Objective: ensure that all hot streams are ticked-off by cold streams.
150 C
250 C
150 C
200 C
140 C
180 C
140 C
230 C
CP
0.15
15 MW
0.25
12.5 MW
0.20
8 MW
0.30
27 MW
CP
0.15
15 MW
0.25
0 MW
0.20
8 MW
0.30
14.5 MW
Start the design at the pinch and make sure that CPC CPH
150 C
250 C
150 C
200 C
140 C
140 C
180 C
181.67 C
12.5 MW
230 C
12.5
0.3
+ 140 = 181.67
150 C
203.33 C
200 C
150 C
140 C
140 C
250 C
180 C
8 MW
181.67 C
230 C
12.5 MW
CP
0.15
7 MW
0.25
0 MW
0.20
0 MW
0.30
14.5 MW
150 C
250 C
203.33 C
150 C
200 C
140 C
140 C
180 C
8 MW
181.67 C
205 C
230 C
CP
0.15
0 MW
0.25
0 MW
0.20
0 MW
0.30
7.5 MW
7 MW
12.5 MW
At this stage, all hot streams have been ticked-off by cold streams. For the balance cold stream(s)
that are not ticked-off, use heater to satisfy the heating requirement.
150 C
250 C
203.33 C
150 C
200 C
140 C
140 C
180 C
8 MW
181.67 C
12.5 MW
205 C
7 MW
230 C
7.5 MW
CP
0.15
0 MW
0.25
0 MW
0.20
0 MW
0.30
0 MW
40 C
150 C
80 C
150 C
20 C
140 C
CP
0.15
16.5 MW
0.25
17.5 MW
0.20
24.0 MW
CP
0.15
16.5 MW
0.25
0 MW
0.20
6.5 MW
Start the design at the pinch and make sure that CPH CPC
40 C
150 C
80 C
150 C
20 C
140 C
52.5 C
17.5 MW
17.5
0.2
= 52.5
40 C
150 C
106.67 C
80 C
150 C
20 C
140 C
52.5 C
6.5 MW 17.5 MW
CP
0.15
10 MW
0.25
0 MW
0.20
0 MW
At this stage, all cold streams have been ticked-off by hot streams. For the balance hot stream(s)
that are not ticked-off, use cooler to satisfy the cooling requirement.
40 C
C
80 C
20 C
10 MW
106.67 C
150 C
150 C
140 C
52.5 C
6.5 MW 17.5 MW
CP
0.15
0 MW
0.25
0 MW
0.20
0 MW