painting to the plain surface of cement plaster wooden planks, steel sheets etc., in two coats
with super grade oil paint.

Spec. No. :MORTH : 500, 501, 504 Page No. 145 to 149

M.C.C.D.S.R.2005-06 Rate Analysis for Road Works Item

Item No. 88
Providing oil painting to the plain surface of cement plaster wooden planks, steel sheets etc., in two coats
Spec. No. :MORTH : 500, 501, 504 Page No. 145 to 149
DESCRIPTION

QUANTITY RATE IN Rs. UNIT

1) Labour
Mazdoor, unskilled heavyl male
Mazdoor, unskilled light/female
Watchman
2)

Material
Bitumen Bulk at Mumbai(Density 2.40 MTICu
Aggregate 10 mm and below (Crushed)
Lime soaked (Fine Lime)

25.000
75.000
84.000

145.00
Day
145.00
Day
145.00
Day
Total Labour in

3625.00
10875.00
12180.00
26680.00

5.560
56.000
40.000

25229.00
M.T.
400.00
CU.m.
Kg.
5.00
Total Material in

140273.24
22400.00
200.00
162873.24

3.360
3.360
0.550
0.600
2.520
0.550

2039.00
Hour
742.00
Hour
8096.00
Day
3040.00
Day
4128.00
Day
2732.00
Day
Total Machinary in
Total of No.1 to 3 il

6851.04
2493.12
4452.80
1824.00
10402.56
1502.60
27526.12
217079.36

3)

Machinery :
Drum mix plant
Self propelled Paver finisher
Vibratory roller (8 to 10 MI.)
Power roller (8 to 10 MI.)
Dumper I Tipper
Boiler

4) Scaffolding
Total

5) Sundries (1.0%)

0.010

6) Water charges

0.000

7)

Laboratory Testing (0.50%)

0.005

8)

Formwork etc.

0.000

Total
Total

Total

Total

9) Overhead charges (10%)

0.100
Total

10) Total Lead


Metal (5 Km.)

Total (for 40 Cu.ml.)


11 ) Multyplying Factor

AMOUNT IN Rs.

1.350

109.06

0.00
217079.36
2170.79
219250.15
0.00
219250.15
1096.25
220346.40
0.00
220346.40
22034.64
242381.04
147.23

Total Ie,
Total

0.025
Say Completed Item Rate in Rs Per Cum

12) Labour Component


Say Labour Component in

147.23
242528.28
6063.21
6063.00
667.00
667.00

M.C.C.D.S.R.200S-06 Rate Analysis for Road Works Item

Item No. 89
Providing oil painting to the plain surface of cement plaster wooden planks, steel sheets etc., in
Spec. No. :MORTH : 500, 501,504 Page No. 145 to 149
QUANTITY RATE IN Rs. UNIT

DESCRIPTION
1) Labour
Mazdoor, unskilled heavyl male
Mazdoor, unskilled light/female
Watchman
2)

3)

Material
Bitumen Buik at Mumbai(Densily 2.40 MTICu
Aggregate 10 mm ;and below (Crushed)
Lime soaked (Fine Lime)
Machinery :
Drum mix plant
Self propelled Paver finisher
Vibratory roller (8 to 10 MI.)
Power roller (8 to 10 MI.)
Dumper I Tipper
Boiler

145.00
Day
145.00
Day
145.00
Day
Total Labour in

3625.00
10875.00
12180.00
26680.00

5.560
56.000
40.000

25229.00
M.T.
400.00
Cu.m.
5.00
Kg.
Total Material in

140273.24
22400.00
200.00
162873.24

3.360
3.360
0.550
0.600
2.520
0.550

2039.00
Hour
742.00
Hour
8096.00
Day
3040.00
Day
4128.00
Day
2732.00
Day
Total Machinary in
Total of No.1 to 3 il

6851.04
2493.12
4452.80
1824.00
10402.56
1502.60
27526.12
217079.36

Total
5) Sundries (1.0%)

0.010

6) Water charges

0.000

7)

0.005

Total
Total

Total
8)

Formwork etc.

0.000

Total
9)

Overhead charges (10%)

0.100

Total
10) Total Lead
Metai (5 Km.)

Total (for 40 Cu.ml.)


11) Mullypiying Factor

AMOUNT IN Rs.

25.000
75.000
84.000

4) Scaffolding

Laboratory Testing (0.50%)

two coats

1.350

109.06

0.00
217079.36
2170.79
219250.15
0.00
219250.15
1096.25
220346.40
0.00
220346.40
22034.64
242381.04
147.23

Total Ie,
Total
0.025
Say Completed Item Rate in Rs Per Cum

12) Labour Component


Say Labour Component in

147.23
242528.28
6063.21
6063.00
667.00
667.00

M.C.C.D.S.R.200S-06 Rate Analysis for Road Works Item

Item No. 90
Providing oil painting to the plain surface of cement plaster wooden planks, steel sheets etc., in two coats
Spec. No. :MORTH : 500, 501, 504 Page No. 145 to 149
QUANTITY RATE IN Rs. UNIT

DESCRIPTION
1) Labour
Mazdoor, unskilled heavyl male
Mazdoor, unskilled IighUfemale
Watchman
2)

)
/

3)

Material
Bitumen Bulk at Mumbai(Density 2.40 MT/Cu
Aggregate 10 mm and below (Crushed)
Lime soaked (Fine Lime)
Machinery :
Drum mix plant
Self propelled Paver finisher
Vibratory roller (8 to 10 MI.)
Power roller (8 to 10 MI.)
Dumper I Tipper
Boiler

25.000
75.000
84.000

145.00
Day
145.00
Day
145.00
Day
Total Labour in

3625.00
10875.00
12180.00
26680.00

5.560
56.000
40.000

25229.00
M.T.
400.00
CU.m.
5.00
Kg.
Total Material in

140273.24
22400.00
200.00
162873.24

3.360
3.360
0.550
0.600
2.520
0.550

f039.00

Hour
742.00
Hour
8096.00
Day
3040.00
Day
4128.00
Day
2732.00
Day
Total Machinary in
Total of No. 1 to 3 il

4) Scaffolding

Total
5) Sundries (1.0%)

0.010

Total
6) Water charges

0.000

7)

Laboratory Testing (0.50%)

0.005

8)

Formwork etc.

0.000

9)

Overhead charges (10%)

0.100

Total
Total
Total
Total
10) Total Lead
Metal (5 Km.)

Total (for 40 Cu.ml.)


11) Multyplying Factor

AMOUNT IN Rs.

1.350

109.06

6851.04
2493.12
4452.80
1824.00
10402.56
1502.60
27526.12
217079.36
0.00
217079.36
2170.79
219250.15
0.00
219250.15
1096.25
220346.40
0.00
220346.40
22034.64
242381.04
147.23

Total leI
Total
0.025
Say Completed Item Rate in Rs Per Cum

12) Labour Component


Say Labour Component in

147.23
242528.28
6063.21
6063.00
667.00
667.00

M.C.C.D.S.R.2005-06 Rate Analysis for Road Works Item

Item No. 91
Providing oil painting to the plain surface of cement plaster wooden planks, steel sheets etc., in two coats
9pec. No. :MORTH : 500, 501,504 Page No. 145 to 149
DESCRIPTION

QUANTITY RATE IN Rs. UNIT

AMOUNT IN Rs.

1) Labour
Mazdoor, unskilled heavyl male
Mazdoor, unskilled light/female
Watchman

25.000
75.000
84.000

145.00
145.00
145.00

3625.00
10875.00
12180.00
26680.00

5.560
56.000
40.000

25229.00
400.00
5.00

140273.24
22400.00
200.00
162873.24

3.360
3.360
0.550
0.600
2.520
0.550

2039.00
742.00
8096.00
3040.00
4128.00
2732.00

6851.04
2493.12
4452.80
1824.00
10402.56
1502.60
27526.12
217079.36
0.00
217079.36
2170.79
219250.15
0.00
219250.15
1096.25
220346.40
0.00
220346.40
22034.64
242381.04

Day
Day
Day
Total Labour in

2) Material
Bitumen Bulk at Mumbai(Densily 2.40 MT/Cu
Aggregate 10 mm and below (Crushed)
Lime soaked (Fine Lime)
'I
/

M.T.
CU.m.
Kg.
Total Material in

3) Machinery :
Drum mix plant
Self propelled Paver finisher
Vibratory roller (8 to 10 MI.)
Power roller (8 to 10 MI.)
Dumper I Tipper
Boiler

Hour
Hour
Day
Day
Day
Day
Total Machinary in
Total of No.1 to 3 il

4) Scaffolding
Total

5) Sundries (1.0%)

0.010
Total

6) Water charges

0.000

7) Laboratory Testing (0.50%)

0.005

8) Formwork etc.

0.000

9) Overhead charges (10%)

0.100

Total
Total

Total
Total

10) Total Lead


Metal (5 Km.)

Total (for 40 Cu.ml.)


11 ) Mullyplying Factor

1.350

109.06

147.23
Total Ie,
Total

0.025
Say Completed Item Rate in Rs Per Cum

12) Labour Component


Say Labour Component in

147.23
242528.28
6063.21
6063.00
667.00
667.00

M.C.C.D.S.R.2005-06 Rate Analysis for Road Works Item

Item No. 92
Providing oil painting to the plain surface of cement plaster wooden planks, steel sheets etc., in two coats
Spec. No. :MORTH: 500, 501, 504 Page No. 145 to 149
QUANTITY RATE IN Rs. UNIT

DESCRIPTION

AMOUNT IN Rs.

1) Labour
Mazdoor, unskilled heavy! male
Mazdoor, unskilled light/female
Watchman

25.000
75.000
84.000

145.00
Day
145.00
Day
Day
145.00
Total Labour in

3625.00
10875.00
12180.00
26680.00

2) Material
Bitumen Bulk at Mumbai(Density 2.40 MT!Cu
Aggregate 10 mm and below (Crushed)
Lime soaked (Fine Lime)

5.560
56.000
40.000

25229.00
M.T.
400.00
Cu.m.
Kg.
5.00
Total Material in

140273.24
22400.00
200.00
162873.24

3.360
3.360
0.550
0.600
2.520
0.550

2039.00
Hour
742.00
Hour
8096.00
Day
3040.00
Day
4128.00
Day
2732.00
Day
Total Machinary in
Total of No.1 to 3 II

6851.04
2493.12
4452.80
1824.00
10402.56
1502.60
27526.12
217079.36
0.00
217079.36
2170.79
219250.15
0.00
219250.15
1096.25
220346.40
0.00
220346.40
22034.64
242381.04

3)

Machinery :
Drum mix plant
Self propeiled Paver finisher
Vibratory roiler (8 to 10 MI.)
Power roiler (8 to 10 MI.)
Dumper I Tipper
Boiler

4) Scaffolding

Total
5) Sundries (1.0%)

0.010

6) Water charges

0.000

Total
Total
7)

Laboratory Testing (0.50%)

0.005

8)

Formwork etc.

0.000

Total
Total
9) Overhead charges'(10%)

0.100

Total
10) Total Lead
Metal (5 Km.)

Total (for 40 Cu.ml.)


11 ) Multyplying Factor

1.350

109.06

147.23

Total Ie,
Total
0.025
Say Completed Item Rate in Rs Per Cum

12) Labour Component


Say Labour Component in

147.23
242528.28
6063.21
6063.00
667.00
667.00

M.C.C.D.S.R.2005-06 Rate Analysis for Road Works Item

Item No. 93
Refixing the disturbed guard in position and line with necessary excavation and back filling ramming etc.,
Spec. No. :MORTH: 500, 501, 504 Page No. 145 to 149
DESCRIPTION

QUANTITY RATE IN Rs. UNIT

AMOUNT IN Rs.

1) Labour
Mazdoor, unskilled heavyl male
Mazdoor, unskilled light/female
Watchman

25.000
75.000
84.000

;145.00

Day
145.00
Day
145.00
Day
Total Labour in

3625.00
10875.00
12180.00
26680.00

2) Material
Bitumen Bulk at Mumbai(Density 2.40 MT/Cu
Aggregate 10 mm and below (Crushed)
Lime soaked (Fine Lime)

5.560
56.000
40.000

25229.00
M.T.
400.00
CU.m.
5.00
Kg.
Total Material in

140273.24
22400.00
200.00
162873.24

3.360
3.360
0.550
0.600
2.520
0.550

2039.00
Hour
742.00
Hour
8096.00
Day
3040.00
Day
4128.00
Day
2732.00
Day
;Total Machinary in
Total of No.1 to 3 iI

6851.04
2493.12
4452.80
1824.00
10402.56
1502.60
27526.12
217079.36
0.00
217079.36
2170.79
219250.15
0.00
219250.15
1096.25
220346.40
0.00
220346.40
22034.64
242381.04

3)

Machinery :
Drum mix plant
Self propelled Paver finisher
Vibratory roller (8 to 10 Mt.)
Power roller (8 to 10 Mt.)
Dumper I Tipper
Boiler

4) Scaffolding

Total
5) Sundries (1.0%)

0.010

6) Water charges

0.000

7)

Laboratory Testing (0.50%)

0.005

8)

Formwork etc.

0.000

Total
Total
Total
Total
9) Overhead charges (10%)

0.100

Total
10) Total Lead
Metal (5 Km.)

Total (for 40 Cu.mt.)


11) Multyplying Factor

1.350

109.06

147.23

Total Ie,
Total
0.025
Say Completed Item Rate in Rs Per Cum

147.23
242528.28
6063.21
6063.00

Say Labour Component in

667.00
667.00

12) Labour Component

M.C.C.D.S.R.2005-06 Rate Analysis for Road Works Item

Item No_ 94
Removing and refixing existing kerb stone etc., complete.
Spec. No. :MORTH: 500, 501, 504 Page No. 145 to 149
DESCRIPTION

QUANTITY RATE IN Rs. UNIT

1) Labour
Mazdoor, unskilled heavyl male
Mazdoor, unskilled light/female
Watchman
2)

Material
Bitumen Bulk at Mumbai(Density 2.40 MTICu
Aggregate 10 mm and beiow (Crushed)
Lime soaked (Fine Lime)

3) Machinery :
Drum mix piant
Self propelled Paver finisher
Vibratory roller (8 to 10 Mt.)
Power roller (8 to 10 MI.)
Dumper I Tipper
Boiler

25.000
75.000
84.000

145.00
Day
145.00
Day
;145.00
Day
Total Labour in

3625.00
10875.00
12180.00
26680.00

5.560
56.000
40.000

25229.00
M.T.
400.00
CU.m.
5.00
Kg.
Total Material in

140273.24
22400.00
200.00
162873.24

3.360
3.360
0.550
0.600
2.520
0.550

2039.00
Hour
742.00
Hour
8096.00
Day
3040.00
Day
4128.00
Day
2732.00
Day
Total Machinary in
Total of No. 1 to 3 iI

6851.04
2493.12
4452.80
1824.00
10402.56
1502.60
27526.12
217079.36

4) Scaffolding

Total
5) Sundries (1.0%)

0.010

6) Water charges

0.000

7)

Laboratory Testing (0.50%)

0.005

8)

Formwork etc.

0.000

Total
Total

Total
Total
9) Overhead charges (10%)

0.100

Total
10) Total Lead
Metal (5 Km.)

Total (for 40 Cu.mt.)


11) Multyplying Factor

AMOUNT IN Rs.

1.350

109.06

0.00
217079.36
2170.79
219250.15
0.00
219250.15
1096.25
220346.40
0.00
220346.40
22034.64
242381.04
147.23

Total Ie,
Total
0.025
Say Completed Item Rate in Rs Per Cum

12) Labour Component


Say Labour Component in

147.23
242528.28
6063.21
6063.00
667.00
667.00

M.C.C.D.S.R.2005-06 Rate Analysis for Road Works Item

Item No. 95
Providing white washing to the parapate of bridges, culverts and parapet in two coats of approved colour
washing etc., complete.
Spec. No. :MORTH : 500, 501, 504 Page No. 145 to 149
DESCRIPTION
1)

2)

QUANTITY RATE IN Rs. UNIT

Labour
Mazdoor, unskilled heavyl male
Mazdoor, unskilled light/female
Watchman

25.000
75.000
84.000

145.00
Day
145.00
Day
145.00
Day
Total Labour in

3625.00
10875.00
12180.00
26680.00

Material
Bitumen Bulk at Mumbai(Density 2.40 MT/Cu
Aggregate 10 mm and below (Crushed)
Lime soaked (Fine Lime)

5.560
56.000
40.000

25229.00
M.T.
400.00
Cu.m.
Kg.
5.00
Total Material in

140273.24
22400.00
200.00
162873.24

3.360
3.360
0.550
0.600
2.520
0.550

2039.00
Hour
742.00
Hour
8096.00
Day
3040.00
Day
4128.00
Day
2732.00
Day
Total Machinary in
Total of No.1 to 3 il

6851.04
2493.12
4452.80
1824.00
10402.56
1502.60
27526.12
217079.36
0.00
217079.36
2170.79
219250.15
0.00
219250.15
1096.25
220346.40
0.00
220346.40
22034.64
242381.04

)
3)

4)

Machinery :
Drum mix plant
Self propelled Paver finisher
Vibratory roller (8 to 10 MI.)
Power roller (8 to 10 MI.)
Dumper I Tipper
Boiler

Scaffolding
Total

5) Sundries (1.0%)

0.010

6) Water charges

0.000

7)

Laboratory Testing (0.50%)

0.005

8)

Formwork etc.

0.000

Total

..
)

Total
Total
Total
9)

AMOUNT IN Rs.

Overhead charges (10%)

0.100
Total

10) Total Lead


Metal (5 Km.)

Total (for 40 Cu.ml.)


11) Multyplying Factor

1.350

147.23

109.06
Total Ie,
Total

147.23
242528.28

0.025
Say Completed Item Rate in Rs Per Cum

6063.21

6063.00
667.00

12) Labour Component


Say Labour Component in

667.00

Code
No.

---'

"

Material

Mason 1st class with tools


96 for plasterinq
Mason 2nd class with tools
97 for brickwork
98 Mason 2nd class skilled
99 Mason 3rd class concrete
Mechanic 1st class
100 'mixer & Vibrator)
101 Mechanic 2nd Class
102 Mate
103 Mate I Supervisor
104 Mazdoor
105 Mazdoor for cuttinq trees
106 Mazdoor unskilled (Heaw)
107 Mazdoor unskilled
108 Mazdoor unskilled (Liahtl Female)
109 Mazdoor unskileed (Liaht)
110 Mazdoor with Tanker
111 Mukadam
112 Mixer Operator (Driver)
113 Pump Operator (Driver)
114 Vibrator Operator
115 Painter IFirst Class for Oil Paintinq
116 Painter First Class for Letterinq
Painter Second Class skilled
117 Colour I Washin\:l)
118 Painter Semi Skilled
119 Polishman 1st Class (Furniture)
120 Polishman 2nd Class
121 Plumper 1st Class with tools
122 Plumber 2nd Class with tools
123 Quarry man semi skilled
124 Roller Driver
125 Sharpenin\:l
126 Skilled Labour
127 Asphalt Soraver (Throuah) Brouser .
128 Asphalt Sprayer (Zariwala)
129 Stone Cutter with tools
130 Sweeper wet
131 Sweeper Dry
132 Watchman
133 Welder Skilled
134 Room Boy

Unit

RATES FOR
Approvel for
M.C.C. O.S.R.

Per day 8 hours

185.00

Per day 8 hours


Per day 8 hours
Per day 8 hours

175.00
175.00
165.00

Per day 8 hours


Per day 8 hours
Per day 8 hours
Per day 8 hours
Per day 8 hours
Per day 8 hours
Per day 8 hours
Per day 8 hours
Per day 8 hours
Per day 8 hours
Per day 8 hours
Per day 8 hours
Per day 8 hours
Per day 8 hours
Per day 8 hours
Per day 8 hours
Per day 8 hours

220.00
200.00
160.00
165.00
160.00
160.00
160.00
160.00
160.00
160.00
160.00
180.00
180.00
180.00
180.00
180.00
180.00

Per day 8 hours


Per day 8 hours
Per day 8 hours
Per day 8 hours
Per day 8 hours
Per day 8 hours
Per day 8 hours
Per day 8 hours
Per day 8 hours
Per day 8 hours
Per day 8 hours
Per day 8 hours
Per day 8 hours
Per day 8 hours
Per day 8 hours
Per day 8 hours
Per day 8 hours
Per day 8 hours

175.00
160.00
180.00
160.00
180.00
160.00
165.00
200.00
170.00
170.00
170.00
170.00
180.00
170.00
160.00
160.00
170.00
160.00

\\CI11 08007\d\New Folder\DWG-BRANCH\D S R\DSR\Compartative Statemant.xls

M.C.C.D.S.R.2005-06 Rate Analysis for Road Works Item

Item No. 96
Providing white washing to the guard stones in two coates approved colour washing etc., complete.
Spec. No. :MORTH : 500, 501, 504 Page No. 145 to 149
DESCRIPTION

QUANTITY RATE IN Rs. UNIT

AMOUNT IN Rs.

1) Labour
Mazdoor, unskilled heavyl male
Mazdoor, unskilled light/female
Watchman

25.000
75.000
84.000

145.00
Day
145.00
Day
Day
145.00
Total Labour in

3625.00
10875.00
12180.00
26680.00

2) Material
Bitumen Bulk at Mumbai(Density 2.40 MT/Cu
Aggregate 10 mm and below (Crushed)
Lime soaked (Fine Lime)

5.560
56.000
40.000

M.T.
25229.00
400.00
Cu.m.
Kg.
5.00
Total Material in

140273.24
22400.00
200.00
162873.24

3.360
3.360
0.550
0.600
2.520
0.550

2039.00
Hour
742.00
Hour
8096.00
Day
3040.00
Day
4128.00
Day
2732.00
Day
Total Machinary in
Total of No.1 to 3 iI

6851.04
2493.12
4452.80
1824.00
10402.56
1502.60
27526.12
217079.36
0.00
217079.36
2170.79
219250.15
0.00
219250.15
1096.25
220346.40
0.00
220346.40
22034.64
242381.04

3)

Machinery :
Drum mix plant
Self propelled Paver finisher
Vibratory roller (8 to 10 Mt.)
Power roller (8 to 10 Mt.)
Dumper I Tipper
Boiier

4) Scaffolding

Total
5) Sundries (1.0%)

0.010

Total
6) Water charges

0.000

7)

0.005

Total
Laboratory Testing (0.50%)

Total
8) Formwork etc.

0.000

9) Overhead charges (10%)

0.100

Total
Total
10) Total Lead
Metal (5 Km.)

Total (for 40 Cu.mt.)


11) Multyplying Factor

1.350

109.06

147.23

Total Ie,
Total
0.025
Say Completed Item Rate in Rs Per Cum

12) Labour Component


Say Labour Component in

147.23
242528.28
6063.21
6063.00
667.00
667.00

M.C.C.D.S.R.2005-06 Rate Analysis for Road Works Item

Item No. 97
Breaking and removing the existing C. C. pavement to full width depth including lean concrete cutting
Spec. No. :MORTH : 500, 501, 504 Page No. 145 to 149
QUANTITY RATE IN Rs. UNIT

DESCRIPTION
1) Labour
Mazdoor, unskilled heavyl male
Mazdoor, unskilled light/female
Watchman
2)

Material
Bitumen Bulk at MiJmbai(Density 2.40 MTICu
Aggregate 10 mm and below (Crushed)
Lime soaked (Fine Lime)

3) Machinery :
Drum mix plant
Self propelled Paver finisher
Vibratory roller (8 to 10 Mt.)
Power roller (8 to 10 MI.)
Dumper I Tipper
Boiler

25.000
75.000
84.000

145.00
Day
145.00
Day
145.00
Day
Total Labour in

3625.00
10875.00
12180.00
26680.00

5.560
56.000
40.000

25229.00
M.T.
400.00
Cu.m.
5.00
Kg.
Total Material in

140273.24
22400.00
200.00
162873.24

3.360
3.360
0.550
0.600
2.520
0.550

2039.00
Hour
742.00
Hour
8096.00
Day
3040.00
Day
4128.00
Day
2732.00
Day
Total Machinary in
Total of No.1 to 3 il

6851.04
2493.12
4452.80
1824.00
10402.56
1502.60
27526.12
217079.36

4) Scaffolding

Total
5) Sundries (1.0%)

0.010

Total
6) Water charges

0.000

Total
7)

Laboratory Testing (0.50%)

0.005

8)

Formwork etc.

0.000

Total
Total
9) Overhead charges (10%)

0.100

Total
10) Totai Lead
Metal (5 Km.)

Total (for 40 Cu.mt.)


11) Multyplying Factor

AMOUNT IN Rs.

1.350

109.06

0.00
217079.36
2170.79
219250.15
0.00
219250.15
1096.25
220346.40
0.00
220346.40
22034.64
242381.04
147.23

Total Ie,
Total
0.025
Say Completed Item Rate in Rs Per Cum

12) Labour Component


Say Labour Component in

147.23
242528.28
6063.21
6063.00
667.00
667.00

M.C.C.D.S.R.2006-07 Rate Analysis for Road Works Item


Item No. 65(A)
Providing & laying hot mix hot laid bituminous macadam with 3% bitumen content by weight of total mix for
levelling course to remove irregularities, including diversion of traffic supply of all materials, heating bitumen
and chips in hot mix plant laying bituminous macadam by sensor paver finisher to the required line, level and
camber including compactinging with power roller and vibratory roller to achieve desired density etc.
complete. (excluding tack coat) with 60nO grade bitumen
Spec. No. :MORTH : 500, 501,504 Page No. 145 to 149
DESCRIPTION
1) Labour
Mazdoor, unskilled heavyl male
Mazdoor, unskilled IighVfemale

QUANTITY RATE IN Rs.

UNIT

30.000
16.000

145.00
Day
145.00
Day
Total Labour in Rs.

4350.00
2320.00
6670.00

2.000
7.000;

25125.00
M.T.
400.00
Cu.m.
400.00
CU.m.
400.00
CU.m.
400.00
Cu.m.
Total Material in Rs.

50250.00
2800.00
8800.00
8400.00
7000.00
77250.00

4128.00
Day
3040.00
Day
2732.00
Day
2039.00
Hour
742.00
Hour
Total Machinary in Rs.
Total of No.1 to 3 in Rs.

9081.60
1672.00
1502.60
6851.04
2968.00
22075.24
105995.24

2) Material
Bitumen Bulk at Mumbai density
Course Aggregate 10 MM
Tr. metal 40 mm blasted
Tr. metal 25 mm (Crushed)
Aggregate 12 mm

22.000
21.000
17.500

3) Machinery :
Dumper I Tipper
Power roller (8 to 10 MI.)
Boiler (Asphalt)
Hot mix plant (30 to 40 T)
Paver finisher

2.200
0.550
0.550
3.360
4.000

4) Scaffolding

Total
5) Sundries (1.5%)

0.010

6) Water charges

0.000;

7) Laboratory Testing (0.50%)

0.005

8) Formwork etc.

0.000

9) Overhead charges (10%)

0.100

Total
Total

Total
Total
Total
10) Total Lead
Bitumen (5 Km.)

Total (for 50 Cu.ml.)


11) Multyplying Factor

AMOUNT IN Rs.

1.350

109.06

0.00
105995.24
1059.95
107055.19
0.00
107055.19
535.28
107590.47
0.00
107590.47
10759.05
118349.52
147.23

Total lead
Total
0.020
Say Completed Item Rate in Rs Per Cum

12) Labour Component


Say Labour Component in Rs.

147.23
118496.75
2369.93
2370.00
133.40
133.00

M.C.C.D.S.R.2006-07 Rate Analysis for Road Works Item


Item No. 65(B)
Providing & laying hot mix hot laid bituminous macadam with 3% bitumen content by weight of total mix for
levelling course to remove irregularities, including diversion of traffic supply of all materials, heating bitumen
and chips in hot mix plant laying bituminous macadam by sensor paver finisher to the required line, level and
camber including compactinging with power roller and vibratory roller to achieve desired density etc.
complete. (excluding tack coat) with 30140 grade bitumen
Spec. No. :MORTH : 500, 501,504 Page No. 145 to 149
DESCRIPTION
1) Labour
Mazdoor, unskilled heavyl male
Mazdoor, unskilled lighUfemale
2)

3)

Material
Bitumen Bulk at Mumbai
Course Aggregate 10 MM
Tr. metal 40 mm blasted
Tr. metal 25 mm (Crushed)
Aggregate 12 mm
Machinery :
Dumper I Tipper
Power roller (8 to 10 MI.)
Boiler (Asphalt)
Hot mix plant (30 to 40 T)
Paver finisher

QUANTITY RATE IN Rs.


30.000
16.000

145.00
145.00

UNIT

AMOUNT IN Rs.

Day
Day

4350.00
2320.00

Total Labour in Rs.

6670.00

3.000
7.000
22.000
21.000
17.500

26735.00
M.T.
400.00
CU.m.
400.00
Cu.m.
400.00
CU.m.
400.00
CU.m.
Total Material in Rs.

80205.00
2800.00
8800.00
8400.00
7000.00
107205.00

2.200
0.550
0.550
3.360
4.000

4128.00
Day
3040.00
Day
2732.00
Day
2039.00
Hour
742.00
Hour
Total Machinary in Rs.
Total of No.1 to 3 in Rs.

9081.60
1672.00
1502.60
6851.04
2968.00
22075.24
135950.24
0.00
135950.24
1359.50
137309.74
0.00
137309.74
686.55
137996.29
0.00
. 137996.29
13799.63
151795.92

4) Scaffolding

Total
5) Sundries (1.0%)

0.010

6) Water charges

0.000

7)

0.005

Total
Total

'j

Laboratory Testing (0.50%)

Total
8) Formwork etc.

0.000

Total
9) Overhead charges (10%)

0.100

Total
10) Total Lead
Bitumen (5 Km.)

Total (for 50 Cu.ml.)


11) Multyplying Factor

1.350

109.06

147.23

Total lead
Total
0.020
Say Completed Item Rate in Rs Per Cum

12) Labour Component


Say Labour Component in Rs.

147.23
151943.15
3038.86
3039.00
133.40
133.00

\ "0) \

M.C.C.D.S.R.2006-07 Rate Analysis for Road Works Item


Item No. 66(A)
Providing & laying hot mix hot laid bituminous macadam with 3.5% bitumen content by weight of total mix
including diversion of traffic supply of all materials, heating bitumen and chips, mixing bitumen and chips in
hot mix plant, laying bituminous macadam by sensor paver finisher to the required line, level and camber
including compacting with power roller and vibratory roller to achieve desired density etc.
complete. (excluding tack coat) with BOnO grade bitumen
Spec. No. :MORTH : 500, 501, 504 Page No. 145 to 149
DESCRIPTION

QUANTITY RATE IN Rs.

1) Labour
Mazdoor, unskilled heavyl male
Mazdoor, unskilled light/female

30.000
16.000

2) Material
Bitumen Bulk at Mumbai(Density 2.00 MT/Cur
Tr. metal 40 mm (Crushed)
Tr. metal 25 mm (Crushed)
Aggregate 10/12 mm(Crushed)
Aggregate 10/12 mm(Crushed)
3) Machinery :
Hot mix plant (30 to 40 T)
Paver finisher
Boiler (Asphalt)
Dumper I Tipper
Vibratory roller (8 to 10 MI.)
Power roller (8 to 10 MI.)

4)

Scaffolding

5)

Sundries (1.0%)

145.00
145.00

UNIT

AMOUNT IN Rs.

Day
Day

4350.00
2320.00

Total Labour in Rs.

6670.00

3.500
22.000
21.000
17.500
7.000

25125.00
M.T.
400.00
CU.m.
400.00
Cu.m.
400.00
Cu.m.
400.00
CU.m.
Total Material in Rs.

87937.50
8800.00
8400.00
7000.00
2800.00
114937.50

3.360
4.000
0.550
2.200
0.550
0.550

2039.00
Hour
742.00
Hour
2732.00
Day
4128.00
Day
8096.00
Day
3040.00
Day
Total Machinary in Rs.
Total of No.1 to 3 in Rs.

6851.04
2968.00
1502.60
9081.60
4452.80
1672.00
15206.40
136813.90
0.00
136813.90
1368.14
138182.04
0.00
138182.04
690.91
138872.95
0.00
138872.95

Total
0.010

Total
6) Water charges

0.000

7)

0.005

Total

-)

LaboratorY Testing (0.50%)

Total
8) Formwork etc.

0.000;

9) Overhead charges (10%)

0.100

Total
Total
10) Total Lead
Metal (5 Km.)
Total (for 50 Cu.ml.)
11) Multyplying Factor

1.350

109.06

147.23

Total lead
Total
0.020
Say Completed Item Rate in Rs Per Cum

12) Labour Component


Say Labour Component in Rs.

147.23
152907.48
3058.15
3058.00
133.40
133.00

M.C.C.D.S.R.2006-07 Rate Analysis for Road Works Item


Item No. 66(8)
Providing & laying hot mix hot laid bituminous macadam with 3.5% bitumen content by weight of total mix
including diversion of traffic supply of all materials, heating bitumen and chips, mixing bitumen and chips in
hot mix plant, laying bituminous macadam by sensor paver. finisher to the required line, level and camber
including compacting with power roller and vibratory roller to achieve desired density etc.
complete. (excluding tack coat) with 30140 grade bitumen
Spec. No. :MORTH : 500, 501, 504 Page No. 145 to 149
QUANTITY RATE IN Rs.

DESCRIPTION
1) Labour
Mazdoor, unskilled heavyl male
Mazdoor, unskilled light/female
2)

30.000
16.000

Material
Bitumen Bulk at Mumbai(Density 2.00 MT/Cur
Tr. metal 40 mm (Crushed)
Tr. metal 25 mm (Crushed)
Aggregate 10/12 mm(Crushed)
Aggregate 10/12 mm(Crushed)

3) Machinery :
Hot mix plant (30 to 40 T)
Paver finisher
Boiler (Asphalt)
Dumper 1Tipper
Vibratory roller (8 to 10 MI.)
Power roller (8 to 10 MI.)

145.00
145.00

UNIT

AMOUNT IN Rs.

Day
Day

4350.00
2320.00

Total Labour in Rs.

6670.00

3.500
22.000
21.000
17.500
7.000

26735.00
M.T.
400.00
Cu.m.
400.00
CU.m.
400.00
Cu.m.
400.00
Cu.m.
Total Material in Rs.

93572.50
8800.00
8400.00
7000.00
2800.00
120572.50

3.360;
4.000
0.550
2.200
0.550
0.550

2039.00
Hour
742.00
Hour
2732.00
Day
4128.00
Day
8096.00
Day
3040.00
Day
Total Machinary in Rs.
Total of No.1 to 3 in Rs.

6851.04
2968.00
1502.60
9081.60
4452.80
1672.00
15206.40
142448.90

4) Scaffolding

Total
5) Sundries (1.0%)

0.010

Total
6) Water charges

0.000

Total

7) Laboratory Testing (0.50%)

0.005

8)

0.000

Total
Formwork etc.

Total
9) Overhead charges (10%)

0.100;

Total
10) Total Lead
Metai (5 Km.)

Total (for 50 Cu.ml.)


11) Multyplying Factor

1.350

0.00
142448.90
1424.49
143873.39
0.00
143873.39
719.37
144592.76
0.00
144592.76
14459.28
159052.03
147.23

109.06

Total lead
Total
0.020
Say Completed Item Rate in Rs Per Cum

12) Labour Component


Say Labour Component in Rs.

147.23
159199.26
3183.99
3184.00
133.40
133.00

M.C.C.D.S.R.2006-07 Rate Analysis for Road Works Item


Item No. 76 I(A)
Providing & laying hot mix hot laid bituminous concrete of required thickness with 5.8% bitumen content by
weight of total mix including supply of all materials, heating bitumen and chips, mixing bitumen and chips
in hot mix plant, laying bituminous concrete by sensor paver finisher to the required line, level and camber
and compacting with power roller and vibratory roller to achieve desired density including diversion of trafifc
etc. complete. (excluding tack coat) with BOnO grade bitumen
Spec. No. :MORTH: 500, 501, 504.Page No. 145 to 149
DESCRIPTION

QUANTITY RATE IN Rs.

1) Labour
Mazdoor, unskilled heavyl male
Mazdoor, unskilled IighUfemale
Watchman
2)

3)

Material
Bitumen Bulk at Mumbai(Density 2.40 MT/Cur
Aggregate 10 mm and below (Crushed)
Lime soaked (Fine Lime)
Machinery :
Drum mix plant
Self propelled Paver finisher
Vibratory roller (8 to 10 MI.)
Power roller (8 to 10 MI.)
Dumper I Tipper
Boiler

4)

Scaffolding

5)

Sundries (1.0%)

UNIT

25.000
75.000
84.000

Day
145.00
145.00
Day
Day
145.00
Total Labour in Rs.

3625.00
10875.00
12180.00
26680.00

5.560
56.000
40.000

25125.00
M.T.
Cu.m.
400.00
5.00
Kg.
Total Material in Rs.

139695.00
22400.00
200.00
162295.00

3.360
3.360
0.550
0.600
2.520;

2039.00
Hour
742.00
Hour
8096.00
Day
3040.00
Day
4128.00
Day
2732.00
Day
Total Machinary in Rs.
Totat of No.1 to 3 in Rs.

6851.04
2493.12
4452.80
1824.00
10402.56
1502.60
27526.12
216501.12
0.00
216501.12
2165.01
218666.13
0.00
218666.13
1093.33
219759.46
0.00
219759.46
21975.95
241735.41

0.550

Total
0.010

Total
6) Water charges

0.000

7) Laboratory Testing (0.50%)

0.005

8)

0.000

Total
Total

Formwork etc.

Total
9)

Overhead charges (10%)

0.100

Total
10) Total Lead
Metal (5 Km.)

Total (for 40 Cu.ml.)


11 ) Multyplying Factor

AMOUNT IN Rs.

1.350;

147.23

109.06

Total lead
Total
0.025
Say Completed Item Rate in Rs Per Cum

12) Labour Component


Say Labour Component in Rs.

147.23
241882.64
6047.07
6047.00
667.00
667.00

( ') '1

M.C.C.D.S.R.2006-07 Rate Analysis for Road Works Item


Item No. 76 1(8)
Providing & laying hot mix hot laid bituminous concrete of required thickness with 5.8% bitumen content by
weight of total mix including supply of all materials, heating bitumen and chips, mixing bitumen and chips
in hot mix plant, laying bituminous concrete by sensor paver tinisher to the required line, level and camber
and compacting with power roller and vibratory roller to achieve desired density including diversion of tratifc
etc. complete.(excluding tack coat) with CRMB 55 grade bitumen
Spec. No. :MORTH : 500, 501, 504 Page No. 145 to 149
QUANTITY RATE IN Rs.

DESCRIPTION
1) Labour
Mazdoor, unskilled heavyl male
Mazdoor, unskilled lighUfemale
Watchman
2)

)
3)

Material
Bitumen Bulk at Mumbai(Density 2.40 MT/Cur
Aggregate 10 mm and below (Crushed)
Lime soaked (Fine Lime)
Machinery :
Drum mix plant
Self propelled Paver finisher
Vibratory roller (8 to 10 MI.)
Power roller (8 to 10 MI.)
Dumper I Tipper
Boiler

4)

Scaffolding

5)

Sundries (1.0%)

UNIT

25.000
75.000
84.000

Day
145.00
145.00
Day
Day
145.00
Total Labour in Rs.

3625.00
10875.00
12180.00
26680.00

5.560
56.000
40.000

25229.00
M.T.
400.00
CU.m.
5.00
Kg.
Total Material in Rs.

140273.24
22400.00
200.00
162873.24

3.360
3.360
0.550
0.600
2.520
0.550'

2039.00
Hour
742.00
Hour
8096.00
Day
Day
3040.00
Day
4128.00
2732.00
Day
Total Machinary in Rs.
Total of No.1 to 3 in Rs.

6851.04
2493.12
4452.80
1824.00
10402.56
1502.60
27526.12
217079.36
0.00
217079.36
2170.79
219250.15
0.00
219250.15
1096.25
220346.40
0.00
220346.40
22034.64
242381.04

Total
0.010

Total
6) Water charges

0.000

Total
7)

Laboratory Testing (0.50%)

0.005

Total
8) Formwork etc.

0.000

Total
9)

Overhead charges (10%)

0.100

Total
10) Total Lead
Metal (5 Km.)

Total (for 40 Cu.ml.)


11) Mullyplying Factor

AMOUNT IN Rs.

1.350

147.23

109.06

Total lead
Total
0.025
Say Completed Item Rate in Rs Per Cum

12) Labour Component


Say Labour Component in Rs.

147.23
. 242528.28
6063.21
6063.00
667.00
667.00

M.C.C.D.S.R.2006-07 Rate Analysis lor Road Works Item


Item No. 76 I(e)
Providing & laying hot mix hot laid bituminous concrete of required thickness with 5.8% bitumen content by
weight of total mix including supply of all materials, heating bitumen and chips, mixing bitumen and chips
in hot mix plant, laying bituminous concrete by sensor paver finisher to the required line, level and camber
and compacting with power roller and vibratoI}' roller to achieve desired density including diversion of trafifc
etc. complete.(excluding tack coat) with 30140 grade bitumen
Spec. No. :MORTH : 500, 501,504 Page No. 145 to 149
DESCRIPTION

QUANTITY RATE IN Rs.

UNIT

25.000
75.000
84.000

Day
145.00
145.00
Day
145.00
Day
Total Labour in Rs.

3625.00
10875.00
12180.00
26680.00

2) Material
Bitumen Bulk at Mumbai(Density 2.40 MTICur
Aggregate 10 mm and below (Crushed)
Lime soaked (Fine Lime)

5.560
56.000
40.000

26735.00
M.T.
CU.m.
400.00
5.00
Kg.
Total Material in Rs.

148646.60
22400.00
200.00
171246.60

3.360
3.360
0.550
0.600
2.520
0.550

2039.00
Hour
742.00
Hour
8096.00
Day
3040.00
Day
4128.00
Day
2732.00
Day
Total Machinal}' in Rs.
Total of No.1 to 3 in Rs.

3)

Machinery :
Drum mix plant
Sell propelled Paver finisher
Vibratory roller (8 to 10 MI.)
Power roller (8 to 10 MI.)
Dumper /Tipper
Boiler

4) Scaffolding

Total
5) Sundries (1.0%)

0.010

Total
6) Water charges

0.000

7) Laboratory Testing (0.50%)

0.005

8) Formwork etc.

0.000

9) Overhead charges (10%)

0.100

Total

AMOUNT IN Rs.

1) Labour
Mazdoor, unskilled heavyl male
Mazdoor, unskilled IighUlemale
Watchman

Total
Total
Total
10) Total Lead
Metal (5 Km.)

Total (lor 40 Cu.ml.)


11) Multyplying Factor

1.350

6851.04
2493.12
4452.80
1824.00
10402.56
1502.60
27526.12
225452.72
0.00
. 225452.72
2254.53
227707.25
0.00
227707.25
1138.54
228845.78
0.00
228845.78
22884.58
251730.36
147.23

109.06

Total lead
Total
0.025'
Say Completed Item Rate in Rs Per Cum

12) Labour Component


Say Labour Component in Rs.

147.23
251877.59
6296.94
6297.00
667.00
667.00

M.C.C.D.S.R.2006-07 Rate Analysis for Road Works Item


Item No. 107
Providing & fixing interlocking concrete pavers unishape (monolithic single layer precast concrete blocks) of
Gray cement coloured 60 mm thick having average crusting strength of 40 N / Isqm placed on average
thickness of 40 mm uniformly graded rlver sand custioning with properly compacted with mechanical
compactor with required level grade and camber etc., complete as directed.
Spec. No. :MORTH : 500, 501,504 Page No. 145 to 149
DESCRIPTION
1) Labour
Mason 2nd Class skilled
Mazdoor, unskilled heavyl male
Mazdoor, unskilled light/female

2) Material
Paver Blocks
Sand
3)

Machinery :
Compactor I Vibrator

QUANTITY RATE IN Rs.


2.00
8.000
8.000;

103.000
4.500

4.000

160.00
145.00
145.00

UNIT

AMOUNT IN Rs.

Day
Day
Day

320.00
1160.00
1160.00

Total Labour in Rs.

2640.00

425.00
Sqmt.
Cu.m.
560.00
Total Material in Rs.

43775.00
2520.00
46295.00

85.00
Hour
Total Machinary in Rs.
Total of No.1 to 3 in Rs.

4) Scaffolding

Total
5) Sundries (1.0%)

0.010

6) Water charges

0.000

Total
Total
7)

Laboratory Testing (0.50%)

0.005

8)

Formwork etc.

0.000

Total
Total
9) Overhead charges (10%)

0.100

Total
10) Totai Lead
Sand 5 km.
Paver Biocks

109.06
272.66

CU.m.
1000 Nos.
Total lead
Total
Say Completed Item Rate in Rs Per Sqm
4.500
5150.000

Say

340.00
340.00
49275.00
0.00
49275.00
492.75
49767.75
0.00
49767.75
248.84
50016.59
0.00
50016.59
5001.66
55018.25
490.77
1404.20
1894.97
56913.22
569.13
569.00

12) Labour Component


Say Labour Component in Rs.

30.00

M.C.C.D.S.R.2006-07 Rate Analysis for Road Works Item


Item No. 108
Providing & fixing interlocking concrete pavers unishape (monolithic single layer precast concrete blocks) of
Gray cement coloured 80 mm thick having average crusting strength of 40 N / Isqm placed on average
thickness of 80 mm uniformly graded river sand custioning with properly compacted with mechanical
compactor with required level grade and camber etc., complete as directed.
Spec. No. :MORTH : 500, 501,504 Page No. 145 to 149
DESCRIPTION
1) Labour
Mason 2nd Class skilled
Mazdoor, .unskilled heavyl male
Mazdoor, unskilled Iight/femaie

2) Material
Paver Blocks
Sand
3)

Machinery :
Compactor I Vibrator

QUANTITY RATE IN Rs.


2.00
8.000
8.000

103.000
4.500

4.000

160.00
145.00
145.00

UNIT

AMOUNT IN Rs.

Day
Day
Day

320.00
1160.00
1160.00

Total Labour in Rs.

2640.00

550.00
Sqmt.
560.00
Cu.m.
Total Material in Rs.

56650.00
2520.00
59170.00

85.00
Hour
Total Machinary in Rs.
Total of No.1 to 3 in Rs.

340.00
340.00
62150.00

4) Scaffolding

Total
5) Sundries (1.0%)

0.010

6) Water charges

0.000

Total
Total
7) Laboratory Testing (0.50%)

0.005

8) Formwork etc.

0.000

9) Overhead charges (10%)

0.100

Total
Total
Total

10) Total Lead


Sand 5 km.
Paver Blocks

4.500
5150.000

109.06
272.66

Cu.m.
1000 Nos.
Totallead
Total
Say Completed Item Rate in Rs Per Sqm
Say

0.00
62771.50
313.86
63085.36
0.00
63085.36
6308.54
69393.89
490.77
1404.20
1894.97
71288.86
712.89
713.00

12) Labour Component


Say Labour Component in Rs.

30.00

M.C.C.D.S.R.2006-07 Rate Analysis for Road Works item


Item No. 109
Providing & fixing interlocking concrete pavers unishape (monolithic single layer precast concrete blocks) of
Gray cement coloured 100 mm thick having average crusting strength of 45 N I sqm placed on average
thickness of 45 mm uniformly graded river sand custioning with properly compacted with mechanical
compactor with required level grade and camber etc., complete as directed.
Spec. No. :MORTH : 500, 501,504 Page No. 145 to 149
DESCRIPTION
1) Labour
Mason 2nd Class skilled
Mazdoor, unskilled heavyl male
Mazdoor, unskilled light/female

')

2) Material
Paver Blocks
Sand
3)

Machinery:
Compactor I Vibrator

QUANTITY RATE IN Rs.


2.00
8.000
8.000

103.000
4.500

4.000

160.00
145.00
145.00

UNIT

AMOUNT IN Rs.

Day
Day
Day

320.00
1160.00
1160.00

Total Labour in Rs.

2640.00

700.00
Sqmt.
560.00
CU.m.
Total Material in Rs.

72100.00
2520.00
74620.00

85.00
Hour
Total Machinary in Rs.
Total of No. 1 to 3 in Rs.

Total

340.00
340.00
77600.00
0.00
77600.00
776.00
78376.00
0.00
78376.00
391.88
78767.88
0.00
78767.88
7876.79
86644.67

CU.m.
1000 Nos.
Total lead
Total

490.77
1404.20
1894.97
88539.64

4) Scaffolding

Total
5) Sundries (1.0%)

0.010

6) Water charges

0.000

7)

0.005

Total
Total
Laboratory Testing (0.50%)

Total
8) Formwork etc.

0.000

Total
9) Overhead charges (10%)
10) Total Lead
Sand 5 km.
Paver Blocks
Total (for 50 Cu.mt.)
11) Multyplying Factor

0.100

4.500
5150.000

109.06
272.66

0.000
Say Completed Item Rate in Rs Per Sqm
Say

0.00
885.40
885.00

12) Labour Component


Say Labour Component in Rs.

30.00

M.C.C.D.S.R.2006-07 Rate Analysis for Bridge Works Item

Item No.1
Excavation for foundation including shoring and strutting as necessary and disposing off excavated stuff as
directed in earth, soils of all types, sand, gravel, soft murum etc., (excluding dewatering).
Spec. No. : SR. 3a, Page No.1 02 MORT & H Clause No. 304
DESCRIPTION
1)

2)

3)

Labour
Mazdoor, unskilled heavyl male
Mazdoor, unskilled light/female

AMOUNT IN Rs.

0.353
0.265

145.00
Day
145.00
Day
Total Labour in Rs.

51.19
38.43
89.61

RATE IN Rs.

0.000

0.000
Total Material in Rs.

0.00

Material

Machinery :
0.000

Quantity for one cum.


UNIT

QUANTITY

4)

Scaffolding

5)

Sundries (1.0%)

0.010

6)

Water charges

0.000

7)

Laboratory Testing

0.000

8)

Formwork etc.(0.50%)

0.005

9)

__.Overhead charges (10%)

0.100

10)

Total Lead

0.000
Total Machinary in Rs.
Total of No.1 to 3 in Rs.
Total
Total
Total
Total
Total

~
_
.

Total

0.000

0.00

Total lead
Total
Say Completed Item Rate in Rs Per Cum

11 )

Labour Component for One Cum.


Say Labour Component in Rs. Per Cum

Rate proposed for M.C.C. D.S.R. 2006-2007

Camp. Rate

Labour Rate

Unit

80.00

80.00

Cum

0.00
0.00
89.61
0.00
89.61
0.90
90.51
0.00
90.51
0.00
90.51
0.45
90.96
9.10
100.05

0.00
100.05
100.00
89.61
90.00

\60

M.C.C.D.S.R.2006-07 Rate Analysis for Bridge Works Item


Item No.2
Excavation for foundation in hard murum including shoring and strutting as necessary and disposing off
excavated stuff as directed (excluding dewatering)
Spec. No. : BR. 3b, Page No.1 02 MORT & H Clause No. 304
DESCRIPTION
1)

2)

3)

QUANTITY

Labour
Mazdoor, unskilled heavyl male
Mazdoor, unskilled light/female

0.500
0.265

Material

Machinery :

RATE IN Rs.

Quantity for one cum.


UNIT
AMOUNT IN Rs.
72.50
38.43
110.93

0.00

145.00
Day
145.00
Day
Total Labour in Rs.
0.00
Total Material in Rs.
0.00

0.00

0.00

Total Machinary in Rs.


Total of No.1 to 3 in Rs.

4)

Scaffolding

5)

Sundries (1.0%)

0.010

6)

Water charges

0.000

7)

Laboratory Testing

0.000

8)

Formwork etc.(0.50%)

0.005

Total
Total
-'-'To"'ta='

_ _ _ _ _ _ _ _ _--::-::-:c:c-

Total
Total

9)

Overhead charges (10%)

10)

Total Lead

0.100
Total

0.000

,
)

11)

0.00

0.00

0.00

Total lead
Total
Say Completed Item Rate in Rs Per Cum

123.85

Say labour Component in Rs. Per Cum

111.00

124.00
110.93

Labour Component for One Cum.

Rate proposed for M.C.C. D.S.R. 2006-2007

0.00
110.93
0.00
110.93
1.11
112.03
0.00
.112.03
0.00
112.03
0.56
112.59
11.26
123.85

Camp. Rate

labour Rate

Unit

95.00

95.00

Cum

t to\

M.C.C.D.S.R.2006-07 Rate Analysis for Bridge Works Item


Item No.3
Excavation for foundation in hard murum and boulders including shoring and strutting as necessary and
disposing off excavated stuff as directed (excluding dewatering)
Spec. No. : BR. 3c, Page NO.1 02 MORT & H Clause No. 304
Quantity for one cum.
DESCRIPTION
1)

QUANTITY

UNIT

AMOUNT IN Rs.
101.50
38.43
139.93

0.00

145.00
Day
145.00
Day
Total Labour in Rs.
0.00
Total Material in Rs.
0.00

0.00

0.00

Labour
Mazdoor, unskilled heavyl male
Mazdoor, unskilled lighU femaie

0.700
0.265

2)

Material

3)

Machinery :

RATE IN Rs.

Total Machinary in Rs.


Total of No.1 to 3 in Rs.
4)

Scaffolding

5)

Sundries (1.0%)

0.010

6)

Water charges.

0.000

7)

Laboratory Testing

0.000

8)

Formwork etc.(0.50%)

9)

.Overhead charges (10%)

10)

Total Lead

Total
Total
Total
Total
0.005
Total
0.100

0.000

11)

0.00

0.00

Total lead
Total
Say Completed Item Rate in Rs Per Cum

0.00
156.23
156.00

Say Labour Component in Rs. Per Cum

140.00

Labour Component for One Cum.

Rate proposed for M.C.C. D.S.R. 2006-2007

0.00
139.93
0.00
139.93
1.40
141.32
0.00
141.32
0.00
141.32
0.71
142.03

139.93

Camp. Rate

Labour Rate

Unit

110.00

110.00

Cum

M.C.C.D.S.R.2006-07 Rate Analysis for Bridge Works Item


Item No.4
Excavation for foundation in soft rock ncluding shoring and strutting as necessary and disposing off excavated
Spec. No.: BR. 3d, Page No. 102 MORT & H Clause No. 304
Quantity for one cum.
DESCRIPTION
1)

2)

3)

Labour
Black Smith with tools
Quarry man
Mazdoor unskilled IighUfemale
Mazdoor unskilled

QUANTITY

RATE IN Rs.

UNIT

AMOUNT IN Rs.

0.040
1.170
0.265
0.040

165.00
Day
145.00
Day
145.00
Day
145.00
Day
Total Labour in Rs.

6.60
169.65
38.43
5.80
.220.48

0.000

0.00
Total Material in Rs.
0.00

0.00

Material

Machinery :

0.000

Total Machinary in Rs.


Total of No.1 to 3 in Rs.

)
4)

Scaffolding

5)

Sundries (1.0%)

0.010

6)

Water charges

0.000

7)

Laboratory Testing

0.000

8)

Formwork etc.

0.000

Total
Total
Total
Total
Total
9)

Overhead charges (10%)

10)

Total Lead

0.100

Total
0.000

0.00

0.00

Total lead
Total
Say Completed Item Rate in Rs Per Cum

11)

Labour Component for One Cum.


Say Labour Component in Rs. Per Cum

Rate proposed for M.C.C. D.S.R. 2006-2007

Compo Rate

Labour Rate

Unit

210.00

210.00

Cum

0.00
220.48
0.00
220.48
2.20
222.68
0.00
222.68
0.00
222.68
0.00
222.68
22.27
244.95

0.00
244.95
245.00
220.48
220.00

M.C.C.D.S.R.2006-07 Rate Analysis for Bridge Works Item


Item No.5
Excavation for foundation including shoring and strutting as necessary and disposing off excavated stuff as

Spec. No. : BR. 3e, Page No.1 02 MORT & H Clause No. 304
Quantity for one cum.
DESCRIPTION
1)

Labour
Black Smit with tools
Quarry Man
Mazdoor, unskilled light/ female
Blaster
Mazdoor, unskilled light/female

QUANTITY

RATE iN Rs.

UNIT

AMOUNT IN Rs.

0.050
0.180
0.180
1.000
1.000

165.00
145.00
145.00
165.00
145.00

Day
Day
Day
Day
Day

8.25
26.10
26.10
165.00
145.00
370.45

Total Labour in Rs.

2)

.\

Material
Noble Dynamite
Detonators (Electrical)
Nippals for Detonators
Red Tape Safety (Fuse)

0.170
0.014
1.400
0.650

65.00
1000.00
10.00
24.00

Kg
100 Nos.
No.
Metre

Total Material in Rs.

3)

Machinery :
Air Compressor
Waggon Drill

0.160
0.160

457.00
208.00

Hour
Hour

Total Machinary in Rs.


Total of No.1 to 3 fn Rs.

4)

Scaffolding

5)

Sundries (1.0%)

0.010

6)

Water charges

0.000

7)

Laboratory Testing (0.50%)

0.005

8)

Formwork etc.

0.000

9)

Overhead charges (10%)

0.100

10)

Total Lead

Total
Total
Total
Total
Total
T<~o_"ta"_I

--cc---:--

0.000

Say Completed Item Rate in Rs Per Cum


Labour Component for One Cum.
Say Labour Component in Rs. Per Cum

Rate proposed for M.C.C. D.S.R. 2006-2007

Camp. Rate

labour Rate

Unit

330.00

330.00

Cum

73.12
33.28
106.40
531.50
0.00
531.50
5.32
536.82
0.00
536.82
2.68
539.50
0.00
539.50
53.95
_'_593.45

0.00

0.00
Total lead
Total

11)

11.05
14.00
14.00
15.60
54.65

0.00
593.45
593.00
370.45
370.00

M.C.C.D.S.R.2006-07 Rate Analysis for Bridge Works Item


Item No.6
Excavation for foundation including disposing off excavated stuff as directed in hard rock chiselled and wedged
or line drilled)

Rate proposed for M.C.C. D.S.R. 2006-2007

Compo Rate

Labour Rate

Unit

410.00

410.00

Cum

M.C.C.D.S.R.2006-07 Rate Analysis for Bridge Works Item


Item No.7
Excavalion in slush including disposing off excavaled malerial as and when direcled elc., complele.

Rate proposed for M.C.C. D.S.R. 2006-2007

Camp. Rate

Labour Rate

Unit

140.00

140.00

Cum

M.C.C.D.S.R.2006-07 Rate Analysis for Bridge Works Item

Item No.8
Providing and laying in situ 1:3:6 cement concrete of trap metal in foundation inctuding necessary bailling out of
Spec. No. : BR. 5, Page No.1 05 MORT & H Clause No. 1000 & 1700
Quantity for one cum.
DESCRIPTION
QUANTITY
RATE IN Rs.
UNIT
AMOUNT IN Rs.
1) Labour
Mason 2nd class skilled
160.00
Day
0.100
16.00
Bhisti Semi skillled
145.00
Day
39.15
0.270
145.00
Day
137.75
Mazdoor. unskilled heavyl male
0.950
Day
Mazdoor. unskilled light/female
0.500
145.00
72.50
Mazdoor. unskilled light/female
0.680
145.00
Day
98.60
Mukadam
175.00
Day
7.00
0.040
Totat Labour in Rs.
371.00
2) Material
Metal 10 mm to 20 mm (crusher broken)
0.700
400.00
Cum
280.00
0.240
400.00
Cum
96.00
Fine Aggregate 6 mm to 12 mm
Sand (a) screened I Unscreened
560.00
Cum
263.20
0.470
Cement
4400.00
M.T.
968.00
0.220
Total Material in Rs.
1607.20
3) Machinery :
1344.00
Day
56.45
Hire & running charges of including the
0.042
waQes of mixer mechnical
Total Machinary in Rs.
56.45
Total of No.1 to 3 in Rs.
2034.65
61.04
4) Scaffolding (3%)
0.030
Total
2095.69
20.96
5) Sundries (1.0%)
0.010
2116.64
Total
6) Water charges (1%)
21.17
0.010
Total
2137.81
10.69
7) Laboratory Testing (0.50%)
0.005
2148.50
Total
0.00
8)
Formwork etc.
0.000
Total
2148.50
214.85
9) Overhead charges (10%)
0.100
Total
2363.35
10) Total Lead
Metal
109.06
Cum
102.52
0.940
109.06
Cum
51.26
Sand
0.470
17.14
Cement
0.220
77.90
M.T.
Total lead
170.91
Total
2534.26
Say Completed Item Rate in Rs Per Cum
2534.00
11 ) Labour Component for One Cum.
371.00
Say Labour Component in Rs. Per Cum
371.00

Rate proposed for M.C.C. D.S.R. 2006-2007

Camp. Rate

Labour Rate

Unit

2200.00

325.00

Cum

\ (, r

M.C.C.D.S.R.2006-07 Rate Analysis for Bridge Works Item

Item No.9
Providing and laying in situ 1:4:8 cement concrete of trap metal for haunch filling levelling course R.C.C. raft
below cut off and curtain wall including necessary compacting, curing and scaffolding etc.,
Spec. No. : BR. 45, Page No. 139 MORT & H Clause No. 1000 & 1700
Quantity for one cum.
DESCRIPTION
QUANTITY
RATE IN Rs.
UNIT
AMOUNT IN Rs.
1) Labour
Mason 2nd class skilled
160.00
Day
16.00
0.100
Bhisti semi skilled
145.00
Day
39.15
0.270
Mazdoor, unskilled heavy! male
0.500
145.00
Day
72.50
Mazdoor, unskilled light! female
0.680
145.00
Day
98.60
Mukadam
175.00
Day
7.00
0.040
Total Labour in Rs.
233.25
2) Material
400.00
190.00
Metal 10 mm to 20 mm (crushed broken)
0.475
Cum
400.00
190.00
Fine aggregate 6 mm to 10 mm
0.475
Cum
Sand (a) screened! Unscreened
560.00
Cum
240.80
0.430
Cement
4400.00
M.T.
748.00
0.170
Total Material in Rs.
1368.80
3) Machinery :
Hire & running charges of including the
0.042
1344.00
Day
56.45
wages of mixer mechnical
Total Machinary in Rs.
56.45
1658.50
Total of No.1 to 3 in Rs.
49.75
4) Scaffolding (3%)
0.030
Total
1708.25
17.08
0.010
5) Sundries (1.0%)
Total
1725.34
17.25
0.010
6) Water charges (1 %)
1742.59
Total
8.71
7) Laboratory Testing (0.50%)
0.005
Total
1751.30
0.00
0.000
8) Formwork etc.
Total
1751.30
175.13
9) Overhead charges (10%)
0.100
Total
1926.43
10) Total Lead
109.06
Cum
92.70
Metal
0.850
109.06
Cum
51.80
Sand
0.475
77.90
M.T.
13.24
Cement
0.170
Total lead
157.75
Total
2084.18
Say Completed Item Rate in Rs Per Cum
2084.00
233.25
11) Labour Component for One Cum.
Say Labour Component in Rs. Per Cum
233.00

Rate proposed for M.C.C. D.S.R. 2006-2007

Camp. Rate

Labour Rate

Unit

2000.00

325.00

Cum

\6 <t
M.C.C.D.S.R.2006-07 Rate Analysis for Bridge Works Item

Item No.10
Providing and laying in situ 1:5:10 cement concrete of trap metal for haunch filling levelling for foundation
inciuding formwork compaction, curing and scaffolding etc., complete.
Spec. No. : BR. 45, Page No. 139 MORT & H Clause No. 1000 & 1700
Quantity for one cum.
DESCRIPTION
QUANTITY
RATE IN Rs.
UNIT
AMOUNT IN Rs.
1) Labour
16.00
160.00
Day
Mason 2nd class skilled
0.100
39.15
0.270
145.00
Day
Bhisti semi skilled
137.75
0.950
145.00
Day
Mazdoor, unskilled heavyl male
Mazdoor, unskilled
72.50
0.500
145.00
Day
Mazdoor, unskilled light I female
98.60
0.680
145.00
Day
Mukadam
7.00
0.040
175.00
Day
371.00
Total Labour in Rs.
2) Material
0.00
0.00
Metal 10 mm to 20 mm (crushed broken)
0.865
400.00
Cum
346.00
Sand (a) screened I Unscreened
0.430
560.00
Cum
240.80
Cement
0.124
4400.00
Cum
543.40
Total Material in Rs.
1130.20
3) Machinery :
1344.00
Day
56.45
0.042
Hire & running charges of including the
_ _ wages of mixer mechnical
;Total Machinary in Rs.
56.45
Total of No.1 to 3 in Rs.
1557.65
4) Scaffolding (3%)
46.73
0.030
Total
1604.38
8.02
5) Sundries (0.50%)
0.005
Total
1612.40
16.12
6) Water charges (1 %)
0.010
Total
1628.52
7) Laboratory Testing (0.50%)
0.005
8.14
Total
1636.67
8) Formwork etc.
0.000
0.00
Total
1636.67
"S)" Overhead charges (10%)
0.100
163.67
Total
1800.33
10) Total Lead
0.865
109.06
Cum
94.34
Metal
0.430
109.06
46.90
Sand
Cum
77.90
M.T.
9.62
Cement
0.124
150.85
Totallead
1951.19
Total
Say Completed Item Rate in Rs Per Cum
1951.00
371.00
11) Labour Component for One Cum.
Say Labour Component in Rs. Per Cum
371.00

Rate proposed for M.C.C. D.S.R. 2006-2007

Camp. Rate

Labour Rate

Unit

1800.00

325.00

Cum

10

\ b "\

M.C.C.D.S.R.2006-07 Rate Analysis for Bridge Works Item


Item No.11
Providing and laying in situ .M. -15 cement concrete of trap metal for the bottom plugs of weI/sin the dry or
under water including compaction and curing wherever necessary etc., complete.
Spec. No.: BR. 17, Page No. 120 MORT & H Clause No. 1500 & 1700

1)

2)

3)

DESCRIPTION
Labour
Mason 2nd class skilled
Bhisti semi skilled
Mazdoor, unskilled heavyl male
Mazdoor, unskilled

QUANTITY

RATE IN Rs.

Quantity for one cum.


UNIT
AMOUNT IN Rs.

0.180
0.100
1.050
1.500

160.00
Day
145.00
Day
145.00
Day
145.00
Day
Total Labour in Rs.

28.8'0
14.50
152.25
217.50
413.05

Material
Metal 10 mm to 20 mm (crushed broken)
Fine aggregate 6 mm to 10 mm
Sand (a) screened I Unscreened
Cement

0.475
0.475
0.430
0.340

400.00
Cum
400.00
Cum
560.00
Cum
4400.00
M.T.
Total Material in Rs.

190.00
190.00
240.80
1496.00
2116.80

Machinery :
Concrete Mixer (cap.0.4010.28 cum)
Vibrator

0.042
0.042

4)

Scaffolding

5)

Sundries (1.0%)

1344.00
Day
680.00
Day
Total Machinary in Rs.
Total of No.1 to 3 in Rs.

Total

,~====:c:-c=,6) Water charges (1%)

0.010

==
0.010

--,Ti-=o.::ta,,-I
Total

7)

Laboratory Testing (0.50%)

0.005

8)

Formwork etc.(5%)

0.050

9)

Overhead charges (10%)

0.100

10)

Total Lead
Metal
Sand
Cement

Total
Total
Total

J
11)

Cum
Cum
M.T.
Totallead
Total
Say Completed Item Rate in Rs Per Cum
0.950
0.430
0.340

109.06
109.06
77.90

Labour Component for One Cum.


Say Labour Component in Rs. Per Cum

Rate proposed for M.C.C. D.S.R. 2006-2007

Compo Rate

Labour Rate

Unit

3000.00

325.00

Cum

11

56.45
28.56
85.01
2614.86
0.00
2614;86
26.15

~2641.01
26.41
2667.42
13.34
2680.75
134.04
2814.79
281.48
3096.27
103.61
46.90
26.49
176.99
3273.26
3273.00
413.05
413.00

M.C.C.D.S.R.2006-07 Rate Analysis for Bridge Works Item

'J

Item No.11(a)
Providing and laying in situ M-20 cement concrete of trap metal for the bottom plug, of wells in the dry or under
water including compaction and curing where necessary etc., complete.
Spec. No.: BR. 17, Page No. 120 MORT & H Clause No. 1500 & 1700
Quantity for one cum.
AMOUNT IN Rs.
DESCRIPTION
QUANTITY
RATE iN Rs.
UNIT
1) Labour
Manson 2nd class skilled
0.420
160.00
Day
67.20
Labour for mixer
0.330
145.00
Day
47.85
Mazdoor, unskilled heavyl male
0.330
145.00
Day
47.85
0.250
145.00
Day
36.25
Dewatering
Bhisii seki skilled
0.100
145.00
Day
14.50
Total Labour in Rs.
213.65
2) Material
0.820
400.00
Cum
328.00
Metal 10 mm to 20 mm (crushed broken)
560.00
Cum
235.20
Sand (a) screened I Unscreened
0.420
0.420
4400.00
M.T.
1848.00
Cement
Total Material in Rs.
2411.20
3) Machinery :
1344.00
Day
56.45
Concrete Mixer (cap.0.40/0.28 cum)
0.042
26.21
Vibrator
0.042
624.00
Day
Total Machinary in Rs.
82.66
2707.51
Total of No.1 to 3 in Rs.
0.00
4) Scaffolding
2707.51
Total
0.000
0.00
5) Sundries
Total
2707.51
0.010
27.08
6) Water charges (1%)
2734.58
Total
13.67
0.005
7) Laboratory Testing (0.50%)
2748.25
Total
412.24
0.150
8) Formwork etc. (15%)
3160.49
Total
316.05
9) Overhead charges (10%)
0.100
Total
3476.54
10) Total Lead
89.43
0.820
109.06
Cum
Metal
45.81
0.420
109.06
Cum
Sand
0.420
77.90
M.T.
32.72
Cement
167.95
Total lead
3644.49
Total
Say Completed Item Rate in Rs Per Cum
3644.00
213.65
11 ) Labour Component for One Cum.
Say Labour Component in Rs. Per Cum
214.00

Rate proposed for M.C.C. D.S.R. 2006-2007

Camp. Rate

Labour Rate

Unit

3200.00

435.00

Cum

12

\71

M.C.C.D.S.R.2006-07 Rate Analysis for Bridge Works Item


Item No.11(b)
Providing and laying in situ M-25 of trap metal for the bottom plug, of wells in the dry or under water including
Spec. No. : BR. 17, Page No. 120 MORT & H Clause No. 1500 & 1700
Quantity for one cum.
QUANTITY
RATE IN Rs.
DESCRIPTION
UNIT
AMOUNT IN Rs.
Rate as per R.A. of It.No.11 a
3200.00
for M-200
Add for M 25
Cement 8.2 - 7.2
=
Cement 1 x 220
=
Lead 1 x 20 x 77.90 =
Add 10% over head charges.

1 bag
220

3.895
223.895
22.3895

Say

246.2845
3446.28
3446
435

Rs.
Rs.

Labour Component for One Cum.

Rate proposed for M.C.C. D.S.R. 2006-2007

Compo Rate

Labour Rate

Unit

3400.00

435.00

Cum

Item No.12(a)
Providing and laying in situ M-t5 c.c. of trap metal for the top plug, of wells inthe dry or under water including
compaction and curing where necessary etc., complete.
Spec. No. : BR. 17, Page No. 120 MORT & H Clause No. 1500 & 1700
DESCRIPTION

QUANTITY

RATE IN Rs.

Quantity for one cum.


UNIT
AMOUNT IN Rs.

Rate as per R.A. of It.No.11 a


for M-200
Add for M 25

Deduct for M250 (7.2 - 6.4)


=
Cement
0.8 x 220
=
Lead
0.8 x 20 x 77.90 =
Add 10% over head charges.

3200.00

0.8 bag
176
3.116
179.116
17.9116
197.0276

197.02
3002.98
3003.00
435.00

Rs.
Rs.

Say
Labour Component for One Cum.

Rate proposed for M.C.C. D.S.R. 2006-2007

Compo Rate

labour Rate

Unit

2950.00

435.00

Cum

13

\ r--M.C.C.D.S.R.2006-07 Rate Analysis for Bridge Works Item


Item No.12(b))
Providing and laying in situ M-15 C.c. of trap metal for the top plug, of wells inthe dry or under water including
Spec. No. : BR. 17, Page No. 120 MORT & H Clause No. 1500 & 1700
Quantity for one cum.
DESCRIPTION
UNIT
AMOUNT IN Rs.
QUANTITY
RATE IN Rs.
Rate of bottom plug (M20) Item No.11 (a)

3200.00

Deduct for dewatering

36.25

Add 10% overhead charges


Total Deduction

3.625
39.875
-39.875
3160.13
3160.00
435.00

Rs.
Rs.

Say
Labour Component for One Cum.

Rate proposed for M.C.C. D.S.R. 2006-2007

Camp. Rate

Labour Rate

Unit

3150.00

435.00

Cum

Item No.12(c)
Providing and laying in situ M-25 cement concrete of trap metal for top plug of wells in the dry or under
including compaction and curing where necessary.
Spec. No. : BR. 17, Page No. 120 MORT & H Clause No. 1500 & 1700
Quantity for one cum.
QUANTITY
RATE IN Rs.
DESCRIPTION
UNIT
AMOUNT IN Rs.
Rate of bottom plug (M20) Item No.11 (a)
Add for M 250 =
Cement
=
Lead

3200.00
8.2 x7.2
1.0x220
1/20 x 77.90

Add 10% overhead charges


Total Deduction
!

1
220
3.895
223.895
22.3895
246.2845

Rs.
Rs.

Say

3446.28
3446.00
435.00

Labour Component for One Cum.

Rate proposed for M.C.C. D.S.R. 2006-2007

Camp. Rate

Labour Rate

Unit

3350.00

435.00

Cum

14

M.C.C.D.S.R.2006-07 Rate Analysis for Bridge Works item

...

)
Rate proposed for M.C.C. D.S.R. 2006-2007

Camp. Rate

Labour Rate

Unit

34300.00

1600.00

MT

15

\ -r"

M.C.C.D.S.R.2006-07 Rate Analysis for Bridge Works Item

Item No.15
Providing and laying A. C. 100 mmdia meter pressure relief pipe for R. C. C. raft as per drawing.
Spec. No. : MORT & H Clause No. 2204
Quantity for per Rmt.
QUANTITY
RATE IN Rs.
UNIT
AMOUNT IN Rs.
DESCRIPTiON
1) Labour
150.00
Day
37.50
SKiLLED LABOUR FOR KEEPiNG IN
0.250
POSITiON CUTTING OF PIPES ETC.
37.50
Total Labour in Rs.
2) Material
262.50
A.C.PIPE ONE M. LONG.
250.00
NO.
1.050
Total Material in Rs.
262.50
3) Machinery :
7.00
7.00
Other than Labour & Material
1.000
6.66
6.66
HACKSOW BLADE L.S.
1.000
CONVEYANCE UPTO LEAD OF
Total Machinary in Rs.
13.66
5.00 KM. 1.00 MTS
313.66
Total of No.1 to 3 in Rs.
0.00
4) Scaffoiding
Total
313.66
3.14
5) Sundries (1.0%)
0.010
Total
316.80
3.17
6) Water charges
0.010
319.96
Total
0.00
7) Laboratory Testing
0.000
Total
319.96
0.00
0.000
8) Formwork etc.
Total
319.96
32.00
9) Overhead charges (10%)
0.100
Total
351.96
10) Total Lead

--_._---

11)

351.96

Say Labour Component in Rs. Per R.m

38.00

Labour Component for One Rmt.

)
Rate proposed for M.C.C. D.S.R. 2006-2007

0.00

Total lead
Total
Say Completed Item Rate in Rs Per R.m

352.00
37.50

Camp. Rate

Labour Rate

Unit

100.00

24.00

Rmt.

17

\'1'" b

M.C.C.D.S.R.2006-07 Rate Analysis for Bridge Works Item


Item No.16
Providing and laying in position rubble stone of approved quality for apron on dis and u/s sides as per drawing.
Spec. No. : MORT & H Clause No. 2500

1)

2)

3)

DESCRIPTION
Labour
Mazdoor, unskilled heavy! male

Material
RUBBLE FOR ROAD WORK

QUANTITY

RATE IN Rs.

0.500

145.00

1.220

Quantity for One Cum


UNIT
AMOUNT IN Rs.
Day

72.50

Total Labour in Rs.

72.50

230.00
Cum
Total Material In Rs.

280.60
280.60

Machinery :
Total Mach/nary in Rs.
Total of No.1 to 3 in Rs.

4)

Scaffolding

5)

Sundries (1.0%)

0.010

6)

Water charges

0.010

7)

Laboratory Testing

0.000

8)

Formwork etc.

0.000

9)

Overhead charges (10%)

0.100

10)

Total Lead
Rubble

Total
Total
Total
Total
Total
Total

1.220

128.31

156.54

Total lead
Total
Say Completed Item Rate in Rs Per Cum

11)

Labour Component for One Cum.


Say Labour Component in Rs. Per Cum
Camp. Rate

Labour Rate

Unit

350.00

45.00

Cum

)
Rate proposed for M.C.C. D.S.R. 2006-2007

18

0.00
353.10
0.00
353.10
3.53
356.63
3.57
'360.20
0.00
360.20
0.00
360.20
36.02
396.22

156.54
552.76
553.00
72.50
73.00

M.C.CD.S.R.2006-07 Rate Analysis for Bridge Works Item


Item No.1?
Providing fabricating, launching, floating and grounding in position steel curbs for wells with necessary steel
bracings and steel cutting edges as shown in the detailed drawings. ;
Spec. No.: Br8 Page No.108 MORT & H Clause No. 1200

1)

2)

DESCRIPTION
Labour
Carpainter 1st Class
Driller
Head fitter with tools
Mazdoor unskilled heavy I male
.Mazdoor unskilled heavy I Female
Material
Structural steel (RSJ I Angles & all roll)
Welding electrodes
Transporation

QUANTITY
4.000
4.000
8.000
8.000
5.000

1.050
100.000
L.S.

RATE IN Rs.

Quantity for One MT


UNIT
AMOUNT IN Rs.

175.00
Day
150.00
Day
145.00
Day
145.00
Day
145.00
Day
Total Labour in Rs.
35000.00
6.00

M.T.

KG.

Total Material in Rs.


3)

Machinery :
Crane
Welding Machine

1.000
1.000

4)

Scaffolding

5)

Sundries (1.0%)

0.010

6)

Water charges

0.010

7)

Laboratory Testing (0.50%)

0.005

8)

Formwork etc.

0.000

9)

Overhead charges (10%)

0.100

10)

Total Lead
Structural Steel

3696.00
Day
1584.00
Day
;Total Machinary in Rs.
Total of No.1 to 3 in Rs.

Total
M.T.

81.80

Total
Total
Total
Total

77.90

Total lead
Total
Say Completed;ltem Rate in Rs Per MT

)
11 )

Labour Component for One Cum.


Say Labour Component in Rs. Per MT

Rate proposed for M.C.C. D.S.R. 2006-2007

Compo Rate

Labour Rate

Unit

50000.00

5500.00

MT

19

36750.00
600.00
1000.00
38350.00
3696.00
1584.00
5280.00
47975.00
0.00
47975.00
479.75
48454.75
484.55
48939.30
244.70
49183.99
0.00
49183.99
4918.40
54102.39

Total

1.050

700.00
600.00
1160.00
1160.00
725.00
4345.00

81.80
54184.19
54184.00
4345.00
4345.00

\ T-'t

M.C.C.D.S.R.2006-07 Rate Analysis for Bridge Works Item


Item No.18
Providing fand laying in situ M-15 cement concrete of trap metal for R.C.C. well curbs including necessary
shuttering, compacting by vibrating, finishing and curing etc., complete. (excluding reinforcement)
Spec. No. : Br 12 Page No.112 MORT & H Clause No. 1700 Pg.419 to 435
Quantity for One Cum
UNIT
AMOUNT IN Rs.
DESCRIPTION
QUANTITY
RATE IN Rs.
Labour
1)
Masson 2nd class skilled
160.00
Day
0.330
52.80
0.670
Bhisti Semi Skilled Mukadam
145.00
Day
97.15
0.080
Mukadam
175.00
Day
14.00
290.00
2.000
Mazdoor unskilled heavy I male
145.00
Day
Mazdoor unskilled heavy I Female
145.00
Day
290.00
2.000
Total Labour in Rs.
743.95
2) Material
400.00
Cum
268.00
Metal 10mm to 20 mm (Crusher broken)
0.670
Fine aggregate 6 mm to 10 10 mm
0.220
400.00
Cum
88.00
Sand (a) Screened I Unscreened
0.445
560.00
Cum
249.20
1496.00
Cement
0.340
4400.00
MT
Total Material in Rs.
2101.20
3) Machinery :
0.042
1344.00
Day
56.45
Concrete Mixer (Cap.0.40/0.28 Cum)
Vibrator
0.042
788.00
Day
33.10
Total Machinary in Rs.
89.54
Total of No.1 to 3 in Rs.
2934.69
4) .Scaffolding
0.00
'Total
2934.69
29.35
5) Sundries (1.0%)
0.010
2964.04
Total
29.64
0.010
6) Water charges
2993.68
Total
0.005
14.97
7) Laboratory Testing (0.50%)
Total
3008.65
0.100
300.86
8) Formwork etc.
Total
3309.51
330.95
0.100
9) Overhead charges (10%)
Total
3640.47
10) Total Lead
145.60
1.335
109.06
Metal & Sand
Cum
0.320
77.90
Cement
24.93
MT
Total lead
170.52
Total
3810.99
Say Completed Item Rate in Rs Per Cum
3811.00
743.95
11) Labour Component for One Cum.
Say Labour Component in Rs. Per Cum
744.00

Rate proposed for M.C.C. D.S.R. 2006-2007

Compo Rate

Labour Rate

Unit

3300.00

620.00

Cum

20

M.C.C.D.S.R.2006-07 Rate Analysis for Bridge Works Item


Item No.18(a)
Providing fand laying in situ M-20 cement concrete of trap metal for R. C.C. well curbs including necessary
Spec. No. : Br 12 Page NO.112 MORT & H Clause No. 1700 PgA19 to 435
Quantity for One Cum
DESCRIPTION
RATE IN Rs.
UNIT
AMOUNT IN Rs.
QUANTITY
1)

2)

3)

Labour
Masson 2nd class skilled
Bhisti Semi Skilled Mukadam
Mukadam
Mazdoor unskilled heavy / male
Mazdoor unskilled heavy / Female
Material
Metal 1Omm to 20 mm (Crusher broken)
Fine ag9regate 6 mm to 10 10 mm
Sand (a) Screened / Unscreened
Cement
Machinery :
Concrete Mixer (Cap.OAO/0.28 Cum)
Vibrator

0.330
0.670
0.080
2.000
2.000

160.00
Day
145.00
Day
175.00
Day
145.00
Day
145.00
Day
Total Labour in Rs.

52.80
97.15
14.00
290.00
290.00
743.95

0.670
0.220

400.00
Cum
400.00
Cum
560.00
Cum
4400.00
MT
Total Material in Rs.

268.00
88.00
249.20
1584.00
2189.20

1344.00
Day
680.00
Day
Total Machinary in Rs.
Total of No.1 to 3 in Rs.

56045

00445
0.360

0.042
0.042

4)

Scaffolding

5)

Sundries (1.0%)

0.010

6)

Water charges

0.010

Total
Total

30048
Total

7)

Laboratory Testing (0.50%)

0.005

8)

Formwork etc.

0.100

Total

9)

.Overhead charges (10%)

10)

Total Lead
Metal & Sand
Cement

28.56
85.01
3018.16
0.00
3018.16
. 30.18
3048.34
3078.82
15.39
3094.22

Total

11)

1.335
0.360

109.06
77.90

Cum
MT
Total lead
Tolal
Say Completed Item Rate in Rs Per Cum

Labour Component for One Cum.


Say Labour Component in Rs. Per Cum

Rate proposed for M.C.C. D.S.R. 2006-2007

Compo Rate

Labour Rate

Unit

3500.00

620.00

Cum

21

145.60
28.04
173.64
3917.64
3918.00
743.95
744.00

M.C.C.D.S.R.2006-07 Rate Analysis for Bridge Works Item


Item No.18(b)
Providing fand laying in situ M-25 cement concrete of trap metal for R. C. C. well curbs including necessary
shuttering, compacting by vibrating, finishing and curing etc., complete. (excluding reinforcement)
Spec. No. : Br 12 Page No.112 MORT & H Clause No. 1700 PgA19 to 435
Quantity for One Cum
UNIT
AMOUNT IN Rs.
DESCRIPTION
RATE IN Rs.
QUANTITY
1) Labour
52.80
Masson 2nd class skilled
160.00
Day
0.330
0.670
97.15
Bhisti Semi Skilled Mukadam
145.00
Day
14.00
175.00
Day
0.080
Mukadam.
'290.00
Mazdoor unskilled heavy I male
2.000
145.00
Day
Mazdoor unskilled heavy I Female
290.00
2.000
145.00
Day
743.95
Total Labour in Rs.
2) Material
268.00
0.670
400.00
Cum
Metal 10mm to 20 mm (Crusher broken)
88.00
0.220
Fine aggregate 6 mm to 10 10 mm
400.00
Cum
Sand (a) Screened I Unscreened
249.20
560.00
Cum
0.445
1408.00
Cement
0.320
4400.00
MT
2013.20
Total Material in Rs.
3) Machinery :
1344.00
Day
Concrete Mixer (Cap.OAO/0.28 Cum)
56.45
0.042
Vibrator
680.00
Day
28.56
0.042
Total Machinary in Rs.
85.01
2842.16
Total of No.1 to 3 in Rs.
0.00
4) Scaffolding
Total
2842.16
28.42
5) Sun~ries (1.0%)
0.010
Total
2870.58
28.71
0.010
6) Water charges
2899.29
Total
14.50
7) Laboratory Testing (0.50%)
0.005
2913.78
Total
291.38
8) Formwork etc.
0.100
3205.16
Total
320.52
0.100
9) Overhead charges (10%)
Total
3525.68
10) Total Lead
1.335
109.06
Cum
145.60
Metal & Sand
24.93
0.320
77.90
MT
Cement
Total lead
170-52
3696.20
Total
Say Completed Item Rate in Rs Per Cum
3696.00
743.95
11) Labour Component for One Cum.
Say Labour Component in Rs. Per Cum
744.00

Rate proposed for M.C.C. D.S.R. 2006-2007

Compo Rate

Labour Rate

Unit

4000.00

620.00

Cum

22

\ '6"\

M.C.C.D.S.R.2006-07 Rate Analysis for Bridge Works Item


Item No.18(c)
Providing and laying in situ M-30 cement concrete of trap metal for R. C. C. well curbs including necessary
shuttering, compacting by vibrating, finishing and curing etc., complete. (excluding reinforcement)
Spec. No.: Br 12 Page No.112 MORT & H Clause No. 1700 PgA19 to 435

1)

2)

3)

DESCRIPTION
Labour
Masson 2nd class skilled
Bhisli Semi Skilled Mukadam
Mukadam
Mazdoor unskilled heavy I male
.Mazdoor unskilled heavy I Female

QUANTITY

RATE IN Rs.

Quantity for One Cum


UNIT
AMOUNT IN Rs.

0.330
0.670
0.080
2.000
2.000

160.00
Day
145.00
Day
175.00
Day
145.00
Day
145.00
Day
Total Labour in Rs.

52.80
97.15
14.00
290.00
.290.00
743.95

Material
Metal 10mm to 20 mm (Crusher broken)
Fine aggregate 6 mm to 10 10 mm
Sand (a) Screened I Unscreened
Cement

0.670
0.220
0.445
00460

400.00
Cum
400.00
Cum
560.00
Cum
4400.00
MT
Total Material in Rs.

268.00
88.00
249.20
2024.00
2629.20

Machinery :
Concrete Mixer (Cap.OAOI0.28 Cum)
Vibrator

0.042
0.042

4)

Scaffolding

5)

Sundries (1.0%)

0.010

6)

Water charges

0.010

7)

Laboratory Testing (0.50%)

0.005

8)

Formwork etc.

0.100

9)

Overhead charges (10%)

0.100

10)

Total Lead
Metal & Sand
Cement

1344.00
Day
788.00
Day
Total Machinary in Rs.
Talai of No. 1 10 3 in Rs.
Total
Total
Total
Total
Total
Total

)
11 )

1.335
00460

109.06
77.90

Cum
MT
Total lead
Total
Say Completed Item Rate in Rs Per Cum

Labour Component for One Cum.


Say Labour Component in Rs. Per Cum

Rate proposed for M.C.C. D.S.R. 2006-2007

Compo Rate

Labour Rate

Unit

4200.00

620.00

Cum

23

56.45
33.10
89.54
3462.69
0.00
3462.69
34.63
3497.32
34.97
3532.29
17.66
3549.96
355.00
3904.95
390.50
4295045
145.60
35.83
181.43
4476.88
4477.00
743.95
744.00

M.C.C.D.S.R.2006-07 Rate Analysis for Bridge Works Item

-)

,
!

Item No.19
Providing and laying in situ M-20 cement concrete of trap metal for well steining including necessary
Spec. No. :MORTH: CI. 1700 Page No. 419 to 435
Quantity for One Cum
QUANTITY
RATE IN Rs.
UNIT
AMOUNT IN Rs.
DESCRIPTION
1) Labour
Masson 2nd class skilled
0.100
160.00
Day
16.00
Bhisti Semi Skilled Mukadam
0.270
145.00
Day
39.15
Mazdoor unskilled heavy I male
0.950
145.00
Day
137.75
Day
Mazdoor unskilled heavy I Female
0.680
145.00
98.60
Total Labour in Rs.
291.50
2) Material
268.00
Metal 1Omm to 20 mm (Crusher broken) .
0.670
400.00
Cum
Fine aggregate 6 mm to 10 10 mm
0.220
400.00
Cum
. 88.00
Sand (a) Screened I Unscreened
0.445
560.00
Cum
249.20
Cement
0.360
4400.00
1584.00
MT
Total Material in Rs.
2189.20
3)
Machinery :
Concrete Mixer (Cap.0.40/0.28 Cum)
0.042
1344.00
Day
56.45
Vibrator
0.042
788.00
Day
33.10
Total Machinary in Rs.
89.54
Total of No.1 to 3 in Rs.
2570.24
4) Scaffolding
0.00
Total
2570.24
5) Sundries (1.0%)
0.010
25.70
2595.95
Total
25.96
6) Water charges
0.010
2621.91
Total
7) Laboratory Testing (0.50%)
0.005
13.11
Total
2635.02
8) Formwork etc.
0.100
263.50
Total
2898.52
9) Overhead charges (10%)
0.100
289.85
Total
3188.37
10) Total Lead
Metal & Sand
1.335
109.06
145.60
Cum
Cement
0.360
77.90
28.04
MT
Total lead
173.64
3362.01
Total
Say Completed Item Rate in Rs Per Cum
3362.00
11 ) Labour Component for One Cum.
291.50
Say Labour Component in Rs. Per Cum
292.00

Rate proposed for M.C.C. D.S.R. 2006-2007

Compo Rate

Labour Rate

Unit

3100.00

560.00

Cum

24

M.C.C.D.S.R.2006-07 Rate Analysis for Bridge Works Item

Item No.19(a)
Providing and laying in situ C.C. M-25 of trap metal for well steining including necessary shuttering,
Spec. No. :MORTH: CI. 1700 Page No. 419 to 435
Quantity for One Cum
DESCRIPTION
UNIT
AMOUNT IN Rs.
QUANTITY
RATE IN Rs.
1) Labour
Masson 2nd class skilled
0.100
160.00
Day
16.00
Bhisti Semi Skilled Mukadam
0.270
145.00
Day
39.15
Mazdoor unskilled heavy / male
0.950
145.00
Day
137.75
Mazdoor unskilled heavy / Female
Day
0.680
145.00
98.60
Totat Labour in Rs.
291.50
2) Material
Metal 1Omm to 20 mm (Crusher broken)
0.670
400.00
Cum
268.00
0.220
400.00
Cum
88.00
Fine aggregate 6 mm to 10 1.0 mm
Sand (a) Screened / Unscreened
560.00
Cum
249.20
0.445
Cement
4400.00
MT
1804.00
0.410
Total Material in Rs.
2409.20
3) Machinery :
Concrete Mixer (Cap.0.40/0.28 Cum)
1344.00
Day
56.45
0.042
Vibrator
Day
33.10
0.042
788.00
Total Machinary in Rs.
89.54
Total of No.1 to 3 in Rs.
2790.24
4) Scaffolding
0.00
Tolal
2790.24
27.90
5) Sundries (1.0%)
0.010
Total
2818.15
28.18
6) Water charges
0.010
Total
2846.33
14.23
7) Laboratory Testing (0.50%)
0.005
Total
2860.56
286.06
8) Formwork etc..
0.100
Total
3146.62
314.66
9) Overhead charges (10%)
0.100
3461.28
Total
10) Total Lead
Metal & Sand
109.06
Cum
'145.60
1.335
Cement
77.90
31.94
0.410
MT
Total lead
177.53
3638.81
Total
Say Completed Item Rate in Rs Per Cum
3639.00
291.50
11) Labour Component for One Cum.
Say labour Component in Rs. Per Cum
292.00

Rate proposed for M.C.C. D.S.R. 2006-2007

Compo Rate

labour Rate

Unit

3400.00

560.00

Cum

25

M.C.C.D.S.R.2006-07 Rate Analysis for Bridge Works Item

')

Item No.20
Providing sump in hard rock in wells including necessary excavation by manual or technical means disposing
Spec. No. MORT & H Ci 1700
Quantity for One Cum
DESCRIPTION
QUANTITY
RATE IN Rs.
UNIT
AMOUNT IN Rs.
1) Labour
Blaster
0.250
165.00
Day
41.25
Marine Khalashi
1.000
175.00
Day
175.00
1.000
Driver Operator for Jac
200.00
Day
200.00
Electrician
0.250
150.00
Day
37.50
Mazdoor unskilled lighUfemale
1.000
145.00
Day
145.00
for convery excavated stuff upto 50 mtrs.
Total Labour in Rs.
598.75
2) Material
Noble Dynamite
0.170
11.05
65.00
Kg
Ditonetors (Electricals)
0.014
1000.00
100 Nos.
14.00
Nipples for Ditonetors
1.400
10.00
No.
14.00
Red Tape Safty (Fuse)
0.650
24.00
15.60
Metre
Total Material in Rs.
54.65
3) Machinery :
Air Compressor
0.063
3176.00
Day
200.09
Jak Hammer
0.250
160.00
Day
40.00
Pump Set (10 to 19 H.P.)
0.250
1168.00
Day
292.00
30 K.v. Genrator
0.063
1776.00
Day
111.89
Winch or crane
0.063
11072.00
697.54
Day
Total Machinary in Rs.
1341.51
1994.91
Total of No.1 to 3 in Rs.
4) Scaffolding
0.00
Total
1994.91
5) Sundries (1.0%)
0.010
19.95
2014.86
Total
6) Water charges
0.010
20.15
Total
2035.01
7) Laboratory Testing (0.50%)
0.000
0.00
Total
2035.01
8) Formwork etc.
0.000
0.00
2035.01
Total
9) Overhead charges (10%)
0.100
'203.50
Total
2238.51
10) Total Lead
0.000
0.00
0.00
Total lead
Total
Say Completed Item Rate in Rs Per Cum
11 )

Labour Component for One Cum.


Say Labour Component in Rs. Per Cum

Rate proposed for M.C.C. D.S.R. 2006-2007

Compo Rate

Labour Rate

Unit

2200.00

360.00

Cum

26

0.00
2238.51
2239.00
598.75
599.00

\ 'V3

M.C.C.D.S.R.2006-07 Rate Analysis for Bridge Works Item


Item No.21(a)
Providing steel anchor dowels at the base of the well including drilling holes placing the dowels in position and
effectively grouting theholes (40 mm M.S.,bar4 mt. Long)
Spec. No. :Br-16 Page No. 120
Quantity for one set
DESCRIPTION
QUANTITY
RATE IN Rs.
UNIT
AMOUNT IN Rs.
1) Labour
3.000
175.00
Day
Marine Khalashi
525.00
9.45
0.063
150.00
Day
Cutter
1.000
145.00
Day
Mazdoor, unskilled light/female
145.00
679.45
Total Labour in Rs.
2) Material
0.050
26900.00
M.T.
M.S.Bars upto 10 mm and above
1345.00
0.050
4400.00
M.T.
Cement
220.00
0.500
310.00
Scraping sand paper
155.00
Sgm!.
Total Material in Rs.
1720.00
3) Machinery :
457.00
Air Compressor
1.000
457.00
Hour
1664.00
Wagon drill
1.000
1664.00
Day
111.00
0.063
1776.00
Day
Rent of generator set 30 kv
2232.00
Total Machinary in Rs.
4631.45
Total of No.1 to 3 in Rs.
231.57
0.050
4) Scaffolding
4863.02
Total
48.63
0.010
5) Sundries (1.0%)
4911.65
Total
49.12
0.000
6) Water charges
4960.77
Total
24.80
0.005
7) Laboratory Testing (0.50%)
4985.57
Total
0.00
0.000
8) Formwork etc.
4985.57
Total
498.56
0.100
9) Overhead charges (10%)
5484.13
Total
10) Total Lead
0.00
Total lead
Total
Say Completed Item Rate in Rs Per Set
11) .Labour Component for One Set
Say Labour Component in Rs. Per Set

Rate proposed for M.C.C. D.S.R. 2006-2007

Camp. Rate

Labour Rate

Unit

5485.00

475.00

Set

27

0.00
5484.13
5484.00
679.45
679.00

M.C.C.D.S.R.2006-07 Rate Analysis for Bridge Works Item


Item No.21 (b)
Providing steel anchor dowels at the base of the well including drilling holes placing the dowels in position and
effectively grouting the holes (320 mm diameter)
Spec. No. :Br-16 Page No. 120

1)

2)

3)

DESCRIPTION
Labour
Marine Khalashi
Cutter
Mazdoor, unskilled (heavy)
Material
M.S. Bars upto 10 mm and above
Cement
Alluminium powder
Scrappint sand paper
Total Material
Machinery :
Air compressor
Wagon drill
Welding machine
Rent of generator set 30kv.

QUANTITY
3.000
1.060
1.000

0.032
0.050
5.000
0.500

1.000
1.000
0.060
0.063

4)

Scaffolding

0.100

5)

Sundries (1.0%)

0.010

6)

Water charges

0.010

7)

Laboratory Testing (0.50%)

0.005

8)

Formwork etc.

0.050

9)

Overhead charges (10%)

0.100

10)

Total Lead
M.S. Bars upto 10 mm and above
Cement

RATE IN Rs.

Quantity for one set


UNIT
AMOUNT IN Rs.

175.00
Day
150.00
Day
145.00
Day
Total Labour in Rs.
26900.00
4400.00
150.00
100.00

860.80
220.00
750.00
50.00
1880.80

397.00
HOUR
1664.00
Day
1584.00
Day
2176.00
Day
Total Machinary in Rs.
Total of No.1 to 3 in Rs.
Total
Total
Total
Total
Total
Total

11)

0.032
0.050

77.90
109.06

MT
MT
Total lead
Total
Say Completed Item Rate in Rs Per Cum

Labour Component for One Set


Say Labour Component in Rs. Per Cum

Rate proposed for M.C.C. D.S.R. 2006-2007

Compo Rate

Labour Rate

Unit

6530.00

575.00

Cum

28

525.00
159.00
145.00
829.00

397.00
1664.00
95.04
136.00
2292.04
5001.84
500.18
5502.02
55.02
5557.04
55.57
5612.61
28.06
5640.68
282.03
5922.71
592.27
6514.98
2.49
5.45
7.95
6522.93
6523.00
829.00
829.00

M.C.CD.S.R.2006-07 Rate Analysis for Bridge Works Item


Item No.22
Providing and laying in situ M-25 cement concrete of trap metal for RCC raft foundation including necessary
formwork, compacting and curing and including dewatering the trench if necessary as directed.
Spec. No. :MORTH : 1700 Page No. 419'to 435
Quantity for One Cum
RATE IN Rs.
AMOUNT IN Rs.
DESCRIPTION
QUANTITY
UNIT
Labour
1)
Mason 2nd class skilled
0.440
160.00
Per day
70.40
Bhisti Semi Skilled
2.670
145.00
Per day
387.15
Mukadam
0.080
175.00
Per day
14.00
Mazdoor unskilled (Heavy)
2.660
145.00
Per day
385.70
for laying and conveying
Mazdoor unskilled (Heavy)
2.660
145.00
Per day
385.70
for laying and conveying
Total labour
1242.95
Material
Metal 10 mm to 20 mm (crusher broken)
Sand (a) Screened/Unscreened
Cement

0.820
0.420
0.410

Machinery :
Concrete Mixer (cap.0.40/0.28 cum)
Needle Vibrator

0.031
0.250

4)

Scaffolding

0.000

5)

Sundries (1.0%)

0.010

6)

Water charges

0.010

7)

Laboratory Testing (0.50%)

0.005

8)

Formwork etc.

0.000

9)

Overhead charges (10%)

0.100

10)

Total Lead
Metal
Sand
Cement

2)

3)

400.00
Cum!.
560.00
Cum!.
4400.00
M.T.
Total Material in Rs.
1344.00
Day
74.00
Hour
Totat Machinary in Rs.
Total of No.1 to 3 in Rs.

Total
Total
Total
Tota/
Total
Totai

11)

0.820
0.420
0.410

109.06
109.06
77.90

Cum!.
Cum!.
M.T.
Total lead
Total
Say Completed Item Rate in Rs Per Cum

Labour Component for One Cum.


Say Labour Component in Rs. Per Cum

Rate proposed for M.C.C. D.S.R. 2006-2007

Compo Rate

Labour Rate

Unit

3800.00

525.00

Cum

29

328.00
235.20
1804.00
2367.20
42.00
18.50
60.50
3670.65
0.00
3670.65
36.71
3707.36
37.07
3744.43
18.72
3763.15
0.00
3763.15
376.32
4139.47
89.43
45.81
31.94
167.17
4306.64
4307.00
1242.95
1243.00

M.C.C.D.S.R.2006-07 Rate Analysis for Bridge Works Item


Item No.23
Providing and laying in situ C.C. M-20 of trap metal for RCC well/pile cap including necessary formwork,
compaction by vibrating finishing and curing complete.

1)

2)

Spec. No. :BR -24 Page No. 124 MORTH : 1700


DESCRIPTION
QUANTITY
Labour
0.440
Mason 2nd class skilled
Bhisti Semi Skilled
2.670
0.080
Mukadam
2.660
Mazdoor unskilled (Heavy)
for laying and conveying
Mazdoor unskilled (Heavy)
2.660
for laying and conveying
Tolallabour
Material
0.820
Metal 10 mm to 20 mm (crusher broken)
0.420
Sand (a) ScreenedlUnscreened
Cement
0.360
Water
150.000
Machinery :
Concrete Mixer (cap.0.4010.28 cum)
Vibrator

0.031
0.031

4)

Scaffolding

0.050

5)

Sundries (1.0%)

0.010

6)

Water charges

0.010

7)

Laboratory Testing (0.50%)

0.005

8)

Formwork etc.

0.000

9)

Overhead charges (10%)

0.100

10)

Total Lead
METAL
CEMENT
SAND

3)

RATE IN Rs.

Quantity for One Cum.


UNiT
AMOUNT IN Rs.

160.00
145.00
175.00
145.00

Per day
Per day
Per day
Per day

70.40
387.15
14.00
385.70

145.00

Per day

385.70
1242.95 1

400.00
Cum.
560.00
Cum.
4400.00
M.T.
0.00
Litter
Total Material in Rs.
1344.00
Day
624.00
Day
.Total Machinary in Rs.
Total of No.1 to 3 in Rs.

Total
Total
Total
Total
Total
Total

'1

Total (for 40 Cu.mt.)


11)

0.820
0.360
0.420

109.06
77.90
109.06

Cumt.
M.T.
W.M.
Total lead
Total
Say Completed lfem Rate in Rs Per Cum

Labour Component for One Cum.


Say Labour Component in Rs. Per Cum

Rate proposed for M.C.C. D.S.R. 2006-2007

Compo Rate

Labour Rate

Unit

3900.00

525.00

Cum

30

328.00
235.20
1584.00
0.00
2147.20
41.66
19.34
61.01
3451.16
172.56
3623.72
36.24
3659.95
36.60
3696.55
18.48
3715.04
0.00
3715.04
371.50
4086.54
7247.43
89.43
28.04
45.81
163.28
4249.82
4250.00
1242.95
1243.00

M.C.C.D.S.R.2006-07 Rate Analysis for Bridge Works Item


Item No.23 (a)
Providing and laying in situ M-25 cement concrete of trap metal for RCG well/piple cap including necessary
formwork, compaction by vibrating finishing and curing complete.
Spec. No. :BR -24 Page No. 124 MORTH : 1700 Page No. 419 to 435
Quantity for One Cum.
UNIT
AMOUNT IN Rs.
DESCRIPTION
QUANTITY
RATE IN Rs.
1) Labour
70.40
Mason 2nd class skilled
160.00
Per day
0.440
387.15
2.670
Bhisli Semi Skilled
145.00
Per day
14.00
0.080
Mukadam
175.00
Per day
385.70
2.660
Mazdoor unskilled (Heavy)
145.00
Per day
for laying and conveying
385.70
2.660
Mazdoor unskilled (Heavy)
145.00
Per day
for laying and conveying
Total labour
1242.95\
2) Material
400.00
Cum!.
Metal 10 mm to 20 mm (crusher broken)
268.00
0.670
400.00
Cum!.
Fine Aggregate 6mm to 10 mm
88.00
0.220
Sand (a) Screened/Unscreened
560.00
Cum!.
249.20
0.445
4400.00
M.T.
Cement
1804.00
0.410
Total Material in Rs.
2409.20
3) .Machinery :
0.042
1344.00
Day
Concrete Mixer (cap.0.40/0.28 cum)
56.45
Needle Vibrator
624.00
Day
26.210
0,042
Total Machinary in Rs.
82.66
3734.81
Total of No.1 to 3 in Rs.
0.00
0.000
4) Scaffolding
Total
3734.81
37.35
0.010
5) Sundries (1.0%)
Total
3772.16
6) Water charges
0.010
Total
7) Laboratory Testing (0.50%)
0.005
Total
191.45
0.050
8) Formwork etc.
Total
4020.38
402.04
9) Overhead charges (10%)
0.100
4422.41
Total
7469.62
10) Total Lead
109.06
Cum!.
97.06
METAL
0.890
77.90
M.T.
31.94
CEMENT
0.410
109.06
W.M.
48.53
SAND
0.445
177.53
Total lead
4599.95
Total
Say Completed Item Rate in Rs Per Cum
4600.00
1242.95
Labour Component for One Cum.
Say Labour Component in Rs. Per Cum
11 )
1243.00

Rate proposed for M.C.C. D.S.R. 2006-2007

Camp. Rate

Labour Rate

Unit

4000.00

525.00

Cum

31

M.C.C.D.S.R.2006-07 Rate Analysis for Bridge Works Item

Item No.23 (b)


Providing and laying in situ M-30 cement concrete of trap metal for RGG we/l/piple cap including necessary
formwork. compaction bv vibratinq finishinq and curinq complete.
Spec. No. :BR -24 Page No. 124 MORTH: 1700 Page No. 419 to 435
Quantify for One Cum.
DESCRIPTION
UNIT
AMOUNT iN Rs.
QUANTITY
RATE IN Rs.
1) Labour
Mason 2nd class skilled
00440
160.00
Per day
70040
Bhisti Semi Skilled
145.00
2.670
Per day
387.15
Mukadam
0.080
175.00
Per day
14.00
Mazdoor unskilled (Heavy)
2.660
145.00
Per day
385.70
for laying and conveying
.Mazdoor unskilled (Heavy)
145.00
Per day
385.70
2.660
for laying and conveying
1242.95
Total labour
2) Material
Metal 10 mm to 20 mm (crusher broken)
400.00
0.670
Cum!.
268.00
Fine Aggregate 6mm to 10 mm
0.220
400.00
Cum!.
88.00
Sand (a) ScreenedlUnscreened
560.00
Cum!.
249.20
00445
Cement
00460
4400.00
M.T.
2024.00
Total Material in Rs.
2629.20
3) Machinery :
Concrete Mixer (cap.OAOI0.28 cum)
56045
0.042
1344.00
Day
Vibrator
624.00
Day
26.210
0,042
Total Machinary in Rs.
82.66
Total of No.1 to 3 in Rs.
3954.81
4) Scaffolding
0.000
0.00
Total
3954.81
39.55
0.010
5) Sundries (1.0%)
Total
3994.36
39.94
0.010
6) Water charges
Total
4034.30
20.17
0.005
7) Laboratory Testing (0.50%)
4054.47
Total
202.72
0.050
8) Formwork etc.
4257.20
Total
425.72
0.100
9) Overhead charges (10%)
Total
4682.92
10) Total Lead
109.06
Cum!.
102.52
0.940
METAL
CEMENT
109.06
M.T.
50.17
00460
152.68
Total Lead
Total lead
152.68
Total
4835.60
Say Completed Item Rate in Rs Per Cum
4836.00
1242.95
12) Labour Component for One Cum.
1243.00
Say Labour Component in Rs.

Rate proposed for M.C.G. D.S.R. 2006-2007

Camp. Rate

Labour Rate

Unit

4300.00

575.00

Cum

32

\'1 \

M.C.C.D.S.R.2006-07 Rate Analysis for Bridge Works Item


Item No.24
Providing and filling in well wiih sand including compaction between the top and bottom plugs etc., complete.
Spec. No. :BR -18 Page No. 122 MORTH : Clause No.304
Quantity for One Cum.
DESCRIPTION
1)

2)

3)

QUANTITY

RATE IN Rs.

UNIT

AMOUNT IN Rs.

Labour
Mazdoor, unskilled heavyl male
Mazdoor, unskilled light/female

0.330
0.330

145.00
Day
Day
145.00
Total Labour In Rs.

47.85
47.85
95.70

Material
Sand (a) ScreenedlUnscreened

1.000

560.00
Cumt
Total Materiat in Rs.

560.00
560.00

Machinery :
Total of No.1 to 3 in Rs.

4)

Scaffolding

0.000

5)

Sundries (1.0%)

0.000

6)

Water charges

0.000

Total
Total
Total
7)

Laboratory Testing

0.000

8)

Formwork etc.

0.000

9)

Overhead charges (10%)

0.100

10)

Total Lead
Sand

Total
Total
Total
1.000

109.00

Cumt.

Total lead
Total
Say Completed Item Rate in Rs Per Cum
12)

,. --,

Labour Component for One Cum.

Say Labour Component in Rs. Per Cum

Rate proposed for M.C.C. D.S.R. 2006-2007

Compo Rate

Labour Rate

Unit

650.00

75.00

Cum

33

655.70
0.00
655.70
0.00
655.70
0.00
655.70
0.00
655.70
0.00
655.70
65.57
721.27
109.00
109.00
830.27
939.27
95.70
96.00

M.C.C.D.S.R.2006-07 Rate Analysis for Bridge Works Item

Item No.25
Taking loadtest on well foundations on wells including all labour, materials, equipments etc.,complete.

Spec. No. : MORTH : Clasue NO.2107


147.00

Rate as per bridge work item No.25 of

a.SR.2005-2006
14.70

Add 10 %
Total

161.70

Say

.162.00
81.00

Labour Component for One Cum.

Rate proposed for M.C.C. a.SR. 2006-2007

Compo Rate

Labour Rate

Unit

160.00

80.00

Cum

34

M.C.C.D.S.R.2006-07 Rate Analysis for Bridge Works Item

Item No.26(a)
Dewatering including diversion of stream providing cofferdams bunds etc., as may be necessaty for
fouondation or pipe trenches and steer parts of the work and bailing out water during and after excavation as
required (3 HP.and above but less than 5 HPJ
Spec. No. : 8r-4 Page No.1 03
DESCRIPTION
1)

2)

QUANTITY

RATE IN Rs.

UNIT

AMOUNT IN Rs.

0.300

145.00

Day

43.50

Total Labour In Rs.

43.50

35.59
Liter
Total Material in Rs.

53.39
53.39

Material
Diesel

1.500

Machinery :
Water Pump 10 to 15 H.P.

0.125

4)

Scaffolding

0.000

5)

Sundries (1.0%)

0.000

6)

Water charges

0.000

3)

Labour
Mazdorr unskilled heavylmale

Quantity for One Hour

123.00
Hour
Total Machinaty in Rs.
Total of No.1 to 3 in Rs.

Total
Total
Total
7)

Laboratory Testing (0.50%)

0.000

8)

Formwork etc.

0.000

9)

Overhead charges (10%)

0.100

10)

Total Lead

0.000

Total
Total
Total
Total lead
Total
Say Completed Item Rate in Rs Per Hour
12)

Labour Component for One Hour


Say Labour Component in Rs. Per Hour

Rate proposed for M.C.C. D.S.R. 2006-2007

Compo Rate

Labour Rate

Unit

60.00

18.00

Per Hour

35

15.38
15.38
112.27
0.00
112.27
0.00
112.27
0.00
112.27
0.00
112.27
0.00
112.27
11.23
123.50
0.00
0.00
'123.50
123.00
43.50
44.00

...,

M.C.C.D.S.R.2006-07 Rate Analysis for Bridge Works Item

Item No.26(b)
Dewatering including diversion of stream providing cofferdams bunds etc., as may be necessary for
fouondation or pipe trenches and steer parts of the work and bailing out water during and after excavation as
required (6 HP.and above but less than 9 HP.
Spec. No. : 8r-4 Page No.103
Quantity for One Hour
DESCRIPTION
1)

2)

Labour
Mazdoor unskilled heavy I male
for repairing bunds and maintaining
water channels etc.,

QUANTITY

RATE IN Rs.

UNIT

AMOUNT IN Rs.

0.300

145.00

Day

43.50

Total Labour in Rs.

43.50

35.59
Liter
Total Material in Rs.

71.18
71.18

Material
Diesel

2.000

Machinery :
Water Pump 10 to 15 H.P.

0.125

4)

Scaffolding

0.000

5)

Sundries (1.0%)

0.000

3)

Hour
123.00
Total Machinary in Rs.
Total of No.1 to 3 in Rs.

Total
Total
6)

Water charges

0.000

7)

Laboratory Testing (0.50%)

0.000

8)

Formwork etc.

0.000

Total
Total
Total
9)

Overhead charges (10%)

10)

Total Lead

0.100

Total
0.000

0.00

0.00

Total lead
Total
Say Completed Item Rate in Rs Per Hour
12)

Labour Component for One Hour


Say Labour Component in Rs.Per Hour

Rate proposed for M.C.C. D.S.R. 2006-2007

36

15.38
15.38
130.06
0.00
130.06
0.00
130.06
0.00
130.06
0.00
130.06
0.00
130.06
13.01
143.07

0.00
143.07
143.00
43.50
44.00

Compo Rate

abour Rat

Unit

80.00

20.00

Per Hour

1'1)

M.C.C.D.S.R.200S07 Rate Analysis for Bridge Works Item

Item No.26(c)
Dewatering including diversion of stream providing cofferdams bunds etc., as may be necessal)l for
fouondation or pipe trenches and steer parts of the work and bailing out water during and after excavation as
required (10 HP.and above but less than 20 H.
Spec. No. : 8r-4 Page NO.1 03
Quantity One Hour
DESCRIPTION
1)

Labour
Mazdoor unskilled heavy I male
for repairing bunds and maintaining
water channels etc.,

QUANTITY

RATE IN Rs.

UNIT

AMOUNT IN Rs.

0.300

145.00

Day

43.50

Total Labour in Rs.

43.50

Materiai
Diesel

3.000

35.59
Liter
Total Material in Rs.

106.77
106.77

Machinery :
Water Pump 10 to 15 H.P.

0.125

123.00
Hour
Total Machinal)l in Rs.
Total of 1 to 3

4)

Scaffolding

0.000

5)

Sundries (1.0%)

0.000

6)

Water charges

0.000

7)

Laboratory Testing (0.50%)

0.000

8)

Formwork etc.

0.000

15.38
15.38
165.65
0.00
165.65
0.00
165.65
0.00
165.65
0.00
165.65
0.00
165.65
16.57
182.22

2)

3)

)
/

Total
Total
Total
Total
Total
9)

Overhead charges (10%)

10)

Total Lead

0.100

Total
0.000

Total lead
Total
Say Completed Item Rate in Rs Per Hour
11)

Labour Component for One Hour


Say Labour Component in Rs. Per Hour

Rate proposed for M.C.C. D.S.R. 2006-2007

Compo Rate

Labour Rate

UnIT

110.00

21.00

Per Hour

37

0.00
0.00
182.22
182.00
43.50
44.00

M.C.C.D.S.R.2006-07 Rate Analysis for Bridge Works Item

Item No.27
Providing uncoursed rubble trap/gtanite/quartizite/gnelss stone masonry in cement morter 1:5 for foundation of
piers, abutments, wings etc., including bailing out of water striking joints and watering complete.
Spec. No. :BR -6 Page No. 107 MORTH : 1400 Page No. 391 to 397
Quantity for One Cum

1)

2)

3)

DESCRIPTION
Labour
Mason 2nd class skilled
Mazdoor unskilled (Heavy)
Mazdoor unskilled (LighUFemale)
Bhisti Semi Skilled
Mason 2nd class skilled
Mazdoor unskilled (Heavy)
Mazdoor unskilled (LighUFemale)
Material
Face stonefTrap rubble
b) Rubble 23 em for masonry work
Quions
Header (Dressed) 2'-6"
Sand (a) ScreenedlUnscreened
Cement

QUANTITY

RATE IN Rs.

UNIT

0.870
0.947
0.710
0.070
0.160
0.160
0.500

160.00
Per day
145.00
Per day
145.00
Per day
145.00
Per day
160.00
Per day
145.00
Per day
145.00
Per day
Total Labour in Rs.

0.500
0.300
2.000
7.000
0.353
0.100

250.000
Cum!.
250.000
Cum!.
90.000
Sqm!.
No.
: 25.000
560.000
Cum!.
4400.000
M.T.
Total Material in Rs.

125.00
75.00
180.00
175.00
197.68
440.00
1192.68

0.000

0.000
Total Machinary in Rs.
Total of No.1 to 3 in Rs.

0.00
0.00
1703.60
85.18
1788.77
17.89
1806.66
18.07
1824.73
9.12
1833.85
0.00
1833.85
183.39
2017.24

Scaffolding (5%)

0.050

5)

Sundries (1.0%)

0.010

6)

Water charges

0.010

7)

Laboratory Testing (0.50%)

0.005

8)

Formwork etc.

0.000

9)

Overhead charges (10%)

0.100

10)

Total Lead
Rubble

Total
Total
Total
Total
Total
Total

12)

139.20
137.32
102.95
10.15
25.60
23.20
72.50
510.921

Machinery :

4)

AMOUNT IN Rs.

Cum!.
Total lead
Total
Say Completed Item Rate in Rs Per Cum
0.300

128.31

Labour Component for One Cum


Say Labour Component in Rs. Per Cum

Rate proposed for M.C.C. D.S.R. 2006-2007

Compo Rate

Labour Rate

Unit

1700.00

350.00

Cum

38

38.49
38.49
2055.73
2056.00
510.92
511.00

M.C.C.D.S.R.200607 Rate Analysis for Bridge Works Item

Item No.28
Providing coursed rubble stone masonry in cement morter 1:5 for returns, wings etc., with Khandki facing and
pointing with cement morter 1:3 for Khandki faces and rubblefacing with struck joiontsfor rubble backing
including scaffolding, bailing out water
.

,)

Spec. No. :BR -25 Page No. 125 MORTH : Clause No.1400, Page No. 391 to 397
Quantity for One Cum
DESCRIPTION
QUANTITY
RATE IN Rs.
UNIT
AMOUNT IN Rs.
1 Labour
Mason 2nd class skilled
1.000
160.00
Per day
160.00
Mason 2nd class skilled
1.670
160.00
Per day
267.20
Mason 2nd class skilled
0.170
160.00
Per day
27.20
0.170
Black smith with tools
165.00
Per day
28.05
Bhisli Semi Skilled
0.670
145.00
Per day
97.15
Mazdoor Unskilled (Heavy)
266.80
1.840
145.00
Per day
Mazdoor Unskilled (Heavy)
0.500
145.00
Per day
72.50
Mazdoor Unskilled (LighVFemale)
0.670
145.00
Per day
97.15
Blow Boy
24.65
0.170
145.00
Per day
Total Labour in Rs. I
1040.701
2) Material
Header (Dressed) 2"-6"
4.000
25.000
No.
100.00
Pine Headers
2.000
20.000
No.
40.00
b) Rubble 23 cm formasonry work
0.800
250.000
200.00
Cum!.
Khandki (Dressed) 8" to 9"
4.000
20.000
No.
80.00
0.320
560.000
Sand (a) Screened IUnscreened
179.20
Cum!.
0.090
4400.000
Cement
396.00
M.T.
Total Material in Rs.
995.20
3) Machinery :
0.000
0.000
0.00
Total Machinary in Rs.
0.00
Total of No.1 to 3 in Rs.
2035.90
0.050
101.80
Total
2137.70
0.010
21.38
Total
2159.07
0.010
21.59
2180.66
Total
0.005
10.90
Total
2191.57
0.000
0.00
2191.57
Total
0.100
219.16
2410.72
Total
0.800
0.320
0.090

128.310
109.060
77.900

Total lead
Total
Say Completed Item Rate in Rs Per Cum
11)

Labour Component for One Cum.


Say Labour Component in Rs. Per Cum

Rate proposed for M.C.C. D.S.R. 2006-2007

Compo Rate

Labour Rate

Unit

2500.00

925.00

Cum

39

102.65
34.90
7.01
144.56
2555.28
2555.00
1040.70
1041.00

'

M.C.C.D.S.R.2006-07 Rate Analysis for Bridge Works Item

Item No.29
Providing coursed rubble trap /granite / quartizite /gneiss stone masonry in cement morter 1:4 for returns,
wings etc., with Khandki facing with struck joints for rubble baking including scaffoldingand watering masonry
complete.
Spec. No. :BR -25 Page No. 125 MORTH: CI.No.1400
DESCRIPTION
QUANTITY
1 Labour
Mason 2nd class skilled
1.000
1.670
Mason 2nd class skilled
0.170
Mason 2nd class skilled
0.170
Black smith with tools
Bhisli Semi Skilled
0.670
Mazdoor Unskilled (Heavy)
1.840
Mazdoor Unskilled (Heavy)
0.500
0.670
Mazdoor Unskilled (Light/Female)
Blow Boy
0.170
2)

3)

Material
Header (Dressed) 2"-6"
Pine Headers
b) Rubble 23 em formasonry work
Khandki (Dressed) 8" to 9"
Sand (a) Screened IUnscreened
.Cement

RATE IN Rs.

Quantity for one cum.


UNIT
AMOUNT IN Rs.
Per day
Per day
Per day
Per day
Per day
Per day
Per day
Per day
Per day

160.00
267.20
27.20
28.05
97.15
266.80
72.50
97.15
24.65
1040.70\

4.000
2.000
0.800
4.000
0.320
0.120

25.000
No.
20.000
No.
250.000
Cum!.
20.000
No.
560.000
Cum!.
4400.000
M.T.
Total Material in Rs.

100.00
40.00
200.00
80.00
179.20
528.00
1127.20

0.000

0.000
Total Machinary in Rs.
Total of No.1 to 3 in Rs.

0.00
0.00
2167.90
108.40
2276.30
22.76
2299.06
22.99
2322.05
11.61
2333.66
0.00
2333.66
233.37
2567.02

160.00
160.00
160.00
165.00
145.00
145.00
145.00
145.00
145.00

Machinery :

4)

Scaffolding

0.050

5)

Sundries (1.0%)

0.010

6)

Water charges

0.010

7)

Laboratory Testing (0.50%)

0.005

8)

Formwork etc.

0.000

9)

Overhead charges (10%)

0.100

10)

Total Lead

Total
Total
Total
Total
Total

..
)

Total
0.000

0.00

Total lead
Total
Say Completed Item Rate in Rs Per Cum
11)

Labour Component for One Cum


Say Labour Component in Rs. Per Cum

Rate proposed for M.C.C. D.S.R. 2006-2007

Camp. Rate

Labour Rate

Unit

2200.00

900.00

Cum

40

0.00
0.00
2567.02
2567.00
1040.70
1041.00

M.C.C.D.S.R.2006-07 Rate Analysis for Bridge Works Item

Item No.30
Providing coursed rubble trap stone masonry in cement morter 1:5 forpierswith khandki facing and pointing with
cement morter 1:3 on allsides including cut and ease water. necessary scaffolding. & watering masonry
compiete.
Spec. No. :BR :26 Page No. 127 MORT & H Clause No. : 1400 Page No. 391 to 397
Quantity for One Cum
DESCRIPTION
1 Labour
Mason 1st class with tools for plastering
Black smith with tools
Bhisli Semi Skilled
Mazdoor Unskilled (Heavy)
Mazdoor Unskilled (Heavy)
Mazdoor Unskilled (Light/Female)
Blow Boy

2)

3)

Material
Header (Dressed) 2"-6"
Header (Dressed) 2"-6"
Pine Headers
b) Rubble 23 cm formasonry work
Khandki (Dressed) 8" to 9"
Sand (a) Screened IUnscreened
Cement

QUANTITY

RATE IN Rs.

UNIT

2.670
0.170
0.670
1.670
0.500
2.000
0.170

170.00
165.00
145.00
145.00
145.00
145.00
145.00
Total Labour

Per day
Per day
Per day
Per day
Per day
Per day
Per day

453.90
28.05
97.15
242.15
72.50
290.00
24.65
1208.40

4.000
3.000
2.000
0.800
6.000
0.450
0.095

No.
25.000
25,000
No.
20.000
No.
250.000
Cum!.
No.
20.000
560.000
Cum!.
.4400.000
M.T.
Total Material in Rs.

100.00
75.00
40.00
200.00
120.00
252.00
418.00
1205.00

0.000

0.000
Total Machinary in Rs.
Total of No.1 to 3 in Rs.

0.00
0.00
2413.40
241.34
2654.74
26.55
2681.29
26.81
2708.10
13.54
2721.64
0.00
2721.64
272.16
2993.80

Machinery :

4)

Scaffolding

0.100

5)

Sundries (1.0%)

0.010

6)

Water charges

0.010

7)

Laboratory Testing (0.50%)

0.005

8)

Formwork etc.

0.000

9)

Overhead charges (10%)

0.100

10)

Total Lead
Rubble
Sand
Cement

Total
Total
Total
Total
Total
Total

11)

AMOUNT IN Rs.

0.800
0.450
0.095

128.00
109.00
77.90

Cum!.
Cum!.
M.T.
Totallead
Total
Say Completed Item Rate in Rs Per Cum

Labour Component for One Cum.


Say Labour Component in Rs.Per Cum

Rate proposed for M.C.C. D.S.R. 2006-2007

Compo Rate

Labour Rate

Unit

2500.00

825.00

Cum

41

102.40
49.05
7.40
158.85
3152.66
3153.00
1208.40
1208.00

M.C.C.D.S.R.2006-07 Rate Analysis for Bridge Works Item

Item No.31
Providing coursed rubble trap stone masonl)l in cement morter 1:4 for piers with khandki facing and pointing
with cement morter 1:3 on all sides including cut and ease water, necessal)l scaffolding, & watering masonl)l
complete.
Spec. No. :BR -26 Page No. 127 MaRTH: Clause No.1400 Page No. 391 to 397
Quantity for One Cum.
DESCRIPTION
1 Labour
Mason 1st class with tools for plastering .
Black smith with tools
Bhisti Semi Skilled
Mazdoor Unskilled (Heavy)
Mazdoor Unskilled (Heavy)
Mazdoor Unskilled (LighUFemale)
Blow Boy

2)

3)

Material
Header (Dressed) 2"-6"
Header (Dressed) 2"-6"
Pine Headers
b) Rubble 23 em formasonry work
Khandki (Dressed) 8" to g"
Sand (a) Screened /Unscreened
Cement

QUANTITY

RATE IN Rs.

UNIT

2.670
0.170
0.670
1.670
0.500
2.000
0.170

170.00
165.00
145.00
145.00
145.00
145.00
145.00
Total Labour

Per day
Per day
Per day
Per day
Per day
Per day
Per day

4.000
3.000
2.000
0.800
6.000

00450
0.120

1208.40

25.000
No.
25.000
No.
20.000
No.
250.000
Cum!.
No.
20.000
Cum!.
560.000
M.T.
4400.000
Total Material in Rs.

Scaffolding

0.000
Total Machinary in Rs.
Total of No.1 to 3 in Rs.

0.100

Total
5)

453.90
28.05
97.15
242.15
72.50
290.00
24.65

100.00
75.00
40.00
200.00
120.00
252.00
528.00

1315.00

Machinery :
0.000

4)

AMOUNT IN Rs.

Sundries (1.0%)

6 ) ' Water charges

0.010

Total
0.010

Total
7)

Laboratory Testing (0.50%)

0.005

8)

Formwork etc.

0.000

9)

Overhead charges (10%)

0.100

10)

Total Lead
Concrete Mixer (cap.OAO/0.28 cum)
Vibrator
Cement

Total

0.00

0.00
2523.40
252.34
2775.74
27.76
2803.50
28.03
2831.53
14.16
2845.69

Total
Total
0.042
0.042
0.120

1344.00
788.00
77.90

Day
Day

M.T.

Totallead
Total
Say Completed Item Rate in Rs Per Cum
11)

Labour Component for One Cum.


Say Labour Component in Rs.Per Cum

Rate proposed for M.C.C. D.S.R. 2006-2007

Compo Rate

Labour Rate

Unit

2650.00

825.00

Cum

42

56045
33.10
9.35

98.89
3229.15
3229.00
1208040
1208.00

M.C.C.D.S.R.2006-07 Rate Analysis for Bridge Works Item


Item No.32

Providing & laying M 10 cement concrete of trap metal for cast in situ piers, abutments, returns, wings etc.,
including provision of "V" shaped false jointstoform suitable panels on thefaces to approveddesign with
necessary centering, compacting by vibrating, finish
Spec. No. :BR -27 Page No. 127 MORT & H: CI. NO.1700 Page No. 419 to 435 CI.2200 Pg. 529 to 532
Quantity for One Cum
1)

DESCRIPTION
Labour
Mason 2nd class skilled
Bhisti Semi Skilled
Mazdoor unskilled (Heavy)
Mazdoor unskilled (Heavy)
Mazdoor unskilled (Light IFemale)

QUANTITY

RATE IN Rs.

UNIT

0.100
0.500
1.000
0.500
1.000

160.00
145.00
145.00
145.00
145.00

Per day
Per day
Per day
Per day
Per day

Total Labour
2)

Material
Metal 10 mm to 20 mm (crusher broken)
Fine Aggregate 6mm to 10 mm
Sand (a) ScreenedlUnscreened
Cement

0.700
0.240
0.470
0.220

400.00
400.00
560.00
4400.00

Cum!.
Cum!.
Cum!.
M.T.

Total Material in Rs.


3)

Machinery :
Concrete Mixer (cap.0.4010.28 cum)
Vibrator

0.042
0.042

1344.00
788.00

Day
Day

Total Machinary in Rs.


Total of No.1 to 3 in Rs.
4)

Scaffolding

0.030

5)

Sundries (1.0%)

0.010

6)

Water charges

0.010

7)

Laboratory Testing

0.000

8)

Formwork etc.

0.050

Total
Total
Total
Total
Total
9) , Overhead charges (10%)

0.100

Total
10)

Total Lead
Metal
Sand
Cement

0.940
0.470
0.220

109.00
109.00
77.90

Cum!.
Cum!.
M.T.

Total lead
Total
Say Completed Item Rate in Rs Per Cum
11 )

Labour Component for One Cum.


Say Labour Component in Rs.Per Cum
Camp. Rate

Rate proposed for M.C.C. D.S.R. 2006-2007

2600.00

43

Labour Rate

Unit

340.00

Cum

AMOUNT IN Rs.
16.00
72.50
'145.00
72.50
145.00
451.00
280.00
96.00
263.20
968.00
1607.20
56.45
33.10
89.55
2147.75
64.43
2212.18
22.12
2234.30
22.34
2256.64
0.00
2256.64
112.83
2369.48
236.95
2606.42
102.46
51.23
17.14
170.83
2777.25
2777.00
451.00
451.00

M.C.C.D.S.R.2006-07 Rate Analysis for Bridge Works Item


Item No.33 (a)
Providing & laying M 15 cement concrete of trap metai for cast in situ piers, abutments, returns, wings etc.,
including provision of "V" shaped false jointstoform suitable panels on thefaces to approveddesign with
necessary centering, compacting by vibrating, finish
Spec. No. :BR -27 Page No. 127 MORT & H : 1700 Page No. 419 to 435 CJ.2200 Pg. 529 to 532
Quantity for one cum.
DESCRIPTION
QUANTITY
RATE IN Rs.
UNIT
AMOUNT IN Rs.
1)

2)

)
3)

Labour
Mason 2nd class skilled
Bhisti Semi Skilled
Mazdoor unskilled (Heavy)
Mazdoor unskilled (Heavy)
Mazdoor unskilled (Light iFemale)
Material
Metal 10 mm to 20 mm (crusher broken)
Fine Aggregate 6mm to 10 mm
Sand (a) ScreenedlUnscreened
Cement
Machinery :
Concrete Mixer (cap.OAOI0.28 cum)
Vibrator

0.100
0.500
1.000
0.500
1.000

160.00
145.00
145.00
145.00
145.00

0.700
0.240

Cum!.
400.00
Cum!.
400.00
560.00
Cum!.
4400.00
M.T.
Total Material in Rs.

00470
0.320

0.042
0.042

Per day
Per day
Per day
Per day
Per day
Total Labour

1344.00
Day
788.00
Day
Total Machinary in Rs.
Total of No.1 to 3 in Rs.

0.030

Total
0.010

Total
0.010

Total
0.005

Total
0.050

Total
0.100

Total
Cum!.
Cum!.
0.320
M.T.
Totallead
Total
Say Completed Item Rate in Rs Per Cum
0.940

00470

11)

109.06
109.06
77.90

Labour Component for One Cum.


Say Labour Component in Rs.Per Cum

Rate proposed for M.C.C. D.S.R. 2006-2007

Camp. Rate

Labour Rate

Unit

2900.00

340.00

Cum

44

16.00
72.50
145.00
72.50
.145.00
451.00
280.00
96.00
263.20
1408.00
2047.20

56045

33.10
89.55\
2587.75
77.63
2665.38
26.65
2692.03
26.92
2718.95
. 13.59
2732.55
136.63
2869.17
286.92
3156.09
102.52
51.26
24.93
178.70
3334.79
3335.00
451.00
451.00

M.C.C.D.S.R.2006-07 Rate Analysis for Bridge Works Item


Item No.33 (b)
Providing & laying. M 20 cement concrete of trap metal for cast in situ piers, abutments, returns, wings etc.,
including provision of "V" shaped false jointstoform suitable panels on thefaces to approveddesign with
necessary centering, compacting by vibrating, finish
Spec. No. ;BR -27 Page No. 127 MORT &H ; 1700 Page No. 419 to 435 CI.2200 Pg. 529 to 532
Quantity for one cum.
1)

2)

3)

4)

DESCRIPTION
Labour
Mason 2nd class skilled
Bhisti Semi Skilled
Mazdoor unskilled (Heavy)
Mazdoor unskilled (Heavy)
Mazdoor unskilled (Light IFemale)
Material
Metal 10 mm to 20 mm (crusher broken)
Fine Aggregate 6mm to 10 mm
Sand (a) ScreenedlUnscreened
Cement

QUANTITY

RATE IN Rs.

0.100
0.500
1.000
0.500
1.000

160.00
145.00
145.00
145.00
145.00

0.700
0.240

400.00
Cum!.
400.00
Cum!.
560.00
Cum!.
4400.00
M.T.
Total Material in Rs.

00470
00410

Machinery ;
Concrete Mixer (cap.OAO/0.28 cum)
Vibrator

0.042
0.042

Scaffolding

0.030

UNIT

AMOUNT IN Rs.

Per day
Per day
Per day
Per day
Per day
Total Labour

1344.00
Day
788.00
Day
Total Machinary in Rs.
Total of No. 1 to 3 in Rs.

16.00
72.50
145.00
72.50
145.00
451.00
280.00
96.00
263.20
1804.00
2443.20

56045

Total
5)

Sundries (1.0%)

0.010

6)

Water charges

0.010

7)

Laboratory Testing

0.005

8)

Formwork etc.

0.050

9)

Overhead charges (10%)

0.100

10)

Totai Lead
Metal
Sand
Cement

Total
Total
Total
Total

Total

11)

0.940

Cum!.
Cum!.
0.410
M.T.
Totat lead
Total
Say Completed Item Rate in Rs Per Cum

00470

109.06
109.06
77.90

Labour Component for One Cum.


Say Labour Component in Rs.Per Cum

Rate proposed for M.C.C. D.S.R. 2006-2007

Compo Rate

Labour Rate

Unit

3200.00

350.00

Cum

45

33.10
89.551
2983.75
89.51
3073.26
30.73
3103.99
31.04
3135.03
15.68
3150.71
157.54
3308.24
330.82
3639.07
102.52
51.26
31.94
185.71
3824.78
3825.00
451.00
451.00

M.C.C.D.S.R.2006-07 Rate Analysis for Bridge Works Item

Item No.33 (c)


Providing & laying. M 25 cement concrete of trap metal for cast in situ piers, abutments, returns, wings etc.,
including provision of "V" shaped false jointstoform suitable panels on thefaces to' approveddesign with
necessary centering, compacting by vibrating, finish

Spec. No. :SR -27 Page No. 127 MORT & H : 1700 Page No. 419 to 435 CI.2200 Pg. 529 to 532
Quantity for One Cum
DESCRIPTION
QUANTITY
RATE IN Rs.
UNIT
AMOUNT IN Rs.
1) Labour
16.00
Mason 2nd class skilled
0.100
160.00
Per day
Shisli Semi Skilled
72.50
0.500
145.00
Per day
Mazdoor unskilled (Heavy)
145.00
1.000
145.00
Per day
Mazdoor unskilled (Heavy)
72.50
0.500
145.00
Per day
Mazdoor unskifled (Light IFemale)
145.00
1.000
145.00
Per day
Total Labour
451.00
2) Material
0.700
400.00
Cum!.
Metal 10 mm to 20 mm (crusher broken)
280.00
Fine Aggregate 6mm to 10 mm
0.240
400.00
Cum!.
96.00
Sand (a) ScreenedlUnscreened
263.20
Cum!.
0.470
560.00
Cement
0.410
4400.00
M.T.
1804.00
Total Material in Rs.
2443.20
3) Machinery :
Concrete Mixer (cap.0.4010.28 cum)
0.042
1344.00
Day
56.45
Vibrator
0.042
788.00
Day
33.10
Total Machinary in Rs.
89.55
Total of No.1 to 3 in Rs.
2983.75
4) Scaffolding
0.030
89.51
Total
3073.26
5) Sundries (1.0%)
0.010
30.73
Total
3103.99
6) Water charges.
0.010
31.04
Total
3135.03
7) Laboratory Testing
0.005
15.68
Total
3150.71
8) Formwork etc.
0.050
157.54
Total
3308.24
0.100
330.82
9) Overhead charges (10%)
Total
3639.07
10) Total Lead
102.52
Metal
109.06
0.940
Cum!.
51.26
Sand
0.470
Cum!.
109.06
Cement
77.90
0.410
M.T.
31.94
Tota/lead
185.71
Total
3824.78
Say Completed Item Rate in Rs Per Cum
3825.00
11) Labour Component for One Cum.
451.00
Say Labour Component in Rs.Per Cum
451.00

Rate proposed for M.C.C. D.S.R. 2006-2007

Camp. Rate

Labour Rate

Unit

3400.00

370.00

Cum

46

M.C.C.D.S.R.200S..Q7 Rate Analysis for Bridge Works Item

Item No.33 (d)


Providing & laying M 30 cement concrete of trap metal for cast in situ piers, abutments, retums, wings etc.,
including provision of "V" shaped false jointstoform suitable panets on thefaces to approveddesign with
necessary centering, compacting by vibrating, finish
Spec. No. :BR -27 Page No. 127 MORT & H : 1700 Page No. 419 to 435 CI.2200 Pg. 529 to 532
Quantity for one cum.
RATE IN Rs.

0.100
0.500
1.000
0.500
1.000

160.00
145.00
145.00
145.00
145.00

Per day
Per day
Per day
Per day
Per day
Total Labour

16.00
72.50
145.00
72.50
145.00
451.00

Material
Metal 10 mm to 20 mm (crusher broken)
Fine Aggregate 6mm to 10 mm
Sand (a) Screened/Unscreened
Cement

0.700
0.240
0.470
0.460

Cum!.
400.00
Cum!.
400.00
560.00
Cum!.
4400.00
M.T.
Totat Material in Rs.

280.00
96.00
263.20
2024.00
2663.20

Machinery :
Concrete Mixer (cap.0.40/0.28 cum)
Vibrator

0.042
0.042

1344.00
Day
788.00
Day
Total Machinary in Rs.
Total of No.1 to 3 in Rs.

4)

Scaffolding

0.030

5)

Sundries (5.0%)

0.050

6)

Water charges

0.010

7)

laboratory Testing

0.005

8)

Formwork etc.

0.050

9)

Overhead charges (10%)

0.100

56.45
33.10
89.55
3203.75
96.11
3299.86
164.99
3464.85
.34.65
3499.50
17.50
3517.00
175.85
3692.85
.369.28
4062.13

10)

Total lead
Metal
Sand
Cement

2)

3)

DESCRIPTION
Labour
Mason 2nd class skilled
Bhisti Semi Skilled
Mazdoor unskilled (Heavy)
Mazdoor unskilled (Heavy)
Mazdoor unskilled (Light /Female)

UNIT

AMOUNT IN Rs.

QUANTITY

1)

Total
Total
Total
Total
Total

Total

11)

0.940
0.470
0.460

109.06
109.06
77.90

Cum!.
Cum!.
M.T.
Total lead
Total
Say Completed Item Rate in Rs Per Cum

labour Component for One Cum.


Say labour Component in Rs.Per Cum

Rate proposed for M.C.C. D.S.R. 2006-2007

Compo Rate

labour Rate

Unit

3500.00

380.00

Cum

47

102.52
51.26
35.83
189.61
4251.74
4252.00
451.00
451.00

M.C.C.D.S.R.2006-07 Rate Analysis for Bridge Works Item


Item No.34
Providing & laying M 10 cement concrete of trap metal for cast in situ piers, abutments, returns, wings etc.,
including provision of "V" shaped false jointstoform suitable panels on thefaces to approved design with
necessary centering, compacting by vibrating, finis
Spec. No. :BR -27a Page No. 127 MORT & H: CI.No. 1700 Page No. 419 to 436 CI.2200 Pg. 529 to 532
Quantity for one cum.
QUANTITY

RATE IN Rs.

0.100
0.500
1.000
1.000

160.00
145.00
145.00
145.00

Per day
Per day
Per day
Per day
Total Labour

16.00
72.50
145.00
145.00
378.50

Material
Metal 10 mm to 20 mm (crusher broken)
Fine Aggregate 6mm to 10 mm
Sand (a) ScreenedlUnscreened
Quarry Spouls
Cement

0.550
0.240
00400
0.150
0.220

400.00
Cum!.
400.00
Cum!.
560.00
Cum!.
200.00
Cum!.
4400.00
M.T.
Total Material in Rs.

220.00
96.00
224.00
30.00
968.00
1538.00

Machinery :
Concrete Mixer (cap.OAOI0.28 cum)
Vibrator

0.042
0.042

1344.00
Day
788.00
Day
Total Machinary in Rs.
Total of No.1 to 3 in Rs.

4)

Scaffolding

0.030

5)

Sundries (5.0%)

0.010

6)

Water charges

0.010

7)

Laboratory Testing

0.005

8)

Formwork etc.

0.050

9)

Overhead charges (10%)

0.100

56045
33.10
89.55
2006.05
60.18
2066.23
20.66
2086.89
20.87
2107.76
10.54
2118.30
105.91
2224.21
222042
2446.63

10)

Total Lead
Metal
Sand
Cement

1)

2)

)
3)

DESCRIPTION
Labour
Mason 2nd class skilled
Bhisti Semi Skilled
Mazdoor unskilled (Heavy)
Mazdoor unskilled (Light IFemale)

UNIT

Total
Total
Total
Total
Total
Total

11)

0.940
00400
0.220

109.06
109.06
77.90

Cum!.
Cum!.
M.T.
Total lead
Total
Say Completed Item Rate in Rs Per Cum

Labour Component for One Cum.


Say Labour Component in Rs.Per Cum

Rate proposed for M.C.C. D.S.R. 2006-2007

Compo Rate

Labour Rate

Unit

2500.00

380.00

Cum

48

AMOUNT IN Rs.

102.52
43.62
17.14
163.28
2609.91
2610.00
378.50
379.00

M.C.C.D.S.R.2006-07 Rate Analysis for Bridge Works Item


Item No.35

Providing & laying in situ M 20 controlled cement concreted of trap, for R.C. C. caps over piers and abutments
including necessary scaffolding, 'formwork, ,centring, compacting by vibrating, finishing and curing
etc.,complete.
Spec. No. :BR -29 Page No. 129 MORT & H : CI.No. 1700 Page No. 419 to 435 CI.2200 Pg. 529 to 532
Quantity for one cum.
1)

DESCRIPTION
Labour
Mason 2nd class skilled
Bhisti Semi Skilled
Mazdoor unskilled (Heavy)
Mazdoor unskilled (Heavy)
Mazdoor unskilled (Light IFemale)

QUANTITY

RATE IN Rs.

UNIT

0.440
0.080
2.670
2.660
2.660

160.00
175.00
145.00
145.00
145.00

Per day
Per day
Per day
Per day
Per day

Total Labour
2)

Material
Metal 10 mm to 20 mm (crusher broken)
Fine Aggregate 6mm to 10 mm
Sand (a) Screened/Unscreened
Cement

0.667
0.220
0.445
0.360

400.00
400.00
560.00
4400.00

Cum!.
Cum!.
Cum!.
M.T.

Total Material in Rs.


3)

Machinery :
Concrete Mixer (cap.0.40/0.28 cum)
Vibrator

0.042
0.042

1344.00
788.00

Day
Day

Total Machinary in Rs.


Total of No.1 to 3 in Rs.
4)

Scaffolding

0.050

5)

Sundries (5.0%)

0.010

6)

Water charges

0.010

7)

Laboratory Testing

0.005

8)

Formwork etc.

0.050

9)

Overhead charges (10%)

0.100

10)

Total Lead
Metal
Sand
Cement

Total
Total
Total
Total
Total
Total
0.887
0.445
0.360

109.06
109.06
77.90

Cum!.
Cum!.
M.T.

Total lead
Total
Say Completed Item Rate in Rs Per Cum
11)

Labour Component for One Cum.


Say Labour Component in Rs.Per Cum

Rate proposed for M.C.C. D.S.R. 2006-2007

Camp. Rate

Labour Rate

Unit

3650.00

925.00

Cum

49

AMOUNT IN Rs.
70.40
14.00
387.15
385.70
385.70
1242.95
266.80
88.00
249.20
1584.00
2188.00
56.45
33.10
89.55
3520.50
176.02
3696.52
36.97
3733.49
37.33
3770.82
18.85
3789.67
189.48
3979.16
397.92
4377.07
96.74
48.53
28.04
173.31
4550.39
4550.00
1242.95
1243.00

M.C.C.D.S.R.2006-07 Rate Analysis for Bridge Works Item


Item No.35 (a)
Providing & laying in situ. M 25 controlled cement concreted of trap for R. C. C. caps over piers and abutments
including necessary scaffolding, formwork, centring, compacting by vibrating, finishing and curing
etc., complete.
Spec. No. :BR -29 Page No. 129. MORT&H :CI.No. 1700 Page No. 419 to 435 CI.2200 Pg. 529 to 532

Quantity for one cum.


QUANTITY

RATE IN Rs.

Labour
Mason 2nd class skilled
Mukadam
Bhisti Semi Skilled
Mazdoor unskilled (Heavy)
Mazdoor unskilled (Light IFemale)

0.440
0.080
2.670
2.660
2.660

160.00
175.00
145.00
145.00
145.00

Per day
Per day
Per day
Per day
Per day
Total Labour

70.40
14.00
387.15
385.70
385.70
1242.95

Material
Metal 10 mm to 20 mm (crusher broken)
Fine Aggregate 6mm to 10 mm
Sand (a) Screened/Unscreened
Cement

0.667
0.220
0.445
0.360

Cum!.
400.00
Cum!.
400.00
560.00
Cum!.
4400.00
M.T.
Total Material in Rs.

266.80
88.00
249.20
1584.00
2188.00

Machinery :
Concrete Mixer (cap.0.4010.28 cum)
. Vibrator

0.042
0.042

1344.00
Day
788.00
Day
Total Machfnary in Rs.
Total of No.1 to 3 in Rs.

4)

Scaffolding

0.050

5)

Sundries (5.0%)

0.010

6)

Water charges

0.010

7)

Laboratory Testing

0.005

8)

Formwork etc.

0.050

9)

Overhead charges (10%)

0.100

56.45
33.10
89.55
3520.50
176.02
3696.52
36.97
3733.49
37.33
3770.82
18.85
3789.67
189.48
3979.16
397.92
4377.07

10)

Total Lead
Metal
Sand
Cement

DESCRIPTION
1)

2)

3)

UNIT

Total
Total
Total
Total
Total
Total

11 )

Cum!.
Cum!.
M.T.
Totat tead
Total
Say Completed Item Rate in Rs Per Cum
0.887
0.445
0.360

109.06
109.06
77.90

Labour Component for One Cum.


Say Labour Component in Rs.Per Cum

Rate proposed for M.C.C. D.S.R. 2006-2007

Compo Rate

Labour Rate

Unit

4000.00

960.00

Cum

50

AMOUNT IN Rs.

96.74
48.53
28.04
'173.31
4550.39
4550.00
1242.95
1243.00

M.C.C.D.S.R.2006-07 Rate Analysis for Bridge Works Item


Item N0.35 (b)
Providing & laying in situ M 30 controlled cement concreted of trap for R. C. C. caps over piers and abutments
including necessary' scaffolding, formwork, centring, compacting by vibrating, finishing and curing
etc.,complete.
Spec. No. :BR -29 Page No. 129. MORT&H :CI.No. 1700 Page No. 419 to.435 CI.2200 Pg. 529 to 532

Quantity for one cum.


1)

DESCRIPTION
Labour
Mason 2nd class skilled
Mukadam
Bhisti Semi Skilled
Mazdoor unskilled (Heavy)
Mazdoor unskilled (Light IFemale)

QUANTITY

RATE IN Rs.

UNIT

AMOUNT IN Rs.

00440
0.080
2.670
2.660
2.660

160.00
Per day
175.00
Per day
145.00
Per day
145.00
Per day
145.00
Per day
Total Labour in Rs.

70040
14.00
387.15
385.70
385.70
1242.95

Material
Metal 10 mm to 20 mm (crusher broken)
Fine Aggregate 6mm to 10 mm
Sand (a) ScreenedlUnscreened
Cement

0.667
0.220
00445
00460

400.00
Cum!.
400.00
Cum!.
560.00
Cum!.
4400.00
M.T.
Total Material in Rs.

266.80
88.00
249.20
2024.00
2628.00

Machinery :
Concrete Mixer (cap.OAOI0.28 cum)
Vibrator

0.042
0.042

4)

Scaffolding

0.050

5)

Sundries (5.0%)

0.010

6)

Water charges

0.010

7)

Laboratory Testing

0.005

8)

Formwork etc.

0.050

9)

Overhead charges (10%)

0.100

10)

Total Lead
Metal
Sand
Cement

2)

)
3)

1344.00
Day
788.00
Day
.Total Machinary in Rs.
Total of No.1 to 3 in Rs.

Total
Total
Total
Total
Total
Total

11)

Cum!.
Cum!.
M.T.
Total lead
Total
Say Completed Ifem Rate in Rs Per Cum
0.887
0.445
0.460

109.06
109.06
77.90

Labour Component for One Cum.


Say Labour Component in Rs.Per Cum

Rate proposed for M.C.C. D.S.R. 2006-2007

Camp. Rate

Labour Rate

Unit

4765.00

800.00

Cum

51

56.45
33.10
89,55
3960.50
198.02
4158.52
41.59
4200.11
42.00
4242.11
21.21
4263.32
213.17
4476.48
447.65
4924.13
96.74
48.53
35.83
181.10
5105.23
5105.00
1242.95
1243.00

M.C.C.D.S.R.2006-07 Rate Analysis for Bridge Works Item


Item No.36 (a)
Providing & laying in situ M 25 controlled cement concrete of trap for the R.C.C. concrete block below the
bearing including formwork, centring, compaction by vibrating, finishing and curing complete.
Spec. No. :BR -30' Page No. 130 MORT&H: CI.No.1700 Page No. 419 to 435 CI.2200 Pg. 529 to 532

DESCRIPTION
1)

QUANTITY

RATE IN Rs.

Quantity for one cum.


UNIT
AMOUNT IN Rs.

Labour
Mason 2nd class skilled
Mukadam
Bhisti Semi Skilled
Mazdoor unskilled (Heavy)
Mazdoor unskilled (Light IFemale)

0.440
0.080
2.670
2.660
2.660

160.00
Per day
175.00
Per day
145.00
Per day
145.00
Per day
145.00
Per day
Total Labour in Rs.

70.40
14.00
387.15
385.70
385.70
1242.95

Material
Metal 10 mm to 20 mm (crusher broken)
Fine Aggregate 6mm to 10 mm
Sand (a) ScreenedlUnscreened
Cement

0.667
0.220
0.445
0.360

400.00
Cum!.
Cum!.
400.00
560.00
Cum!.
4400.00
M.T.
Total Material in Rs.

266.80
88.00
249.20
1584.00
2188.00

Machinery :
Concrete Mixe( (cap.0.4010.28 cum)
Vibrator

0.042
0.042

1344.00
Day
788.00
Day
Total Machinary in Rs.
Total of No.1 to 3 in Rs.

4)

Scaffolding

0.050

5)

Sundries (5.0%)

0.010

6)

Water charges

0.010

7)

Laboratory Testing

0.005

8)

Formwork etc.

0.050

56.45
33.10
89.55
3520.50
176.02
3696.52
36.97
3733.49
37.33
3770.82
18.85
3789.67
189.48
3979.16
397.92
4377.07

2)

)
3)

Total
Total
Total
Total
Total

9)

Overhead charges (10%)

10)

Total Lead
Metal
Sand
Cement

0.100

Total

11)

0.887
0.445
0.360

109.06
109.06
77.90

Cum!.
Cum!.
M.T.
Total lead
Total
Say Completed Item Rate in Rs Per Cum

Labour Component for One Cum


Say Labour Component in Rs.Per Cum

Rate proposed for M.C.C. D.S.R. 2006-2007

Compo Rate

Labour Rate

Unit

4200.00

920.00

Cum

52

96.74
48.53
28.04
173.31
4550.39
4550.00
1242.95
1243.00

it \\

M.C.C.D.S.R.2006-07 Rate Analysis for Bridge Works Item


Item No.36 (b)
Providing & laying in situ M-30 controlled cement concrete of trap metal for R.C.C. concrete block below the
bearing including form work scaffolding compacting by vibrating finishing and curing etc. complete.
Spec. No. :BR -30 Page No. 130 MORT&H . CI.No.1700 Page No. 419 to 435 CJ.2200 Pg. 529 to 532

Quantity for one cum.


DESCRIPTION
1)

2)

Labour
Mason 2nd class skilled
Mukadam
Bhisti Semi Skilled
Mazdoor unskilled (Heavy)
Mazdoor unskilled (Light /Female)

QUANTITY

00440
0.080
2.670
2.660
2.660

RATE IN Rs.

UNIT

AMOUNT IN Rs.

70040

160.00
Per day
175.00
Per day
145.00
Per day
145.00
Per day
145.00
Per day
Total Labour in Rs.

14.00
387.15
385.70
385.70
1242.95

Material
Metal 10 mm to 20 mm (crusher broken)
Fine Aggregate 6mm to 10 mm
Sand (a) Screened/Unscreened
Cement

00450
00440
00445
00460

Cum!.
400.00
Cum!.
400.00
560.00
Cum!.
4400.00
M.T.
Total Material in Rs.

180.00
176.00
249.20
2024.00
2629.20

Machinery :
Concrete Mixer (cap.OAO/0.28 cum)
Vibrator

0.042
0.042

1344.00
Day
788.00
Day
Total Machinary in Rs.
Total of No.1 to 3 in Rs.

4)

Scaffolding

0.050

5)

Sundries (5.0%)

0.010

6)

Water charges

0.010

7)

Laboratory Testing

0.005

8)

Formwork etc.

0.050

9)

Overhead charges (10%)

0.100

56.45
33.10
89.55
3961.70
198.08
4159.78
41.60
4201.38
42.01
4243.39
21.22
4264.61
213.23
4477.84
447.78
4925.62

10)

Total Lead
Metal
Sand
Cement

3)

Total
Total
Total
Total
Total
Total

11)

Cuml.
Cuml.
00445
M.T.
00460
Tota/lead
Total
Say Completed Item Rate in Rs Per Cum
0.887

109.06
109.06
77.90

Labour Component for One Cum.


Say Labour Component in Rs Per Cum

Rate proposed for M.C.C. D.S.R. 2006-2007

Compo Rate

Labour Rate

Unit

4400.00

1025.00

Cum

53

96.74
48.53
35.83
181.10
5106.73
5107.00
1242.95
124300

M.C.C.D.S.R.2006-07 Rate Analysis for Bridge Works Item


Item No.37
Providing & laying in situ M-20 controlled cement concrete of trap metal for R.C.C. work including ramming
vibrating, finishing centering, formwork and curing etc., complete in solid slab (excluding reinforcement)
Spec. No. :BR -38 Page No. 135 MORT&H :CI.No. 2300 Page No. 535 to 539
Quantity for one cum.
DESCRIPTION
1)

QUANTITY

RATE IN Rs.

UNIT

AMOUNT IN Rs.

Labour
Mason 2nd class skilled
Mukadam
Bhisti Semi Skilled
Mazdoor unskilled (Heavy)
Mazdoor unskilled (Light IFemale)

0.440
0.080
2.670
2.660
2.660

160.00
Per day
Per day
175.00
145.00
Per day
145.00
Per day
145.00
Per day
Total Labour in Rs.

70.40
14.00
387.15
'385.70
385.70
1242.95

Material
Metal 10 mm to 20 mm (crusher broken)
Fine Aggregate 6mm to 10 mm
Sand (a) ScreenediUnscreened
Cement

0.670
0.220
0.445
0.360

Cum!.
400.00
Cum!.
400.00
560.00
Cum!.
4400.00
M.T.
Total Material in Rs.

268.00
88.00
249.20
1584.00
2189.20

Machinery :
Concrete Mixer (cap.0.4010.28 cum)
Vibrator

0.042
0.042

1344.00
Day
788.00
Day
Total Machinary in Rs.
Total of No.1 to 3 in Rs.

4)

Scaffoldin9

0.100

5)

Sundries (5.0%)

0.010

56.45
33.10
89.55
3521.70
352.17
3873.87
38.74
3912.60
39.13
3951.73
19.76
3971.49
198.57
4170.06
417.01
4587.07

2)

3)

Total
Total
6)

Water charges

0.010

7)

Laboratory Testing

0.005

8)

Formwork etc.

0.050

Total
Total
Total
9)

Overhead charges (10%)

10)

Total Lead
Metal
Sand
Cement

0.100

Total

11)

0.870
0.445
0.360

109.06
109.06
77.90

Cum!.
Cum!.
M.T.
Totallead
Total
Say Completed Item Rate in Rs Per Cum

Labour Component for One Cum.


Say Labour Component in Rs Per Cum

Rate proposed for M.C.C. D.S.R. 2006-2007

Camp. Rate

Labour Rate

Unit

4000.00

475.00

Cum

54

94.88
48.53
28.04
171.46
4758.53
4759.00
1242.95
124300

M.C.C.D.S.R.2006-07 Rate Analysis for Bridge Works Item


Item No.37 (a)
Providing & laying in situ M-25 controlled cement concrete of trap metal for R.C.C. work including ramming
vibrating, finishing centering, formwork and curing etc., complete in solid slab (excluding reinforcement)
Spec. No. :BR -38 Page No. 135 MORT&H :CI.No. 2300 Page No. 535 to 539
Quantity for one cum.
DESCRIPTION

QUANTITY

RATE IN Rs.

UNIT

AMOUNT IN Rs.

Labour
Mason 2nd class skilled
Mukadam
Bhisti Semi Skilled
Mazdoor unskilled (Heavy)
Mazdoor unskilled (Light/Female)

0.440
0.080
2.670
2.660
2.660

160.00
Per day
175.00
Per day
145.00
Per day
145.00
Per day
145.00
Per day
Tota/ Labour in Rs.

70.40
14.00
387.15
385.70
385.70
1242.95

Material
Metal 10 mm to 20 mm (crusher broken)
Fine Aggregate 6mm to 10 mm
Sand (a) Screened/Unscreened
Cement

0.670
0.220
0.445
0.410

Cum!.
400.00
Cum!.
400.00
560.00
Cum!.
4400.00
M.T.
Total Material in Rs.

268.00
88.00
249.20
1804.00
2409.20

Machinery :
Concrete Mixer (cap.0.40/0.28 cum)
Vibrator

0.042
0.042

1344.00
Day
788.00
Day
Total Machinary in Rs.
Total of No.1 to 3 in Rs.

4)

Scaffolding

0.100

5)

Sundries (5.0%)

0.010

56.45
33.10
89.55
3741.70
374.17
4115.87
41.16
4157.02
41.57
4198.59
20.99
4219.59
210.98
4430.57
443.06
4873.62

1)

2)

~)
3)

Total
Total
6)

Water charges

0.010

7)

Laboratory Testing

8)

Formwork etc.

0.050

9)

Overhead charges (10%)

0.100

10)

Total Lead
Metal
Sand
Cement

Total
0.005

Total
Total
Total

11)

0.870
0.445
0.410

109.06
109.06
77.90

Cum!.
Cum!.
M.T.
Total lead
Total
Say Completed Item Rate in Rs Per Cum

Labour Component for One Cum.


Say Labour Component in Rs.Per Cum

Compo Rate

55

Labour Rate

Unit

94.88
48.53
31.94
175.35
5048.98
5049.00
1242.95
1243.00

Rate proposed for M.C.C. D.S.R. 2006-2007

4100.00
515.00
Cum
M.C.C.D.S.R.2006-07 Rate Analysis for Bridge Works Item

Item No.37 (b)


Providing & laying in situ M-30 controlled cement concrete of trap metal for R.C.C. work including ramming
vibrating, finishing centering, fonnwork and curing etc., complete in solid slab (excluding reinforcement)
Spec. No. :BR -38 Page No. 135 MORT&H :CI.No. 2300 Page No. 535 to 539
Quantity for one cum.
DESCRIPTION
1)

QUANTITY

RATE IN Rs.

UNIT

AMOUNT IN Rs.

Labour
Mason 2nd class skilled
Mukadam
Bhisti Semi Skilled
Mazdoor unskilled (Heavy)
Mazdoor unskilled (Light /Female)

0.440
0.080
2.670
2.660
2.660

160.00
Per day
175.00
Per day
145.00
Per day
145.00
Per day
145.00
Per day
Total Labour in Rs.

70.40
14.00
387.15
385.70
385.70
1242.95

Material
Metal 10 0101 to 20 0101 (crusher broken)
Fine Aggregate 60101 to 10 0101
Sand (a) Screened/Unscreened
Cement

0.670
0.220
0.445
0.460

400.00
Cum\.
Cum\.
400.00
560.00
Cum\.
4400.00
M.T.
Total Material in Rs.

268.00
88.00
249.20
2024.00
2629.20

Machinery :
Concrete Mixer (cap.0.40/0.28 cum)
Vibrator

0.042
0.042

1344.00
Day
788.00
Day
Total Machinary in Rs.
Total of No.1 to 3 in Rs.

4)

Scaffolding

0.100

5)

Sundries (5.0~)

0.010

6)

Water charges

0.010

7)

Laboratory Testing

0.005

8)

Formwork etc.

0.050

56.45
33.10
89.55
3961.70
396.17
4357.87
43.58
4401.44
44.01
4445.46
22.23
4467.69
223.38
4691.07
469.11
5160.18

2)

3)

Total
Total
Total
Total
Total
9)

Overhead charges (10%)

10)

Total Lead
Metal
Sand
Cement

0.100

Total

11)

Cum!.
Cum!.
M.T.
Total lead
Total
Say Completed Item Rate in Rs Per Cum
0.870
0.445
0.460

109.06
109.06
77.90

Labour Component for One Cum.


Say Labour Component in Rs Per Cum

Rate proposed for M.C.C. D.S.R. 2006-2007

Camp. Rate

Labour Rate

Unit

4800.00

570.00

Cum

56

94.88
48.53
35.83
179.25
5339.43
5339.00
1242.95
124300

M.C.C.D.S.R.2006-07 Rate Analysis for Bridge Works 'tern


Item No.37 (e)
Providing & laying in situ M-35 controlled cement concrete of trap metal for R.C.C. work including ramming
vibrating, finishing centering, formwork and curing etc., complete in solid slab (excluding reinforcement)
Spec. No. :BR -38 Page No. 135 MORT&H :CI.No. 2300 Page No. 535 to 539
Quantity for one cum.
DESCRIPTION

QUANTITY

RATE IN Rs.

UNIT

AMOUNT IN Rs.

Labour
Mason 2nd class skilled
Mukadam
Bhisli Semi Skilled
Mazdoor unskilled (Heavy)
Mazdoor unskilled (Light IFemale)

0.440
0.080
2.670
2.660
2.660

160.00
Per day
175.00
Per day
Per day
145.00
145.00
Per day
145.00
Per day
Total Labour in Rs.

70.40
14.00
387.15
385.70
385.70
1242.95

Material
Metal 10 mm to 20 mm (crusher broken).
Fine Aggregate 6mm to 10 mm
Sand (a) ScreenedlUnscreened
Cement

0.670
0.220
0.445
0.510

Cum!.
400.00
Cum!.
400.00
560.00
Cum!.
4400.00
M.T.
Total Material in Rs.

268.00
88.00
'249.20
2244.00
2849.20

Machinery :
Concrete Mixer (cap.0.4010.28 cum)
Vibrator

0.042
0.042

1344.00
Day
Day
788.00
Total Machinary in Rs.
Total of No.1 to 3 in Rs.

4)

Scaffolding

0.100

5)

Sundries (5.0%)

0.010

6)

Water charges

0.010

7)

Laboratory Testing

0.005

8)

Formwork etc.

0.050

9)

Overhead charges (10%)

0.100

56.45
33.10
89.55
4181;70
418.17
4599.87
46.00
4645.86
46.46
4692.32
23.46
4715.78
235.79
4951.57
495.16
5446.73

1)

2)

)
3)

Total
Total
Total
Total
Total
Total
10)

11)

Total Lead
Metal
Sand
Cement

Cum!.
Cum!.
M.T.
Total lead
Total
Say Completed Item Rate in Rs Per Cum
0.870
0.445
0.510

109.06
109.06
77.90

Labour Component for One Cum.


Say Labour Component in Rs.Per Cum

Rate proposed for M.C.C. D.S.R. 2006-2007

Compo Rate

Labour Rate

Unit

4850.00

570.00

Cum

57

94.88
48.53
39.73
183.14
5629.87
5630.00
1242.95
1243.00

M.C.C.D.S.R.2006-07 Rate Analysis for Bridge Works Item


Item No.38
Providing & laying in situ M-20 controlled cement concrete of trap metal for R.C.C. work including ramming
vibrating, finishing centering, formwork and curing etc., complete in desk slab, main cross girders diaphrams,
archesetc.
Spec. No. :BR -38 Page No. 135 MORT&H :CI.No. 2300 Page No. 535 to 539
Quantity for one cum.
DESCRIPTION
QUANTITY
RATE IN Rs.
UNIT
AMOUNT IN Rs.
1)

Labour
Mason 2nd class skilled
Mukadam
Bhisli Semi Skilled
.Mazdoor unskilled (Heavy)
Mazdoor unskilled (Light IFemale)

0.440
0.080
2.670
2.660
2.660

160.00
Per day
175.00
Per day
145.00
Per day
145.00
Per day
145.00
Per day
Totat Labour in Rs.

70.40
14.00
387.15
385.70
385.70
1242.95

Material
Metal 10 mm to 20 mm (crusher broken)
Fine Aggregate 6mm to 10 mm
Sand (a) ScreenedlUnscreened
Cement

0.670
0.220
0.445
0.360

Cum!.
400.00
400.00
Cum!.
560.00
Cum!.
4400.00
M.T.
Total Material in Rs.

268.00
88.00
249.20
1584.00
2189.20

Machinery :
Concrete Mixer (cap.0.4010.28 cum)
Vibrator

0.042
0.042

1344.00
Day
Day
788.00
Total Machinary in Rs.
Total of No.1 to 3 in Rs.

4)

Scaffolding

0.150

5)

Sundries (5.0%)

0.010

6)

Water charges

0.010

7)

Laboratory Testing

0.005

8)

Formwork etc.

0.170

9)

Overhead charges (10%)

0.100

56.45
33.10
89.55
3521.70
528.25
4049.95
40.50
4090.45
40.90
4131.35
20.66
4152.01
705.84
4857.85
"485.79
5343.64

10)

Total Lead
Metal
Sand
Cement

2)

3)

Total
Total
Total
Total
Total

Total

11)

0.887
0.445
0.360

109.06
109.06
77.90

Cum!.
Cum!.
M.T.
Tota/lead
Tota/
Say Completed Item Rate in Rs Per Cum

Labour Component for One Cum.


Say Labour Component in Rs.Per Cum

Rate proposed for M.C.C. D.S.R. 2006-2007

Compo Rate

Labour Rate

Unit

4700.00

545.00

Cum

58

96.74
48.53
28.04
173.31
5516.95
5517.00
1242.95
124300

M.C.C.D.S.R.2006-07 Rate Analysis for Bridge Works Item


Item No.38(a)
Providing & laying in situ M-25 control/ed cement concrete of trap metal for R.C.C. work including ramming
vibrating, finishing centering, formwork and curing etc., complete in desk slab, main cross girders diaphrams,
arches etc.
Spec. No. :BR -38 Page No. 135 MORT&H :CI.No. 2300 Page No. 535 to 539
Quantity for one cum.
DESCRIPTION
QUANTITY
RATE IN Rs.
UNIT
AMOUNT IN Rs.
1)

Labour
Mason 2nd class skilled
Mukadam
Bhisti Semi Skilled
Mazdoor unskilled (Heavy)
Mazdoor unskilled (Light IFemale)

0.440
0.080
2.670
2.660
2.660

160.00
Per day
175.00
Per day
145.00
Per day
145.00
Per day
145.00
Per day
Total Labour in Rs.

70.40
14.00
387.15
385.70
385.70
1242.95

Material
Metal 10 mm to 20 mm (crusher broken)
Fine Aggregate 6mm to 10 mm
Sand (a) Screened/Unscreened
Cement

0.670
0.220
0.445
0.410

Cum!.
400.00
Cum!.
400.00
560.00
Cum!.
4400.00
M.T.
Total Material in Rs.

268.00
88.00
249.20
1804.00
2409.20

Machinery :
Concrete Mixer (cap.0.4010.28 cum)
Vibrator

0.042
0.042

1344.00
Day
788.00
Day
Total Machinary in Rs.
Total of No.1 to 3 in Rs.

4)

Scaffolding

0.150

5)

Sundries (5.0%)

0.010

6)

Water charges

0.010

56.45
33.10
89.55
3741.70
561.25
4302.95
43.03
4345.98
43.46
4389.44
21.95
4411.39
749.94
5161.32
516.13
5677.45

2)

3)

Total
Total
Total
7)

Laboratory Testing

0.005

8)

Formwork etc.

0.170

9)

Overhead charges (10%)

0.100

10)

Total Lead
Metal
Sand
Cement

Total
Total
Total

11)

Cum!.
Cum!.
M.T.
Total lead
Total
Say Completed Item Rate in Rs Per Cum
0.887
0.445
0.410

109.06
109.06
71.90

Labour Component for One Cum.


Say Labour Component in Rs.Per Cum

Rate proposed for M.C.C. D.S.R. 2006-2007

Camp. Rate

Labour Rate

Unit

4750.00

570.00

Cum

59

96.74
48.53
31.94
177.21
5854.66
5855.00
1242.95
1243.00

M.C.C.D.S.R.2006-07 Rate Analysis for Bridge Works Item


Item No.38(b)
Providing & laying in situ M-30 controlled cement concrete of trap metal for R.C.C. work including ramming
vibrating, finishing centering, formwork and curing etc., complete if); desk slab, main cross girders diaphrams,
arches etc.
Spec. No. :BR -38 Page No. 135 MORT&H :CI.No. 2300 Page No. 535 to 539
Quantity for one cum.
DESCRIPTION
QUANTITY
RATE IN Rs.
UNIT
AMOUNT IN Rs.
1)

Labour
Mason 2nd class skilled
Mukadam
Bhisti Semi Skilled
Mazdoor unskilled (Heavy)
Mazdoor unskilled (Light IFemale)

0.440
0.080
2.670
2.660
2.660

160.00
Per day
175.00
Per day
145.00
Per day
145.00
Per day
145.00
Per day
Total Labour in Rs.

70.40
14.00
387.15
385.70
385.70
1242.95

Material
Metal 10 mm to 20 mm (crusher broken)
.Fine Aggregate 6mm to 10 mm
Sand (a) Screened/Unscreened
Cement

0.670
0.220
0.445
0.460

400.00
Cum!.
Cum!.
400.00
560.00
Cum!.
4400.00
M.T.
Total Material in Rs.

268.00
88.00
249.20
2024.00
2629.20

Machinery :
Concrete Mixer (cap.0.4010.28 cum)
Vibrator

0.042
0.042

1344.00
Day
788.00
Day
Total Machinary in Rs.
Total of No.1 to 3 in Rs.

4)

Scaffolding

0.150

5)

Sundries (5.0%)

0.010

6)

Water charges

0.010

7)

Laboratory Testing

0.005

8)

Formwork etc.

0.170

9)

Overhead charges (10%)

0.100

56.45
33.10
89.55
3961.70
594.25
4555.95
45.56
4601.51
46.02
4647.53
23.24
4670.76
794.03
5464.79
546.48
6011.27

10)

Totai Lead
Metal
Sand
Cement

2)

3)

Total
Total
Total
Total
Total
Total

11)

0.887
0.445
0.460

109.06
109.06
77.90

Cum!.
Cum!.
M.T.
Totallead
Total
Say Completed Item Rate in Rs Per Cum

Labour Component for One Cum.


Say Labour Component in Rs Per Cum

Rate proposed for M.C.C. D.S.R. 2006-2007

Compo Rate

Labour Rate

Unit

4850.00

640.00

Cum

60

96.74
48.53
35.83
181.10
6192.37
6192.00
1242.95
124300

;,1\'1.

M.C.C.D.S.R.2006-07 Rate Analysis for Sridge Works Item


Item No.38(c)
Providing & laying in situ M-35 controlled cement concrete of trap metal for R.C.C. work including ramming
vibrating, finishing centering, fonnwork and curing etc., complete in desk slab, main cross girders diaphrams,
arches etc.
Spec. No. :SR -38 Page No. 135 MORT&H :CI.No. 2300 Page No. 535 to 539
Quantity for one cum.
DESCRIPTION

QUANTITY

RATE IN Rs.

UNIT

AMOUNT IN Rs.

Labour
Mason 2nd class skilled
Mukadam
Shisti Semi Skilled
Mazdoor unskilled (Heavy)
Mazdoor unskilled (Light /Female)

0.440
0.080
2.670
2.660
2.660

160.00
Per day
175.00
Per day
145.00
Per day
145.00
Per day
145.00
Per day
Total Labour in Rs.

70.40
14.00
387.15
385.70
385.70
1242.95

Material
Metal 10 mm to 20 mm (crusher broken)
Fine Aggregate 6mm to 10 mm
Sand (a) Screened/Unscreened
Cement

0.670
0.220
0.445
0.480

400.00
Cum\.
400.00
Cum\.
560.00
Cum\.
4400.00
M.T.
Total Material in Rs.

268.00
88.00
249.20
2112.00
2717.20

Machinery :
Concrete Mixer (cap.0.40/0.28 cum)
Vibrator

0.042
0.042

1344.00
Day
788.00
Day
Total Machinary in Rs.
Total of No.1 to 3 in Rs.

4)

Scaffolding

0.150

56.45
33.10
89.55
4049.70
607.45
4657.15

5)

Sundries (5.0%)

0.010

6)

Water charges

7)

Laboratory Testing

1)

2)

3)

Total

Total
0.005

Total
8)

Formwork etc.

0.170

9)

Overhead charges (10%)

0.100

10)

Total Lead
Metal
Sand
Cement

Total
Total

11)

0.887
0.445
0.480

109.06
109.06
77.90

Cum\.
Cum!.
M.T.
Total lead
Total
Say Completed Item Rate in Rs Per Cum

Labour Component for One Cum.


Say Labour Component in Rs Per Cum

Rate proposed for M.C.C. D.S.R. 2006-2007

Camp. Rate

Labour Rate

Unit

5200.00

670.00

Cum

61

23.75
4774.51
811.67
5586.18
558.62
6144.80
96.74
48.53
37.39
182.66
6327.46
6327.00
1242.95
124300

M.C.C.D.S.R.2006-07 Rate Analysis for Bridge Works Item


Item No.38(d) i
Providing & laying in situ M-20 controlled cement concrete of trap metal for R.C.C. work including ramming
vibrating, finishing centering, formwork and curing etc., complete in desk slab, main cross girders diaphrams,
arches etc. (For work in creek area
MORT&H :CI.No. 2300 Page No. 535 to 539
Quantity for one cum.
DESCRIPTION
1)

2)

3)

4)

Labour
Mason 2nd class skilled
Mukadam
Bhisti Semi Skilled
.Mazdoor unskilled (Heavy)
Mazdoor unskilled (Light IFemale)

QUANTITY

RATE IN Rs.

UNIT

0.440
0.080
2.670
2.660
2.660

160.00
Per day
175.00
Per day
145.00
Per day
Per day
145.00
Per day
145.00
Total Labour fn Rs.

70.40
14.00
387.15
385.70
385.70
1242.95

Material
Metal 10 mm to 20 mm (crusher broken)
Fine Aggregate 6mm to 10 mm
Sand (a) ScreenedlUnscreened
Cement

0.670
0.220
0.445
0.360

400.00
Cum!.
Cum!.
400.00
560.00
Cum!.
4400.00
M.T.
Total Material in Rs.

268.00
88.00
249.20
1584.00
2189.20

Machinery :
Concrete Mixer (cap.0.4010.28 cum)
Vibrator

0.042
0.042

1344.00
Day
788.00
Day
Total Machinary in Rs.
Total of No.1 to 3 in Rs.

Scaffolding

0.200

56.45
33.10
89.55
3521.70
704.34
4226.04
42.26
4268.30
42.68
4310.98
21.55
4332.53
649.88
4982.41
498.24
5480.65

Total
5)

Sundries (5.0%)

0.010

6)

Water charges

0.010

7)

Laboratory Testing

0.005

8)

Formwork etc.

0.150

9)

Overhead charges (10%)

0.100

10)

Total Lead
Metal
Sand
Cement

Total
Total
Total
Total
Total

11)

AMOUNT IN Rs.

0.887
0.445
0.360

109.06
109.06
77.90

Cum!.
Cum!.
M.T.
Totallead
Total
Say Completed Item Rate in Rs Per Cum

Labour Component for One Cum.


Say Labour Component in Rs.Per Cum

Rate proposed for M.C.C. D.S.R. 2006-2007

Compo Rate

Labour Rate

Unit

4600.00

600.00

Cum

62

96.74
48.53
28.04
173.31
5653.97
5654.00
1242.95
124300

M.C.C.D.S.R.2006-07 Rate Analysis for Bridge Works Item


Item No.38(d) ii
Providing & laying in situ M-25 controlled cement concrete of trap metal for R.C.C. work including ramming
vibrating, finishing centering, formwork and curing etc., complete in desk slab, main cross girders diaphrams,
arches etc. (For work in creek area
MORT&H :CI.No. 2300 Page No. 535 to 539
Quantity for one cum.
DESCRIPTION
1)

2)

3)

4)

QUANTITY

RATE IN Rs.

UNIT

Labour
Mason 2nd class skilled
Mukadam
Shisti Semi Skilled
Mazdoor unskilled (Heavy)
Mazdoor unskilled (Light IFemale)

0.440
0.080
2.670
2.660
2.660

160.00
Per day
175.00
Per day
145.00
Per day
145.00
Per day
145.00
Per day
Total Labour in Rs.

. 70.40
14.00
387.15
385.70
385.70
1242.95

Material
Metal 10 mm to 20 mm (crusher broken)
Fine Aggregate 6mm to 10 mm
Sand (a) ScreenedlUnscreened
Cement

0.670
0.220
0.445
0.410

Cum!.
-400.00
400.00
Cum!.
560.00
Cum!.
4400.00
M.T.
Total Material in Rs.

268.00
88.00
249.20
1804.00
2409.20

Machinery :
Concrete Mixe, (cap.0.40/0.28 cum)
Vibrator

0.042
0.042

1344.00
Day
788.00
Day
Total Machinary in Rs.
T6tal of No.1 to 3 in Rs.

Scaffolding

0.200

56.45
33.10
89;55
3741.70
748.34
4490.04
44.90
4534.94
45.35
4580.28
22.90
4603.19
690.48
5293.66
529.37
5823.03

Total
5)

Sundries (5.0%)

0.010

6)

Water charges

0.010

7)

Laboratory Testing

0.005

8)

Formwork etc.

0.150

9)

Overhead charges (10%)

0.100

10)

Total Lead
Metal
Sand
Cement

Total
Total
Total
Total
Total

11)

AMOUNT IN Rs.

0.887
0.445
0.410

109.06
109.06
77.90

Cum!.
Cum!.
M.T.
Totallead
Total
Say Completed Item Rate in Rs Per Cum

Labour Component for One Cum.


Say Labour Component in Rs.Per Cum

Rate proposed for M.C.C. D.S.R. 2006-2007

Camp. Rate

Labour Rate

Unit

4700.00

625.00

Cum

63

96.74
48.53
31.94
177.21
6000.24
6000.00
1242.95
124300

M.C.C.D.S.R.2006-07 Rate Analysis for Bridge Works Item


Item No.38{d) iii
Providing & laying in situ M-30 controlled cement concrete of trap metal for R. C. C. work including ramming
vibrating, finishing centering, formwork and curing etc., complete in desk slab, main cross girders diaphrams,
arches etc. (For work in creek area
MORT&H :CI.No. 2300 Page No. 535 to 539
Quantity for one cum.
DESCRIPTION
1)

QUANTITY

RATE IN Rs.

UNIT

AMOUNT IN Rs.

Labour
Mason 2nd class skilled
Mukadam
Bhisti Semi Skilled
Mazdoor unskilled (Heavy)
Mazdoor unskilled (Light IFemale)

00440
0.080
2.670
2.660
2.660

160.00
Per day
175.00
Per day
145.00
Per day
145.00
Per day
145.00
Per day
Total Labour in Rs.

70.40
14.00
387.15
385.70
385.70
1242.95

Material
Metal 10 mm to 20 mm (crusher broken)
Fine Aggregate 6mm to 10 mm
Sand (a) Screened/Unscreened
Cement

0.670
0.220
0.445
0.460

Cum!.
400.00
Cum!.
400.00
560.00
Cum!.
M.T.
4400.00
Total Material in Rs.

268.00
88.00
249.20
2024.00
2629.20

Machinery :
Concrete Mixer (cap.0040I0.28 cum)
Vibrator

0.042
0.042

1344.00
Day
Day
788.00
Total Machinary in Rs.
Total of No.1 to 3 in Rs.

4)

Scaffolding

0.200

5)

Sundries (5.0%)

0.010

6)

Water charges

0.010

7)

Laboratory Testing

0.005

8)

Formwork etc.

0.150

9)

Overhead charges (10%)

0.100

56.45
33.10
89.55
3961.70
792.34
4754.04
47.54
4801.58
48.02
4849.59
24.25
4873.84
731.08
5604.92
560.49
6165.41

10)

Total Lead
Metal
Sand
Cement

2)

)
3)

Total
Total
Total
Total
Total
Total

11)

0.887
0.445
0.460

109.06
109.06
77.90

Cum!.
Cum!.
M.T.
Total lead
Total
Say Completed Item Rate in Rs Per Cum

Labour Component for One Cum


Say Labour Component in Rs.Per Cum

Rate proposed for M.C.C. D.S.R. 2006-2007

Compo Rate

Labour Rate

Unit

4950.00

660.00

Cum

64

96.74
48.53
35.83
181.10
6346.51
6347.00
1242.95
1243.00

M.C.C.D.S.R.2006-07 Rate Analysis for Bridge Works Item


Item No.38(d) iv
Providing & laying in situ M-35 controlled cement concrete of trap metal for R. C. C. work including ramming
vibrating, finishing centering, formwork and curing etc., complete in desk slab, main cross girders diaphrams,
arches etc. (For work in creek area
MORT&H :CI.No. 2300 Page No. 535 to 539
Quantity for one cum.
DESCRIPTION
1)

QUANTITY

RATE IN Rs.

UNIT

AMOUNT IN Rs.

Labour
Mason 2nd class skilled
Mukadam
Bhistl Semi Skilled
Mazdoor unskilled (Heavy)
Mazdoor unskilled (Light iFemale)

0.440
0.080
2.670
2.660
2.660

160.00
Per day
175.00
Per day
145.00
Per day
145.00
Per day
145.00
Per day
Total Labour in Rs.

70.40
14.00
387.15
385.70
'385.70
1242.95

Material
Metal 10 mm to 20 mm (crusher broken)
Fine Aggregate 6mm to 10 mm
Sand (a) ScreenedlUnscreened
Cement

0.670
0.220
0.445
0.510

400.00
Cum!.
Cum!.
400.00
560.00
Cum!.
4400.00
M.T.
Total Material in Rs.

268.00
88.00
249.20
2244.00
2849.20

Machinery :
Concrete Mixer (cap.0.4010.28 cum)
Vibrator

0.042
0.042

1344.00
Day
788.00
Day
Total Machfnary in Rs.
Total of No.1 to 3 in Rs.

4)

Scaffolding

0.200

5)

Sundries (5.0%)

0.010

6)

Water charges

0.010

7)

Laboratory Testing

0.005

8)

Formwork etc.

0.150

56.45
33.10
89.55
4181.70
836.34
5018.04
50.18
5068.22
. 50.68
5118.90
25.59
5144.49
771.67
5916.17
591.62
6507.78

2)

3)

Total
Total
Total
Total
Total
9)

Overhead charges (10%)

10)

Total Lead
Metal
Sand
Cement

0.100

Total

11)

0.887
0.445
0.510

109.06
109.06
77.90

Cum!.
Cum!.
M.T.
Totallead
Total
Say Completed Item Rate in Rs Per Cum

Labour Component for One Cum.


Say Labour Component in Rs Per Cum

Rate proposed for M.C.C. D.S.R. 2006-2007

Compo Rate

Labour Rate

Unit

5250.00

690.00

Cum

65

96.74
48.53
39.73
185.00
6692.78
6693.00
1242.95
124300

M.C.C.D.S.R.2006-07 Rate Analysis for Bridge Works Item


Item No.39
Providing & applying anticorrosive treatment to Mild Steel bars reinforcement cut and bent to the required
length, shape and size including transportation of the steel bars for treatment and bringing back the same for
fixing in position including all accessories and material required for giving the treatment using chemical
etc.completed.
A.C.P.C.C.
As per C.E.C.R.1. Method
As per D.S.R. 2005-2006
Labour

Rate proposed for M.C.C. D.S.R. 2006-2007


)

Rs.
Rs.

Compo Rate

Labour Rate

Unit

5200.00

640.00

Cum

3000.00
615.00

Item No.40
Providing and applying anticorrosive treatment to HYSD reinforcement cut and bent to the required length,
shapeand size including transportation of thesteel barsfor treatment and bringing back the same for fiding in
position including all accessories and
A.C.P.C.C.
As per C.E.C.R.1. Method
As per D.S.R. 2005-2006
Labour

Rate proposed for M.C.C. D.S.R. 2006-2007

Rs.
Rs.

Compo Rate

Labour Rate

Unit

5500.00

640.00

Cum

3300.00
615.00

Item No.40 (a)


Providing fusion bonded epoxy to reinfoming bars as per IS: 3620-1933 specification for a thickness of 175+ /50 microns including testing of coating at plant, extra cost for careful handling using PVC coating, binding
wires, instead of G.I. wires, toe
A.C.P.C.C.
As per C.E.C.R.1. Method
As per D.S.R. 2005-2006
Labour

Rate proposed for M.C.C. D.S.R. 2006-2007

Rs.
Rs.

Compo Rate

Labour Rate

Unit

9680.00

0.00

Cum

66

9240.00
0.00

M.C.C.D.S.R.2006-07 Rate Analysis for Bridge Works Item


Item No.41(a)
Providing fixing restrained neoprene pad bearings as per detaileddesign, drawing and specification.

Spec. No.: MORT & H CI.No. 2005 Pg.No.500


As per D.S.R. 2005-2006
Add 10 %

Rale proposed for M.C.C. D.S.R. 2006-2007

Rs.
Rs.

0.07

0.70

Total

Rs.

0.77

Compo Rate

Labour Rate

Unit

0.77

0.00

Cum

Item No.42
Providing expansion jointsofcopperas per detailed drawings.

Spec. No.: BR -43 Pg.No.138


Rs.
Rs.

1270.00
63.50

Tolal

Rs.
Rs.

1333.50
225.00
23.00
24800

Compo Rate

Labour Rale

Unit

1325.00

250.00

Cum

As per D.S.R. 2005-2006


Add5%

Labour

Rate proposed for M.C.C. D.S.R. 2006-2007

Item No.43
Providing expansion joints of copperas per detailed drawings.

Spec. No.: BR -43 Pg.No.138


Rs.
Rs.

2300.00
230.00

Total

Rs.
Rs.

2530.00
225.00

Compo Rate

Labour Rate

Unit

2530.00

225.00

PerMT

As per D.S.R. 2005-2006


Add 10 %

Labour

Rate proposed for M.C.C. D.S.R. 2006-2007

67

M.C.C.D.S.R.2006-07 Rate Analysis for Bridge Works Item


Item No.44
Providing & casting special grade in situ M 35 controlled cement concrete of specified strength for prestressed
concretework for main girder including slab cross girder etc., including centering and scaffolding or launching
including necessary plant and machinery forjob shutteting, vibrating, curing, finishing etc. complete.
Spec. No. : BR -38 Page No. 135 MORT& H CI. 2300 Page No. 535 to 539
Quantity for one cum.
1)

DESCRIPTION
Labour
Mason 2nd class skilled
Mukadam
Bhisti Semi Skilied
Mazdoor unskilled (Heavy)
Mazdoor unskilied (Light IFemale)

QUANTITY

RATE IN Rs.

UNIT

AMOUNT IN Rs.

00440
0.080
2.670
2.660
2.660

160.00
Per day
175.00
Per day
145.00
Per day
145.00
Per day
145.00
Per day
Total Labour in Rs.

70040
14.00
387.15
385.70
385.70
1242.95

Material
Metal 10 mm to 20 mm (crusher broken)
Fine Aggregate 6mm to 10 mm
Sand (a) ScreenedlUnscreened
Cement

0.670
0.220
0.445
0.510

400.00
Cum!.
400.00
Cum!.
560.00
Cum!.
4400.00
M.T.
Total Material in Rs.

268.00
. 88.00
249.20
2244.00
2849.20

Machinery :
Concrete Mixer (cap.OAOI0.28 cum)
Vibrator

0.042
0.042

1344.00
Day
788.00
Day
Total Machinary in Rs.
Total of No.1 to 3 in Rs.

4)

Scaffolding

0.200

5)

Sundries (5.0%)

0.010

6)

Water charges

0.010

7)

Laboratory Testing

0.005

8)

Formwork etc.

0.150

9)

Overhead charges (10%)

0.100

56045
33.10
89.55
4181.70
836.34
5018.04
50.18
5068.22
50.68
5118.90
25.59
5144049
771.67
5916.17
.591.62
6507.78

10)

Total Lead
Metal
Sand
Cement

2)

3)

Total
Total
Total
Total
Total
Total

11)

0.887
00445
0.510

109.06
109.06
77.90

Cuml.
Cuml.
M.T.
Total lead
Total
Say Completed Item Rate in Rs Per Cum

Labour Component for One Cum.


Say Labour Component in Rs.Per Cum

Rate proposed for M.C.C. D.S.R. 2006-2007

Compo Rate

Labour Rate

Unit

5400.00

890.00

Cum

68

96.74
48.53
39.73
185.00
6692.78
6693.00
1242.95
1243.00

M.C.C.D.S.R.200q-07 Rate Analysis for Bridge Works Item


Item No.44(a)
Providing & casting special grade in situ M 40 controlled cement concrete of specified strength for prestressed
concretework for main girder including slab cross girder etc., including centering and scaffolding or launching
including necessary plant and m
Spec. No. : BR-38 Page No. 135 MORT&H : CI.2300 Page No. 535 to 539
Quantity for one cum.

1)

DESCRIPTION
Labour
Mason 2nd class skilled
Mukadam
Bhisli Semi Skilled
Mazdoor unskilled (Heavy)
Mazdoor unskilled (Light IFemale)

RATE IN Rs.

QUANTITY

UNIT

AMOUNT IN Rs.

0.440
0.080
2.670
2.660
2.660

160.00
Per day
175.00
Per day
145.00
Per day
145.00
Per day
145.00
Per day
Total Labour in Rs.

70.40
14.00
387.15
385.70
385.70
1242.95

Material
Metal 10 mm to 20 mm (crusher broken)
Fine Aggregate 6mm to 10 mm
.Sand (a) Screened/Unscreened
Cement

0.670
0.220
0.445
0.540

400.00
Cum!.
400.00
Cum!.
560.00
Cum!.
M.T.
4400.00
Total Material in Rs.

268.00
88.00
249.20
2376.00
2981.20

Machinery :
Concrete Mixer (cap.0.4010.28 cum)
Vibrator

0.042
0.042

1344.00
Day
788.00
Day
Total Machinary inRs.
. Total of No.1 to 3 in Rs.

4)

Scaffolding

0.200

5)

Sundries (5.0%)

0.010

6)

Water charges

0.010

7)

Laboratory Testing

0.005

8)

Formwork etc.

0.200

9)

Overhead charges (10%)

0.100

56.45
33.10
89.55
4313.70
862.74
5176.44
51.76
5228.20
52.28
5280.48
26.40
5306.88
1061.38
6368.26
636.83
7005.09

10)

Total Lead
Metal
Sand
Cement

2)

:>

3)

Total
Total
Total
Total
Total
Total

11 )

0.887
0.445
0.540

109.06
109.06
77.90

Cum!.
Cum!.
M.T.
Total lead
Total
Say Completed Item Rate in Rs Per Cum

Labour Component for One Cum


Say Labour Component in Rs.Per Cum

Rate proposed for M.C.C. D.S.R. 2006-2007

Compo Rate

Labour Rate

Unit

5700.00

910.00

Cum

69

96.74
48.53
42.07
187.33
7192.42
7192.00
1242.95
1243.00

M.C.C.D.S.R.2006-07 Rate Analysis for Bridge Works Item


Item No.44(b)i
Providing & casting special grade in situ M 35 controlled cement concrete of specified strength for prestressed
concretework for main girder including slab cross girder etc., including centering and scaffolding or launching
including necessary plant and machinary for the job shttering, vibratoing, cUring, finishing etc. complete.
Spec. No. : BR-38 Page No. 135 MORT&H : CI.2300 Page No. 535 to 539
Quantity for one cum.
DESCRIPTION
1)

QUANTITY

RATE IN Rs.

UNIT

AMOUNT IN Rs.

Labour
Mason 2nd class skilled
Mukadam
Bhisli Semi Skilled
Mazdoor unskilled (Heavy)
Mazdoor unskilled (Light IFemale)

0.440
0.080
2.670
2.660
2.660

160.00
Per day
175.00
Per day
145.00
Per day
145.00
Per day
Per day
145.00
Total Labour in Rs.

70.40
14.00
387.15
385.70
385.70
1242.95

Material
Metal 10 mm to 20 mm (crusher broken)
Fine Aggregate 6mm to 10 mm
Sand (a) ScreenedlUnscreened
Cement

0.670
0.220
0.445
0.510

400.00
Cum!.
400.00
Cum!.
560.00
Cum!.
M.T.
4400.00
Total Material in Rs.

268.00
88.00
249.20
2244.00
2849.20

Machinery :
Concrete Mixer (cap.0.40/0.28 cum)
Vibrator

0.042
0.042

1344.00
Day
Day
788.00
Total Machinary in Rs.
Total of No.1 to 3 in Rs.

4)

Scaffolding

0.300

5)

Sundries (5.0%)

0.010

6)

Water charges

0.010

7)

Laboratory Testing

0.005

8)

Formwork etc.

0.200

9)

Overhead charges (10%)

0.100

. 56.45
33.10
89.55
4181.70
'1254.51
5436.20
54.36
5490.57
54.91
5545.47
27.73
5573.20
1114..64
6687.84
668.78
7356.62

10)

Total Lead
Metal
Sand
Cement

2)

)
3)

Total
Total
Total
Total
Total
Total

11 )

0.887
0.445
0.510

109.06
109.06
77.90

Cum!.
Cum!.
M.T.
Total lead
Total
Say Completed Item Rate in Rs Per Cum

Labour Component for One Cum.


Say Labour Component in Rs.Per Cum

Rate proposed for M.C.C. D.S.R. 2006-2007

Compo Rate

Labour Rate

Unit

5500.00

1000.00

Cum

70

96.74
48.53
39.73
185.00
7541.62
7542.00
1242.95
1243.00

M.C.CD.S.R.2006-07 Rate Analysis for Bridge Works Item


Item No.44(b}ii
Providing & casting special grade in. situ M 40 controlled cement cO(lcrete of specified strength for prestressed
concretework for main girder including slab croSs girder etc., including centering and scaffolding or launching
including necessary plant and machinary for the job shttering, vibratoing, curing, finishing etc. complete..
Spec. No. : BR-38 Page No. 135 MORT&H : CI.2300 Page No. 535 to 539
Quantity for one cum.

1)

DESCRIPTION
Labour
Mason 2nd class skilled
Mukadam
Bhisti Semi Skilled
Mazdoor unskilled (Heavy)
Mazdoor unskilled (Light IFemale)

QUANTITY

RATE IN Rs.

UNIT

AMOUNT IN Rs.

0.440
0.080
2.670
2.660
2.660

160.00
Per day
175.00
Per day
145.00
Per day
145.00
Per day
145.00
Per day
Total Labour in Rs.

70.40
14.00
387.15
385.70
385.70
1242.95

Material
Metal 10 mm to 20 mm (crusher broken)
Fine Aggregate 6mm to 10 mm
Sand (a) ScreenedlUnscreened
Cement

0.670
0.220
0.445
0.540

400.00
Cum!.
400.00
Cum!.
560.00
Cum!.
4400.00
M.T.
Total Material in Rs.

268.00
88.00
249.20
2376.00
2981.20

Machinery :
Concrete Mixer (cap.0.4010.28 cum)
Vibrator

0.042
0.042

1344.00
Day
788.00
Day
Total Machinary in Rs.
Total of No.1 to 3 in Rs.

4)

Scaffolding

0.300

5)

Sundries (5.0%)

0.010

6)

Water charges

0.010

7)

Laboratory Testing

0.005

8)

Formwork etc.

0.200

9)

Overhead charges (10%)

0.100

56.45
33.10
89.55
4313.70
1294.11
5607.80
56.08
5663.88
56.64
5720.52
28.60
5749.12
1149.82
6898.95
689.89
7588.84

10)

Total Lead
Metal
Sand
Cement

2}

)
3}

Total
Total
Total
Total
Total
Total

11)

0.887
0.445
0.540

109.06
109.06
77.90

Cum!.
Cum!.
M.T.
Tota/lead
Total
Say Completed Item Rate in Rs Per Cum

Labour Component for One Cum.


Say Labour Component in Rs.Per Cum

Rate proposed for M.C.C. D.S.R. 2006-2007

Camp. Rate

Labour Rate

Unit

5600.00

1000.00

Cum

71

96.74
48.53
42.07
187.33
7776.18
7776.00
1242.95
1243.00

M.C.C.D.S.R.2006-07 Rate Analysis for Bridge Works Item


Item No.45
Providing & fixing in position to exact profife and prestressing high tensiie steel of specified ultimate strength
including preparing cable with sheathing and spacers.

Spec. No. :MORT&H : 1803, Page No. 441 to 445

Rs.
Rs.

72550.00
18137.50

Total

Rs.
Rs.
Rs.
Rs.

90687.50
3280.00
328.00
3608.00

Camp. Rate

Labour Rate

Unit

90660.00

3500.00

PerMT

As per D.S.R. 2005-2006


Add 25%

Labour
Add 10 %

Rate proposed for M.C.C. D.S.R. 2006-2007

72

M.C.C.D.S.R.2006-07 Rate Analysis for Sridge Works Item


Item No.46
Providing & laying in situ M 20 cement concrete of/rap metal including compacting, finishing, curing and filling
in joints with bitumen complete. For wearing course 75mm thick.
Spec. No. :SR 47 Page No.140
Quantity for one cum.

1)

DESCRIPTION
Labour
Mason 2nd class skilled
Mukadam
Shisli Semi Skilled
Mazdoor unskilled (Heavy)
Mazdoor unskilled (Light /Female)

QUANTITY

RATE IN Rs.

UNIT

AMOUNT IN Rs.

0.330
0.080
0.670
2.000
2.000'

160.00
Per day
175.00
Per day
145.00
Per day
145.00
Per day
145.00
Per day
Total Labour in Rs.

. 52.80
14.00
97.15
290.00
290.00
743.95

Material
Metal 10 mm to 20 mm (crusher broken)
Fine Aggregate 6mm to 10 mm
Sand (a) Screened/Unscreened
Cement
F W. for coping to plinth
TAR. paper 3mm thick

0.670
0.220
00445
0.360
1.000
1.500

400.00
Cum!.
400.00
Cum!.
560.00
Cum!.
M.T.
4400.00
60.00
Cum!.
22.10
Cum!.
Total Material in Rs.

268.00
88.00
249.20
1584.00
60.00
33.15
2282.35

Machinery :
Concrete Mixer (cap.OAO/0.28 cum)
Vibrator

0.042
0.042

1344.00
Day
788.00
Day
Total Machinary in Rs.
Total of No. 1 to 3 in Rs.

4)

Scaffolding

0.050

5)

Sundries (5.0%)

0.010

6)

Water charges

0.010

7)

Laboratory Testing

0.005

8)

Formwork etc.

0.150

9)

Overhead charges (10%)

0.100

56045
33.10
89.55
3115.85
155.79
3271.64
. 32.72
3304.35
33.04
3337040
16.69
3354.09
503.11
3857.20
385.72
4242.92

10)

Total Lead
Metal
Sand
Cement

2)

"

3)

Total
Total
Total
Total
Total
Total

11)

Cum!.
Cum!.
M.T.
Total lead
Totat
Say Completed Item Rate in Rs Per Cum
0.890
00445
0.360

109.06
109.06
77.90

Labour Component for One Cum


Say Labour Component in Rs.Per Cum

Rate proposed for M.C.C. D.S.R. 2006-2007

Compo Rate

Labour Rate

Unit

3400.00

1075.00

Cum

73

97.06
48.53
28.04
173.64
4416.56
4417.00
743.95
744.00

M.C.C.D.S.R.2006-07 Rate Analysis for Bridge Works Item


Item No.47
Providing & laying in situ M 25 C. C. of trap metal including compacting, finishing, curing and filling in joints with
bitumen complete. For wearing course 75mm thick.
Spec. No. :BR 47 Page No.140
Quantity for One Cum.
DESCRIPTION

QUANTITY

RATE IN Rs.

UNIT

AMOUNT IN Rs.

1)
3400.00

Rate for M 20

Total Labour in Rs.


2)

Material
Difference of cement

Rate proposed for M.C.C. D.S.R. 2006-2007

0.050

4400.00

M.T.

Camp. Rate

Labour Rate

Unit

3700.00

1260.00

Cum.

74

3400.00
220.00

M.C.C.D.S.R.2006-07 Rate Analysis for Bridge Works Item


Item No.48
Providing & laying in situ M 30C.C. of trap metal including compacting, finishing, cUring and filling in joints with
bitumen complete. For wearing course 75mm thick.
Spec. No. :BR 47 Page No.140
Quantity for per Cum..

DESCRIP liON

QUAN III y

RAI E IN Rs.

UNII

AMOONI IN Rs.

1)
Rate for M 20

Rate proposed for M.C.C. D.S.R. 2006-2007

3400.00

Camp. Rate

Labour Rate

Unil

4100.00

1260.00

M.T.

75

M.C.C.D.S.R.2006-07 Rate Analysis for Bridge Works Item


Item NoA9
Providing & laying in situ M 20 C.C. of trap metalfor RCC Work of ballast walls, kerbs, box returns etc.,
including scaffolding compaction, finishing & curing complete.
Spec. No. :BR 50 Page No.143
Quantity for one cum.
DESCRIPTION
1)

QUANTITY

RATE IN Rs.

UNIT

AMOUNT IN Rs.

Labour
Mason 2nd class skilled
Mukadam
Bhisti Semi Skilled
Mazdoor unskilled (Heavy)
Mazdoor unskilled (Light IFemale)

0.330
0.080
0.670
2.000
2.000

160.00
Per day
175.00
Per day
145.00
Per day
145.00
Per day
145.00
Per day
Total Labour in Rs.

52.80
14.00
97.15
290.00
290.00
743.95

Material
Metal 10 mm to 20 mm (crusher broken)
Fine Aggregate 6mm to 10 mm
Sand (a) ScreenedlUnscreened
Cement

0.670
0.220
0.445
0.360

Cum!.
400.00
400.00
Cum!.
560.00
Cum!.
4400.00
M.T.
Total Material in Rs.

268.00
88.00
249.20
1584.00
2189.20

Machinery :
Concrete Mixer (cap.OAO/0.28 cum)
Vibrator

0.042
0.042

1344.00
Day
788.00
Day
Total Machinary in Rs.
Total of No.1 to 3 in Rs.

4)

Scaffolding

0.100

5)

Sundries (5.0%)

0.010

6)

Water charges

0.010

7)

Laboratory Testing

0.005

8)

Formwork etc.

0.150

9)

Overhead charges (10%)

0.100

10)

Total Lead
Metal
Sand
Cement

2)

3)

Total
Total
Total
Total
Total
Total

11 )

Cum!.
Cum!.
M.T.
Total lead
Total
Say Completed Item Rate in Rs Per Cum

96.92
48.53
28.04
173.50
4485.57
4486.00

Say Labour Component in Rs.Per Cum

743.95
744.00

0.889
0.445
0.360

109.06
109.06
77.90

Labour Component for One Cum.

Rate proposed for M.C.C. D.S.R. 2006-2007

56045
33.10
89.55
3022.70
302.27
3324.97
33.25
3358.22
33.58
3391.80
16.96
3408.76
511.31
3920.07
392.01
4312.08

Compo Rate

Labour Rate

Unit

3450.00

850.00

Cum

76

M.C.C.D.S.R.2006-07 Rate Analysis for Bridge Works item


Item No.49(a)
Providing & laying in situ M 25 C. C. of trap metalfor RCC Work of ballast walls, kerbs, box returns etc.,
including scaffolding compaction, finishing & curing complete.
Spec. No. :BR 50 Page No.143
Quantity for one cum.
DESCRIPTION
1)

QUANTITY

RATE IN Rs.

UNIT

AMOUNT IN Rs.

Labour
Mason 2nd class skilled
Bhisli Semi Skilled
Mazdoor unskilled (Heavy)
Mazdoor unskilled (light IFemale)

0.330
0.670
2.000
2.000

160.00
Per day
145.00
Per day
145.00
Per day
145.00
Per day
Total Labour in Rs.

52.80
97.15
290.00
290.00
729.95

Material
Metal 10 mm to 20 mm (crusher broken)
Fine Aggregate 6mm to 10 mm
Sand (a) Screened/Unscreened
Cement

0.670
0.220
0.445
0.410

400.00
Cum!.
Cum!.
400.00
560.00
Cum!.
4400.00
M.T.
Total Material in Rs.

268.00
88.00
249.20
1804.00
2409.20

Machinery :
Concrete Mixer (cap.0.4010.28 cum)
Vibrator

0.042
0.042

1344.00
Day
788.00
Day
Total Machinary in Rs.
Total of No.1 to 3 in Rs.

4)

Scaffolding

0.100

5)

Sundries (5.0%)

0.010

6)

Water charges

0.010

7)

Laboratory Testing

0.005

8)

Formwork etc.

0.150

9)

Overhead charges (10%)

0.100

56.45
33.10
89.55
3228.70
322.87
3551.57
35.52
3587.08
35.87
3622.95
18.11
3641.07
546.16
4187.23
418.72
4605.95

10)

Total Lead
Metal
Sand
Cement

2)

)
3)

Total
Total
Total
Total
Total

Total

11)

Cum!.
Cum!.
M.T.
Total lead
Total
Say Completed Item Rate in Rs Per Cum
0.887
0.445
0.410

109.06
109.06
77.90

Labour Component for One Cum.


Say Labour Component in Rs.Per Cum

Rate proposed for M.C.C. D.S.R. 2006-2007

Camp. Rate

labour Rate

Unit

3750.00

900.00

Cum

77

96.74
48.53
31.94
177.21
4783.16
4783.00
729.95
730.00

M.C.C.D.S.R.2006-07 Rate Analysis for Bridge Works Item


Item No.50
Providing RCC parapet (15 em x 60cm )with M 15/ C. C. of trap metal with cast in situ panelsas per the detailed
drawing including reinforcement, scaffolding, centering, formwork, compacting, finishing and curing complete.
Spec. No. :BR.51 Page NO.144
Quantity for 30 Rmt.
DESCRIPTION

1)

QUANTITY

RATE IN Rs.

UNIT

Fitter 1st class with tools


Carpainter 2nd class
Mason 1st class with tolls
Bhisti Semi Skilled
Mazdoor unskilled (Heavy)
Mazdoor unskilled (light IFemale)

5.000
14.000
7.500
7.000
18.500
15.500

165.00
Per day
160.00
Per day
170.00
Per day
145.00
Per day
145.00
Per day
145.00
Per day
Total Labour in Rs.

825.00
2240.00
1275.00
1015.00
2682.50
2247.50
10285.00

Material
M.S. Bar upto 10 mm & above.
Metal 10 mm to 20 mm (crusher broken)
Cement
Sand (a) ScreenedlUnscreened
C (Silver Ock all size 2.5 m. length)
Binding wire- galvnised binding
Nails

0.293
2.700
0.900
1.620
0.250
2.500
5.000

26900.00
M.T.
400.00
Cum!.
4400.00
MT.
560.00
Cum!.
16000.00
Cum!.
40.00
Kg.
40.00
Kg.
Total Material in Rs.

7881.70
1080.00
3960.00
907.20
4000.00
100.00
200.00
18128.90

Machinery :
Concrete Mixer (cap.0.4010.28 cum)

0.100

1344.00
Day
Total Machinary in Rs.
Total of No.1 to 3 in Rs.

4)

Scaffolding

0.030

5)

Sundries (5.0%)

0.010

6)

Water charges'

0.010

7)

Laboratory Testing

0.005

8)

Formwork etc.

0.050

9)

Overhead charges (10%)

0.100

134.40
134.40
28548.30
856.45
29404.75
294.05
29698.80
296.99
29995.78
149.98
30145.76
1507.29
31653.05
3165.31
34818.36

10)

Total Lead
Steel
Metal
Sand
Cement

2)

3)

Total
Total
Total
Total
Total
Total

AMOUNT IN Rs.

Labour

For 30 Rmt
11 )

M.T.
Cum!.
Cum!.
M.T.
Total lead
Total
Say Completed Item Rate in Rs Per Rmt
0.293
2.700
1.620
0.900

77.90
109.06
109.06
77.90

Labour Component for 30 Rm!.


Say Labour Component in Rs.Per Rmt

Rate proposed for M.C.C. D.S.R. 2006-2007

Camp. Rate

Labour Rate

Unit

750.00

260.00

Rmt

78

22.82
294.46
176.68
70.11
564.07
35382.43
1179.41
10285.00
342.83

M.C.C.D.S.R.2006-07 Rate Analysis for Bridge Works .Item


Item No.50(a)
Providing RCC parapet (15 em x 60cm )with M 20IC.C. of trap metal with cast in situ panelsas per the detailed
drawing including reinforcement, scaffolding, centering, fonnwork, compacting, finishing and curing complete.
Spec. No. :BR.51 Page NO.144

1)

2)

)
3)

DESCRIPTION
Labour
Fitter 1st class with tools
Carpainter 2nd class
Mason 1st class with tolls
Bhisti Semi Skilled
Mazdoor unskilled (Heavy)
Mazdoor unskilled (Light /Female)

Quantity for 30 Rmt.


QUANTITY

RATE IN Rs.

5.000
14.000
7.500
7.000
18.500
15.500

Material
M.S. Bar upto 10 mm & above.
Metal 10 mm to 20 mm (crusher broken)
Cement
Sand (a) Screened/Unscreened
C (Silver Ock all size 2.5 m. length)
Binding wire- galvnised binding
Nails

0.293
2.700
1.013
1.620
0.250
2.500
5.000

Machinery :
Concrete Mixer (cap.OAO/0.28 cum)

0.100

4)

Scaffolding

0.030

5)

Sundries (5.0%)

0.010

6)

Water charges

0.010

7)

Laboratory Testing

0.005

8)

Formwork etc.

0.050

9)

Overhead charges (10%)

0.100

UNIT

165.00
Per day
160.00
Per day
170.00
Per day
145.00
Per day
145.00
Per day
145.00
Per day
Total Labour in Rs.

825.00
2240.00
1275.00
1015.00
2682.50
2247.50
10285.00

26900.00
M.T.
400.00
Cum!.
4400.00
M.T.
560.00
Cum!.
16000.00
Cum!.
40.00
Kg.
40.00
Kg.
Total Material in Rs.

7881.70
1080.00
4457.20
907.20
4000.00
100.00
200.00
18626.10

1344.00
Day
Total Machinary in Rs.
Total of No.1 to 3 in Rs.

Total
Total

35424.76

Total
Total
Total

Total Lead
Steel
Metal
Sand
Cement
For 30 Rm!.

11 )

0.293
2.700
1.620
1.013

3220043
77.90
109.06
109.06
77.90

M.T.
Cum!.
Cum!.
M.T.
Total lead
Total
Say Completed Item Rate in Rs Per Rmt

Labour Component for 30 Cum.


Say Labour Component in Rs.Per Rmt

Rate proposed for M.C.C. D.S.R. 2006-2007

Compo Rate

Labour Rate

Unit

800.00

260.00

Rmt

79

134040
134.40
29045.50
871.37
29916.87
299.17
30216.03
302.16
30518.19
152.59
30670.78
1533.54
32204.32

Total

10)

AMOUNT IN Rs.

22.82

294046
176.68
78.91
572.88
35997.63
1199.93
10285.00
342.83

M.C.C.D.S.R.2006-07 Rate Analysis for Bridge Works Item


Item No.50(b)
Providing RCC parapet (15 em x 80cm )with M 25/C.C. of trap metal with cast in situ panelsas per the detaiied
drawing including reinforcement, scaffolding, centering, formwork, compacting, finishing and curing complete.
Spec. No. :BR.51 (a) Page NO.144
1)

DESCRIPTION
Labour
Fitter 1st class with tools
Carpainter 2nd class
Mason 1st class with tolls
Bhisti Semi Skilled
Mazdoor unskilled (Heavy)
Mazdoor unskilled (Light IFemale)

Quantity for 30 Rm!.


QUANTITY

RATE IN Rs.

UNIT

AMOUNT IN Rs.

5.000
14.000
7.500
7.000
18.500
15.500

165.00
Per day
160.00
Per day
170.00
Per day
145.00
Per day
145.00
Per day
145.00
Per day
Total Labour in Rs.

825.00
2240.00
1275.00
1015.00
2682.50
2247.50
10285.00

Material
M.S. Bar upto 10 mm & above.
Metal 10 mm tq 20 mm (crusher broken)
Cement
Sand (a) ScreenedlUnscreened
C (Silver Ock all size 2.5 m. length)
Binding wire- galvnised binding
Nails

0.293
2.700
1.153
1.620
0.250
2.500
5.000

26900.00
M.T.
400.00
Cum!.
4400.00
M.T.
560.00
Cum!.
; 16000.00
Cum!.
40.00
Kg.
40.00
K9
Total Material in Rs.

7881.70
1080.00
5073.20
907.20
4000.00
100.00
200.00
19242.10

Machinery :
Concrete Mixer (cap.0.4010.28 cum)

0.100

1344.00
Day
Totat Machinary in Rs.
Total of No.1 to 3 in Rs.

4)

Scaffolding

0.030

5)

Sundries (5.0%)

0.010

6)

Water charges

0.010

7)

Laboratory Testing

0.005

8)

Formwork etc.

0.050

9)

Overhead charges (10%)

0.100

134.40
134.40
29661.50
889.85
30551.35
305.51
30856.86
308.57
31165.43
155.83
31321.25
1566.06
32887.32
3288.73
36176.05

10)

Total Lead
Steel
Metal
Sand
Cement

2)

)
3)

Total
Total
Total
Total
Total
Total

')

"

For 30 Rm!.
11 )

0.293
2.700
1.620
1.153

77.90
109.06
109.06
77.90

M.T.
Cum!.
Cum!.
M.T.
Total lead
Total
Say Completed Item Rate in Rs Per Rmt

Labour Component for 30 Rm!.


Say Labour Component in Rs.Per Rmt

Rate proposed for M.C.C. D.S.R. 2006-2007

Compo Rate

Labour Rate

Unit

850.00

270.00

Rmt

80

22.82
294.46
176.68
89.82
583.78
36759.83
1125.33
10285.00
342.83

M.C.C.D.S.R.2006-07 Rate Analysis for Bridge Works Item


Item No.51
Providing Railing of G.I. pipes with M.S. angle posts at 2.5 m c/c detailed drawings including and painting 3
rows.
Spec. No. :BR.51(b) Page NO.145
Quantity for 5 Rmt.
DESCRiPTION

i)

QUANTITY

RATE IN Rs.

UNIT

AMOUNT IN Rs.

Labour
Welder I Driller Skilled
Head Filler with tools, skilled
Painter 2nd class skilled
Mazdoor unskilled (Heavy)
Mazdoor unskilled (Light IFemaie)

1.000
1.500
0.500
0.500
1.500

150.00
Per day
155.00
Per day
150.00
Per day
145.00
Per day
145.00
Per day
Total Labour in Rs.

150.00
232.50
75.00
72.50
217.50
747.50

Material
G.1. Pipe C Class 50 mm dia.
G.1. Pipe Socket 40 mm.! rivets 12 mm.
Steel for structural work
T.R. metal 20 mm (crust)
Sand (sreened)
Cement
Black Japan Synthetic paint

18.300
3.000
0.068
0.072
0.025
0.036
2.000

250.00
Rmt
22.00
No.
35000.00
M.T.
400.00
Cum!.
4400.00
M.T.
560.00
Cum!.
175.00
Liller
Total Material in Rs.

4575.00
66.00
2380.00
28.80
110.00
20.16
350.00
7529.96

Machinery :
Concrete Mixer (cap.0.40/0.28 cum)

0.100

1344.00
Day
Total Machinary in Rs.
Total of No.1 to 3 in Rs.

4)

Scaffolding

0.000

5)

Sundries (1.0%)

0.010

6)

Water charges

0.010

7)

Laboratory Testing

0.005

8)

Formwork etc.

0.000

9)

Overhead charges (10%)

0.100

134.40
'134.40
8411.86
0.00
8411.86
84.12
8495.98
84.96
8580.94
42.90
8623.84
0.00
8623.84
862.38
9486.23

10)

Total Lead
Steel
Metal
Sand
Cement

2)

,
)

3)

Total
Total
Total
Total
Total
Total

For 5 Rm!.
11)

M.T.
Cum!.
Cum!.
M.T.
Total lead
Total
Say Completed Item Rate in Rs Per Rmt
0.068
0.072
0.036
0.025

77.90
109.06
109.06
77.90

Labour Component for 5 Rm!.


Say Labour Component in Rs.Per Rmt

Rate proposed for M.C.C. D.S.R. 2006-2007

Camp. Rate

Labour Rate

Unit

1500.00

150.00

Rmt

81

5.30
7.85
3.93
1.95
19.02
9505.25
1901.00
747.50
149.60

M.C.C.D.S.R.2006-07 Rate Analysis for Bridge Works Item


Item No.52
Providing Railing of cast in situ R.C.C. Postsat 2.5 m cle with M 15/1:2:4 C.C. oftrap metal for approved quality
and G.I. pipes as per the detailed drawings including scaffolding, centering, formwork compaction, finishing and
.
curing etc., complete.
Quantity for 10 Rmt

Spec. No. :BR.51 (c) Page NO.147

1)

DESCRIPTION
Labour
Fitter 2nd Class with tools
Mason 2nd class skilled.
Carpenter 2nd class
Bhisti Semi-Skilled
Mazdoor unskilled (Heavy/Male)

QUANTITY

RATE IN Rs.

UNIT

4.000
5.000
4.500
1.000
7.500

155.00
Per day
160.00
Per day
160.00
Per day
145.00
Per day
145.00
Per day
Total Labour in Rs.

.620.00
800.00
720.00
145.00
1087.50
3372.50

Material
M.S. Bar upto 100 mm & above
Cement
Metal 10 mm to 20 mm (Crust broken)
Sand (a) Screened / Unscreened
a) Jangal wood for scantlling treated above
Nails
G.J.Pipe "C" Glass 50 mm dia
G.J. Pipe socket 40 mm / Riverts 12 mm

0.360
0.275
0.800
0.630
0.850
3.000
31.000
3.000

26900.00
M.T.
4400.00
M.T.
400.00
Cumt.
560.00
Cumt.
13000.00
Cumt.
Kg.
40.00
250.00
Rmt
22.00
No.
Total Material in Rs.

9684.00
1210.00
320.00
352.80
11050.00
120.00
7750.00
66.00
30552.80

Machinery :
Concrete Mixer (cap.0.40/0.28 cum)
Vibrator

0.120
0.120

4)

Scaffolding

0.030

5)

Sundries (1.0%)

0.010

6)

Water charges

0.010

7)

Laboratory Testing

0.005

8)

Formwork etc.

0.050

9)

Overhead charges (10%)

0.100

10)

Total Lead
Steel
Metal
Sand
Cement

2)

3)

1344.00
788.00

Day
Day

Total of No.1 to 3 in Rs.


Tota/
Total
Total
Total
Total
Total

AMOUNT IN Rs.

For10 Rmt.
11)

0.360
0.800
0.630
0.275

77.90
109.06
109.06
77.90

M.T.
Cumt.
Cumt.
M.T.
Totallead
Total
Say Completed Item Rate in Rs Per Rmt

Labour Component for 10 Rmt.


Say Labour Component in RS.Per Rmt

Rate proposed for M.C.C. D.S.R. 2006-2007

Compo Rate

Labour Rate

Unit

1100.00

75.00

Rmt

82

.161.28
94.56
255.84
34181.14
1025.43
35206.57
352.07
35558.64
355.59
35914.23
179.57
36093.80
1804.69
37898.49
3789.85
41688.34
28.04
87.25
68.71
21.42
205.42
41893.76
4189.37
3372.50
337.25

M.C.C.D.S.R.2006-07 Rate Analysis for Bridge Works Item


Item No.52(a)

Providing Railing of cast in situ R.C.C. Posts at 2.5 m clc with M 20/1:2:4 C.C. of trap metal for approved
quality and G./. pipes as per the detailed drawings including scaffolding, centering, formwork compaction,
finishing and curing etc., complete.
Spec. No. :BR.51(c) Page No.147

1)

DESCRiPTION
Labour
Filter 2nd Class with tools
Mason 2nd class skilled.
Carpenter 2nd class
Bhisti Semi-Skilled
Mazdoor unskiiled (Heavy/Maie)

Quantity for 10 Rm\.


QUANTITY

RATE IN Rs.

UNIT

4.000
5.000
4.500
1.000
7.500

155.00
160.00
160.00
145.00
145.00

Per day
Per day
Per day
Per day
Per day

Total Labour in Rs.


2)

Material
M.S. Bar upto 100 mm & above
Cement
Metal 10 mm to 20 mm (Crust broken)
Sand (a) Screened I Unscreened
a) Jangal wood for scantiling treated above
Nails
G.i.Pipe "C" Gll1SS 50 mm dia
G.i. Pipe socket 40 mm I Riverts 12 mm

0.360
0.309
0.800
0.630
0.850
3.000
31.000
3.000

26900.00
4400.00
400.00
560.00
13000.00
40.00
250.00
22.00

M.T.
M.T.
Cuml.
Cuml.
Cum\.
Kg.
Rmt
No.

Total Material in Rs.


3)

Machinery :
Concrete Mixer (cap.OAO/0.28 cum)
Vibrator

0.120
0.120

4)

Scaffolding

0.030

5)

Sundries (1.0%)

0.010

6)

Water charges

0.010

1344.00
788.00

Day
Day

Totat of No.1 to 3 in Rs.


Total
Total

Laboratory Testing

0.005

8)

Formwork etc.

0.050

9)

Overhead charges (10%)

0.100

10)

Total Lead
Steel
Metal
Sand
Cement

Total
Total
Total
0.360
0.800
0.630
0.309

77.90
109.06
109.06
77.90

M.T.
Cum\.
Cuml.
M.T.

Totallead
Total

For 10 Rml.

Say Completed Item Rate in Rs Per Rmt


11)

Labour Component for 10 Rml.


Say Labour Component in Rs.Per Rmt

Rate proposed for M.C.C. D.S.R. 2006-2007

Compo Rate

Labour Rate

Unit

150.00

75.00

Rmt

83

620.00
800.00
720.00
145.00
1087.50
3372.50
9684.00
1359.60
320.00
352.80
11050.00
120.00
7750.00
66.00
30636.40
161.28
94.56
255.84
34264.74
1027.94
35292.68
352.93
35645.61

356046
Total

7)

AMOUNT IN Rs.

36002.07
180.01
36182.08
1809.10
37991.18
3799.12
41790.30
28.04
87.25
68.71
24.07
208.07
41998.37
4199.84
3372.50
337.25

M.C.C.D.S.R.2006-07 Rate Analysis for Bridge Works Item


Item No.52(b)
Providing Railing of cast in situ R.C.C. Postsat 2.5 m clc with M 25/1:2:4 C.C. oftrap metalfor approved quality
and G.I. pipes as per the detailed drawings including scaffolding, centering, formwork compaction, finishing and
curing etc., complete. Spec. No. :BR.51 (c) Page No.147

1)

DESCRIPTION
Labour
Fitter 2nd Class with tools
Mason 2nd class skilled.
Carpenter 2nd class
Bhisli Semi-Skilled
Mazdoor unskilled (Heavy/Male)

Quantity for 10 Rmt.


QUANTITY

RATE IN Rs.

UNIT

4.000
5.000
4.500
1.000
7.500

155.00
Per day
160.00
Per day
160.00
Per day
145.00
Per day
145.00
Per day
Total Labour in Rs.

-620.00
800.00
720.00
145.00
1087.50
3372.50

Material
M.S. Bar upto 100 mm & above
Cement
Metal 10 mm to 20 mm (Crust broken)
Sand (a) Screened I Unscreened
a) Jangal wood for scantlJing treated above
Nails
G.I.Pipe "C" Glass 50 mm dia
G.1. Pipe socket 40 mm I Riverls 12 mm

0.360
0.352
0.800
0.630
0.850
3.000
31.000
3.000

26900.00
M.T.
4400.00
M.T.
400.00
Cum!.
560.00
Cum!.
13000.00
Cum!.
40.00
Kg.
250.00
Rmt
22.00
No.
Total Material in Rs.

9684.00
1548.80
320.00
352.80
11050.00
120.00
7750.00
66.00
30825.60

Machinery :
Concrete Mixer (cap.OAO/0.28 cum)
Vibrator

0.120
0.120

1344.00
Day
680.00
Day
Total Machinary in Rs.
Total of No.1 to 3 in Rs.

4)

Scaffolding

0.030

5)

Sundries (1.0%)

0.010

6)

Water charges

0.010

7)

Laboratory Testing

0.005

8)

Formwork etc.

0.050

9)

Overhead charges (10%)

0.100

161.28
81.60
242.88
34440.98
1033.23
35474.21
354.74
35828.95
358.29
36187.24
180.94
36368.18
1818041
38186.59
3818.66
42005.24

10)

Total Lead
Steel
Metal
Sand
Cement

2)

3)

Total
Total
Total
Total
Total
Total

AMOUNT IN Rs.

For 10 Cum.
11)

0.360
0.800
0.630
0.352

77.90
109.06
109.06
77.90

M.T.
Cum!.
Cum!.
M.T.
Total lead
Total
Say Completed Item Rate in Rs Per Rmt

Labour Component for 10 Cum.


Say Labour Component in Rs.Per Rmt

Rate proposed for M.C.C. D.S.R. 2006-2007

Camp. Rate

Labour Rate

Unit

1200.00

75.00

Rmt

84

28.04
87.25
68.71
27042
211.42
42216.67
4221.67
3372.50
'337.25

M.C.C.D.S.R.2006-07 Rate Analysis for Bridge Works Item


Item No.53
Providing coursed rubble trap stone masonry in cement mortar 1:6 for parapet with Khandki facing and pointing
with cement morter 1:3 on all khandki faces including scaffolding and watering masonry.
Quantity for 2 Cum

Spec. No. :BR.53 Page No.149


DESCRIPTION
1)

2)

3)

Labour
Mason 2nd class skilled
Mukadam
Bhisti Semi Skilled
Mazdoor unskilled (Heavy)
Mazdoor unskilled (Light IFemale)
Material
Header (Dressed) 2'-6"
b) Rubble 23 cm. for masonary work
Sand (a) Screened I Unscreened
Cement
Khandki (Dressed) 8" to 9"

QUANTITY

RATE IN Rs.

UNIT

3.670
0.500
0.670
1.670
1.670

160.00
Per day
165.00
Per day
145.00
Per day
145.00
Per day
145.00
Per day
Total Labour in Rs.

587.20
82.50
97.15
.242.15
242.15
1251.15

12.000
0.170
0.280
0.145
110.000

No
25.00
Cum!.
250.00
560.00
Cum!.
4400.00
M.T.
20.00
No
Total Material in Rs.

300.00
42.50
156.80
638.00
2200.00
3337.30

0.00
Total Machinary in Rs.
Total of No.1 to 3 in Rs.

0.00
0.00
4588.45
229.42
4817.87
48.18
4866.05
. 48.66

Machinery :
0.000

4)

Scaffolding

0.050

5)

Sundries (1.0%)

0.010

6)

Water charges

0.010

7)

Laboratory Testing

0.005

Total
Total
Total
Total
8)

Formwork etc.

0.000

9)

Overhead charges (10%)

0.100

10)

Total Lead
Rubble
Sand
Cement

Total
Total

For2 Cum
11)

AMOUNT IN Rs.

0.170
0.280
0.145

128.31
109.06
77.90

Cum!.
Cum!.
M.T.
Total lead
Total
Say Completed Item Rate in Rs Per Cum

Labour Component for 2 Cum.


Say Labour Component in Rs.Per Cum

Rate proposed for M.C.C. D.S.R. 2006-2007

Camp. Rate

Labour Rate

Unit

2200.00

850.00

Cum

85

4914.71
24.57
4939.29
0.00
4939.29
493.93
5433.21
21.81
30.54
11.30
63.65
5496.86
2748.43
1251.15
625.58

M.C.C.D.S.R.2006-07 Rate Analysis for Bridge Works Item


Item No.54
Providing galvanised iron 100 mm diameter (about 4'7 water spouts as per drawings (0.6 mtr long with G./.
gratings)
Spec. No. :BR.55 Page No.149
DESCRIPTION
1)

2)

3)

Quantity for One No.


QUANTITY

RATE iN Rs.

UNIT

0.250
0.500

150.00
Per day
145.00
Per day
Total Labour in Rs.

37.50
72.50
110.00

Material
G.!. Pipe "C" Class 100 mm dia
BDU 1 A (M.S. Grill)

0.600
0.010

550.00
Rml.
Sqml.
520.00
Total Material in Rs.

'330.00
5.20
335.20

0.000

0.00
Total Machinary in Rs.
Total of No.1 to 3 in Rs.

0.00
0.00
445.20
0.00
445.20
4.45
449.65
4.50
454.15
2.27
456.42
0.00
456.42
. 45.64
502.06

Machinery :

)
4)

Scaffolding

0.000

5)

Sundries (1.0%)

0.010

Total
Total
6)

Water charges

0.010

7)

Laboratory Testing

0.005

8)

Formwork etc.

0.000

9)

Overhead charges (10%)

0.100

10)

Total Lead

Total
Total
Total
Total
0.000
For One No.
11 )

AMOUNT IN Rs.

Labour
Plumber 1st Class with tools
Mazdoor unskilled (Heavy)

0.00

Total lead
Total
Say Completed Item Rate in Rs Per No

Labour Component for One No..


Say Labour Component in Rs.Per No

Rate proposed for M.C.C. D.S.R. 2006-2007

Compo Rate

Labour Rate

Unit

520.00

40.00

No.

86

0.00
0.00
502.06
502.00
110.00
110.00

M.C.CD.S.R.2006-07 Rate Analysis for Bridge Works Item


Item No.55
Providing vent holes 100 mm diameter in the slab and wearing course with iron grill at the top and galvanised
iron pipe at bottom as per drawings.
Quantity for One Rmt.

Spec. No. :BR.48 Page NO.142


DESCRiPTION
1)

2)

3)

QUANTITY

RATE IN Rs.

UNIT

Labour
Plumber 1st Class with tools
Mazdoor unskiiled (Heavy)

0.250
0.500

150.00
Per day
145.00
Per day
Total Labour in Rs.

37.50
72.50
110.00

Material
G.!. Pipe "C" Class 100 mm dia
BDU 1 A (M.S. Griil)

0.600
0.010

Rmt.
550.00
Sqmt.
520.00
Total Material in Rs.

330.00
5.20
335.20

0.000

0.00
Total Machinary in Rs.
Total of No.1 to 3 in Rs.

0.00
0.00
445.20
0.00
445.20
4.45
449.65
4.50
454.15
2.27
456.42
0.00
456.42
45.64
502.06

Machinery :

)
4)

Scaffolding

0.000

5)

Sundries (1.0%)

0.010

Total
Total
6)

Water charges

0.010

7)

Laboratory Testing

0.005

8)

Formwork etc.

0.000

Total
Total
Total

9)

Overhead charges (10%)

10)

Tolai Lead

0.100

Total
0.000
For One Rmt
11)

AMOUNT IN Rs.

0.00

Total lead
Total
Say Completed Item Rate in Rs Per Rmt

Labour Component for One Rmt.


Say Labour Component in Rs.Per Rmt

Rate proposed for M.C.C. D.S.R. 2006-2007

Compo Rate

Labour Rate

Unit

350.00

65.00

Rmt

87

0.00
0.00
502.06
502.00
110.00
110.00

M.C.C.D.S.R,2006-07 Rate Analysis for Bridge Works Item


Item No.56
Providing and fixing marble tabiet ofsizeand description as per detailed drawings including moulded marble 1:2
cement moriar borders including engraving the description and filling the iead etc., complete.
Spec. No. :BR,56 Page No.150
DESCRIPTION
1)

Labour
Mason 1st Class with tools for plaster
Painter 2nd skilled (Colour)
Mazdoor unskilled (Heavy)

Quantity for One Sqm


QUANTITY

RATE IN Rs.

UNIT

AMOUNT IN Rs.

2.000
1.000
1.000

170.00
Per day
150.00
Per day
145.00
Per day
Total Labour in Rs.

340.00
150.00
145.00
635.00

1.100
0.005
0.005

1800.00
Sq.m
. 4400.00
M.T.
560.00
Cum.
Lumpusum
Total Material in Rs.

1980.00
22.00
2.80
2000.00
4004.80

Machinery :
Culling Maching
Transportation

1.000
1.000

500.00
Lumpusum
Total Machinary in Rs.
Total of No.1 to 3 in Rs.

4)

Scaffolding

0.050

5)

Sundries (1.0%)

0.010

6)

Water charges

0.010

7)

Laboratory Tesling

0.005

8)

Formwork etc.

0.000

9)

Overhead charges (10%)

0.100

500.00
200.00
700.00
5339.80
266.99
5606.79
56.07
5662.86
56.63
5719.49
28.60
5748.08
0.00
5748.08
574.81
6322.89

10)

Total Lead

2)

3)

Material
Marbl e plate
Cement
Sand (a) screenedlunscreened
Engraving

Total
Totai
Total
Total
Total
Total
0.000
For One Sq.m.
11)

0.00

Total lead
Total
Say Completed Item Rate in Rs Per Sq.m

Labour Component for One Sq.m.


Say Labour Component in Rs.Per Sq.m

Rate proposed for M.C.C. D.S.R. 2006-2007

Compo Rate

Labour Rate

Unit

6000.00

3275.00

Sq.m

88

0.00
0.00
6322.89
6323.00
635.00
635.00

M.C.C.D.S.R,2006-07 Rate Analysis for Bridge Works Item


Item No.57
Providing trap/granite/quartzite/gneiss rubble filling behind the abutment, returns or wimgs.
Spec. No. :BR,57 Page No.151
DESCRIPTION
1)

2)

3)

4)

Quantity for One Cum


QUANTITY

RATE IN Rs.

UNIT

Labour
Mason 1st Class with tools for plaster
Mazdoor unskilled (Heavy)

0.200
0.200

170.00
Per day
145.00
Per day
Total Labour in Rs.

34.00
29.00
63.00

Material
b) Rubble 23 em. for masonary work

1.400

Cum.
250.00
Total Material in Rs.

350.00
350.00

0.000

0.00
Total Machinary in Rs.
Total of No.1 to 3 in Rs.

0.00
0.00
'413.00
0.00
413.00
0.00
413.00
4.13
417.13
2.09
419.22
0.00
419.22
41.92
461.14

Machinery :

Scaffolding

0.000

Total

)
5)

Sundries (1.0%)

0.000

6)

Water charges

0.010

7)

Laboratory Testing

0.005

8)

Formwork etc.

0.000

9)

Overhead charges (10%)

0.100

10)

Total Lead
Lead rate

Total
Total
Total
Total
Total

For One Cum.


11 )

AMOUNT IN Rs.

1.400

109.79

Cum.
Total lead
Total
Say Completed Item Rate in Rs Per Cum

Labour Component for One Cum.


Say Labour Component in Rs.Per Cum

Rate proposed for M.C.C. D.S.R, 2006-2007

Camp. Rate

Labour Rate

Unit

460.00

60.00

Cum

89

153.71
153.71
614.84
615.00
63.00
63.00

M.C.C.D.S.R.2006-07 Rate Analysis for Bridge Works Item


Item No.58
Providing and fixing cast iron man hole of 750 mm dia.

Quantity for Per No.


Rate as per Presedency D.S.R. 2005-2006
Item No.92, Page No.105

6050.00

Add 10 to 12 % increesed in Steel Rate

665.05
Total Rs. _ _--'=60::-71::::5"".0"='5
250.25

Labour Component

Rate proposed for M.C.C. D.S.R. 2006-2007

Compo Rate

Labour Rate

Unit

6718.00

250.00

No.

90

M.C.C.D.S.R.2006-07 Rate Analysis for Bridge Works Item


Item No.59
Providing rubble filling of traplgranitelquartzitelgneiss stones foundations including hand packing filling gravell
sand in the voids etc., complete.

1)

2)

3)

Spec. No. :CD 1 Page NO.159


DESCRIPTION
Labour
Mazdoor unskilled (Heavy)
Mazdoor unskilied (Heavy)
Material
b) Rubble 23 em. for masonary work
Gravel at Nali Bed

Quantity for One Cum.


QUANTITY

RATE IN Rs.

UNiT

0.360
0.330

145.00
Per day
145.00
Per day
Total Labour in Rs.

52.20
47.85
100.05

1.000
0.330

Cum.
250.00
115.00
Cum.
Total Material in Rs.

250.00
37.95
287.95

0.000

0.00
Total Machinary in Rs.
Total of No.1 to 3 in Rs.

0.00
0.00
388.00
0.00
388.00
3.88
391.88
3.92
395.80
0.00
395.80
0.00
395.80
39.58
435.38

Machinery :

4)

Scaffolding

0.000

5)

Sundries (1.0%)

0.010

6)

Water charges

0.010

7)

Laboratory Testing

0.000

8)

Formwork etc.

0.000

9)

Overhead charges (10%)

0.100

Total
Total
Total
Total
Total
Total
10)

Total Lead
Rubble
Gravel
For One Cum

11)

AMOUNT IN Rs.

1.000
0.330

128.31
128.31

Cum.
Cum.
Total lead
Total
Say Completed Ifem Rate in Rs Per Cum

Labour Component for One Cum.


Say Labour Component in Rs.Per Cum

Rate proposed for M.C.C. D.S.R. 2006-2007

Compo Rate

Labour Rate

Unit

325.00

45.00

Cum

91

128.31
42.34
170.65
606.03
606.00
100.05
100.00

M.C.C.D.S.R.2006-07 Rate Analysis for Bridge Works Item


Item No.60
Providing approved quality trap rubQle stone paving 15 em. (about 6;'j thick in 1:3cement mortar avera bedding
of 15 em. (about 6'jthick cement concrete of'1:4:8 proportion with trap metal including striking joiontsand
watering etc., complete.
Spec. No. :CD 4 Page No.160
Quantity for One Sq.m.
DESCRIPTION
1)

2)

)
3)

QUANTITY

RATE IN Rs.

UNIT

0.330
0.500
0.250
0.100

160.00
Per day
145.00
Per day
145.00
Per day
145.00
Per day
Total Labour in Rs.

52.80
72.50
36.25
14.50
176.05

Material
b) Rubble 23 em. for masonary work
Cement
Sand (a) Screened I Unscreend
BDE 1-C (C.C 1 48)

0.150
0.035
0.075
0.150

250.00
Cum.
M.T.
4400.00
Cum.
560.00
Cum.
1655.00
Total Material in Rs.

37.50
154.00
42.00
248.25
481.75

0.000

0.00
Total Machinary in Rs.
Total of No.1 to 3 in Rs.

0.00
0.00
657.80
0.00
657.80
6.58
664.38
6.64
671.02
3.36
674.38
0.00
674.38
67.44
741.81

Machinery :

4)

Scaffolding

0.000

5)

Sundries (1.0%)

0.010

6)

Water charges

0.010

Total
Total
Total
7)

Laboratory Testing

0.005

8)

Formwork etc.

0.000

9)

Overhead charges (10%)

0.100

Total
Total

Total
10)

Total Lead
Rubble
Cement
Sand
For One Sq.m.

11 )

AMOUNT IN Rs.

Labour
Mason 2nd Class Skilled
Mazdoor unskilled (Heavy)
Mazdoor unskilled (LighVFemale)
Bhisti Semi Skilled

0.150
0.035
0.075

128.31
77.90
109.06

Cum.
M.T.
Cum.
Total lead
Total
Say Completed Item Rate in Rs Per Sq.m

Labour Companen for One Cum.


Say Labour Component in Rs.Per Sq.m

Rate proposed for M.C.C. D.S.R. 2006-2007

Camp. Rate

Labour Rate

Unit

550.00

90.00

Sq.m.

92

19.25
2.73
8.18
30.15
771.97
772.00
176.05
176.00

M.C.C.D.S.R.2006-07 Rate Analysis for Bridge Works Item


Item No.61
Providing approved quality trap Khandki paving of 25 cm. (about 6') thickness in 1:3 cement mortar over
bidding of 15 cm (about 6') thick cement concrete of 1:4:8 proportion with trap metal including loading and
unloading of pipes.
Spec. No. :CD 5 Page No.161
Quantity for One Sq.m.
1)

2)

3)

4)

DESCRIPTION
Labour
Mason 2nd Class Skilled
Mazdoor unskilled (Heavy)
Bhisli Semi Skilled
Material
Khandki (Dressed) 8" to 9"
Cement
Sand (a) Screened I Unscreend
BDE 1-C (C.C 1 48)

QUANTITY

RATE IN Rs.

UNIT

0.750
1.500
0.100

160.00
Per day
145.00
Per day
145.00
Per day
Total Labour fn Rs.

120.00
217.50
14.50
352.00

5.000
0.035
0.075
0.150

20.00
No
M.T.
4400.00
Cum.
560.00
Cum.
1655.00
Total Material in Rs.

100.00
154.00
42.00
248.25
544.25

0.000

0.00
;Total Machinary in Rs.
Total of No.1 to 3 in Rs.

0.00
0.00
896.25
0.00
896.25
8.96
905.21
9.05
914.26
4.57
918.84
0.00
918.84
91.88
1010.72

Machinery :

Scaffolding

0.000

Total
5)

Sundries (1.0%)

0.010

6)

Water charges

0.010

7)

.Laboratory Testing

0.005

Total
Total
Total
8)

Formwork etc.

0.000

9)

Overhead charges (10%)

0.100

10)

Total Lead
Cement
Sand

Total
Total

For One Sq.m.


11)

AMOUNT IN Rs.

0.035
0.075

77.90
109.06

M.T.
Cum.
Total lead
Total
Say Completed Item Rate in Rs Per Sq.m

Labour Component for One Sq.m.


Say Labour Component in Rs.Per Sq.m

Rate proposed for M.C.C. D.S.R. 2006-2007

Compo Rate

Labour Rate

Unit

700.00

275.00

Sq.m.

93

2.73
8.18
10.91
1021.63
1022.00
352.00
352.00

M.C.C.D.S.R.2006-07 Rate Analysis for Bridge Works Item


Item No.62
Providing and laying cement concrete pipe of I.S. NP-2 class of 300 mm (12') diameter in properfine level and
slope including providing fixing collars in cement morfar 1:2etc., complete including loading and unloading of
pipes.
Spec. No. :CD 7 Page No.162
DESCRIPTION
1)

QUANTITY

RATE IN Rs.

Quantity for 10 Rmt.


UNIT
AMOUNT IN Rs.

Labour
Mazdoor unskilled (Heavy/Male)
Mazdoor unskilled (LighVFemale)
Mason 2nd Class Skilled
Bhisti Semi Skilled

2.000
4.000
0.330
0.170

145.00
Per day
145.00
Per day
160.00
Per day
145.00
Per day
Total Labour In Rs.

290.00
580.00
52.80
24.65
947.45

Material
NP- 2 Pipe 300 mm dia
Sand (a) Screened I Unscreend
Cement
Colour for NP - 2 Pipe (300 mm dial

10.000
0.080
0.055
3.000

Rmt.
277.00
Cum.
560.00
M.T.
4400.00
27.70
No.
Total Material in Rs.

2770.00
44.80
242.00
83.10
3139.90

Machinery :
Chain & Pully

0.310

215.00
Hour
Total Machinary in Rs.
Total of No.1 to 3 in Rs.

4)

Scaffolding

0.000

5)

Sundries (1.0%)

0.010

6)

Water charges

0.010

7)

Laboratory Testing

0.010

66.65
66.65
4154.00
0.00
4154.00
41.54
4195.54
41.96
4237.50
42.37
4279.87
42.80
4322.67
432.27
4754.94

2)

)
3)

Total
Total
Total
Total
8)

Formwork etc.

0.010

9)

Overhead charges (10%)

0.100

10)

Total Lead
Cement
Sand

Total

,,
)

Total

For 10 Rmt.
11)

0.055
0.080

77.90
109.06

M.T.
Cum.
Total lead
Total
Say Completed Item Rate in Rs Per Rmt

Labour Component for 10 Rmt.


Say Labour Component in Rs.Per Rmt

Rate proposed for M.C.C. D.S.R. 2006-2007

Compo Rate

Labour Rate

Unit

475.00

80.00

Rmt

94

4.28
8.72
13.01
4767.95
476.79
947.45
94.75

M.C.C.D.S.R.2006-07 Rate Analysis for Bridge Works Item


Item No.63
Providing and laying cement concrete pipe of I.S. NP-2 class of 450 mm (1B'? diameter in proper/ine level and
slope'including providing fixing collars in cement mOltar 1:2 etc., complete including loading and unloading of
pipes.
Spec. No. :CD 7 Page NO.162
DESCRIPTION
1)

Quantity for 10 Rmt.


QUANTITY

RATE IN Rs.

UNIT

Labour
Mazdoor unskilled (Heavy/Male)
Mazdoor unskilled (Light/Female)
Mason 2nd Class Skilled
Bhisti Semi Skilled

2.000
4.500
0.330
0.150

145.00
Per day
145.00
Per day
160.00
Per day
145.00
Per day
Total Labour in Rs.

290.00
652.50
52.80
21.75
1017.05

Material
NP- 2 Pipe 450 mm dia
Sand (a) Screened I Unscreend
Cement
Colour for NP-2 Pipe (450 mm dial

10.000
0.150
0.060
3.000

395.50
Rmt.
Cum.
560.00
4400.00
M.T.
39.55
No
Total Material in Rs.

3955.00
84.00
264.00
118.65
4421.65

Machinery :
Chain & Pully

0.310

215.00
Hour
Total Machinary in Rs.
Total of No.1 to 3 in Rs.

4)

Scaffolding

0.000

5)

Sundries (1.0%)

0.010

6)

Water charges

0.010

7)

Laboratory Testing

0.010

8)

Formwork etc.

0.000

9)

Overhead charges (10%)

66.65
66.65
5505.35
0.00
5505.35
55.05
5560.40
55.60
5616.01
56.16
5672.17
0.00
5672.17
567.22
6239.38

10)

Total Lead
Cement
Sand

2)

)
3)

Total
Total
Total
Total
Total
0.100

Total

AMOUNT IN Rs.

For 10 Rmt.
11)

0.060
0.150

77.90
109.06

M.T.
Cum.
Total lead
Total
Say Completed Item Rate in Rs Per Rmt

4.67
16.36
21.03
6260.42
626.04

Say Labour COlnponent in Rs.Per Rmt

1017.05
101.71

Labour Component for 10 Rmt.

Rate proposed for M.C.C. D.S.R. 2006-2007

Camp. Rate

Labour Rate

Unit

625.00

75.00

Rmt

95

M.C.C.D.S.R.2006-07 Rate Analysis for Bridge Works Item


Item No.64
Providing and laying cement concrete pipe of I.S. NP-2 class of 500 mm (21'1 diameter in proper/ine level and
slope including providing fixing collars in cement mortar 1:2 etc., complete including loading and unloading of
pipes.
Spec. No. :CD 7 Page No.162
DESCRIPTION
1)

Quantity for 10 Rml


QUANTITY

RATE IN Rs.

UNIT

AMOUNT IN Rs.

Labour
Mazdoor unskilled (Heavy/Male)
Mazdoor unskilled (LighVFemale)
Mason 2nd Class Skilled
Bhisti Semi Skilled

2.000
5.000
0.330
0.170

145.00
Per day
145.00
Per day
160.00
Per day
145.00
Per day
Total Labour in Rs.

290.00
725.00
52.80
24.65
1092.45

Material
NP- 2 Pipe 500 mm dia
Sand (a) Screened I Unscreend
Cement
Colour for NP-2 Pipe (500 mm. dial

10.000
0.100
0.060
3.000

Rmt.
588.95
Cum.
560.00
4400.00
M.T.
58.90
No
Total Material in Rs.

5889.50
56.00
264.00
176.70
6386.20

Machinery :
Chain & Pully

0.500

215.00
Hour
Total Machinary in Rs.
Total of No.1 to 3 in Rs.

4)

Scaffolding

0.000

107.50
107.50
7586.15
0.00
7586.15

5)

Sundries (1.0%)

0.010

2)

3)

Total
Total
6)

Water charges

0.010

Total
7)

Laboratory Testing

0.010

8)

Formwork etc.

0.010

9)

Overhead charges (10%)

0.100

10)

Total Lead
Cement
Sand

Total
Total
Total

For 10 Rmt.
11)

0.060
0.100

77.90
109.06

M.T.
Cum.
Total lead
Total
Say Completed Item Rate in Rs Per Rmt

Labour Component for 10 Rmt.


Say Labour Component in Rs.Per Rmt

Rate proposed for M.C.C. D.S.R. 2006-2007

Compo Rate

Labour Rate

Unit

870.00

80.00

Rmt

96

75.86
7662.01
76.62
7738.63
77.39
7816.02
78.16
7894.18
789.42
8683.60
4.67
10.91
15.58
8699.18
869.92
1092.45
109.25

M.C.C.D.S.R.2006-07 Rate Analysis for Bridge Works item


Item No.65
Providing and laying cement concrete pipe of I.S. NP-2 class of 600 mm (24'7 diameter in proper/ine level and
slope including providing fixing collars in cement mortar 1:2 etc., complete including loading and unloading of
pipes.
Spec. No. :CD 7 Page NO.162
DESCRIPTION
1)

2)

)
3)

4)

Quantity for 10 Rmt.


QUANTITY

RATE IN Rs.

UNIT

Labour
Mazdoor unskilled (Heavy/Male)
Mazdoor unskilled (Light/Female)
Mason 2nd Class Skilled
Bhisti Semi Skilled

2.500
5.500
0.400
0.150

145.00
Per day
145.00
Per day
160.00
Per day
145.00
Per day
Total Labour in Rs.

362.50
797.50
64.00
21.75
1245.75

Material
NP- 2 Pipe 600 mm dia
Sand (a) Screened / Unscreend
Cement
Colour for NP-2 Pipe (600 mm. dial

10.000
0.110
0.080
3.000

618.00
Rm!.
Cum.
560.00
M.T.
4400.00
61.80
No
Tota/ Material in Rs.

6180.00
61.60
352.00
185.40
6779.00

215.00
Hour
Total Machinary in Rs.
Total of No.1 to 3 in Rs.

107.50
107.50
8132.25
0.00
8132.25

Machinery :
Chain & Pully

Scaffolding

0.500

0.000

Total
5)

Sundries (1.0%)

0.010

Total
6)

Water charges

0.010

7)

Laboratory Testing

0.010

8)

Formwork etc.

0.010

9)

Overhead charges (10%)

0.100

10)

Total Lead
Cement
Sand

Total
Total
Total
Total
)

For 10 Rm!.
11)

0.080
0.110

77.90
109.06

M.T.
Cum.
Total lead
Total
Say Completed Item Rate in Rs Per Rmt

Labour Component for 10 Rm!.


Say Labour Component in Rs.Per Rmt

AMOUNT IN Rs.

Rate proposed for M.C.C. D.S.R. 2006-2007

Camp. Rate

Labour Rate

Unit

925.00

100.00

Rmt

97

81.32
8213.57
82.14
8295.71
82.96
8378.67
83.79
8462.45
846.25
9308.70
6.23
12.00
18.23
9326.93
932.69
1245.75
124.58

M.C.CD.S.R.2006-07 Rate Analysis for Bridge Works Item


Item No.66
Providing and laying cement concrete pipe of I.S. NP-2 class of 700 mm (27'J diameter in proper/ine level and
slope including providing fixing collars in cement mortar 1:2 etc., complete including loading and unloading of
pipes.
Spec. No. :CD 7 Page No.162
DESCRIPTION
1)

Quantity for 10 Rmt.


QUANTITY

RATE IN Rs.

UNIT

Labour
Mazdoor unskilled (Heavy/Male)
Mazdoor unskilled (LighUFemale)
Mason 2nd Class Skilled
Bhisti Semi Skilled

2.750
6.000
0.450
0.200

145.00
Per day
145.00
Per day
160.00
Per day
Per day
145.00
Total Labour in Rs.

398.75
870.00
72.00
29.00
1369.75

Material
NP- 2 Pipe 700 mm dia
Sand (a) Screened I Unscreend
Cement
Colour for NP-2 Pipe (700 mm. dial

10.000
0.120
0.092
3.000

Rml.
916.00
Cum.
560.00
4400.00
M.T.
No
91.60
Total Material in Rs.

9160.00
67.20
404.80
274.80
9906.80

Machinery :
Chain & Pully

0.500

215.00
Hour
Total Machinary in Rs.
Total of No.1 to 3 in Rs.

4)

Scaffolding

0.000

5)

Sundries (1.0%)

0.010

6)

Water charges

0.010

7)

Laboratory Testing

0.010

8)

Formwork etc.

0.010

107.50
107.50
11384.05
0.00
11384.05
113.84
11497.89
114.98
11612.87
116.13
11729.00
'117.29
11846.29
1184.63
13030.92

2)

)
3)

Total
Total
Total
Total
Total
9)

Overhead charges (10%)

10)

Total Lead
Cement
Sand

0.100

Total

AMOUNT IN Rs.

For 10 Rml.
11)

0.092
0.120

77.90
109.06

M.T.
Cum.
Total lead
Total
Say Completed Item Rate in Rs Per Rmt

Labour Component for 10 Rml.


Say Labour Component in Rs.Per Rmt

Rate proposed for M.C.C. D.S.R, 2006-2007

Camp. Rate

Labour Rate

Unit

1300.00

100.00

Rmt

98

7.17
13.09
20.25
13051.17
1305.12
1369.75
136.98

M.C.C.D.S.R.2006-07 Rate Analysis for Bridge Works Item


Item No.67
Providing and laying cement concrete pipe of I.S. NP-2 class of 900 mm (36'7 diameter in proper/ine level and
slope including providing & fixing colours in cement mar/or 1: 2 etc. complete loading and unloading of pipes.
Quantity for 10 Rmt.

Spec. No. :CD 7 Page No.162


DESCRIPTION
1)

RATE IN Rs.

UNIT

AMOUNT IN Rs.

4.000
7.500
0.500
0.200

145.00
Per day
145.00
Per day
160.00
Per day
145.00
Per day
Total Labour in Rs.

580.00
1087.50
80.00
29.00
1776.50

Material
NP- 2 Pipe 900 mm dia
Sand (a) Screened I Unscreend
Cement
Colour for NP-2 Pipe (900 mm. dial

10.000
0.150
0.110
3.000

Rmt.
1301.00
Cum.
560.00
M.T.
4400.00
No
130.10
Total Material in Rs.

13010.00
84.00
.484.00
390.30
13968.30

Machinery :
Chain & PUlly

0.750

215.00
Hour
Total Machinary in Rs.
Total of No. 1 to 3 in Rs.

4)

Scaffolding

0.000

5)

Sundries (1.0%)

0.010

161.25
161.25
15906.05
0.00
15906.05
159.06
16065.11
160.65
16225.76
162.26
16388.02
0.00
16388.02
1638.80
18026.82

2)

QUANTITY

Labour
Mazdoor unskilled (Heavy/Male)
Mazdoor unskilled (Light/Female)
Mason 2nd Class Skilled
Bhisli Semi Skilled

3)

Total
Total
6)

Water charges

0.010

7)

Laboratory Tes)ing

0.010

8)

Formwork etc.

0.000

Total
Total
Total
9)

Overhead charges (10%)

10)

Total Lead
Cement
Sand

0.100

Total

For 10 Rmt.
11)

0.110
0.150

77.90
109.06

M.T.
Cum.
Total lead
Total
Say Completed Item Rate in Rs Per Rmt

Labour Component for 10 Rmt.


Say Labour Component in Rs.Per Rmt

Rate proposed for M.C.C. D.S.R. 2006-2007

Compo Rate

Labour Rate

Unit

1808.00

140.00

Rmt

99

8.57
16.36
24.93
18051.75
1805.17
1776.50
177.65

M.C.C.D.S.R.2006-07 Rate Analysis for Bridge Works Item


Item No.68
Providing and laying cement concrete pipe of I.S. NP-3 class of 1000 mm (48'J diameter in proper/ine level and
slope including providing & fixing colours in cement mar/or 1: 2 etc. complete loading and unloading of pipes.
Spec. No. :CD 7 Page No.162
DESCRIPTION
1)

Quantity for 10 Rmt.


QUANTITY

RATE IN Rs.

UNIT

AMOUNT IN Rs.

Labour
Mazdoor unskilled (Heavy/Male)
Mazdoor unskilled (Light/Female)
Mason 2nd Class Skilled
Bhisti Semi Skilled

5.000
8.500
0.600
0.250

145.00
Per day
145.00
Per day
160.00
Per day
145.00
Per day
Total Labour in Rs.

725.00
1232.50
96.00
36.25
2089.75

Material
NP- 2 Pipe 1000 mm dia
Sand (a) Screened I Unscreend
Cement
Colour for NP-2 Pipe (1000 mm. dial

10.000
0.170
0.125
3.000

Rmt.
1820.00
560.00
Cum.
M.T.
4400.00
162.00
No
Total Material in Rs.

18200.00
95.20
550.00
486.00
19331.20

Machinery :
Chain & Pully

0.875

215.00
Hour
Total Machinary in Rs.
Total of No.1 to 3 in Rs.

4)

Scaffolding

0.000

5)

Sundries (1.0%)

0.010

6)

Water charges

0.010

188.13
188.13
21609.08
0.00
21609.08
216.09
21825.17
218.25
22043.42
220.43
22263.85
0.00
22263.85
2226.39
24490.24

2)

)
3)

Total
Total
Total
7)

Laboratory Testing

0.010

8)

Formwork etc.

0.000

9)

Overhead charges (10%)

0.100

Total
Total
Total
10)
)

Total Lead
Cement
Sand
For 10 Rmt.

11 )

M.T.
Cum.
Total lead
Total
Say Completed Item Rate in Rs Per Rmt
0.125
0.170

77.90
109.06

Labour Component for 10 Rmt.


Say Labour Component in Rs.Per Rmt

Rate proposed for M.C.C. D.S.R. 2006-2007

Camp. Rate

Labour Rate

Unit

2225.00

230.00

Rmt

100

9.74
18.54
28.28
24518.51
2451.85
2089.75
208.98

M.C.C.D.S.R.2906-07 Rate Analysis for Bridge Works Item


Item No.69
Providing and laying cement concrete pipe of I.S. NP-2 class of 1200 mm (48'7 diameter in proper/ine level and
slope including providing fixing collars in cement mortar 1:2 etc., complete including loading and unloading of
pipes.
Spec. No. :CD 7 Page NO.162
Quantity for 10 Rmt.
DESCRIPTiON
1)

QUANTITY

RATE IN Rs.

UNiT

AMOUNT IN Rs.

Labour
Mazdoor unskilied (Heavy/Male)
Mazdoor unskilied (Light/Female)
Mason 2nd Class Skiiled
Bhisti Semi Skiiled

5.500
g.OOO
0.600
0.250

145.00
Per day
145.00
Per day
160.00
Per day
145.00
Per day
Total Labour in Rs.

797.50
1305.00
96.00
36.25
2234.75

Material
NP- 2 Pipe 1200 mm dia
Sand (a) Screened I Unscreend
Cement
Coiour for NP-2 Pipe (1200 mm. dial

10.000
0.180
0.130
3.000

2128.00
Rmt.
560.00
Cum.
4400.00
M.T.
No
212.60
Total Material in Rs.

21280.00
100.80
572.00
637.80
22590.60

Machinery :
Chain & Puily

0.875

215.00
Hour
Total Machinary in Rs.
Total of No.1 to 3 in Rs.

4)

Scaffoiding

0.000

5)

Sundries (1.0%)

0.010

6)

Water charges

0.010

7)

Laboratory Testing

0.010

8)

Formwork etc.

0.000

9)

Overhead charges (10%)

0.100

188.13
188.13
25013.48
0.00
25013.48
250.13
25263.61
252.64
25516.25
255.16
25771.41
0.00
25771.41
2577.14
28348.55

10)

Total Lead
Cement
Sand

2)

)
3)

Total
Total
Total
Total
Total
Total

For 10 Rmt.
11)

0.130
0.180

77.90
109.06

M.T.
Cum.
Total lead
Total
Say Completed Item Rate in Rs Per Rmt

Labour Component for 10 Rmt.


Say Labour Component in Rs.Per Rmt

Rate proposed for M.C.C. D.S.R. 2006-2007

Camp. Rate

Labour Rate

Unit

2830.00

250.00

Rmt

101

10.13
19.63
29.76
28378.31
2837.83
2234.75
223.48

< - - ...~

M.C.C.D.S.R.2006-07 Rate Analysis for Bridge Works Item


Item No.70
Providing and laying cement concrete pipe of I.S. NP-3 class of 900 mm (36'J diameter in properline level and
slope including loading and unloading of pipes.
Spec. No. :CD-21
DESCRIPTION

Quantity for 10 Rml


QUANTITY

RATE IN Rs.

UNIT

AMOUNT IN Rs.

Labour
Mazdoor unskilled (Heavy/Male)
Mazdoor unskilled (LighVFemaIe)
Mason 2nd Class Skilled
Bhisti Semi Skilled

5.000
9.380
0.620
0.250

145.00
Per day
145.00
Per day
160.00
Per day
145.00
Per day
Total Labour in Rs.

Material
I.R.S. Pipe Pipe 900 mm dia (NP- 3)
Sand (a) Screened I Unscreend
Cement

10.000
0.150
0.110

2274.00
560.00
4400.00

Colour for I.R.S Pipe NP-3 Pipe (900 mm. dial

3.000

No
227.40
Total Material in Rs.

682.20
23990.20

Machinery :
Chain & Pully

0.750

215.00
Hour
Total Machinary in Rs.
Total of No.1 to 3 in Rs.

4)

Scaffolding

0.000

5)

Sundries (1.0%)

0.010

6)

Water charges

0.010

7)

Laboratory Testing

0.010

8)

Formwork etc.

0.000

9)

Overhead charges (10%)

.161.25
161.25
26372.00
0.00
26372.00
263.72
26635.72
266.36
26902.08
269.02
27171.10
0.00
27171.10
2717.11
29888.21

10)

Total Lead
Cement
Sand

1)

2)

3)

Rmt.
Cum.
M.T.

Total
Total
Total
Total
Total
0.100

Total

For 10 Rmt.
11 )

8.57
16.36
24.93
29913.14
2991.31

Say Labour Component in Rs.Per Rmt

2220.55
222.06

Labour Component for 10 Rmt.

Rate proposed for M.C.C. D.S.R. 2006-2007

22740.00
84.00
484.00

M.T.
Cum.
Total lead
Total
Say Completed Item Rate in Rs Per Rmt
0.110
0.150

77.90
109.06

725.00
1360.10
99.20
36.25
2220.55

Camp. Rate

Labour Rate

Unit

2990.00

225.00

Rmt

102

M.C.C.D.S.R.2006-07 Rate Analysis for Bridge Works Item


Item No.71
Providing and laying cement concrete pipe of I.S. NP-3 class of 1000 mm (40'1 diameter in properline level and
slope including loading and unloading of pipes..
Spec. No. :CD-21
DESCRIPTION
1)

RATE IN Rs.

UNIT

AMOUNT IN Rs.

Labour
Mazdoor unskilled (Heavy/Male)
Mazdoor unskilled (Light/Female)
Mason 2nd Class Skilled
Bhisli Semi Skilled

6.250
10.620
0.750
0.310

145.00
Per day
145.00
Per day
160.00
Per day
145.00
Per day
Total Labour in Rs.

906.25
1539.90
120.00
44.95
2611.10

Material
I.R.S. Pipe Pipe 1000 mm dia (NP- 3)
Sand (a) Screened / Unscreend
Cement
Colour for I.R.S Pipe NP-3 Pipe (1000 mm. dial

10.000
0.170
0.125
3.000

Rmt.
2681.83
Cum.
560.00
M.T.
4400.00
266.18
No
Total Material in Rs.

26818.30
95.20
550.00
798.54
28262.04

Machinery :
Chain & Pully

0.880

215.00
Hour
Total Machinary in Rs.
Total of No.1 to 3 in Rs.

4)

Scaffolding

0.000

5)

Sundries (1.0%)

0.050

6)

Water charges

0.050

7)

Laboratory Testing

0.010

8)

Labour Amanities

0.010

9)

Overhead charges (10%)

0.100

189.20
189.20
31062.34
0.00
31062.34
1553.12
32615.46
1630.77
34246.23
342.46
34588.69
345.89
34934.58
3493.46
38428.04

10)

Total Lead
Cement
Sand

2)

Quantity for 10 Rmt.


QUANTITY

3)

Total
Total
Total
Total
Total
Total

For 10 Rmt.
11)

0.125
0.170

77.90
109.06

M.T.
Cum.
Total lead
Total
Say Completed Item Rate in Rs Per Rmt

Labour Component for 10 Rmt.


Say Labour Component in Rs.Per Rmt

Rate proposed for M.e.e. D.S.R. 2006-2007

Camp. Rate

Labour Rate

Unit

3820.00

260.00

Rmt

103

9.74
18.54
28.28
38456.31
3845.63
2611.10
261.11

M.C.C.D.S.R.2006-07 Rate Analysis for Bridge Works Item


Item No.72
Providing and laying cement concrete pipe ofl.S. NP-3 class of 1100 mm (44'1 diameter in proper/ine level and
slope including loading and unloading of pipes.
Spec. No. :CD-21
DESCRIPTION
1)

Quantity for 10 Rmt.


QUANTITY

RATE IN Rs.

UNIT

AMOUNT IN Rs.

Labour
Mazdoor unskilled (Heavy/Male)
Mazdoor unskilled (LighVFemale)
Mason 2nd Class Skilled
Bhisli Semi Skilled

5.500
9.000
0.600
0.250

145.00
Per day
145.00
Per day
160.00
Per day
145.00
Per day
Total Labour In Rs.

797.50
1305.00
96.00
36.25
2234.75

Material
I.R.S. Pipe Pipe 1100 mm dia (NP- 3)
Sand (a) Screened I Unscreend
Cement
Colour for I.R.S Pipe NP-3 Pipe (1100 mm. dial

10.000
0.180
0.150
3.000

Rml.
3422.54
Cum.
560.00
4400.00
M.T.
342.25
No
Total Material in Rs.

34225.40
100.80
660.00
1026.75
36012.95

Machinery :
Chain & Pully

3.000

215.00
Hour
Total Machinary in Rs.
Total of No.1 to 3 in Rs.

4)

Scaffolding

0.000

5)

Sundries (1.0%)

0.010

6)

Water charges

0.010

7)

Laboratory Testing

0.010

8)

Labour Amanities

0.010

9)

Overhead charges (10%)

0.100

645.00
645.00
38892.70
0.00
38892.70
388.93
39281.63
392.82
39674.44
396.74
40071.19
400.71
40471.90
4047.19
44519.09

10)

Total Lead
Cement
Sand

2)

3)

Total
Total
Total
Total
Total
Total

For 10 Rml.
11 )

0.150
0.180

77.90
109.06

M.T.
Cum.
Total lead
Total
Say Completed Item Rate in Rs Per Rmt

Labour Component for 10 Rml.


Say Labour Component in Rs.Per Rmt

Rate proposed for M.C.C. D.S.R. 2006-2007

Camp. Rate

Labour Rate

Unit

455.00

260.00

Rmt

104

11.69
19.63
31.32
44550.41
4455.04
2234.75
223.48

M.C.C.D.S.R.2006-07 Rate Analysis for Bridge Works Item


Item No.73
Providing and laying cement concrete pipe of I.S. NP-3 class of 1200 mm (48'7 diameter in proper/ine level and
slope including loading and unloading of pipes.
Spec. No. :CD-21
DESCRIPTION
1)

Quantity for 10 Rmt.


QUANTITY

RATE IN Rs.

UNIT

AMOUNT IN Rs.

Labour
Mazdoor unskilled (Heavy/Male)
Mazdoor unskilled (LighVFemale)
Mason 2nd Class Skilled
Bhisti Semi Skilled

5.500
9.000
0.600
0.250

145.00
Per day
145.00
Per day
160.00
Per day
145.00
Per day
Total Labour in Rs.

"797.50
1305.00
96.00
36.25
2234.75

Material
N.P.-3 Pipe 1200 mm dia
Sand (a) Screened / Unscreend
Cement
Colour for N.P-3 Pipe (1200 mm. dial

10.000
0.180
0.150
10.000

Rmt.
3827.08
560.00
Cum.
4400.00
M.T.
No
382.71
Total Material in Rs.

38270.80
100.80
660.00
3827.10
42858.70

Machinery :
Chain & Pully

3.000

215.00
Hour
Total Machinary in Rs.
Total of No.1 to 3 in Rs.

4)

Scaffolding

0.000

5)

Sundries (1.0%)

0.010

6)

Water charges

0.010

7)

Laboratory Testing

0.010

8)

Labour Amanities

0.010

9)

Overhead charges (10%)

0.100

645.00
645.00
45738.45
0.00
45738.45
.457.38
46195.83
461.96
46657.79
466.58
47124.37
471.24
47595.61
4759.56
52355.18

2)

3)

Total
Total
Totai
Total
Total
Total
10)

Total Lead
Cement
Sand
For 10 Rmt

11)

0.150
0.180

77.90
109.06

M.T.
Cum.
Total lead
Total
Say Completed Item Rate in Rs Per Rmt

Labour Component for 10 Rrilt.


Say Labour Component in Rs.Per Rmt

Rate proposed for M.C.C. D.S.R. 2006-2007

Camp. Rate

Labour Rate

Unit

5239.00

275.00

Rmt

105

11.69
19.63
31.32
52386.49
5238.65
2234.75
223.48

M.C.CD.S.R.2006-07 Rate Analysis for Bridge Works Item

Item No.74
Supplying, filling and fixing in position, true to the line and level P. O. T PTFE bearing suitable for biaxial
movement as per drawing and as 5400 sections 9.1 x 9.2 etc., complete.
One Ton Capacity

Complete Rate

165.00

Add 10 %

16.50
Total Rs.

Rate proposed for M.C.C. D.S.R. 2006-2007

Camp. Rate

Labour Rate

Unit

175.00

0.00

One Ton

106

""'18;:,.1"'.5'-'-0

M.C.C.D.S.R.2006-07 Rate Analysis for Bridge Works Item


Item No.75
Providing and applying approved coal tar epoxy painting in three coats to concrete surface.
Quantity for 4 Sq.m.
DESCRIPTION
1)

2)

3)

4)

QUANTITY

RATE IN Rs.

UNIT

Labour
Painter 2nd class skilled
Mazdoor unskilled (Light/Female)

0.750
0.750

150.00
Per day
145.00
Per day
Total Labour in Rs.

112.50
108.75
221.25

Material
Black Jak Sythelic Paint

1.500

Litter
175.00
Totat Materiat in Rs.

262.50
262.50

0.000

0.00
Totat Machinary in Rs.
Total of No.1 to 3 in Rs.

0.00
0.00
483.75
24.19
507.94
7.62
515.56
5.16
520.71
2.60
523.32
0.00
523.32
52.33
575.65

Machinery :

Scaffolding

0.050

Totat
5)

Sundries

0.015

6)

Water charges

0.010

7)

Laboratory Testing

0.005

8)

Form work

0.000

g)

Overhead charges (10%)

0.100

10)

Total Lead

Total
Total
Total
Total
Total
0.000

0.00

Total lead
Total for 4 Sq.m.
Say Completed Item Rate in Rs Per Sq.m.
11)

AMOUNT IN Rs.

Labour Component for 4 Sq.m.


Say Labour Component in Rs.Per Sq.m.

'J
Rate proposed for M.C.C. D.S.R. 2006-2007

Camp. Rate

Labour Rate

Unit

144.00

35.00

Rmt

107

0.00
0.00
575.65
143.95
221.25
55.31

M.C.C.D.S.R.2006-07 Rate Analysis for Bridge Works item


Item No.1
Guniting surface with C.M. 1:34 50 mm thick under pressure of 2.1 Kg. per Sqcm. including necessary welded
mesh 75 mm x 75 mm x 10 guage reinforcement formswith floating and cutting etc., complete (excluding
scaffolding)
Quantity for

1)

QUANTITY

RATE IN Rs.

UNIT

AMOUNT iN Rs.

1.000
1.000
2.000
0.250
1.000

155.00
Per day
200.00
Per day
145.00
Per day
160.00
Per day
175.00
Per day
Total Labour in Rs.

155.00
200.00
290.00
40.00
175.00
860.00

0.125
0.760
5.500
0.000

4400.00
M.T.
560.00
Cum.
29.00
Sq.m.
Lumpsum
Total Material in Rs.

550.00
425.60
159.50
100.00
1235.10

Machinery :
Gunting Gun
Compressor
Mixer

0.250
0.250
0.250

240.00
No
3141.00
No
672.00
No
Total Machinary in Rs.
Total of No.1 to 3 in Rs.

4)

Scaffolding

0.020

5)

Sundries (1.0%)

0.010

6)

Water charges

0.010

7)

Laboratory Testing

0.005

8)

Form Work

0.010

9)

Overhead charges (10%)

0.100

60.00
785.25
168.00
1013.25
3108.35
62.17
3170.52
31.71
3202.22
32.02
3234.24
16.17
3250.42
32.50
3282.92
328.29
3611.21

10)

Total Lead
Cement
Sand
Welded Mesh
Wire and Naiis

2)

DESCRIPTION
Labour.
Fitter 2nd Class with tools
Driver Engine with license
Mazdoor unskiiled (Heavy/Maie)
Mason 2nd Class Skiiled
Machine Operator

5 Sq.m.

3)

Material
.Cement with 50% wastage 0.62 m.
Sand (a) Screened I Unscreend
Welded Mesh
Wire and Naiis

Total
Total
Total
Total
Total
Total

0.125
0.760
5.500
0.000

77.90
109.06
2.00
0.00

M.T.
Cum.
No

Total lead
Total for 5 Sq.m.
Say Completed Item Rate in Rs Per Sq.m.
11 )

Labour Component for 5 Sq.m.


Say Labour Component in Rs.Per Sq.m.

Rate proposed for M.C.C. D.S.R. 2006-2007

Camp. Rate

Labour Rate

Unit

425.00

60.00

Sq.m

108

9.74
82.89
11.00
0.00
103.62
3714.83
742.00
860.00
172.00

M.C.CD.S.R.2006-07 Rate Analysis for Bridge Works Item


Item No.2
Sand blasting to concrete surface including all material machinery and labouretc., complete.

Quantity for One Sq.m.


Rate as per M.C.C. D.S.R. 2005-06

60.00

Add 10 %

6.00
Total Rs. _ _ _---'-'=.:o.
66.00

Rate proposed for M.C.C. D.S.R. 2006-2007

Compo Rate

Labour Rate

Unit

65.00

5.00

OneSq.m.

109

M.C.C.D.S.R.2006-07 Rate Analysis for Bridge Works Item


Item No.3
Applying acqua epoxy tack coat on cleaned surface including cost of materials labour etc., complete (excluding
cost of scaffolding)

Quantity for Sq.m.


DESCRIPTION
1)

2)

Labour
Painter Semi Skilled
Material
Epoxy paint
147i3.7
Lumpsum for 30 %

QUANTITY

RATE IN Rs.

UNIT

0.400

150.00
Per day
Total Labour in Rs.

3.710

350.00

Total

Total Material in Rs.

80.00
24.26
104.26
4.20
108.46

Machinery :
0.000

)
4)

Scaffolding

0.000

5)

Sundries (1.0%)

0.020

6)

Water charges

0.020

7)

Laboratory Testing

0.000

8)

Form Work

0.000

9)

Overhead charges (10%)

0.100

10)

Total Lead

0.00
Total Machinary in Rs.
Total of No.1 to 3 in Rs.

Total
Total
Total
Total
Total
Total
0.000

0.00

Total lead
Totalfor Sq.m.
Say Completed Item Rate in Rs Per Sq.m.

)
11)

60.00
60.00

Litter

Add Welded Mesh 4 %


3)

AMOUNT IN Rs.

Labour Component for


Say Labour Component in Rs.Per Sq.m.

Rate proposed for M.C.C. D.S.R. 2006-2007

Camp. Rate

Labour Rate

Unit

125.00

5.00

Sq.m

110

0.00
0.00
168.46
0.00
168.46
3.37
171.83
3.44
175.27
0.00
175.27
0.00
175.27
17.53
192.79
0.00
0.00
192.79
193.00
60.00

M.C.CD.S.R.2006-07 Rate Analysis for Bridge Works Item


Item No.4
Providing and IApplying shot creating in C.C. 1:1:2 to an average thickness of 75 mm under pressure of 2.1 kg/
Sq.cm to 2.8 KgJ1Sqm. including providing necessary approved quick setting admixture, cleaning watering
curing etc., with all machinery material
Quantity for 10 Sq.m.
DESCRiPTION
1)

2)

3)

4)

QUANTITY

RATE IN Rs.

UNIT

Labour
Gun Man
Mazdoor unskilled (Heavy/Male)
Mazdoor unskilled (Light/Female)

1.000
3.000
2.000

145.00
Per day
145.00
Per day
145.00
Per day
Total Labour in Rs.

Material
Crush Aggregate
Sand (a) Screened I Unscreend
Cement

1.150
0.800
0.300

400.00
580.00
4400.00

Machinery :
Gunling Gun
Compressor

0.500
0.500

Scaffolding

0.000

Cum.
Cum.
M.T.

Sundries (1.0%)

0.010

6)

Water charges

0.100

7)

Laboratory Testing

0.000

8)

Form Work

0.000

9)

Overhead charges (10%)

0.100

10)

Total Lead
Cement
Sand
Aggregate

240.00
Day
4332.00
Day
Total Machinary in Rs.
Total of No.1 to 3 in Rs.

120.00
2166.00
2286.00
5400.00
0.00
5400.00
54.00
5454.00
545.40
5999.40
0.00
5999.40
0.00
5999.40
599.94
6599.34

Total
Total
Total
Total

11)

0.300
0.420
0.420

77.90
109.06
109.06

M.T.
Cum.
Cum.
Total lead
Total for 10 Sq.m.
Say Completed Item Rate in Rs Per Sq.m.

Labour Component for 10 Sq.m.


Say Labour Component in Rs.Per Sq.m.

Rate proposed for M.C.C. D.S.R. 2006-2007

Camp. Rate

Labour Rate

Unit

340.00

65.00

Sq.m

111

460.00
464.00
1320.00
2244.00

Total

145.00
435.00
290.00
870.00

Total Material in Rs.

Total
5)

AMOUNT IN Rs.

23.37
45.81
45.81
114.98
6714.32
671.43
870.00
87.00

M.C.C.D.S.R.2006-07 Rate Analysis for Bridge Works Item


Item No.5
Providing aepoxy mortar for repairsto the cracked girders including chipping the looseand crackedconcrete
eposing the sheathing cables wherever corroded cleaning rust by meansof wire mesh and sand blasting
rebuilding and giving minumum 3 days compressive

DESCRIPTION
1)

2)

3)

Labour
Carpenter 2nd Class
Mazdoor unskilied (Heavy/Male)
Mason 2nd Class Skilied
Material
Epoxy
Cuartz Sand
Centering and Scaffolding

QUANTITY
0.250
0.500
0.200

6.210
66.000

RATE IN Rs.

Quantity for 0.025 Cum.


UNIT
AMOUNT IN Rs.

160.00
Per day
Per day
145.00
160.00
Per day
Total Labour in Rs.
350.00
9.70
Lumpsum

Litter
Kg.
Cum.

4)

Scaffolding

0.000

5)

Sundries (1.0%)

0.010

Total Material in Rs.

2873.70

0.00
Total Machinary in Rs.
Total of No.1 to 3 in Rs.

0.00
0.00
3018.20
0.00
3018.20
30.18
3048.38
30.48
3078.87
0.00
3078.87
0.00
3078.87
307.89
3386.75
55.10

6)

Water charges

0.010

7)

Laboratory Testing

0.000

8)

Form Work

0.000

9)

Overhead charges (10%)

0.100

Total
Total
Total
Total
Total
Total

..J.QL. Add for sand washing


11)

Total Lead
Lumpsum

Total lead
Total for 0.025 Cum.
Say Completed Item Rate in Rs Per Cum.
11)

2173.50
640.20
60.00

Machinery :
0.000

40.00
72.50
32.00
144.50

Labour Component for 0.025 Cum


Say Labour Component in Rs.Per Cum.

Rate proposed for M.C.C. D.S.R. 2006-2007

Compo Rate

Labour Rate

Unit

130000.00

2000.00

Cum

112

50.00
50.00
3491.85
139674.00
144.50
5780.00

~7\

M.C.C.D.S.R.2006-07 Rate Analysis for Bridge Works Item


Item No.6
Providing and laying epoxy concrete using epoxy fine sand course Sand and trap metal in suitable propotion by
weight Including weighing, mixing, placing, compacting inclusive of cleaning the surface of applyingthe tack
coat atepoxy asdirected and giving
Quantity for 0.015 Cum.
DESCRIPTION
1)

2)

3)

Labour
Carpenter 2nd Class
Mazdoor unskilled (Heavy/Male)
Mason 2nd Class Skilled
Material
Epoxy
Cuartz Sand
Metal
Centering and Scaffolding

QUANTITY

RATE IN Rs.

UNIT

1.000
2.000
1.000

160.00
Per day
145.00
Per day
160.00
Per day
Total Labour in Rs.

160.00
290.00
160.00
610.00

35.310
140.000
0.100

Litter
350.00
9.70
Kg.
400.00
Cum.
Lumpsum
Total Material in Rs.

12358.50
1358.00
40.00
400.00
14156.50

0.00
Total Machinary in Rs.
Total of No.1 to 3 in Rs.

0.00
0.00
14766.50
0.00
14766.50
147.67
14914.17
149.14
15063.31
0.00
15063.31
0.00
15063.31
1506.33
16569.64
55.10

Machinery :
0.000

4)

Scaffolding

0.000

5)

Sundries (1.0%)

0.010

6)

Water charges

0.010

7)

Laboratory Testing

0.000

8)

Form Work

0.000

9)

Overhead charges (10%)

0.100

Total
Total
Total
Total
Total
Total

.-!QL Add for sand washing

11)

Total Lead
Lumpsum

Total lead
Total for 0.015 Cum.
Say Completed Item Rate in Rs Per Cum.
11)

AMOUNT IN Rs.

Labour Component for 0.015 Cum


Say Labour Component in Rs.Per Cum.

Rate proposed for M.C.C. D.S.R. 2006-2007

Camp. Rate

Labour Rate

Unit

100500.00

2000.00

Cum

113

60.00
60.00
16684.74
1112315.00
610.00
4066.66

M.C.C.D.S.R.2006-07 Rate Analysis for Bridge Works Item


Item No.7
Providing epoxy coaling in primer +2 coals 10 Ihe girders including cleaning by sand blasling brushing cosl of
malerials, machinery equipmenl labour elc., complele asdirecled (using superior quality)
Quantity for One Sq.m.
DESCRIPTION
1)

2)

3)

Labour
Painter Semi Skilled
Mazdoor unskilled (Heavy/Male)
Material
Epoxy
Add for brushes
Sacffolding

QUANTITY

RATE IN Rs.

UNIT

0.750
0.750

150.00
Per day
145.00
Per day
Total Labour in Rs.

112.50
108.75
221.25

0.790
0.500

350.00
Litter
Cum
85.00
Lumpsum
Total Material in Rs.

276.50
42.50
30.00
349.00

0.000

0.00
Total Machinary in Rs.
Total of No.1 to 3 in Rs.

0.00
0.00
570.25
0.00
570.25
5.70
.575.95
5.76
581.71
0.00
581.71
0.00
581.71
58.17
639.88
55.10

Machinery :

)
4)

Scaffolding

0.000

5)

Sundries (1.0%)

0.010

6)

Water charges

0.010

7)

Laboratory Testing

0.000

8)

Form Work

0.000

9)

Overhead charges (10%)

0.100

Tolal
Tolal
Tolal
Tolal
Tolal
Tolal

--.!.QL Add for sand washing


11) Total Lead
Lumpsum
Total lead
Total for One Sq.m.
Say Completed Item Rate in Rs Per Sq.m

)
11)

AMOUNT IN Rs.

Labour Component for One Sq.m.


Say Labour Component in Rs.Per Sq.m

Rate proposed for M.C.C. D.S.R. 2006-2007

Camp. Rate

Labour Rate

Unit

425.00

110.00

Sq.m.

114

15.00
15.00
709.98
710.00
221.25
221.00

M.C.C.D.S.R.2006-07 Rate Analysis for Bridge Works Item


Item No.8

Providing and injecting epoxy grout including structing of crack in the body of slab girder by sand blasting fixing
inlet tube arrangements including cost of all materials, machinery requiredfor the work labour charges etc.,
complete.
Quantity for One Kg.
DESCRIPTION
1)

Labour
Operator
Mazdoor unskilled (Heavy/Male)

QUANTITY

RATE IN Rs.

UNIT

0.100
0.300

145.00
145.00

Per day
Per day

Totat Labour in Rs.


2)

Material
Epoxy
Epoxy Mortar Patch Work
P & F P.v.C. Tube
Brushes & eacetone for cleaing

1.050
0.100

350.00
1476.00
Lumpsum
Lumpsum

Litter
Sq.m.

Totat Material in Rs.


3)

Machinery :
Compressor
Gun
Mixer

0.100
0.100
0.100

4632.00
240.00
672.00

Per day
Per day
Per day

;Total Machinary in Rs.


Totat of No.1 to 3 in Rs.
4)

Scaffolding .

0.000

5)

Sundries (1.0%)

0.010

Total
Total
6)

Water charges

0.010

7)

Laboratory Testing

0.000

8)

Form Work

0.000

9)

Overhead charges (10%)

0.100

10)

Total Lead
Lumpsum

Total
Total
Total
Total

11)

14.50
43.50
58.00
367.50
147.60
50.00
70.00
635.10
463.20
24.00
67.20
554.40
1247.50
0.00
1247.50
12.48
1259.98
12.60
1272.57
0.00
1272.57
0.00
1272.57
127.26
1399.83

Total lead
Total for One Kg.
Say Completed 1tem Rate in Rs Per Kg.

56.00
56.00
1455.83
1456.00

Say Labour Component in Rs.Per Kg.

58.00
58.00

Labour Component for One Kg.

Rate proposed for M.C.C. D.S.R. 2006-2007

AMOUNT IN Rs.

Camp. Rate

Labour Rate

Unit

850.00

50.00

Per Kg

115

"'-'T

M.C.C.D.S.R.2006-07 Rale Analysis for Bridge Works Ilem


Item No.9
Providing and applying walerproof cement paint in two coats tothe concrete surface including, cleaning coat of
materials, machine/}' e,quipment labour etc., complete (for 10 Sq.mt.)
Quantity for Ten Sq.m.
DESCRIPTION
1)

2)

3)

QUANTI1Y

RATE IN Rs.

UNIT

Labour
Operator
Painter Semi Skilled
Bhisti Semi Skilled

0.750
1.000
0.500

150.00
Per day
150.00
Per day
145.00
Per day
Total Labour in Rs.

112.50
150.00
72.50
335.00

Material
Water Proof Cement Paint

2.000

Litter
350.00
Total Material in Rs.

700.00
700.00

0.000

0.00
Total Machinary in Rs.
Total of No.1 to 3 in Rs.

0.00
0.00
1035.00
31.05
1066.05
21.32
1087.37
10.87
1098.24
0.00
1098.24
0.00
1098.24
109.82
1208.07

Machinery :

4)

Scaffolding

0.030

5)

Sundries

0.020

6)

Water charges

0.010

Total
Total
Total
7)

Laboratory Testing

0.000

8)

Form Work

0.000

9)

Overhead charges (10%)

0.100

Total
Total
Total
10)

Total Lead

Total lead
Total for Ten Sq.m.
Say Completed Item Rate in Rs Per Sq.m
11)

AMOUNT IN Rs.

Labour Component for Ten Sq.m.


Say Labour Component in Rs.Per Sq.m
Compo Rate

Rate proposed for M.C.C. D.S.R: 2006-2007.

31.00

116

Labour Rate
;

26.00

Unit
Sq.m.

0.00
0.00
1208.07
120.81
335.00
33.50

'1

.-/

STATEMENT
SLN

SHOWING

Material

Unit

O.

BASIC

MATERIAL

RATE

M.B.C.DIVISION
RATES
FOR
Sub-Division
M.B.Sub
RD.SubD.S.R2006- No.8, Turbhe
Division
Division
07
No.1,
No.11,
T,

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25

Metal 40 mm to 50 mm (crusher broken)


Metal 25 mm to 40 mm (crusher broken)
Metal 10 mm to 20 mm (crusher broken)
Fine Aooreoate 6 mm to 10 mm
Grit 6 mm (Screened)
Stone Dust
Hand broken oversize metal orade I
Hand broken oversize metal orade II
Hand broken oversize metal orade III
a) Rubble 23 cm for Road Work
bl Rubble 23 cm for masnolV work
QuarlV Spouls
Hard Murum
Soft Murum
Sand (a) Screened
Khandki !Dressed) 8" to 9"
Header (Dressed) 2'-6"
Header (Undressed) 2'-6"
Pin Headers
Marble Plate
Manure
Red Earth
Coir Strino
Fire Wood
Lime Filler
Junole Wood for all purpose
a) Jungle Wood for scantlling treated upto
2.5 m length
a) Jungle Wood for scantlling treated
above 2.5 m length

26 Antistriooino Aoent (Lid TR-100\


27 Bamboo 10' to 15'Iono 138 to 50 mm)

..

549.00
561.00
561.00
531.00
487.00
402.00
402.00
425.00
430.00
267.00
267.00
369.00
149.00
127.00
870.00
26.00
32.00
27.00
23.00
2117.00
105.00
191.00
38.00
3533.00
5.65
0.00

T.C.B.DIVISION
TCB SubTCB Sub-

Division
No.4,
T,

650.00
650.00
650.00
650.00
650.00
500.00
500.00
600.00
650.00
450.00
450.00
400.00
100.00
80.00
900.00
40.00
45.00
45.00
40.00
2400.00
0.00
125.00
40.00
5600.00
6.00
0.00

480.00
480.00
490.00
520.00
520.00
490.00
410.00
470.00
500.00
300.00
280.00
280.00
200.00
180.00
1400.00
25.00
30.00
25.00
25.00
1800.00
90.00
280.00
35.00
3000.00
6.00
7000.00

Division
No.2,

Division

T,

T".hh

500.00
500.00
520.00
610.00
540.00
490.00
410.00
470.00
500.00
300.00
280.00
280.00
200.00
180.00
1400.00
25.00
30.00
25.00
25.00
1800.00
90.00
280.00
35.00
3000.00
6.00
7000.00

465.00
465.00
465.00
465.00
520.00
480.00
415.00
470.00
500.00
300.00
310.00
360.00
185.00
190.00
1450.00
25.00
35.00
28.00
30.00
1850.00
95.00
290.00
38.00
3150.00
6.00
7200.00

Thane

P.W.
Division

No.7,

312.00
334.00
417.00

RATES FOR
Approvel for
M.e.C.
D.S.R.
2007-2008

Cumt
Cumt
Cumt
Cumt
Cumt
Cumt
Cumt
Cumt
Cumt
Cumt
Cumt
Cumt
Cumt
Cumt
Cumt
No.
No.
No.
No.
Somt
Cumt
Ko.
Ko.
MoT.
Ko.
Cumt

400.00
400.00
400.00
400.00
300.00
175.00
280.00
290.00
300.00
230.00
250.00
200.00
75.00
65.00
560.00
20.00
25.00
22.00
20.00
1800.00
85.00
80.00
30.00
3000.00
5.00

Cumt

12000.00

12333.00 12333.00 15000.00

13000.00 13000.00

13330.00

13000.00

Cumt
Ko.
Per No.

13000.00
80.00
40.00

13333.00 13333.00 17000.00


103.00
103.00
0.00
50.00
50.00
80.00

13500.00 13500.00
80.00
80.00
40.00
40.00

13600.00
82.00
42.00

14000.00
85.00
50.00

---

549.00
561.00
561.00
531.00
487.00
402.00
402.00
425.00
430.00
267.00
267.00
369.00
149.00
127.00
870.00
26.00
32.00
27.00
23.00
2117.00
105.00
191.00
38.00
3533.00
5.65
0.00

TCB Sub-

60.00
777.00
25.00

42.00
1640.00

10.00

434.00
440.00
450.00
450.00
400.00
200.00
337.00
347.00
357.00
. 250.00
265.00
220.00
90.00
80.00
830.00
22.00
27.00
'25.00
22.00
2000.00
90.00
100.00
33.00
3300.00
6.00

IICI110B007\d\New FolderIDWG-BRANCH\D S RIDSRICompartative Slalemant.xls

....,
'-

'--./

Sr,N
o.

28

29

30

31
32
33

34
35
36
37
38
39
40
41
42
43
44
45
46
47
48

Material

Assam Bamboo 16'


Assam Bamboo 24'
JunQle Wood Bullies 10 to 12 lenath
1)8cm dia
211 Oem dia
a) Structural Steei (RSJ/angles & ail Rail
Steel Section)
bl Structural Steel IM.S. Plate)
HiQh Tensile Steel
a) 12.7 mm Strand
bl 15.2 mm strand
M.S. Bars upto 10 mm and above
Tor Steei upto 10 mm and above
G.i. Pioe "C" Ciass 100 mm dia
G.i. Pipe "C" Class 50 mm dia
A.C. Pioe 100 mm dia
Noble Dvnamite
Detonators 10rdinarvl
Detonators (Electrical)
Red Taoe Safetv IFuse)
Nails
Bindina wire - Galvanised BindinQ Wires
PVC Bindina Wires
Niooals for Detonators
EooXY oaint
Red Oxide
Black Jaoan Synthetic Paint
Road Marking Paint (Nerolac, Asian,
Johnson & Nikolsan, Burger etc. only)
Flat Oil Paint
Water Proof Cement Paint
Lime Fiiler
Geru
French Polish

Unit

PerNo.
Per No.

M,B,C,DIVISION
RATES
FOR
Sub-Division M.B.SubR.D.SubD.S.R.2006- No.6, Turbhe Division
Division
07
No.1,
No.11,

----

T"'hho

---

---

--

Division
No.4,

T"'hho

-----

TeB SubDivision

T~~~~"
---

---

32.00
37.00

50.00
60.00

35.00
40.00

Division
No.7,

Thane
P.W.

RATES FOR
Approvel for

Division

M.e.C.

D.S.R.
2007-2008

T, ..hho
---

---

--36.00
40.00

40.00
45.00

30.00
35.00

M.T.
M.T.

35000.00
35000.00

39000.00 39000.00 30000.00


39000.00 39000.00 20000.00

37500.00 37500.00
30500.00 30500.00

M.T.
M.T.
M.T.
M.T.
Rml.
Rml.
Rml.
Ka.
100 Nos
100 Nos
Metre
Ka.
KQ.
Ka.
No.
Per Lt.
Per Lt.
Per Lt.

60000.00
60000.00
29900.00
27100.00
550.00
250.00
70.00
65.00
200.00
1000.00
240.00
40.00
40.00

60000.00
60000.00
29000.00
32000.00
550.00
325.00
83.00
73.00
233.00
1066.00
260.00
59.00
77.00

60000.00
60000.00
29000.00
32000.00
550.00
325.00
83.00
73.00
233.00
1066.00
260.00
59.00
77.00

0.00
0.00
0.00
60000.00
0.00
0.00
60000.00
0.00
30000.00 30000.00 31000.00 30700.00 30700.00
32000.00 32000.00 32200.00 31600.00 31600.00
550.00
550.00
560.00
560.00
270.00
270.00
280.00
260.00
75.00
75.00
75.00
61.00
70.00
0.00
0.00
0.00
80.00
70.00
210.00
210.00
250.00
210.00
1100.00
1100.00 1100.00
1200.00
0.00
0.00
0.00
25.00
260.00
46.00
46.00
48.00
45.00
42.00
42.00
43.00
60.00

---

10.00
350.00
150.00
175.00

11.50
373.00
170.00
171.00

11.50
373.00
170.00
171.00

12.00
400.00
170.00
225.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
320.00
160.00
190.00

170.00
160.00
35.00
5.00
6.00
65.00

187.00
163.00
40.00
500.00
800.00
80.00

187.00
163.00
40.00
500.00
800.00
80.00

225.00
200.00
40.00
5.50
6.50
90.00

0.00
0.00
0.00
6.00
10.00
72.00

0.00
0.00
0.00
6.00
10.00
72.00

190.00

Per Lt.
Per Lt.
Per Lt.
Per Ka.
Per Ka.
Per Lt.

---

60000.00
60000.00
26900.00
27100.00
800.00
330.00
90.00
90.00
240.00
1400.00
300.00
50.00
50.00

--

35.00
40.00

TeB Sub-

Rml.
Rml.

--

32.00
37.00

-----

T.C.B.D1VISION
TeB Sub-

38000.00 32500.00 33000.00


38550.00
33000.00

---

----

11.00
106.00
203.00

188.00
36.00
3.00
10.00
70.00

12.00
375.00
150.00
182.00
225.00
182.00
35.00
6.00
6.00
73.00

1-11

\\CI11080071dlNew FolderIDWG-BRANCHID 5 RIDSRICompartative Statemanl.xls

'+
f'

,
'~

Sr.N
o.

Material

Unit

M.B.C.DIVISION
RATES
FOR
Sub-Division M.B.SubR.D.SubD.S.R.2006- No.8, Turbhe
Division
Division
07
No.1,
No.11,

M.T.

4400.00

5165.00

5165.00

M.T.
M.T.
M.T.

22750.00
25125.00
26735.00
30375.00
25229.00
55.00
0.90
160.00

26450.00
26950.00
28100.00
33350.00
27250.00
62.00
1.00
161.00
450.00
34655.00
0.00

26450.00
26950.00
28100.00
33350.00
27250.00
62.00
1.00
161.00
450.00
34655.00
0.00

M.T.
Per Lt.
Cu.cm
Rmt.
No.
M3
(Old M.T.) Ka.

25000.00
54500.00

425.00
550.00
700.00

P.W.

Division
No.7,

Division

No.2,
T",hh.

T,,,hh.

4800.00

4900.00

22015.00
2480.00
2480.00
23849.00 26700.00 26700.00
25304.00 28100.00
0.00
28850.00
0.00
0.00
23947.00
0.00
0.00
75.00
0.00
0.00
0.90
0.00
0.00
190.00
180.00
180.00
0.00
0.00
0.00
From TCB 25500.00 25500.00
From TCB 55000.00 55000.00

23500.00
26300.00
0.00
0.00
0.00
0.00
0.00
170.00
330.00
25600.00
55000.00

4400.00

---

500.00
615.00
783.00

Thane
TeB Sub-

T,,,hh.

49 Cement
50 Bitumen Ex-Mumbai
a) 80/100 Grade
b 60170 Grade
c 30/40 Grade
d 10/20 Grade
e 60170 C.R.M.B. - 55
51 Solvent for ASDhait
52 NeoDrence Bearino
53 P.V.C. Pipe 100 mm dia.)
54 Cat eves
55 Micro Concrete
56 Eooxv Morter
57 Gantrv Erection
58 Paver block M45 60mm
59 Paver block M45 80mm
60 Paver block M45 100mm
Reinforce earth work panels 200 mm thick
61 with.....

T.C.B.DIVISION

--

500.00
615.00
783.00

573.00
673.00
803.00

TeB SubDivision

TeB SubDivision

T~~~~.

4800.00

--450.00
550.00
750.00

--450.00
550.00
750.00

5000.00

RATES FOR
Approvel for
M.e.C.
D.S.R.
2007-2008

4500.00

22015.00 22015.00
23850.00 23850.00
25300.00 25300.00
28850.00
2576.0.00 25100.00
55.00
0.90
190.00
190.00

--475.00

460.00
560.00
760.00

25000.00
475.00
573.00
673.00
803.00

Per Sq.mt.

..

..

..

Rates approved.

(K.J.Mane)

(R,S,Shinde)

Superintending Engineer,
Mumbai Construction Circle,
Chembuf, Mumbai

Executive Engineer,
Multistoried Bldg. Consn.Dn.,
Chunabhatti, Mumbai

(5. U. Choudhari)

Sub Divisional Engineer,


Road Development Sub On. ":J0.8,
Turbhe, Navi Mumbai.

(P.P.Lahane)

Assistant Engineer Grade-I,


T.C.B. Sub Division No.4,

Turbhe, Navi Mumbai.

(B.N.Barsaiya)
Executive Engineer,
Thane Creek Bridge Dn.l,
Konkan Bhavan, Nai Mumbai.

(R.R.Nirmal)
Sub Divisional Engineer,
Road Development Sub Dn.No.11,
Chembur

(V.N.Shinde)

Assistant Superintending Engineer,


Mumbai Construction Circle,
Chembur, Mumbai

ilS
~j-.

IICI11 080071dlNew FolderIDWG-BRANCHID S RIDSRICompartative Statemant.xls

-i~

TEMENT

SHOWING

BASIC

MATERIAL

R
RATES FOR
Approvel for
M.C.C. D.S.R.

Code
No.

Material

Unit

1
2
3
4
5
6
7
8
9
10
10b
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
25a

Metal 40 mm to 50 mm crusher broken


Metal 25 mm to 40 mm crusher broken
Metal 10 mm to 20 mm crusher broken
Fine Aaareaate 6 mm to 10 mm
Grit 6 mm IScreened\
Stone Dust
Hand broken oversize metal arade I
Hand broken oversize metal arade II
Hand broken oversize metal nrade III
a\ Rubble 23 cm for Road Work
b\ Rubble 23 cm for masnorv work
Quarrv Snouls
Hard Murum
Soft Murum
Sand (a) Screened
Khandki (Dressed) 8" to 9"
Header !Dressed) 2'-6"
Header (Undressecfl2'-6"
Pin Headers
Marble Plate
Manure
Red Earth
Coir Strina
Fire Wood
Lime Filler
Junale Wood for all Duroose
a) Jungle Wood for scantlling treated upto
2.5 m length
a) Jungle Wood forscantlling treated
above 2.5 m length

Cum!.
Cum!.
Cum!.
Cum!.
Cum!.
Cum!.
Cum!.
Cum!.
Cum!.
Cum!.
Cum!.
Cum!.
Cum!.
Cum!.
Cum!.
No.
No.
No.
No.
Sam!.
Cum!.
Ka.
Ka.
M.T.
Ka.
Cum!.

434.00
440.00
450.00
450.00
400.00
200.00
337.00
347.00
357.00
250.00
265.00
220.00
90.00
80.00
830.00
22.00
27.00
25.00
22.00
2000.00
90.00
100.00
33.00
3300.00
6.00

Cum!.

13000.00

Cum!.
Ka.
Per No.
Per No.
Per No.

14000.00
85.00
50.00

25b
26
27
27a
27b
28
28a
28b
29
29b
30
30a.
30b

Antistrinnina Aaent (Lid TR-10m


Bamboo 10' to 15' lona (38 to 50 mm)
Assam Bamboo 16'
Assam Bamboo 24'
Junale Wood Bullies 10 to 121enath
1\8cm dia
2)10cm dia
a) Structural Steel (RSJ/angles & all Roll
Steel Section)
b\ Structural Steel IM.S. Plate\
Hinh Tensile Steel
a\ 12.7 mm Strand
b) 15.2 mm strand

-----

Rm!.
Rm!.

40.00
45.00

M.T.
M.T.

33000.00
33000.00

M.T.
M.T.

60000.00
60000.00

\\CI11 08007\d\New Folder\DWG-BRANCH\D S R\DSR\Compartative Statemant.xls

Code
No.

Material

31
32
33
33b
33c
34
35
35a
36
37
38
38a
39
40
41
42
43

M.S. Bars uDto 10 mm and above


Tor Steel upto 10 mm and above
G.!. Pipe "c" Class 100 mm dia
G.!. Pipe "c" Class 50 mm dia
A.C. Pipe 100 mm dia
Noble Dynamite
Detonators (Ordinary)
Detonators (Electrical)
Red Tape Safety (Fuse)
Nails
Bindina wire - Galvanised Bindina Wires
PVC Bindina Wires
Nipoals for Detonators
Epoxv paint
Red Oxide
Black Japan Synthetic Paint
Road Marking Paint (Nerolac, Asian,
Johnson & Nikolsan, Burger etc. only)
Flat Oil Paint
Water Proof Cement Paint
Lime Filler
Geru
French Polish
Cement
Bitumen Ex-Mumbai
a) 80/100 Grade
b 60/70 Grade
c 30/40 Grade
d 10/20 Grade
e 60170 C.R.M.B. - 55
Solvent for Asphalt
Neoprence Bearinq
P.V.C. Pipe (100 mil'l dia.)
Cat eyes
Micro Concrete
Epoxy Morter
Gantry Erection
Paver block M45 60mm
Paver block M45 80mm
Paver block M45 100mm
Reinforce earth work panels 200 mm thick
with .....

44
45
46
47
48
49
50
50a
50b
50c
50d
50e
51
52
53
54
55
56
57
58
59
60
61

Unit

RATES FOR
Approvel for
M.C.C. D.S.R.

M.T.
M.T.
Rmt.
Rmt.
Rmt.
Kq.
100 Nos
100 Nos
Metre
Ka.
Ka.
Ka.
No.
Per Lt.
Per Lt.
Per Lt.

30700.00
31600.00
560.00
260.00
70.00
70.00
250.00
1200.00
260.00
45.00
60.00
----

12.00
375.00
150.00
182.00

Per Lt.
Per Lt.
Per Lt.
Per Ka.
Per Ka.
Per Lt.
M.T.

225.00
182.00
35.00
6.00
6.00
73.00
4500.00

M.T.
M.T.
M.T.

22015.00
23850.00
25300.00
28850.00
25100.00
55.00
0.90
190.00

M.T.
Per Lt.
CU.cm
Rmt.
No.
M3
(Old M.T.) Ka.

--25000.00
475.00
573.00
673.00
803.00

Per Sq.mt.

IICI11 080071dlNew FolderIDWG-BRANCHID S RIDSRICompartative Statemant.xls

Code.
No.

Material

Unit

RATES FOR
Approvel for
M.C.C. O.S.R.

STATEMENT SHOWING BASIC LABOUR RATES

Code
No.

Labour

Unit

RATES FOR
Approvel for
M.C.C. O.S.R.

20072008

62
63
64
65
66
67
68
69
70
71
72
73
74
75
76

I
.~

Bar Bender
Bairi Soreader
Black Smit 1st Class
Black Smith wothout tools
Black Smith with tools
Blaster
Boiler Boy
Carpenter First Class
Carpenter Second Class
Carpenter Third Class
Chiseller / Breaker
Cutter
Dresser
Dresser or Surveyor
Driller
77 Driver with license
78 Driver Operator for Jack
79 Diver with water depth upto 6.0 Mt.
Diver with depth beyond 6.0 mt.
80 For each additional Mt.
81 Enuminator
Fitter First Class with tools
82 IIR.c.c. work)
83 Fitter Second Class with Tools
84 Assistant. Fitter
85 Fireman
86 Glazior with tools
87 Gun Man
88 Head fitter with tools
89 Helper for fitter
90 Heavv Mazdoor
91 Hot Mazdoor with Paver
92 Labour for traffic
93 Machine Operator
94 Mali for fatchinq doob qrass
95 Marine Khalashi

Per daY 8 hours


Per day 8 hours
Per day 8 hours
Per day 8 hours
Per day 8 hours
Per day 8 hours
Per day 8 hours
Per day 8 hours
Per day 8 hours
Per day 8 hours
Per day 8 hours
Per day 8 hours
Per daY 8 hours
Per day 8 hours
Per day 8 hours
Per day 8 hours
Per day 8 hours
Per day 8 hours

170.00
165.00
170.00

---

180.00
180.00
160.00
185.00
170.00
1!30.00
160.00
160.00

--175.00
160.00
220.00
220.00
200.00

Per day 8 hours


Per day 8 hours

220.00
220.00

Per daY 8 hours


Per daY 8 hours
Per day 8 hours
Per day 8 hours
Per day 8 hours
Per day 8 hours
Per day 8 hours
Per daY 8 hours
Per daY 8 hours
Per day 8 hours
Per day 8 hours
Per day 8 hours
Per day 8 hours
Per day 8 hours

180.00
170.00
165.00
160.00
160.00
160.00
160.00
160.00
160.00
160.00
160.00
190.00
160.00
190.00

IICI11080071dlNew FolderIDWG-BRANCHID S RIDSRICompartative Statemant.xls