Document No.
CHEC/SLCB2/
MS-37
Pages 14
Revision 0
Method Statement
For Tiling
09-09-2016
Dinesh
Rev.
Date
Status
Prepared By
Technical
Engineer
Reviewed By
Technical
Manager
Reviewed By
DPM
Approved By
Project Manager
Table of Content
1.0
Introduction................................................................................................................................. 3
2.0
3.0
4.0
Responsibilities ........................................................................................................................... 4
5.0
Resources .................................................................................................................................... 4
5.1
Manpower:- ........................................................................................................................... 4
5.2
5.3
Material ................................................................................................................................. 4
6.0
7.0
7.1
7.2
7.3
7.4
Grouting .................................................................................................................................. 9
7.5
Protection .............................................................................................................................. 10
8.0
2
China Harbour Engineering Company
1.0
Introduction
The purpose of this document is to lay down the systematic procedures for the various activities
required for Floor & Wall Tiling in Service Areas of Phase 2 Residence for the proposed
Shangri-La Hotel Development on Lots 9132/1 & 9132/2 at Colombo, Sri Lanka, in compliance
with all the required specifications, standards, and proper construction procedures.
2.0
SCHEDULEOFTILINGFORAPARTMENTSANDCOMMONAREAS
LOCATION
CommonAreas/Services
StaircasesandLandings
SmokeFreeLobby
FireFightingLobby
ServiceCorridor,Fire
ProtectedCorridor,
ResidentialCorridor
BasementtoLevel5
FLOOR
nonslipnosingtiles
300x600mmHeavyduty
nonsliphomogeneous
tile
300x600mmHeavyduty
nonsliphomogeneous
tile
300x600mmHeavyduty
nonsliphomogeneous
tile
SKIRTING
NA
100mmhigh
homogeneoustile
skirting
100mmhigh
homogeneoustile
skirting
100mmhigh
homogeneoustile
skirting
BinCentre
300x300mmHeavyduty NA
nonsliphomogeneous
tile
RawWaterTank,Treated 300x300mmGlazed
NA
WaterTank
ceramictilewithnon
toxictileadhesive
SecurityandFire
CommendCentre
300x300mmNonslip
homogeneoustile
100mmhigh
homogeneoustile
skirting
WALL
300x300mm
Homogeneoustile
300x300mm
Glazedceramictile
withnontoxictile
adhesive
3
China Harbour Engineering Company
3.0
4.0
Responsibilities
Detailed organizational responsibilities and accountabilities of key personal; Project Manager,
Construction manager, Engineering staff, Supervisory staff, etc; whose scope of works
defined in Occupational Health & Safety Plan shall be responsible for referred construction
activities under this project.
5.0
Resources
Whole Work would be categorised to specified sub tasks as follows to assign resources
effectively. The capacity/size of the below tools and equipment shall be judged in accordance
with site conditions, requirements, and availability at the time of execution.
5.1
Manpower:
5.2
01
01
01
01
Site Engineer
Forman
Skilled Workers
Labours
01
01
As required
As required
5.3
QAQC Manager
Chief Engineer
Technical Engineer
Material Engineer
Masonry Trowel
Steel Tooth Trowel
Mixing paddle
Angle Grinder
As required
As required
05
10
Concrete cutter
Chisel
Chipping Hammer
Rubber Mallet
01
As required
As required
As required
Material
Tile, Tile Adhesive, Tile Grout
4
China Harbour Engineering Company
6.0
Safety of the personnel and properties is to be given prime importance and all the works to be
carried out without causing any accidents or property damages. Following measures shall be
taken at site and refer Appendix II for Risk Assessments.
All employees shall be provided with complete personal protection equipment PPE.
All employees shall attend Safety Induction and training course to identify all hazards
associated with this work.
All works shall be provided with proper tools and equipment to execute the work safely.
7.0
IF
WATERPROOFING
APPLICATION OF
REQUIRED
WATERPROOFING
CEMENT-SAND SCREED ON
FLOOR / PLASTER ON WALLS
Survey marking for tile laying and datum level line 1m above the finished floor level shall marked
on floor and wall.
6
China Harbour Engineering Company
FLOORTILE
TILEADHESIVE/BEDDING
CEMENTSAND
SCREED
CONCRETESLAB
rubber mallet. Groves of 3mm width shall be maintained using tile spacers.
Figure 6: Tile Laying on Bedding Material while Maintaining Groves using Spacer Blocks
Grouting of the joints shall be carried out within a period of 24 hours of the completion of the
laying of tiles. Tooling of the tile groves shall be after grouting to fill the grout firmly into the
tile grove.
Surface finish level shall be check using straight edge and spirit level to ensure adjoining tiles
are continuous from one surface to the next.
Tiles shall be pressed into the adhesive, tapped firmly into position and groves shall be cleaned
as soon as the bedding is complete.
Tiling around pipes, electrical sunk boxes, etc. shall be neatly cut and fit. General grove width of
3mm shall be maintained along the cut edges.
7.4 Grouting
To achieve consistency of pointing colour, grouting to one location shall be carried out in one
operation using the same mix ratio. The tile joints shall be filled completely with the grout paste
by using a soft trowel.
Excessive grout bleeding through the groves in the tile joint shall be removed using point tool.
Tile shall be cleaned thoroughly with damp sponge usually after 3 hours when the tiles appear
firm enough.
9
China Harbour Engineering Company
7.5 Protection
Finished work shall be protected immediately after their completion, by mopping away all dust,
dirt and grit and covering with polyethylene sheets, card board or plywood board as shown in
Figure 11 & 12.
10
China Harbour Engineering Company
8.0
Nameoftheactivity:Tilling
DateofAssessment: 21stSeptember2016
RevisionNumber: 00
NameofRiskAssessor(s)
1. (SafetyOfficerCHEC)
RevisionDate:00
NoofPages: 05
ResidualRisk
Classification
OriginalRisk
Classification
16
RiskLevel
04
Consequences
04
ProposedMitigationMeasures
(WhatPrecautionsyouaregoingto
implement?)
Likelihood
Injuriesduetonotwearingpersonal
protectiveequipment.
RiskLevel
Consequences
1.
Likelihood
Item
Activityandhazard
(ConsidertheWorstCredible
Scenarios)
CHEC/SLCB2/MS37
Rev(0)
MitigationControl
Unit
(Whoisresponsible
fordoingthis?)
01
04
04
SubcontractorsSite
Engineer/
CHECSiteEngineer
01
05
05
SubcontractorsSite
Engineer/
CHECSiteEngineer
01
05
05
2.
Operatingheavymachine(Crane)
forliftingloads.
04
03
12
3.
Poorvisibilityinworkingarea
05
03
15
SubcontractorsSite
Engineer/
CHECSiteEngineer/
contractorsafety
personnel
11
Method
Statement
Reference
No.
Nameoftheactivity:Tilling
CHEC/SLCB2/MS37
Rev(0)
DateofAssessment: 21stSeptember2016
NameofRiskAssessor(s)
1. (SafetyOfficerCHEC)
RevisionNumber: 00
RevisionDate:00
NoofPages: 05
ResidualRisk
Classification
OriginalRisk
Classification
Fallinjuryduetopoorhousekeeping
andworkingareadisturbance.(slips
andtrips)
12
02
03
06
RiskLevel
04
Consequences
5.
03
ProposedMitigationMeasures
(WhatPrecautionsyouaregoingto
implement?)
Likelihood
RiskLevel
4.
Consequences
Handlingreinforcement
Likelihood
Item
Activityandhazard
(ConsidertheWorstCredible
Scenarios)
MitigationControl
Unit
(Whoisresponsible
fordoingthis?)
SubcontractorsSite
Engineer/
CHECSiteEngineer/
safetypersonnel
01
04
04
01
03
03
SubcontractorsSite
Engineer/
CHECSiteEngineer
01
05
10
SubcontractorsSite
Engineer/
CHECSiteEngineer
01
04
04
SubcontractorsSite
Engineer/
CHECSiteEngineer
Nopermissiontostoreunnecessarymaterials
ontheplatform.
6.
7.
Fallingfromheights
03
05
15
03
03
09
12
China Harbour Engineering Company
Method
Statement
Reference
No.
Nameoftheactivity:Tilling
CHEC/SLCB2/MS37
Rev(0)
DateofAssessment: 21stSeptember2016
NameofRiskAssessor(s)
1. (SafetyOfficerCHEC)
RevisionNumber: 00
RevisionDate:00
NoofPages: 05
ResidualRisk
Classification
OriginalRisk
Classification
Formworkcollapse(before,during&
afterplacementofconcrete
02
05
10
9.
04
04
16
RiskLevel
Consequences
8.
ProposedMitigationMeasures
(WhatPrecautionsyouaregoingto
implement?)
Likelihood
RiskLevel
Consequences
Likelihood
Item
Activityandhazard
(ConsidertheWorstCredible
Scenarios)
MitigationControl
Unit
(Whoisresponsible
fordoingthis?)
01
05
05
SubcontractorsSite
Engineer/
CHECSiteEngineer
01
04
04
Safety Engineer/
CHECSiteEngineer
02
03
06
SubcontractorsSite
Engineer/
CHECSiteEngineer
01
04
04
SubcontractorsSite
Engineer/
CHECSiteEngineer
2. RegularinspectionsbysafetyOfficers
10.
11.
Fallingobjectsfromheights
04
05
20
04
04
16
13
China Harbour Engineering Company
Method
Statement
Reference
No.
Nameoftheactivity:Tilling
CHEC/SLCB2/MS37
Rev(0)
DateofAssessment: 21stSeptember2016
NameofRiskAssessor(s)
1. (SafetyOfficerCHEC)
RevisionNumber: 00
RevisionDate:00
NoofPages: 05
ResidualRisk
Classification
OriginalRisk
Classification
RiskLevel
Consequences
ProposedMitigationMeasures
(WhatPrecautionsyouaregoingto
implement?)
Likelihood
RiskLevel
Consequences
Likelihood
Item
Activityandhazard
(ConsidertheWorstCredible
Scenarios)
MitigationControl
Unit
(Whoisresponsible
fordoingthis?)
Lackoffirstaidfacilities.
03
04
12
01
04
04
SubcontractorsSite
Engineer/
CHECSiteEngineer/
safetypersonnel
Standbyvehicleshallbeinplaceatthevicinity
of works in case of occupational injury or
medicalemergency.Stretchershallbeavailable
closetoworks.
First aid procedures and emergency contact
numbers shall be communicated to all
workmen and prominently displayed in the
vicinityofwork
14
China Harbour Engineering Company