New BTSs
R1.0
LEGAL INFORMATION
By accepting this certain document of ZTE CORPORATION you agree to the following
terms. If you do not agree to the following terms, please notice that you are not allowed
to use this document.
Copyright 2016 ZTE CORPORATION. Any rights not expressly granted herein are
reserved. This document contains proprietary information of ZTE CORPORATION. Any
reproduction, transfer, distribution, use or disclosure of this document or any portion of
this document, in any form by any means, without the prior written consent of ZTE
CORPORATION is prohibited.
and
are registered trademarks of ZTE CORPORATION. ZTEs company
name, logo and product names referenced herein are either trademarks or registered
trademarks of ZTE CORPORATION. Other product and company names mentioned
herein may be trademarks or trade names of their respective owners. Without the prior
written consent of ZTE CORPORATION or the third party owner thereof, anyones access
to this document should not be construed as granting, by implication, estopped or
otherwise, any license or right to use any marks appearing in the document.
The design of this product complies with requirements of environmental protection and
personal security. This product shall be stored, used or discarded in accordance with
product manual, relevant contract or laws and regulations in relevant country
(countries).
This document is provided as is and as available. Information contained in this
document is subject to continuous update without further notice due to improvement
and update of ZTE CORPORATIONs products and technologies.
ZTE CORPORATION
Addres
s:
Websit
e:
Email:
NO. 55
Hi-tech Road South
ShenZhen
P.R.China
518057
http://dms.zte.com.cn (Technical Support)
TSM.Aftersales@zte.com.cn
Revision History
Product Version
Document Version
Serial Number
R1.0
First published
R1.1
R1.2
Author
Date
Document Version
Prepared by
Reviewed by
Approved by
2009-3-11
R1.0
Xu Yongjun
Li Huashan
Li Bin
2010-3-26
R1.1
Li Huashan
Li Bin
Li Bin
2011-4-15
R1.2
Li Huashan
Li Bin
Li Bin
II
Proposal: Before reading this document, you had better have the following knowledge and
skills.
SEQ
1
Reference material
Null
2
3
Follow-up document: After reading this document, you may need the following
information.
SEQ
1
Reference material
Null
Information
Null
2
3
III
Description
IV
TABLE OF CONTENTS
1
1.1
1.2
2
2.1
2.2
2.2.1
2.2.2
2.2.3
3
3.1
3.2
3.3
3.4
3.4.1
3.4.2
3.5
3.6
FIGURES
Figure 2-1 Parameters of BTS Groups Top 20 Worst PN Assignments..............................5
Figure 2-2 Parameters of BTS Groups Sectors and Occurrences......................................5
Figure 3-1 Parameters of PN Groups.....................................................................................7
Figure 3-2 Parameters of BTS Groups...................................................................................8
Figure 3-3 Selecting the BTSs in the Target Area...................................................................9
Figure 3-4 Exporting the Selection........................................................................................10
TABLES
Table 2-1 The PN Groups Worksheet.....................................................................................2
Table 2-2 A Group of Three Parameters for the PN Planning Tool to Automatically Generate a
PN Group................................................................................................................................ 2
Table 2-3 BTS Information......................................................................................................3
Table 2-4 Parameters of BTS Groups.....................................................................................4
Table 2-5 Parameters of BTS Groups Minimum Reuse Distances.....................................6
Table 3-1 Parameters of BTS Groups...................................................................................10
VI
1.1
Features
This tool has the following features.
1.2
It integrates the functions of PN planning for both new sites and capacity-expanding
sites.
It takes into consideration the number of tiers and the distance for PN reuse.
It implements the function of group planning for multiple areas that are far from
each other and have densely deployed BTSs and makes the planning schemes
more reasonable.
After the planning, the program will automatically evaluate the scheme and export
information about the minimum PN reuse distance, the times of PN reuse, and the
top 20 cells with the poorest PN reuse performance.
It runs a little bit slow. We can reduce the calculation workload and improve the
software efficiency by setting different maximum calculation distances for different
BTSs.
Its function is similar to the CNO1s manual planning function. We can consider
exporting several schemes and then choosing the optimal one according to the
evaluation results after the planning.
2.1
PN Plan: The user can fill in the BTS information, set the planning parameters, and
see the evaluation results after the planning.
PN Groups
The PN Groups worksheet is as shown below.
PN1
PN2
PN3
Outdoor
Indoor
Border
Reserved
On the right side of the worksheet is a group of three parameters for the PN planning
tool to automatically generate a PN group, as shown in the following table.
Table 2-2 A Group of Three Parameters for the PN Planning Tool to Automatically
Generate a PN Group
PN_INC
PN Interval
168
Group Interval
2.2
PN Plan
The PN Plan worksheet comprises three parts: the BTS information, the parameter
settings for BTS groups, and the evaluation results after the PN planning.
2.2.1
BTS Information
The BTS information includes the longitudes, latitudes, and other information of the cells,
as shown in the following table.
Sector
BSC
PN
Longitude
Latitud
e
Type
NeedsPNPlan
Grou
ps
2.2.2
Sector: the number of the sector. The value range is 0, 1, and 2. Please note that
the number of sectors for the same BTS should not exceed 3. If it exceeds 3,
modify the Site Id and Sector fields.
PN: the PN value of the BTS. For a BTS that has not been planned, keep blank.
Type: the BTS type. It should be the same as the BTS type set in the PN Groups
worksheet, including the Indoor, Outdoor, and Border options.
NeedsPNPlan: to indicate whether this BTS needs PN planning. If it does not need
PN planning, keep blank.
Groups: the serial number of the BTS group. The program will plan BTS PNs in the
sequence of group numbers.
Reference Site ID
MaxRadius (km)
20
100
2.2.3
Reference Site ID: the reference for the PN planning of each BTS group. Usually,
we choose a BTS from an area where BTSs are densely deployed for reference.
MaxRadius: The parameters of BTS group are introduced to improve the software
efficiency. During the planning of a BTS group, the program only considers the PN
usage of the BTSs that are at most N km from the reference site (N = MaxRadius).
Therefore, if the value of MaxRadius is too small, perhaps there will be something
wrong with the PN reuse.
2.2.3.1
2.2.3.2
Score (low is bad): the score obtained on the basis of the number of tiers and the
distance between the BTSs
2.2.3.3
2.654315472
New Sites
4.574171543
3.1
3.2
Collecting information about the usage of PN groups: the available PN groups for
different types of BTSs and the information about the reserved PN groups
Processing BTS information: The BTS information obtained from the field must
include the BTS names, sector numbers, sector longitudes and latitudes, BTS
configuration types, and whether the BTSs need planning. After obtaining the BTS
information, we should check its validity. Please note that the number of sectors for
the same BTS should not exceed 3. If it exceeds 3, modify the Site Id and Sector
fields. The value range of Sector should be 0, 1, and 2.
On the right of the worksheet, type proper values in the PN_INC, PN_Interval, and
Group Interval fields and click Generate PNs to generate a corresponding PN group.
On the left of the worksheet, set a scenario for each PN group by typing Y in the
corresponding field. For example, for an outdoor BTS, type Y in the corresponding
Outdoor field.
3.3
Note:
1. The content in the Type column must be consistent with the settings in the PN
Groups worksheet.
2. If a certain cell needs PN planning, type Y in the corresponding NeedsPNPlan field;
otherwise, keep blank.
3.4
In the planning area, there is a network for only one large-scale city where BTSs
are densely deployed. In this case, we can consider the urban area as one group
and the outskirts as the other group during the PN planning.
3.4.1
In the planning area, there is a network for several large-scale cities where BTSs
are densely deployed. In this case, we can consider each urban area as one group
and the outskirts of each city as one group during the PN planning.
For a network with many indoor distribution systems, to ensure the reasonableness
of the planning scheme, we suggest performing PN planning for outdoor BTSs first
and then performing PN planning for indoor BTSs on the basis of the PN planning
results for outdoor BTSs.
On the Table menu, click Export to open the Export Table dialog box. Choose the table
you want to export for example, the Selection item in the following figure and save
it in .dbf format.
Open the exported file in Excel, find the selected BTSs in the BTS information, and set
them as one BTS group.
3.4.2
Reference Site ID
MaxRadius (km)
20
100
Usually, we choose a BTS from the area where the BTSs are densest as the reference
site. For the MaxRadius setting, if there are only a few BTSs, we can directly set a large
value for the MaxRadius parameter. If there are a lot of BTSs, we should consider the
software efficiency according to the following principles:
Consider the BTSs that are evenly distributed in the urban area as one group and
set the MaxRadius parameter to about 20.
Consider the BTSs that are sparsely distributed in the outskirts as one group and
set the MaxRadius parameter to about 100.
10
3.5
Consider the indoor distributed BTSs as one group and set the MaxRadius
parameter to a small value, for example, 5.
Planning PNs
After setting the BTS information and the relevant parameters of the BTS groups, click
Plan PNs. A dialog box may appear and ask whether to reserve the rest PN groups if
there are omni sector sites. Choose Yes or No according to the actual conditions.
To cancel the PN planning, click Cancel.
3.6